Loading...
49-012 File#MP-2019-0024 APPLICANT/CONTACT PERSON SYNCA PHA SOLAR ADDRESS/PHONE 250 57TH STREET SU 'E 701 (212) 9-4840 PROPERTY LOCATION PARK HILL RD I (T-GLENDA! RD MAP 49 PARCEL 012 001 ZONE THIS SEC ION FOR OFFICIAL USP,ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid d Building Permit Filled out o Fee Paid TvoeofConstruction: ZPA GROUND MOUNT SOLARIARRAN TO GENERATE ELECTRICITY THAT WILL BE CONNECTED TO THE NATIONAL GRID GRID. New Construction Non Structural interior renovations Addition to Existine Accessory Structure Buildine Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved ✓ Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:: § r Ar,(Z VIM , Intermediate Project: Site Plan AND/OR ✓ Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance' Received&Recorded at Registry of Deeds Proof Enclosed _Other Permits Required: ,,-'Curb Cut from DPW Water Availability Sewer Availability S/epuc Approval Board of Health Well Water Potability Board of Health t- Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission 1'� Permit DPW Storm Water Management 'Iz- B 23 18 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. -Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning&Development for more information. RECEIVED Fite No. AUG 20 20 NTGPERMITAPPMC47TON �e Pleasetype rint all information and return this form to the Building De DDAt�A 7RSIi.t'eXT V"'e It ith the$30fitingfee (check or money order)payable to the City of Northampton 1. Name of Applicant: Syncarpha Solar,LLC AM:Keah Akers Address: 250 51I1h Sheet Suite 701,New York,NY 10101 Telephone: 212.419.4&10 2. Owner of Property: Kane#C.BuR.John H.Bud and JOB Farms,Inc. Address: North Street Ralnfield,Massacusetls Telephone: 3. Status of Applicant: Owner Contract Purchaser x Lessee_Other (explain) 4. Job Location: Perk Hill Road Extension.Northampton.MessachuseM(Map 49,Lot 012) Parcel Id: Zoning Map# Parcel# Dinritt(s), In Elm Street District In Central.Business District 0 BE FILLED IN BY THE BUILDING DEPARTMENT 5. Existing Use of Structure/Property: Vacant 6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): InsWilagon of a photpvoltxic ground mounted solar anay b generate eleclnitay Out wig be wnne tted W into National Grid electrical grid, The property will be subdivWed though an MR process prior to the construction of the solar fatllity with a parcel of lath wnveyed ho Ne City of Nonhampa n. 7. Attached Plans: Sketch Plan Site Plan x Engineered/Surveyed Plans a. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW x YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and/or Document# 9.Does the site contain a brook, body of water or wetlands? NO _ DON7 KNOW YES x IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained x Obtained , date issued: (Farm Continues On Other Side) W:1Dwumcm WORMSbriginalMuildiog-ImpectorlZonin6.Ptmdt•Appi afion.p ivc.doc 8142004 - -- . _.� . a:YS n] _.�_._. '. � ,vi'�_._� �. { 3� r-� 10. Do any signs exist on the property? YES NO x IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES x NO IF YES, describe size, type and location: Ragtdalery signs as required by uta Nafional Erecbaat Code to be plata on hocaane 11. Will the construction activity disturb(clearing, grading,excavation, or filling) over 1 acre or Is it part of a common plan of development that will disturb over 1 acre? YES x NO _ IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED,a PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED REQUIRED BY ZONING Lot Size 37,190.Acres 17.150-Acres Frontage 2,0110-LF 1,0]9a/.LF Setbacks Front NIA 53- Side L: NIA R: NIA L: 2r R: 55• L: R: Rear WA az Building Height NIA WA Building Square Footage NIA WA %Open Space: (lot area minus building B paved t00% 100% parking If of Parking Spaces g o q of Loading Docks 0 0 F1ih 0 0 (volume a location) 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Oate:. 