Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
35
Massachusetts Electric Company&Nantucket Electric Company(d/b/a National Grid) M.D.P.U. 1320 Certificate of Completion for Simplified Process Interconnections Installation Information: Fj Check if owner-installed Interconnecting Customer:Gregory Bossie Contact Person: Mailing Address: 1268 1268 BURTS-PIT RD City: FLORENCE State. MA Zip Code.0 1062 Telephone(Daytime):(831) 278-2609_ (Evening): Facsimile Number: - E-Mail Address:gabossie@gmail.com Address of Facility(if different from above): Electrical Contractor's Name (if appropriate): PV Squared Mailing Address: 311 WELLS ST. SUITE B City: GREENFIELD State: MA Zip Code: 01301 Telephone(Daytime): 413-772-8788 (Evening): SAME Facsimile Number: 413-772-8668 E-Mail Address: interconnection@pvsquared.coop License number: A13764 Date of approval to install Facility granted by National Grid: 10/15/2018 Application ID number: 00 197642 Inspection: The system has been installed and inspected in compliance with the local Building/Electrical Code of (City/County): Signed (Local Electrical Wiring Inspector,or attach signed electrical inspection): Name(printed): Date: License#: As a condition of interconnection you are required to send/e-mail a copy of this form along with a copy of the signed electrical permit to National Grid: National Grid Attn: Distributed Generation 40 Sylvan Rd Waltham,MA 02451 E-mail: distributed.generation(a-)nationalgrid.com Massachusetts:http://www.nationaljzridus.com/masselectric/home/energyef`f/distributed generation.asp Nantucket:httv://www.nationalgridus.com/nantucket/home/energvcff/distributed generation."s Page I of 1 Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play'devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o. Material List,ordering o Daily check-in o Customer interaction and training activities Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or, may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy #9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 SS3 through SS60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy #9 Installation Crew Operating Policy A 46 SERRATIONS M �o L 1 7/8" �— RI /16" 3/4„ 1 /16" R.005 R.010 2X R.01 60.00 3/8„±..006 002 1 /8'' 7/8" X820 DETAIL A .X .1 SCALE 3:1 .XX = +/- .01 .XXX= +/- .005 289 Harrel Street p�Q Morrisville, VT 05661 c C L-101 -3 rEcoFasten Solaro Toll Free Phone 1.877.766.3947 - - - - - - Toll Free Fax 1.888.766.9994 MATERIAL: 6000 SERIES ALUMINUM Q web www.ecofastensolar.com - - e-mail in fo@ecofastensolar.com SCALE: 1:1 1/6/2012 SHEET 1 OF 1 QuikFoot- Product Guide Specifications PART 1 -GENERAL 1.1 SUMMARY 1.3 SUBMITTAL A. WORK INCLUDES A. Submit manufacturer's written specifications. B. Base plate is 6000 series aluminum with one 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. attaches directly to the roof deck. C. Submit installation instructions. C. Fasteners to be compatible with chosen roof 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values for the roof system. ultimate and allowable load values specific to as shown in load test data. B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum em- 1.Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 07500:Roofing 1.4 QUALITY ASSURANCE plate 3.Division 1:Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4.Division7:Thermal and Moisture Protection the area of the project. 1.2 SYSTEM DESCRIPTION A. Bracket is mill finish aluminum 1.5 DELIVERY/STORAGE/HANDLING B. Base flashing-Black-kynar painted A. COMPONENTS: Inspect material upon delivery.Notify manufacturer 1. QuikFoot system consists aluminum within 24 hours of any missing or defective items. PART 3 - EXECUTION bracket and base plate withh stainless steel Keep material dry,covered,and off the ground until stud,(1)stainless steel nut,(11))EPDM washer and(1)bonded stainless steel and EPDM installed. 3.1 EXAMINATION washer. A. Substrate:Inspect structure on which brackets t 2. Fasteners PART 2 - PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand bracket. 