49-012 File#MP-2019-0024
APPLICANT/CONTACT PERSON SYNCA PHA SOLAR
ADDRESS/PHONE 250 57TH STREET SU 'E 701 (212) 9-4840
PROPERTY LOCATION PARK HILL RD I (T-GLENDA! RD
MAP 49 PARCEL 012 001 ZONE
THIS SEC ION FOR OFFICIAL USP,ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid d
Building Permit Filled out o
Fee Paid
TvoeofConstruction: ZPA GROUND MOUNT SOLARIARRAN TO GENERATE ELECTRICITY THAT WILL
BE CONNECTED TO THE NATIONAL GRID GRID.
New Construction
Non Structural interior renovations
Addition to Existine
Accessory Structure
Buildine Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
Approved ✓ Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:: § r Ar,(Z VIM ,
Intermediate Project: Site Plan AND/OR ✓ Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance'
Received&Recorded at Registry of Deeds Proof Enclosed
_Other Permits Required:
,,-'Curb Cut from DPW Water Availability Sewer Availability
S/epuc Approval Board of Health Well Water Potability Board of Health
t- Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission 1'� Permit DPW Storm Water Management
'Iz- B 23 18
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
-Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.
RECEIVED
Fite No.
AUG 20 20 NTGPERMITAPPMC47TON
�e Pleasetype rint all information and return this form to the Building
De DDAt�A 7RSIi.t'eXT V"'e It ith the$30fitingfee (check or money order)payable to the
City of Northampton
1. Name of Applicant: Syncarpha Solar,LLC AM:Keah Akers
Address: 250 51I1h Sheet Suite 701,New York,NY 10101 Telephone: 212.419.4&10
2. Owner of Property: Kane#C.BuR.John H.Bud and JOB Farms,Inc.
Address: North Street Ralnfield,Massacusetls Telephone:
3. Status of Applicant: Owner Contract Purchaser x Lessee_Other (explain)
4. Job Location: Perk Hill Road Extension.Northampton.MessachuseM(Map 49,Lot 012)
Parcel Id: Zoning Map# Parcel# Dinritt(s),
In Elm Street District In Central.Business District
0 BE FILLED IN BY THE BUILDING DEPARTMENT
5. Existing Use of Structure/Property: Vacant
6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary):
InsWilagon of a photpvoltxic ground mounted solar anay b generate eleclnitay Out wig be wnne tted W into National Grid electrical grid,
The property will be subdivWed though an MR process prior to the construction of the solar fatllity with a parcel of lath wnveyed
ho Ne City of Nonhampa n.
7. Attached Plans: Sketch Plan Site Plan x Engineered/Surveyed Plans
a. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO DONT KNOW x YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DONT KNOW YES
IF YES: enter Book Page and/or Document#
9.Does the site contain a brook, body of water or wetlands? NO _ DON7 KNOW YES x
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained x Obtained , date issued:
(Farm Continues On Other Side)
W:1Dwumcm WORMSbriginalMuildiog-ImpectorlZonin6.Ptmdt•Appi afion.p ivc.doc 8142004
- -- . _.� .
a:YS n]
_.�_._.
'. � ,vi'�_._�
�. { 3� r-�
10. Do any signs exist on the property? YES NO x
IF YES, describe size, type and location:
Are there any proposed changes to or additions of signs intended for the property? YES x NO
IF YES, describe size, type and location: Ragtdalery signs as required by uta Nafional Erecbaat Code to be plata on hocaane
11. Will the construction activity disturb(clearing, grading,excavation, or filling) over 1 acre or Is it part of a common
plan of development that will disturb over 1 acre? YES x NO _
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED,a PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
ZONING
Lot Size
37,190.Acres 17.150-Acres
Frontage 2,0110-LF
1,0]9a/.LF
Setbacks Front NIA 53-
Side L: NIA R: NIA L: 2r R: 55• L: R:
Rear WA az
Building Height
NIA WA
Building Square Footage
NIA WA
%Open Space: (lot area
minus building B paved t00% 100%
parking
If of Parking Spaces
g o
q of Loading Docks
0 0
F1ih 0 0
(volume a location)
13. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Oate:. 91-712Q1.R _Applicant's Signatur �
NOTE:Issuance of a zoning permit docs not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health,Conservation Commission,
Historic and Architectural Boards,Department of Public Works and other applicable permit granting
authorities.