91-712Q1.R _Applicant's Signatur � NOTE:Issuance of a zoning permit docs not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health,Conservation Commission, Historic and Architectural Boards,Department of Public Works and other applicable permit granting authorities. W:V)octtmevuiFnRMSimigivspBuadivg-Iv,pectarlZonivg-Pemtit-Applko0av-passive doe 8I4100i rP PILII ' ,L, t August 16,2018 Louis Hasbrouck, Building Commissioner Building Commissioner's Office Puchalski Municipal Building 212 Main Street Northampton, MA 01060 RE: Syncarpha Solar Project Park Hill Road, Northampton, MA Zoning Permit Application Dear Mr. Hasbrouck: On behalf of Syncarpha Solar, LLC,our office would like to submit the enclosed Zoning Permit Application for the proposed ground mounted solar array to be located off Park Hill Road in Northampton, Massachusetts. In support of this application, we have attached the following items: • Zoning Permit Application Form • Application Fee in the amount of$30 payable to City of Northampton • Location Map • Site Plans depicting the proposed development Through our discussions with Wayne Feiden, it is our understanding that this is the initial step in the City permitting process that will involve, among other permits, ANR subdivision, Stormwater Management Permit and Site Plan/Special Permit from the Planning Board. There will also be a Chapter 61A Waiver process with City Council that will be undertaken later in the overall permitting process. If you have any additional questions or require additional information, please do not hesitate to contact me at the address above or via email at tmorey@bealsassocaites.com. Sincerely, Beals Associates, Inc. Zrl/P� Todd P. Morey, P.E. Vice President Enc. Permit Application Form Check for$30 payable to City of Northampton Site Plans C Keith Akers,Syncarpha PI ANMNG • I NGINY1 RING • PGRMff I ING • MANAGIIMI!Nl syncarpha Northampton Building Department Attn:Building Commissioner 212 Main Street Northampton,MA 01060 RE: Syncarpha Solar,LLC Community Shared Solar Permit Application To Whom It May Concern: As the legal owners of a parcel of land located off Glendale Road and more specifically described as Parcel 49-012-001,we hereby authorize Syncarpha Solar,LLC to submit any and all applicable permits associated with the proposed Community Shared Solar project located on the aforementioned property. Sincerely, Kenneth Burt n R John Burt Syncarpha Solar,LLC 1 250 West 5T"Street,New York,New York 101071212-4194840 REFERENCES: PROPERTY LINE INFORMATION, AND 2013 AERIAL PHOTO OBTAINED FROM MASS GIS. • SUBJECT • SITE GLENDALE ROAD Aerial Photo Figure 1� Date:June,2018 Syncarpha Solar, LLC Northampton 0s`"`E2 280 W 5M street,Suite 701 Massachusetts Newyork,NY REFERENCES: MAPS OBTAINED FROM CITY OF NORTHAMPTON ONLINE ASSESSOR PARCEL MAPS INCLUDING ZONING DISTRICT MAPS DATABASE. MAP 49 AND 42 LAST REVISED JANUARY 1, 2017, er y � d = a (n O to Z w SUBJECT - & SITE I s 3 � ' a c 0 N ho c c ' N Projection:Massachusetts State Plane(NAD83) These maps are not intended for use in conveyances and they contain errors and diserepaucier. individuals requiring en authoritative property boundary or other location most retain the services of a professional land surveyor. Assessor lines revision date:01 January 2017 www.NorthamptonMA.gov e-mail: CityG1SCwNorthampmnMA.gcv ` Tax Map 2� p Date:June,2018 SCALE:r=500' Syncarpha Solar, LLC Northampton o 250 500 250w B7th Street,Suite 701 Massachusetts New York,NY ' Zz - BA-�--S= = i - - r I T SREPWI MENSION ...au � A `� Y O HONUM SOS / i � \ f m� r 11 / \ F Mm C'2.0