2.1 MANUFACTURER any additional loading that may be incurred. B.Fasteners should be selected for compat- EcoFasten Solar 11 ibility with the roof deck. 289 Harrel Street,Morrisville,VT 05661 B. Notify General Contractor of any deficiencies C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolar.com q C. Verify that roofing material has been installed system.See test data at 2.2 MATERIALS correctly prior to installing solar attachment www.ecofastensolar.com A. Attachment Bracket brackets. 3. Sealant(if required by roof manufacturer): to be roof manufacturer approved. 6000 Series Aluminum(choose one) 3.2 INSTALLATION 4. Aluminum counter-flashing 1.CP-SQ-Slotted A. Comply with architectural drawings and project 5. Aluminum attachment bracket 2.F-111-A engineers recommendations for location of 3.P-3-CSK system.Comply with Manufacturer's written in- B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5.L-102-3" project engineer. 6.L-102-6" 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads. 877-859-3947 EcoFasten Solan,"All content protected under copyright.All rights reserved.10/09/14 4.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 132 8,181,398 B2 8,166,713 132 8,146,299 132 8,209,914 132 8,245,454 132 8,272,174 B2 8,225,557 132 r QuikFoot— Product Guide Cut Sheets: Bracket Options -SCL-101-3 ,P i I 3/8" A 46 SERRATIONS I� J� 1 7/8" - R1/16" 114" bo 3/4„ 1/16" R.005 R.010f--< �-- 2X R.OI 60.000 + 006 3/8„-.002 v 1/8 7/8" X 820 DETAIL 3:1 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.10/09/14 3.7 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 132 8,153,700 B2 8,181,398 B2 8,166,713 132 8,146,299 B2 8,209,914 132 8,245,454 B2 8,272,174 B2 8,225,557 132 ry QuikFoot— Product Guide Cut Sheets: QFL-812 R.38in 032in 719.53mm] _ [0.81 mm] 12.00in [304.80mm] 3.00in [76.20mm] .SOin ��] �_- 8.00in [ 12.70mm] [203.20mm] 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.10/09/14 3.2 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166,713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 t i .. QuikFoot— Product Guide Cut Sheets: QF-AL-Base 2X 0 .33in [8.38mm] i E O00 l", CN u' LO N LC) c'7 Ci LO 00 1 .50in [� [38.10mm] 3/8"-16 Stud E o E r-I 0�- Q F-M : 1 .5" u QF-L : 1 .75' 877-859-3947 EcoFasten Solar"All content protected under copyright.All rights reserved.10/09/14 3.1 EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 B2 8,153,700 B2 8,181,398 B2 8,166.713 B2 8,146,299 B2 8,209,914 B2 8,245,454 B2 8,272,174 B2 8,225,557 B2 QuikFoot— Product Guide Exploded Product View, Bill of Materials n Materials Needed for Assembly Item No. Description of Material/Part Quantity 7 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 3 QuikFoot Flashing 1 S 4 EPDM Washer 1 5 L-102-3"Bracket*(other options available) 1 L� 6 5/16"EPDM Bonded 18.8 SS Washer 1 7 3/8"Stainless Steel Hex Nut 1 t 3 Required Tools A Ilk2 1 r 877-859-3947 EcoFasten Solar®All content protected under copyright.All rights reserved.10/09/14 •� EcoFasten Solar products are protected by the following U.S.Patents:8,151,522 132 8,153,700 82 8,181,398 B2 8,166,713 132 8,146,299 B2 8,209,914 132 8,245,454 132 8,272,174 132 8,225,557 62 a if QuikFootPRODUCT GUIDE } Exploded Product View/B.O.M. - 1 All Installation Instructions - 2 J r ! , Cut Sheets - 3 Y {}jj"I J, Specifications - 4# D 11 # E # ,�' <� i f � i If r a � „ I ii i ,i' IP i jj� ? aODEcoFasten Solar° . ooa F 1T ------------ SunPower��') lnvisiMountlm Residential Mounting System InvisilMOUnt Component Images Module*/Mid Clamp and Rail Module*/End Clamp and Rail Mid Clamp End Clamp Rail&Rad Splice Ground Lug Assembly End Cap Temperature —40°C to 90°C(-40°F to 194°F) Component Material Weight Max.Load(LRFD) 3000 Pa uplift Mid Clamp Black oxide stainless steel AISI 304 63 g(2.2 oz) _ 6000 Pa downforce End Clamp Black anodized aluminum alloy 6063-T6 110 g(3.88 oz) Rail Black anodized aluminum alloy 6005-T6 830 g/m(9 oz/ft) Rail Splice Aluminum alloy 6005-T5 830 g/m(9 oz/ft) 25-year product warranty Warranties Ground Lug 304 stainless 106.5 g/m(3.75 oz) 5-year