18C-064 (4) 179 PROSPECT AVE SM-2019-0002
COMMONWEALTH OF MASSACHUSETTS
CITY OF NORTHAMPTON
GIS#: P171
Map: 18C -
�'°`k` --
064 SHEETMETAL PERMIT
1I,�,a: 001
YOlit: SHEETMETAL
Category. _:LSOiETMETAL .!
Petmit# SM-2019 0002 "'
— PERMISSION IS HEREBY GRANTED TO:
Project# JS-2619-00011i)
East Cost 1$16,000.00 Contractor: License: Expires:
JM J MOP-AN Shtl 267 10
eemeta -
Fee Charged MO
$50.00 J 28/2019
Balance Due:
ue $.00 '.Owner: MORINI AMEDEO S&ALICE M
4 of Fixtures, Applicant: M J MORAN
DigBafe#4 _.IAT: 179 PROSPECT AVE
UseGroup
ConstClass -
ISSUED ON: 17-.m1-2018 AMENDED ON: EXPIRES ON.
TO PERFORM THE FOLLOWING WORK:
NEW HVAC SYSTEM
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature:
Fee Type: Receipt Not : Oah*aiJ:-' 'i. Check No: Amount:
Sheetmeml REC-2019-0001% 16-Jul-I8 25858 $5000
:I
212 Main Street,Phone:(413)587-1240,Fex:(413)587-1272,Email:lhv brouhQnorthvnptoama.gov
Ge.TMSV 2018 IN,Uuriers Municipal Solutions,Inc.
File#SM-2019-0002
APPLICANT/CONTACT PERSON M I MORAN
ADDRESS/PHONE P O BOX 278 (413)268-7251
PROPERTY LOCATION 179 PROSPECT AVE
MAP 18C PARCEL 064 001 ZONE URB000V
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out
Fee Paid
Typeof Construction: NEW HVAC SYSTEM
New Construction
Non Structural interior renovations
Addition to Existing _
Accessory Structure
Bu'Id' a Plans Includ &
Owner/Statement or License 267
3 sets of Plans/Plot Plan
THE FO LOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF MATION PRESENTED:
_Approved _Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: §
Intermediate Project:_Site Plan AND/OR Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
_Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Bond of Health
Permit from Conservation Commission Permit from CB Architecture Committee
rmit from Elm Street Commission Permit DPW Storm Water Management
6S
a of Buil -9 al Da�
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
e Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact the Office of
Planning&Development for more information.
Commonwealth of Massachusetts RECEIVED
Sheet Metal Permit
JUL 1 6 2018
Date: / (�'�a Permit# 5
Estimated Sob Cost: $ Permit Fee: $ P 0F0UROINAINSP9CnON3_
THPMPTON.MA0106)
Plans Submitted: YES_/ANO Plans Reviewed: YES _ NO _
Business License# C 4 Applicant License# ,)—
Business Inform7ation: 1- Property Owner/Job Location Information:
Name:1'2 '� //�1 L Ci Name:"7ycc_
Street: /yICL/vL ST Street:
City/Town: ,I /�/L� - City/Town:��n
Telephone: ^7� j���o� Telephone:
Photo I.D.required/Copy of Photo I.D. attached: YES NO
srarromal
J-1/162tirestricted license
J-2/M-2-restricted to dwellings 3-stories or lass and commercial up to 10,000 sq.ft. /2-stories or less
Residential: 1-2 family Multi-family_ Condo/Townhouses_ Other_
Commercial: Office Retail Industrial Educational
Institutional Other
Square Footage: under 10,000 sq.ft.� over 10,000 sq. ft. Number ofd Stories:
Sheet metal work to be completed: New Work: Renovation: k:/
HVAC ___Metal Watershed RoofingKitchen Exhaust System__
777���"' Metal Chimney/Vents_ Air Balancing
Provide detailed description of work to be done:
fee a77-aa&J v /''Ictvrtca/ - 7 Co�ao� �Ic,
INSURANCE COVERAGE:
Ihaveacurvan4l'i giQy insurance policy or He equivalent whic meeetstherequirsomerds of M.G.L.Ch.112 YeX Mo❑
If you have checked N s,indicate the type of coverage by checking the appropriate has below: li
A liability insurance policy ® Other type of indemnity ❑ Bond ❑
OWNER'S IMSDRANCE WAIVER:I am wearethat the Its ensee d.es nes Inanro the insurance coverage required by Chapter 1t2 offQhe
Massachusetts General Laws,and that mysignature milds permit applicationwais, this requirement.
