Loading...
13-073 Rockridge Laurel Park SidewalkF: \avll Job \60 -155 N. E. Deaconess \dwg \60 -155 Rods- Prop- 091203.dwg, 06/08/2004 09:08:25 AM PLANNING AND DEVELOPMENT • CITY OF NORTHAMPTON city Hull • 2 i o Main Street, Room 11 • Nortl ampton, MA o i o60 -3198 (413) 587-1266 • Fax: 5 8 7 -126 4 wapne Feiden, Director • planning @nortbamptonplanning.org www.norLbampLonplanning.org June 14, 2004 David Thompson Coler & Colantonio, Inc. One Sugarloaf Street South Deerfield, MA 01373 RE: Revised sidewalk plan for Rock Ridge Dear Dave, At its meeting on June 10, 2004, the Northampton Conservation Commission reviewed the changes to the plan for the sidewalk on North King Street at Rock Ridge. The Commission felt that they were minor changes and that there was no need to modify your existing permit. Additionally, the Commission was pleased that there was an effort made to retain the large trees in the right -of -way. Should you have any questions, please feel free to contact me at 587 -1263. Sincerely, Gloria McPherson Conservation and Land Use Planner planning board • conservation Comm ission • zoning 6oardof appeals • howsing partnership • redeve top mentaKboriLr • nonbamp Lon GIs economic development - commi+nitg levelopment . bistoricdistrictcommission - bistoricalcommission - central6sinessarcbitectwre oryina[printedon recrc[edpaper LETTER OF TRANSMITTAL COLER & COLANTONIO, INC. One Sugarloaf Street South Deerfield, MA 01373 (413) 665 -5300 TO: Northampton Conservation Commission Project No 60 -155 Date 06/08/04 Attention Gloria MacPherson RE Northampton City Hall, 210 Main Street Northampton, MA 01060 WE ARE SENDING YOU the following: ® Attached Under separate cover via ❑ Shop Drawings ❑ Specifications ❑ Copy of letter ❑ Change order r Drin +c F l Plans ❑ Samples ® other THESE TRANSACTIONS ARE: ❑ For your approval ® For your use ❑ Asper your request ❑ for your review and comment(s) ❑ FOR BIDS DUE 19 ❑ Approved as submitted ❑ Resubmit with ❑ Approved as noted ❑ Submit ❑ Corrections noted ❑ Return ❑ for transmittal to contractor ❑ PRINTS RETURNED AFTER LOAN TO US copies for approval copies for distribution corrected prints Remarks: Hi Gloria. The enclosed plan is a further revision of the plan that I gave you during out site visit at Rockridge. The main revision is that the Mass. Highway Dept. requires concrete structures and pipe in their right -of -way (instead of pvc, as previously shown). Mass. Highway would also like to have a confirmation that the plan as revised is still acceptable to your Commission. Thanks, and please call if you have any questions. Signature: David Thompson DESCRIPTION COPIES DATE NUMBER Plan for sidewalk at King Street right -of -way 1 rev. 06/08/04 � � g U THESE TRANSACTIONS ARE: ❑ For your approval ® For your use ❑ Asper your request ❑ for your review and comment(s) ❑ FOR BIDS DUE 19 ❑ Approved as submitted ❑ Resubmit with ❑ Approved as noted ❑ Submit ❑ Corrections noted ❑ Return ❑ for transmittal to contractor ❑ PRINTS RETURNED AFTER LOAN TO US copies for approval copies for distribution corrected prints Remarks: Hi Gloria. The enclosed plan is a further revision of the plan that I gave you during out site visit at Rockridge. The main revision is that the Mass. Highway Dept. requires concrete structures and pipe in their right -of -way (instead of pvc, as previously shown). Mass. Highway would also like to have a confirmation that the plan as revised is still acceptable to your Commission. Thanks, and please call if you have any questions. Signature: David Thompson