W:V)octtmevuiFnRMSimigivspBuadivg-Iv,pectarlZonivg-Pemtit-Applko0av-passive doe 8I4100i
rP PILII '
,L, t
August 16,2018
Louis Hasbrouck, Building Commissioner
Building Commissioner's Office
Puchalski Municipal Building
212 Main Street
Northampton, MA 01060
RE: Syncarpha Solar Project
Park Hill Road, Northampton, MA
Zoning Permit Application
Dear Mr. Hasbrouck:
On behalf of Syncarpha Solar, LLC,our office would like to submit the enclosed Zoning Permit Application
for the proposed ground mounted solar array to be located off Park Hill Road in Northampton,
Massachusetts. In support of this application, we have attached the following items:
• Zoning Permit Application Form
• Application Fee in the amount of$30 payable to City of Northampton
• Location Map
• Site Plans depicting the proposed development
Through our discussions with Wayne Feiden, it is our understanding that this is the initial step in the City
permitting process that will involve, among other permits, ANR subdivision, Stormwater Management
Permit and Site Plan/Special Permit from the Planning Board. There will also be a Chapter 61A Waiver
process with City Council that will be undertaken later in the overall permitting process.
If you have any additional questions or require additional information, please do not hesitate to contact
me at the address above or via email at tmorey@bealsassocaites.com.
Sincerely,
Beals Associates, Inc.
Zrl/P�
Todd P. Morey, P.E.
Vice President
Enc. Permit Application Form
Check for$30 payable to City of Northampton
Site Plans
C Keith Akers,Syncarpha
PI ANMNG • I NGINY1 RING • PGRMff I ING • MANAGIIMI!Nl
syncarpha
Northampton Building Department
Attn:Building Commissioner
212 Main Street
Northampton,MA 01060
RE: Syncarpha Solar,LLC Community Shared Solar Permit Application
To Whom It May Concern:
As the legal owners of a parcel of land located off Glendale Road and more specifically
described as Parcel 49-012-001,we hereby authorize Syncarpha Solar,LLC to submit any and
all applicable permits associated with the proposed Community Shared Solar project located on
the aforementioned property.
Sincerely,
Kenneth Burt n R
John Burt
Syncarpha Solar,LLC 1 250 West 5T"Street,New York,New York 101071212-4194840
REFERENCES:
PROPERTY LINE INFORMATION, AND 2013 AERIAL
PHOTO OBTAINED FROM MASS GIS.
•
SUBJECT
•
SITE
GLENDALE ROAD
Aerial Photo Figure 1�
Date:June,2018
Syncarpha Solar, LLC Northampton 0s`"`E2
280 W 5M street,Suite 701 Massachusetts
Newyork,NY
REFERENCES:
MAPS OBTAINED FROM CITY OF NORTHAMPTON
ONLINE ASSESSOR PARCEL MAPS INCLUDING ZONING
DISTRICT MAPS DATABASE. MAP 49 AND 42 LAST
REVISED JANUARY 1, 2017,
er
y � d
= a
(n
O to
Z w
SUBJECT -
&
SITE
I s
3 �
' a c
0
N
ho
c
c
' N
Projection:Massachusetts State Plane(NAD83)
These maps are not intended for use in conveyances and they contain errors and diserepaucier.
individuals requiring en authoritative property boundary or other location most retain the services of a professional land surveyor.
Assessor lines revision date:01 January 2017
www.NorthamptonMA.gov e-mail: CityG1SCwNorthampmnMA.gcv
` Tax Map 2�
p Date:June,2018
SCALE:r=500'
Syncarpha Solar, LLC Northampton o 250 500
250w B7th Street,Suite 701 Massachusetts
New York,NY
' Zz -
BA-�--S= = i - - r I T
SREPWI MENSION ...au � A `� Y
O
HONUM
SOS /
i
� \ f
m�
r 11
/ \ F
Mm
C'2.0