Check One Only
O:vner ❑ Agent ❑
SignatureofOwner or Owners Agent .
Sy checking this ii-M,l hereby cerpty ihst alt o{phe details and information I M1ave submitted(mv entenetl)regarding Phis application are true and
accurate to the best of my knowledge and thatall sheet metal work and installations performed under the permit issued forthis application will be
in compliance with all perti.lan provision of the Massachusetts Building Godsend Chapter 112 of the General Laws.
Duct inspection required prior to insulation installation:YES- NO
pr bra,ase tr��eem.�w�
Date (", 'rtes
FSnol bapecHnn
Dere Coo enr
Type of License:
By DU Master
'elle_-__._ ❑Master-Restricted —
Glyrfown ____ ❑Journeypersan FFF---
- . Signature of Licensee
Permit M afJ
❑Joumeypersmn-Restricted
License Number.
Fee$ ___
— El Check at vt�rd ryt
Inspector Signature of Permit Approval _�
Load Short Form Job:
• ' WrlghtSOftwry: Jm06,2018
Entire House By:
MJ Moran inc
4SnIM1m9n S.Havbmlk MAR1IX9Rnc 6132$Tb1
R-1@mlMMM
Project Information
For: Mark Jewell
179 ProspectAve.,Northampton,MA
Design
Htg Clg Infiltration
Outside db('F) -2 89 Method Simplified
Inside do('F) 70 75 Construction quality Average
Design TO(°F) 72 14 Fireplaces 1 (Average)
Daily range - M
Inside humidity(%) 50 50
Moisture difference(gr/Ib) 52 23
HEATING EQUIPMENT COOLING EQUIPMENT
Make Make
Trade Trade
Model Cond
AHRI ref Coil
AHRI ref
Efficiency 30AFUE Efficiency 0SEER
Healing input 0 Btuh Sensible cooling 0 Btuh
Healing output 0 Btuh Latent cooling 0 Bluth
Temperature rise 0 °F Total cooling 0 Btuh
Actual air flow 930 dm ALivalairfaw 930 cfm
Air flow factor 0.030 cfm/Btuh Air flow factor 0.050 crani tuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.84
ROOM NAME Area Htg bad Clg bad HtgAVF CIg AVE
(ft� (Btuh) (Btuh) (cm) (cm)
Basement 605 7714 4505 233 226
Istfloor 1066 23129 15477 698 776
Entire House 1671 30844 17991 930 930
Other equip bads 0 0
Equip.@ 094 RSM 16821
Latentccoling 3307
TOTALS 1671 30844 20128 930 930
Calculations approved byACCAto meet all requirements of Manual J 8th Ed.
_ f�F wrlgh[soR• a�a�u�lonza
Ri¢1.9i1�lNves3 D18180D1R9JFA1 P�1
AM Yl`atlCenatYallmStMaR.iaS'eYnp C&-Ml8 Fmrt Lhio� N
Load Short Form Job.