finish warranty Assembly (A2-70 bolt,tin-plated copper lug) End Cap Black acetal(POM)copolymer 10.4 g(0 37 oz) UL 2703 Listed Certifications Roof Attachment Hat dware SUppoi ted by Class A Fire Rated InvisilMount System Design-fool Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Roof Curved and Flat Tile Roof Attachment Universal Interface for Other Roof Attachments Refer to roof attachment hardware manufacturer's documentation. °M(Atdce Ila tie that is mmpat ble wirh the IrvisiMoum syatem iequu ed it,r i'arcware i n i e r o peva bil it,. Gr)1 •SunPcwer Corpor wr. All RI}hts Peserven CU INPOVVER,the SUNPOWER logo,and INVIStMOUNT are Lrademarks or registered trad�ni�uks of Sun Power C�rpoi aUon oil•ther t adeniarks of e the p�opertq ref their respective owr e«. Sunpower.com Spu<`icaton<_ n,.lcded in[his datasheei a e suhjF�t t('-.hang.without notir e. Document#509506 RevC joiloiloo-00- _V SunPower��" InvisiMountTM Residential Mounting System Simple and Fast Installation Integrated module-to-rail grounding Pre-assembled mid and end clamps Levitating mid clamp for easy placement `� Mid clamp width facilitates consistent,even module spacing Simple,pre-drilled rail splice v. . UL 2703 Listed integrated grounding Flexible Design Addresses nearly all sloped residential roofs Design in landscape and portrait Rails enable easy obstacle management Customer-Preferred Aesthetics - #1 module and#1 mounting aesthetics Best-in-class system aesthetics Elegant Simplicity Premium,low-profile design Black anodized components SunPower° InvisiMountTM is a SunPower-designed Hidden mid clamps and end clamps rail-based mounting system. The InvisiMount system and capped,flush rails addresses residential sloped roofs and combines faster Part of Superior System installation time, design flexibility, and superior aesthetics. Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics The InvisiMount product was specifically envisioned and • Combine with SunPower modules and engineered to pair with SunPower modules. The resulting monitoring app system-level approach will amplify the aesthetic and installation benefits for both homeowners and installers. r� sunpower.com b r Y Q U� Jill, I Sun • 1-D-AC ResidentialModule AC Electrical Data- IEEE 1547a-20143 CA Rule 213 SRD Profile (default settings) min./nom./max. min./nom./max. Frequency(Hz) 59.5/60.0/60.5 58.5/60.0/60.5 Power Factor 0.99/1.00/1.00 0.85 lead./1.00/0.85 lag. ±169 Var Reactive Power Volt VAr Voltage @240 V 211.2/240/264 V @208 V 183/208/228.8 V Max.Current @240 V 1.33 A @208 V 1.54 A DC/AC CEC Conversion Efficiency @240 V 96.0% @208 V 95.5% Max.Units Per 20 A Branch Circuit @240 V 12(single phase) @208 V 10(two pole)wye Power 320 W,320 VA No active phase balancing for 3 phase installations DC Power Data War rarities arid Cerufications SPR-X22-360-D-AC Warranties 25-year limited power warranty Nominal Power`(Pnom) 360 W 25-year limited product warranty Power Tolerance +5/-0% UL listed to UL 1741 SA Avg.Panel Efficiencys 22.2% SRDs:IEEE 1547-2003,IEEE 1547a-2014,CA Temp.Coef.(Power) -0.29%/°C Rule 21 Phase 1 Three bypass diodes PV Rapid Shutdown Equipment Shade Tolerance •Integrated module-level maximum power point Equipment Grounding tracking UL 6703,UL 9703 Connectors and cables (load break disconnection) Operating Conditions UL 1741 AC Module(Type 2 fire rating) Operating Temp. -40°F to+185°F(-40°C to+85°C) Certifications Enables installation in accordance with: Max.Ambient Temp. 122°F(50°C) NEC 690.6 Max.Load Wind:62 psf,3000 Pa,305 kg/M2 front&back NEC 690.12 Rapid Shutdown(inside and Snow:125 psf,6000 Pa,611 kg/M2 front outside the array) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) NEC 690.15 AC Connectors,690.33(A)-(E)(1) FCC and ICES-003 Class B Mechanical Data When used with InvisiMount racking(UL 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Integrated grounding and bonding Front Glass High-transmission tempered glass with anti- Class Afire rated reflective coating PID Test Potential-induced degradation free Environmental Rating Outdoor rated Frame Class 1 black anodized(highest AAMA rating) 2W mm Weight 45.5 Ibs(20.6 kg) (11•olW Recommended Max. 1.3 in.