42-030 779 WESTHAMPTON RD BP-2018-1242
GIs#: COMMONWEALTH OF MASSACHUSETTS
MamBlock:42-030 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category:shed BUILDING PERMIT
Permit# BP-2018-1242
Project# JS-2018-002215
Est.Cost:
Fee:$30.00 PERMISSION IS HEREBY GRANTED TO:
Const.Class: Contractor., License:
Use croup: Homeowner as Contractor_
Lot Siae(sa 8.): 79714.80 Owner: SHEPARD KEVIN&TARAH
zoning: Applicant: SHEPARD KEVIN &TARAH
AT: 779 WESTHAMPTON RD
Applicant Address: Phone: Insurance:
779 WESTHAMPTON RD (413)387-5965 0
NORTHAMPTONMA01060 ISSUED ON:512912018 0.00:00
TO PERFORM THE FOLLOWING WORK 8X10 SHED
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House(( Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occuoancv sienature:
FeeTvoe: Date Paid: Amount:
Building 5/292018 0:00:00 $30.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck-Building Commissioner
File#BP-2018-1242
APPLICANT/CONTACT PERSON SHEPARD KEVIN&TARAH
ADDRESS/PHONE 779 WESTHAMPTON RD NORTHAMPTON (413)387-5965 U
PROPERTY LOCATION 779 WESTHAMPTON RD
MAP 42 PARCEL 030 001 ZONE
THIS SECTION FOR OFFTChtL USE ONLY:
PERMITAPPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid n_
Buildine Permit Filled out _
Fee Paid
TypeofC trucfom 8X10 SHED
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Incl ded� _
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
pproved_Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER:-§ ,
Finding Special Permit Variance"
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecnne Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolition Delay
Signature
Signatur�ding Official De[e
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
•Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
City of Northampton
RECEIVE®BBa usetts
lgPABTNE'NT F BI ILDING INSPECTIONS
212 Meln SI ee[ Ml Icipal Building
MAY 2 3 2011 ampt n, NA 01060
OFPT OF BUILDING INSPFCTIONS
NORTHAMPTON.MA nn`b0 /9-y2-
ACCESSORY STRUCTURE PERMIT APPLICATION
(For freestanding s4actun IRs than 200 sq. r a!_la}a! t From any other stmature)
Checldl
PLEASE TYPE IOR PRINTALL INFORMATION
1. Name of Applicant: e0� Jill 14T(Ar 5✓12P fU (�
Address:77925Y� �10✓1 Q� Telephone: 1(.3� 3�7�S96S
!d t I
2. Ownerof Property: 5hel
Address: 5a1w1 Telephone: Sa VvLL (C
3. Status of Applicant:y0wner Contractor
4. Stracture Location: 779 WesYh (W>, P14..A O/06 'L
Parcel to:Zoning Map# Parcel# District(s)
(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
S. Use of Property: S�or Two Family:_z Multifamily:_Commercial:-
6. Description of Proposed Structure
Ona Story Shed under 200 sq.H.: " Freestanding Deck under 290 aq.fl.,less than 30•rtwva grade:
SIZE OF STRUCTURE: SIX/O 6A<II
Other(describe):
7. Attached Plans: Sketch Plan Site Plan Plot Plan
S. Does the site contain a brook, body of water or wetlands? NO— DON'T KNOW YES_
IF YES: Has a permit been, or need to be, obtained from the Conservation Commission?
Needs to be obtained Obtained , Date issued
I CONTINUED ON NEXT PAGE
9. ALL INFORMATION MUST EE COMPLETED, PERMIT G.0 B! DENIED DOE TO L�GK OF INFORMaT10N.
This column to he filled in by
the Building Department
Existing Proposed Required by Zoning
Lot size /00
cr 78.0 FT
Frontage N/A N/A NIA
Front:
Setbacks: Side•.
Rear.
Height
% Open apace: -J' !/
(Lot area minw bldg and /O / O
passel padtl
to.certMeatlam I hereby certify that the Information contained herein Is true end accurate to
the best of my knowledge.
DATE:S-Z 3-/o APPLICANTS SIGNATURE�� '
NOTE: Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements
and obtain all required permits from the Conservation Commission, Department of Public Works and other
applicable permit granting authorities
779 Westhampton Rd - Google Maps Page 1 of 1
Google Maps 779 Westhampton Rd
s
h s.sge t o
-1 Tpa �,o�ata A
A9 mpton Road c Pr/
nnWesthampton Rd
Westhampto^Rd
Westhampton ad
Wesihampt°^Rd
Google
Map data 02016 Google 50ft�
https://W W W.google.com/maps/place/779+Westhampton+Rd,+Northampton,+MA+01062/@42.3007584,-72.7085909,19z/data=... 5/21/2018