wrightsolC Date: Ju106,2018
1st floor ar
MJ Moran inc
4we rinmoa)rroe mamsnsr amt sm.k�rj.iarrcrvn
Project
For: Mark Jewell
179 ProspectAve., Northampton, MA
Design Information
Htg Clg Infiltration
Outside do('F) -2 89 Method Simplified
Inside db(*F) 70 75 Construction quality Average
Desgn TO('F) 72 14 Fireplaces 1 (Average)
Daily range - M
Inside humidity(%) 50 50
Moisture dilFerence(grAb) 52 23
HEATING EQUIPMENT COOLING EQUIPMENT
Make Na Make n/a
Trade We Trade Na
Model n/a Cond Na
AHRI ref Na Coil n/a
AHRI ref We
Efficiency n/a Efficiency Na
Heating input Sensible cooling 0 Ruh
Healing output 0 Ruh Latent cooling 0 Ruh
Temperaturerli;e 0 'F Totalcooling 0 Ruh
Actual air flow 0 cfim Actualairflow 0 chm
Air flow factor 0 cfm/Btuh Airfbwfactor 0 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat n/a Load sensible heat ratio 0
ROOM NAME Area Htg bad Cg bad HIg AVF Cg AVF
(ft') (Btuh) (Btuh) (cfm) (CIM)
Living/Dining 336 6084 3282 184 165
Kitchen 132 3867 2824 117 142
Large bedroom 205 5020 3493 151 175
Bedroom 2 165 4254 2501 128 125
Bedroom 3 99 2232 2111 67 106
Bathroom 72 1530 1187 46 60
Hall 57 141 80 4 4
Calculations approved byACCA to meet all requirements of Manual J 8th Ed.
_ wrlghtcoR' mum ten za
R14"1vVUn Zr6180NR9163E1 Pa 2
.1v(�11 Yl4m CenMNnYImdYAakJexeY.w Cat=MJ9 FN11mSl N
1 st floor 1066 23129 15477 698 776
Other equp bads 0 0
Equip.@ 0.94 RSM 14471
Latent cooling 2209
TOTALS 1066 23129 16680 698 776
Calculations approved byACCA to meet all requirements of Manual J 8th Ed.
_ i}F wrl9htsofY �sddw sitx
�• Ri�19i��nnvesa'D1818004R9JR�1 G 3
r Yl4.ttl CenacNr9l�lHhk Rxa'I J �-MA Fmrt6nf N
Load Short Form Job:
wrightsoft one: Ju106,2016
Basement By:
MJ Moran inc
4wN min s(H�1iMIIG MAOIOP Rvc'al3ffiT61 6a1..�rek®milrolairc¢m
Project Information
For: Mark Jewell
179 ProspectAve,Northampton,MA
Design
Htg (Ag Infiltration
Outside db('F) -2 89 Method Simplfied
Inside db('F) 70 75 Construction qually Average
Design TD('F) 72 14 Fireplaces 1 (Average)
Daily range - M
Inside humidly(%) 50 50
Moisture diflerence(gr1b) 52 23
HEATING EQUIPMENT COOLING EQUIPMENT
Make n/a Make n/a
Trade Na Trade n/a
Model n/a Cond Na
AHRI of n/a Coil Na
AHRI ref Na
Efficiency Na Efficiency n/a
Healing input Sensible cooling 0 Btuh
Healing output 0 Btuh Latentcooling 0 Btuh
Temperature rise 0 'F Total cooling 0 Btuh
Actual airflow 0 cim Actual air flow 0 cfm
Air flow factor 0 dm/Btuh Air few factor 0 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat n/a Load sensible heat ratio 0
ROOM NAME Area Hlg load Cg bad HIgAVF CIg AVF
( (Btuh) (Btuh) (cfm) (dm)
Basement Bed 247 3029 1601 91 80
Future bath 72 1648 1173 50 59
Playroom 286 3038 1732 92 87
Basement 605 7714 4505 233 226
Other equip bads 0 0
Equip.@ 0.94 RSM 4212
Latentcooling 1098
TOTALS 605 7714 5311 233 226
Calculations approved byACCA to meet all requirements of Manual J 8th Ed.