(33 mm) Module Spacingg 1 4mm R (43.3.6 In] 1016 mm Highest of over 3,200 silicon solar panels,Photon Module Survey,Feb.2014 (4121n] '#1 rank in"PV Module Durability Initiative Public Report,"Fraunhofer CSE,Feb 2013.Five out of the top eight largest manufacturers were tested.Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower white paper,Feb 2013.See www.sunpowercom/facts for details. [12 M] 'Factory set to 1547a 2014 default settings.CA Rule 21 default settings profile set during commission ing.See the Equinox Installation Guide#518101 foi more information. 1598 'Standard Test Conditions(I Goo W/m2 iradiance,AM 1.5,25'C).NREL calibration standard, rmm [6131N � wwe�ieaw� SOMS curt ent,LACCS FF and voltage.All DC voltage is fully contained within the module. �� 4 'Based on averaee of measured power values during production, �OYM Please read the safety and installation Instructions for details. My4iM pw firlawrec AM! See www.sunpowercom/facts for more reference information. For more details,see extended datasheet www.sunpowercom/datasheets. 518986 RevB SunPowerl X22-360-D-AC Residential AC Module Series Design-Driven Advantages X #1 module aesthetics and efficiency' Unmatched module reliability2 SERIES No electrolytic capacitors 25-year Combined Power and Product Warranty ' California Rule 21 Phase 1 compliant Maximize Value for Roof Size system for roof,not string inverter Optimize performance of each module • s Expand Deployment Options Complex roofs and partial shading Small systems Optimize System and Installation Efficiency System expandability SunPower"RC modules,which include afactory-integrated SunPower Simplify&Speed Installation microinverter,provide a revolutionary combination of high efficiency,high Factory-integrated microinverter reliability,and module-level DC-to-AC power conversion. Designed Robust,double-locking AC connectors specifically for use with SunPower InvisiMountT"^and the SunPower Design flexibility offsite and onsite No DC string sizing process Monitoring System,SunPower AC modules enable rapid installation,best- Fewer installation steps than competing in-class system aesthetics,and intuitive visibility into system performance. systems Intuitive commissioning All this comes with the best Combined Power and Product Warranty in the industry. Component of Complete System Built for use with SunPower®InvisiMount1m Grid Support Utility-Interactive Smart Inverter and the SunPower Monitoring System(PVS5x) Superior system reliability and aesthetics SunPower's new Type D AC module is UL tested and certified to UL 1741 SA and provides advanced smart inverter functions. SunPower Type D AC modules are fully compliant with the California Rule 21 Phase 1 /, requirements,and the Rule 21 grid profile is easily set during commissioning with SunPower PVS5x monitoring hardware. 4 sunpower.com 8aU4 PV Squared Solar 311 Wells Street,Suite B Greenfield,MA 01301 Roof 306" _�` design@pvsquared.coop 413-772-8788 Array 2933/4" q' JOB: Bossie SITE: 1268 Burts Pit Road ® Northampton,MA 01062 REVISIONS: V m � N O O � rC i Q Array centered between TME: Array Layout gables and roughly equal distance from drip edge. FDN#: 12155 BY: JG DATE: 10/16/2018 SCALE: 1/4"=1'-0" Clamp Torque: 85 in-lbs SIZE: 8.5"X 11" L-Foot Torque: 375 in-lbs Max Span: 48" Max Cantilever: 1/3 adjacent span " -02 e.g 32"span=10-2/3"cantilever Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) (Sheet 2of2) PROJECT INFORMATION: Sa V, • Owner: Greg&Jessica Bossie Q RSO • Address: 1268 Burts Pit Road `I// of Ah Northampton, MA 01062 �At ` •po • Phone: 831-278-2609 PV Squared Solar 311 Wells Street,Suite B • Email: gabossie@gmail.com Greenfield,MA 01301 Jess.bossie@gmail.com design@pvsquared.coop 413-772-8788 • System Size: 5.04 kW JOB: Bossie • Modules: SunPower X22-260-D-AC ---- • Rail: SunPower Invisimount SITE: 1268 Burts Pit Road • Bases: Eco Fasten Quikfoot Northampton,MA 01062 • Snow Load: 40 lbs • ®Wind Speed: 