Loading...
13-045 555 north king st con comMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Emergency Certification Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. rab rerun A. Emergency Information Northampton Issuance From: issuing Authority 1. Site Location: Northampton 2 Reason for Emergency Conservation Com State Police Barrack Parki Area, Route 5 Severe and continuing erosion of steep slope to stream, approximately 10 feet from the edge of a paved parking area. 3. Public agency ordering the work to be performed: Conservation C ommission 4. Date of Site Visit: Start Date: End Date *: May 14, 2004 May 27 2004 June 27, 2004 * no later than 30 days from start date or 60 days in the case of an Immediate Response Action approved by DEP to address an oil /hazardous material release. 5. Work to be allowed *: • Reroute existing drainage pipe to the bottom of the slope and disperse into riprap. • Backfill and compact slope with bank -run gravel to a 2:1 slope. • Cover with a minimum of 4 inches topsoil. • Stabilize slope with native woody and herbaceous vegetation, not riprap, using jute netting or other NRCS approved stabilizer to allow the vegetation to establish. * May not include work beyond that necessary to abate the emergency. B. Signatures Certified to be an Emergency by this Issuing Authority. Signatures: Chair an (or designee) Date A copy of this form must be provided to the appropriate DEP Regional Office. Page 1 of 2 WPA Emergency Certification Rev. 11101 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Emergency Certification Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Emergency Certification or subject to enforcement action. 2. This Emergency Certification does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of property rights. 3. This Emergency Certification does not relieve the applicant or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. Any work conducted beyond that described above, and any work conducted beyond that necessary to abate the emergency, shall require the filing of a Notice of Intent. 5. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Emergency Certification at reasonable hours to evaluate compliance with this Certification, and may require the submittal of any data deemed necessary by the Conservation Commission or the Department for that evaluation. 6. This Emergency Certification shall apply to any contractor or any other person performing work authorized under this Certification. 7. No work may be authorized beyond 30 days from the date of this certification without extension by the Issuing Authority. D. Special Conditions 8. All equipment and machinery shall be staged from existing pavement on the top of the slope. There shall be no equipment on the slope itself. 9. An erosion control barrier consisting of a trenched silt fence shall be installed at the base of the slope as far from the edge of the stream as possible. This shall be the limit of work. 10. Silt fence shall be installed by hand. 11. Silt fence shall be checked daily, repaired and sediment removed as needed to prevent erosion into the stream. 12. Silt fence shall remain in place until the vegetation on the slope is established and capable of preventing erosion into the stream. E. Appeals The Department may, on its own motion or at the request of any person, review: an emergency certification issued by a conservation commission and any work permitted thereunder; a denial by a conservation commission of a request for emergency certification; or the failure by a conservation commission to act within 24 hours of a request for emergency certification. Such review shall not operate to stay the work permitted by the emergency certification unless the Department specifically so orders. The Department's review shall be conducted within seven days of: issuance by a conservation commission of the emergency certification; denial by a conservation commission of the emergency certification; or failure by a conservation commission to act within 24 hours of a request for emergency certification. If certification was improperly granted, or the work allowed thereunder is excessive or not required to protect the health and safety of citizens of the Commonwealth, the Department may revoke the emergency certification, condition the work permitted thereunder, or take such other action as it deems appropriate. WPA Emergency Certification Page 2 of 2 Rev. 11101 L1/V4 zvuv va: FA 00011002 FROM : CTC ENGINEERING FAX NO. : 970 602 0699 Mar. 22 2004 03.50PM P2 • vr_106 -' 'SOB) 8 U- u g y�0 (5a8) 820 — Z(o - 7(v MA 01 0 2 No=khempton 6tata Police Barrack Parking Area aide slope stabilization 1. Hackfill and compact the slope with ordinary gravel borrow to a 7:1 slope. 2. At the and of the now 2,1 elope, dig a trench about 2' deep and 5' aide. 3. Line the new ■lope and the trench with geotextil® filter fabric. Becure the filter fabric at the top Of the elope by burying the fabric in a 2 Z' cross section trench. 4. Place a layer of rough tngular rock riprap about 1 thick on top of the filter fabric. The minimum riprap D50 Rise is 4 incbas. The 050 size refers to the median diameter of the stone. This iR the siz for which 50 percent, by weight, will be smaller and 5o percent will be larger. S. Re -routs the existing dralh pipe to a lees steep area at the bottem of the slope and disperse into riprap with minimu,n medium slzo of 12 inchas. plea refer to the attached crone sectional sketch for details, had c, I1utl" w/ ZB 39Vd MIIODSSV 5Nm LPMOST9L 6S-9T 00WO /E8 EA /ZD 3!WCi d' , HiNb 19566CMG Q13 UT ipeoveves Z1 /V4 1VV4 QU:28 FAX 9002/002 FROM LTC ENGINEERING FAX NO. 979 682 8699 Mir. 22 2004 03:51PM P3 HUNG ASSOCIATES, INC. STRUCTURAL / OWL awRttuo. pr UGHTCAOE STEEL FRAMINC CALIMAnntr a�ro • �� CONSULING ENONEERS aeama mrt I � • L... _ 1.. ...... i Ai- . ..• .•�,.'.. ,• ..�. 1 t I t I • ;.. .; ,� -j,. ,I.. . ,.. ._. . �, .i. .,. 11... . ,' •t ,.. !.. '` V. j •T ......... �.��.�.;.. ' LA- I I, �� - •� l I I t® 3EMd 531I37� CS /C@ [0L®E8ST8L 6li:9T 088E /AL /E8 dTI�MY" 15966ECet WIT beet /ea/ee