1 �wrl9htsofY vteJJmisn za
AM YIN CendVffi ImLV.1Zav9l nq C3c=MJ9 Fmrtmvfffi.N
wrightsoft Project Summary Date: Ju106,2018
Entire House B
MJ Moran inc
4 SnIM1 mtin r.IH/d3rviIIG MA01a�Rvc 4133ST61 6ral-.sxlek�mlrtns'rc`an
Proect Information
For: Mark Jewell
179 ProspectAve.,Northampton,MA
Notes
Desicin Information Orange Muni,MA US
Winter Design Conditions Summer Design Conditions
Outside db -2 °F Outside db 89 °F
Inside db 70 OF Inside db 75 OF
Design TO 72 °F Design TO 14 °F
Daily range M
Relative humidity 50
Moisture diRerence 23 gr/b
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 28951 Btuh Structure 17418 Btuh
Ducts 1892 Ruh Ducts 572 Btuh
Central vent(0 dm) 0 Btuh Central vent(0 cfm) 0 Btuh
(none) (none)
Humidficatlon 0 Btuh Blower 0 Btuh
Piping 0 Buh
Equipmentead 30844 Sun Use manufacturers data n
Rate/swing9 mu lie- 0.94
Infiltration Equipmentsens load 16821 Btuh
Construction quality Simplified
Latent Cooling Equipment Load Sizing
Fireplaces 1 (Average) Structure 2611 Btuh
Ducts 696 Btuh
Central vent(0 drn) 0 Btuh
Heating C001V (none)
Alas(P) 1671 1671 Equipment latent load 3307 Btuh
Wlume(fP) 12014 12014
Archangges/hour 048 0.20 Equipment Total Load(BernLat) 20128 Btuh
EquIv AVF(cfm) 96 40 Reg.total capacRy at 0.70 SHR 2.0 ton
Heating Equipment Summary Cooling Equipment Summary
Make Make
Trade Trade
Model Cond
AHRI of Coil
AHRI ref
Efficiency 80AFUE E"ciency 0SEER
Heating Input 0 Btuh Sensiblemoling 0 Btuh
Heating output 0 Btuh Latentmoling 0 Btuh
Temperature rise 0 °F Total cooling 0 Sun
Actual air few 930 dim Actual air few 930 do
Arfbwfactor 0.030 cfmBtuh Airfbwfactor 0.050 dm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.84
Caeulations approved byACCAto meet all requirements of Manual J 8th Ed.
_P wriQFfsoTt• C3c=MAi&IJ+e 1H112a
�y Rlgi CA,M esy ID181d6a1RSHIfll1 I'aY1
�h. Y\411CenekVaYIm6VAaMJex9lrtp J0 Fmr4GwYa8. N
Job
wrightsoftProject Summary pate: Ju106,2018
1st floor By
MJ Moran inc
a.mmmanr,rva�u�nw i+amoaa.re.m3�rzr rma[�®ml�rwra+2mn
Promect Information
For: Mark Jewell
179 ProspectAve.,Northampton,MA
Nates:
Design
Weather: Orange Muni,MA,US
Winter Design Conditions Summer Design Conditions
Outside db -2 °F Outside db 89 'F
Inside db 70 °F Inside db 75 °F
Design TO 72 °F Design TO 14 °F
Daily range M
Relative humidity 50
Moisture difference 23 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 21519 Btuh Structure 14924 Btuh
Ducts 1610 Btuh Ducts 554 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cm) 0 Btuh
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment bad 23129 Btuh Use manufacturers data n
Rate/min multiplier 094
Infiltration Equpmert sensible bad 14471 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 1 (Average) Structure 1678 Btuh
Ducts 531 Btuh
Central vent(0 dm) 0 Btuh
Heating Codi
Area(1P) 1066 106 Equipment latent load 2209 Btuh
Molume(R') 9594 9594
Auchangges/hour 0.47 0.20 Equipment Total Load lSer.Lat) 16680 Blum
Equv.AVF(dm) 75 31 Req.total capacity at 0. OSUR 1.7 ton
Heating Equipment Summary Cooling Equipment Summary
Make n/a Make n/a
Trade n/a Trade n/a
Model n/a Cond n/a
AHRI ref n/a Coll r/a
AHRI ref n/a
Efficiency n/a Etrciency n/a
Heating input Sensiblecooling 0 BWh
Heating output 0 Btuh Latentcooling 0 Btuh
Temperature rise 0 *F Total cooling 0 Btuh
Actual air flow 0 chn Actualairflow 0 cfm
Air flow factor 0 cfm/Biuh Airlbwfacfor 0 cfm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat n/a Load sensible heat ratio 0
Calculations approved byACCAto meet all requirements of Manual J 8th Ed.