117 mph REVISIONS: ROOF STRUCTURE: • 210 2x6 rafters @ 16"O.C. ROOF MATERIAL: • Asphalt Shingles PROJECT NOTES: 1. Framing location to be verified on site. 2. Slide rail assembly as needed to avoidSite Plan A interfering with splices or bases. No scale 3. Unless otherwise noted bases are staggered and spaced at 48"O.C. 4. Additional or alternative bases may be used BILL OF MATERIALS TITLE: Site Plan to meet actual roof conditions. C/T PART MAKE MODEL 29 Base EcoFasten Quikfoot FDN#: 12155 BY: )G 56 Fastener GRK RSS 5/16"X 3-1/8" DATE: 10/16/2018 10 Rail SunPower Invisimount SCALE: As Shown 8 Rail Splice SunPower Invisimount SIZE: 8.5•X11• 24 Midclamp SunPower Invisimount 8 jEndclamp SunPower linvisimount A-01 14 Module SunPower X22-260-D-AC (Sheet 1 of 2) SQU4 . R Bossie-Florence Back of house,array on this side New England Construction Engineering, PLC PV Squared-Bossie Residence Jonathan Rugg, P.E. Northampton, MA Page 2 of 2 In summary, in my opinion,the house roof will support the proposed PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. : SNOFy��c Sincerely, g JONATHAN A C21 RUGG " Na 51982 N L onathan Rugg, P.E. New England Construction Engineering, PLC. 18 Attachments: -Building Information New England Construction Engineering, PLC 436 Campbell Street (NECE) Structural Construction Solutions White River Junction,VT 05001 Jonathan Rugg, P.E. 603-903-9798 j.rugg@NewEnglandConstructionEngineering.com October 12, 2018 Ms. Madeleine Geschwind Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re: Bossie Residence, Northampton, MA PV Squared Project No. 12155 NECE Project No. 18-001 T-168 Dear Ms. Geschwind, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative, Inc. (PV Squared) provided on the roof and supporting structure of the Bossie residence, at 1268 Burts Pit Road, in Northampton, MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV)array.The information that you provided is attached for reference. You are proposing to erect PV panels on the south facing side of the house roof.The house is a two-story saltbox with full length shed dormer.The dormer has a 21-degree pitch.The proposed array will be mounted on the south facing dormer.The house measures approximately 22'x26'. The roof is supported by 2x6 rafters at 16" O.C.These rafters span approximately 11' on the horizontal.Second floor ceiling joists resist the outward end reaction of the rafters on the walls. The roof has plywood sheathing and asphalt shingles. NECE's analysis and review includes the controlling gravity load combination (snow and dead loads). Conclusion: Based on the information that you provided, in my opinion,the roof will adequately support the design snow load and the additional dead load of the proposed PV array. I base this opinion on the following assumptions. I assume that owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles. I also assume that PV panels will be installed parallel to the roof, eliminating any additional wind load.The ground snow load (Pg) for Northampton is 40psf. According to information that you have provided,the proposed PV panels weigh approximately 2.6 psf. ACID O® CERTIFICATE OF LIABILITY INSURANCE DATE(MM DD/YYYY) 01/03.12018 THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER UONTACT Linda Powers NAME: Webber&Grinnell PHONE (413)586-0111 FAX (413)586-6481 1 00,EX01 (AIC,No): 8 North King Street AD1AIL Ipowers@webberandgrinnell.com INSURER(S)AFFORDING COVERAGE NAIC A' Northampton MA 01060HDI Global Ins.Co/Ener i INSURER A: 9 INSURED INSURER 8: 9 Markel/Ener I Pioneer Valley Photovoltaics Cooperative,Inc. INSURER C: Inter'/Ins.Co of Hannover/Energi Attn Kim Pinkham INSURER D: 311 Wells Street;Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp 1-2019 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IN SR ALIUL 31.15K EXP LTR TYPE OF INSURANCE INSD ima POLICY NUMBER (MIMUDDATM (MMIDDIYYYY) LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S 1,000,000 CLAIMS-MADE ®OCCURPREMISESEa occurrence s 100,000 MED EXP(Any one person) s Excluded A EGGCR0002412118 01101!2018 01101/2019 PERSONAL&ADV INJURY S 1,000,000 GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 5 2,000,000 POLICY JEa F_�LOC PRODUCTS-COMP/OPAGG S 2.000,000 OTHER S AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT s 1,000,000 Ea accident X ANY AUTO BODILY INJURY(Per person) S A OWNED SCHEDULED EAGCR000241218 01/01/2018 01101/2019 BODILY INJURY(Per accident) 5 AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident S Underinsured motorist BI 5 20,000 X UMBRELLA LIAB OCCUR EACH OCCURRENCE s 3,000,000 B EXCESS LIAB HCLAIMS-MADE 18EFXNE60457 01/01/2018 01/01/2019 AGGREGATE s 3,000,000 DED RETENTION 5 S WORKERS COMPENSATIONH- AND EMPLOYERS'LIABILITY YIN STATUTE I ER ANY PROPRIETOR/PARTNER/EXECUTIVE1,000,000 A OFFICER/MEMBER EXCLUDED? N/A EWGCR0002412118 01/01/2018 01101/2019 EL:EACH ACCIDENT 5 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE S 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT S 1,000,000 Business Pers Property $1,750,000 EC Commercial Property CPR18EI7801 01/01/2018 01101/2019 Installation $350,000 DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES(ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Evidence of Insurance ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Anolicant Information Please Print Legibly Name (Business/Organization/Individual):Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): 1.E]I am a employer with 48 employees(full and/or part-time).* 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. ❑Demolition 3.E]lam a homeowner doing all work myself.[No workers'comp.insurance required.]t 10[:]Building addition 4.E]I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.E]Plumbing repairs or additions 5.[3 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.[—]Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 14.Q Other Solar PV 6.[–]We are a corporation and its officers have exercised their right of exemption per MGL c. 152,§1(4),and we have no employees.[No workers'comp.insurance required.] Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:HDI Global Insurance Co/Energi Policy#or Self-ins.Lic.#:EWGCR0002412118 Expiration Date:01/01/2019 Job Site Address: 1268 Burts Pit Rd City/State/Zip:Florence MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby cern alder*pains and penalties of perjury that the information provided above is true and correct. Signature: Date: 10/30/2018 Phone#:413-7(2- _,088 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Commonwealth of Massachusetts Division of Professional Licensure Board of Building Regulations and Standards COnstr bn"Supervisor C5-111266 Egpi res: 031'1412021 DANIEL GOMEZ-G4NA 43 HATFIELD STREET 'a NORTHAMPTON MA O't"D cit. Commissioner Office of Consumer Affairs and Business Regulation One Ashburton Place - Suite 1301 Boston, Massachusetts 02108 Home Improvement Contractor Registration Type: Supplement Card PIONEER VALLEY PHOTOVOLTAICS COOP Registration: 140077 31 1 WELLS ST SUITE B Expiration: 09/15/2019 GREENFIELD,MA 01301 Update Address and Return Card. Office of Consumer Affairs&Business Regulation HOME IMPROVEMENT CONTRACTOR Registration valid for individual use only TYPE:Suoolement Card before the expiration date. It found return to: Registration Expiration Office of Consumer Affairs and Business Regulation 140077 09,15i2019 10 Park Plaza-Suite 5170 PIONEER VALLEY PHOTOVOLTAICS COOP Boston.M 0 116 f (r+RISTOPHER KREZMIEN � —J"a- 31' WELLS ST SUITE B (JIFFNFIE-iD MA 01301 N t valid witho t gnature Undersecretary ATTACHMENT A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT hereby agree to the Project as set out above, and I agree to pay the contract pace according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. S SO, C Q OS Q. C) l; V Pr' ted Name Dat Q M Z.J Si nature Title SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable 0 Name of License Holder:Daniel Gomez Gonzalez CS-111266 License Number 43 Hatfield Street , Northampton MA 01060 03/14/2021 Address IIVAL� 413-772-8788 Expiration Date Signature Telephone 9. Reallstered Home Impro"ment