_ 4Fw_•rancsorc• araeum�bnx
a�9+s.�rtiVesa�eleaaROJamr vaxz
,�A v�arcenav�iouw�ax�+arnp cao=rnre rmno�raa.N
wrightSoft Project Summary Date: Ju106,2018
Basement B
MJ Moran inc
4w —9,Ha 1191M01oa]ave413 M F"i:.wq k�RM^Aai�c.wn
Prollect Information
For: Mark Jewell
179 ProspectAve.,Northampton,MA
Notes:
Design
Weather: Orange Muni,MA US
Winter Design Conditions Summer Design Conditions
Outside db -2 OF Outside db 89 °F
Inside db 70 OF Inside db 75 °F
Design TO 72 'F Design TO 14 'F
Daily range M
Relative humidity 50
Moisture difference 23 gr(Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 7432 Btuh Structure 4427 Btuh
Ducts 282 Bah Ducts 78 Btuh
Centrafvent(Ocfm) 0 Btuh Central vent(0 dm) 0 Btuh
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipmentload 7714 Bluth Use manufacturer's data n
Rate/swingg multipwer 0.94
Infiltration Equipmentsensible bad 4212 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 1 (Average) Structure 933 Btuh
Ducts 105 Stun
Central vent(0 cfm) 0 Btuh
Heating Coding
Area(ft) 805 805 Equipment latent bad 1098 Btuh
Wlume(fP) 2420 2420
Airchangges/nour 0.52 0.22 Equipment Total Load(I enwLat) 5311 Bah
Equv.
iAVF(efm) 21 9 Req.total capacity at 0.770 SHR 0.5 ton
Heating Equipment Summary Cooling Equipment Summary
Make n/a Make n/a
Trade n/a Trade n/a
Model n/a Cond n/a
AHRI of n/a Coil n/a
AHRI ref n/a
Efficiency n/a Efficiency n/a
Heating input Sensible cooling 0 Btuh
Heating output 0 Btuh Latentmoling 0 Btuh
Temperature rise 0 °F Totalmoling 0 Btuh
Actualairtbw 0 dm Actual air flow 0 dm
Air flow factor 0 dmBtuh Ar flow factor 0 dm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Spam thermostat n/a Load sensible heal rata 0
Calculations approved byACCA to meet all requirements of Manual J an Ed.
_ wrlYyb•soR-
Rdtl JJ 161124
ItJY.4il�llrvves2 A18180D1R9JSiA1 Pa 3
YV"u]ICendV¢f ImEYJakJw9lnp C9c=MJ0 FmNmvfaa:N
basement
Basement Bed Playroom
Unfinished
Future bath
onnedfor. MJ Moran inc scaie�ll'7z
Perfo
M rk J.1 4 s.Nh man st Rrcgt8 urte•. B
179 Pmspect he. Haydewry A OW9 1RGNR5U¢
Wftwn ton,AM Phone.41126&7251 anaJumisll�
scemak@nirmmnnc.com �� '��
N
1stfloor
\�T
Large bedroom
Living/Dining
tiaff
Bedroom 2
Krtehen
Bedroom 3 Bathroom
Job#: Sale:a:72
Perforated for. MJ Moran inc
MVAC Jest1
4so:Rh man st ezt un�avte
179Pros .e ,Fie PMn. 41$MAW 7Ce9 re�auaxast
fJorthampicn,MA Plx�ne.41316&]251 �nsJLLm/ens3
scem2k@rz(Mianttc Own .ertYcrmkskw§k,kwtllnp