Contractor: Not Applicable 0 Pioneer Valley Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Weils Street, Suite B. Greenfield, MA, 01301 09/15/2019 Address Expiration Date Telephone 413-772-fl788 I SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 0 No...... 0 Home Owner Exec The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,Provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year Period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official.,that he/she shall be responsible for all such work performed under the building Permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all aDMIcable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors O Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [0 Siding[p] Other[dj Brief Description of Proposed Work: Alteration of existing bedroom Yes No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes X No Plans Attached Roll -Sheet ea.ff Now house and or addition to existing housing.,COME ts- s>Ioiiowing: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Greg and Jessica Bossie ,asOwner ofthe subject property hereby authorize PV Squared to act on my behalf,in all matters relative to work authorized by this building permit application. See Attachment A 10/30/2018 Signature of Owner Date l PV Squared ,as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Chris Krezmien Print Name 10.30 .2018 Signature of Owner/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size �.__ _ _ � � _. ._ �-J L __. _ _ - .-.) Frontage Setbacks Front Side La_. __ _{ R:I_ _1 L:� . _ j R:1 Rear Building Height -- Bldg. Square Footage �� C� OX Space Footage % 7 (Lot area minus bldg&paved -- parking) #of Parking Spaces ----� - - Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES 0 IF YES: enter Book C Page - „ ) and/or Document# _ B. Does the site contain a brook, body of water or wetlands? NO O DON'T KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: l E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plain that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SQUq R� 10RECEIVED Q PV Squared Solar I www.pvsquared.coop Phone:413-772-8788 Fax:413-772-8668 311 Wells St,Ste.B I Greenfield,MA 01301 y�RT a soy�f NOV — 2 2018 MA Elec.Lic.A13764 I MA HIC 140077 DEPT.OF BUILDING INSPECTIONS NORTHAMPTON,MA01060 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager City of Northampton Building Department 212 Main Street Room 100 Northampton, MA 01060 phone 413-587-1240 Fax 413-587-1272 APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 1268 Burts Pit Rd Florence MA 01062 Map Lot unit Zone Overlay District Elm St.Dls&lciL CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Greg and Jessica Bossie 1268 Burts Pit Rd,Florence MA 01062 Name(Print) Current Mailing Address: (831)278-2609 See attachment (A) Telephone Signature 2.2 Authorized Aaent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $3,788 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of 16,518 Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection I f 6. Total=(1 +2+3+4+5) $20,305 1 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: [[ Building Commissioner/Inspector of Buildings Date 1268 BURTS PIT RD BP-2019-0551 GIs#: COMMONWEALTH OF MASSACHUSETTS Map-Block: 35-204 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-0551 Proiect# JS-2019-000890 Est.Cost: $20305.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Qroup: PIONEER VALLEY PHOTOVOLTAICS 111266 Lqt Size(sq. ft.): 57499.20 Owner: BOSSIE GREG&JESSICA Zoning Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 1268 BURTS PIT RD Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 Workers Compensation GREEN FIELDMA01301 ISSUED ON:11/6/2018 0:00:00 TO PERFORM THE FOLLOWING WORK.-ROOF MOUNTED SOLAR 14 PANELS 4.48 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector UndergrounU: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Deaartmellt Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTyue: Date Paid: Amount: Building 11/6/2018 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner