Loading...
11A-015 (2) 54 EAST CENTER ST BP-2018-1185 GIS#: COMMONWEALTH OF MASSACHUSETTS Map-.Block: I IA-015 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Categorv, SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2018-1185 Proiect# JS-2018-002125 Est Cost: $20993.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sp.ft.): 22825.44 Owner: COLLINS CAROLE Zoning,URA(l00)/ Applicant. PIONEER VALLEY PHOTOVOLTAICS AT: 54 EAST CENTER ST Applicant Address: Phone: Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREEN FIELDMA01 301 ISSUED ON:5/11/2018 0:00:00 TO PERFORM THE FOLLOWING WORKROOF MOUNTED SOLAR, 14 PANELS 4.48KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House ft Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 5/11/2018 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner --— Department are pYy. ity of Northampton Slstued Pemab uilding Department Curb CuVDdvemy PemM. YAY 11 2018 212 Main Street SawenSepuc Availability Room 100 WalerlWea Avaftbky DEPT OF NG INSPE6pmDN9 No hampton, MA 01060 Tum 89%Of Saenauckww Pl NORTHAMPHAMP TON.MA yNmate 413- 7-1240 Fax 413-587-1272 Plot/She Plank- Other SpKtfy kroOtherSpKtfy APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1-SITE INFORMATION '312- 1 1.1 Property Address: This rection to be completed by office _ 54 E CENTER STREET, LEEDS, MA 01053 Map Lot Unit Zone Overlay Dlstrla Elm M.DI.VIt CB 01.61it SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: CAROLE COLLINS 54 E CENTER STREBf.LEEDS,MA 01053 Name(PdM) Curent Mailhg Atldriss: (913) 210-7284 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhonVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) � Cement Mailing Address: l 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only cpm feted by Permit aplalicant 1. Building $8,397 (a)Building Permit Fee 2. Electrical 12,596 (b)Estimated Total Cost of Construction hI m 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) "Jnr 7O F 5.Fire Protection 6. Total=0 -2+3+4+5) $20,993 1 Che&Number This Section For Official Use Only Dale Building Penni[Number: Issued: Signa fiyiltli�g missiwrerarepactor INBuildings Data Section 4. ZONING All to ormaoon Must Be Completed.Permit Can Be Denied Due To Incomplete Inmrmauon Existing Proposed Required by Zoning.. This column to M filltdin by Building Us amuma Lot Size Fronts c Setbacks Front Side L: R: L: R'. Rear Building Height Bldg.Square Footage % Open Space Footage % (La arm minus bldg ffi paved #of Parking Spaces Fill: volume fl Locarion A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES,date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO Q IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading excavation,or filling)over 1 acre or is it pad of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Perms from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Me etlonls) ❑ Roofing E]Or Doons Accessory Bldg. ❑ Demolition ❑ New Signs [Ell Decks [q Siding[C) OtherfMa Brief Description of Proposed Work: INSTALLATION OF ROOFMOUNTEDPHOTOVOLTAIC MOUNTING SYS I'EM FOR SOLAR PANELS ON SOrUH GARAGHTREEZEWAY ROOF. Alienation of existing bedroom_Yes x No Adding newbedroom Yes x No Attached Narrative Renovating unfinished basement Yes =_No Plans Attached Rdl -Sheet Ga.if New house and or addition to existing housina.complete the following: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit Number of Ballrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Numberofstorles? t Melhod of healing? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Massaheck Energy Compliance form attached? In. Type of construction I. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain_Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes_No. I. Septic Tank_ CqSewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETEDWHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERM, CAROLE COLLINS ,as Owner of the subject property hereby authorae Philippe Rigollaud to act on my behalf,in all matters relative to work authorized by this building permit application. See attachment (A) Signature of Owner Dale 1. Philippe Rigollaud ,as Qwwe/Autorized Agent hereby declare that the statements and information on the foregoing application are flue and accurate,to he best of my knowledge and belief. Signed under the pains and penalties of perjury. PHILIPPE RIUOLLAUD Pim Name 5/3/2018 Signature of t Dale SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed ConaWallon Supervisor: Not Applicable 0 Name or license Holder:Daniel Gomez Gonzalez CS-111266 license Number 43 Hatfield Street , Northampton MA 01060 03/14/2021 Address / E,,,agon Date 413-772-8788 signature Telephone 9.Replabsed Homs Imraovemerd Comri lor: Not Applicable 0 Pioneer Valley Photovoltaics Cooperative LLC 140077 Company Name Registration Number 311 Wells Street Suite B Greenfield MA 01301 09/15/2019 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(S)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result In the denial. the issuance of the buleling"nood. Signed Affidavit Attached Yes....... 0 No...... ❑ 11. - Rome Owner Exemption The cunent exemption for"homeowners"was extended to imdudo Owner-ocenmed Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 1083.51. DeOnition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory in such use and/or farm structures.A Dem.who consprecis,more than one home in a me-year periesd rbell net be ,oreldemd a homeowner. Such"homeowner".lull submit to the Building Oficial,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buBdio¢permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workem'Compensation) and Chapter 153(Liability of Employers to Employees for injunes not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for persons) you hire to perform work for you under this permit. The undersigned"homeowner"ceri fits and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature Commonwealth of Massachusells ® Division of Professional Licensure Board of Building Regulations and Standards :onstruction Supervisor CS-111266 Expires 03/14/2021 DANIEL GOMEZ 3ONZALEZ 43 HATFIELD STREET NORTHAMPTON MA 01M0 Commissioner f Office of Consumer Affairs and Business Regulation One Ashburton Place - Sxte 1301 Boston. Ma553ChllSet1S 0210E Home Improvement Contraclor Regislratioo 'yip, i 10M I L" PHU t .'A,C9 ;:oov sl aLon i '70?> ?tt Y.r:_b c.. q."U il E p'aFon ) it, It) GHtENriCC rd.+ M3N �ooam taa aPem, Can F 10 VvpW unmrn reovFr,� r+r cnrvTAnc cr. t+43xh�On @tpe Llryrti r]lu[e I� LYIa E isinY95 N .¢ n. _. Ip Puck➢tSul!c�p0 . [ 6oslcn 1.'!.4. 0)'6l ' Not valid Without signalurc ac R CERTIFICATE OF LIABILITY INSURANCE 01032018 THIS CERTIFICATE IS ISSVEDAS AMA'fTER OF INFORMATION ONLY AND CONFERS NORIGHTS 4tPON TFfE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSLE ISI,AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANr. Ill certiRcateholder ia ImA-D—UT16—NALINSURSED,the polfcylies)..at have ADDITIONAL INSURED provisions orbe,endoned. N SUBROGATION IS WAIVED,su0(ect to tlIs terms and conditions oethe policy,certain pMiGies may require an andarsament A statamant on NNs carNRcate does notcemier nW1ta to the csNiBcate AOIMrin Neu of such sntlrDT nt(s7, PRODUCER xA Linda PcwCrs 8Nonet BGtStrevR _ In 1])58&.0111 (4i3l486bA84 8 NO+In King Street tNNI 55' IORY2ISLSWCEUndndOnnOPiI LOT IN5URERISI<fiORgNGCO4ERA nE NAIpa NorUNtmpion MA TOM HEI Slohel[as.ColEner IXSpgFx A: 91 INSURED INSURI OPIW'Etergi Pgn{gx Va1L+V P(IpiPY01}inCSCMIYrafive IM iXSNREk C' In1P(i(n5 >,6 GI N8MOYe(+Ener A Attn NVII Pink11AT xs(IRERO' 311 wells sneer suite 0 INSURER F: Green11Q10 MA 01301 INSURER F. COVERAGES CERTIFICATE NUMBER: Master Exp t-2019 REVISION NUMBER: THIS ASTOCERTHAN THAT THE POLICIESCA iNSbPANCE LISTED BELOW HAVE BEEN ISSUE,TO THE' SUREO ANVOLDABOHIB FOR THE POLICY PERIOD INDICATED. NOTWpI{STANDINGANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OROTHER DOCUIIF.NT IVITH RESPECT TO V/RICH TN's CERTIFICA;E I,IAY 0E ISSUED OR MAY PERTAIN.THE INSL4UNCE AFFORDED BY'rME POLICIES DESORIEED HEREIN 13 B'Ja,LCT TO ALL THE!ERNIS E%C'tllS1LWS p610 C0.VplilONS OP 3UEH POLICIES L@iRS SHOWN MAY HOVE BEEN REDVCEO BY AROC1ARd5 TSEdg LTR ttPE OFIMSORANCE AWL Rula PoUCY MIIYBER IrrB'n IYYYYI LWOOryY'IY1 LIMITS C Cl1MENC4l IiENERµ.LIABLLOY CC QCCIMYCNTF_ _ EAE 1000 000 C'L>Ns-Llnp-c ®occuq nRi?nI9E5 Epamneme' E 1tlU ipO 1+Ep E%PI>n.ane-'s" s Excluded A EGGCRIS0022412118 CO,2M8 9801,2019 HFNAC iA.W�IRaLF;v pEVL+00REGnTE LVaIi+PnaeS PER GEVEa.ALR30F n?. 5 2000.990 Y0.tM ¢6"I LOC PRT'Ps-CCT.^imb3 a^O 4 2QGO 1X19 OThER AUTOMOBILE LU&LI1Y C FRWEO 11 G,_LIIVI5 1009090 rN;Rsada* .W YAJTO BCJILY gIURV LPorwrypry j A FILMS RC GN L20 EAGCRE02A1218 01912018 01 011 019 VIO60ktYIA 09 Z ++6EE0 NOV-0\k¢n' C ER'Y FREE UUSON V 50MY p V de Qtl RIO,61 5 20000 wRRELLa RA - LFB EX"SSLYB L M,MALE 1BEFXNE60457 01/012018 Ot 01V2U19 3000000 OEO R i W ERSCIMPEXSAIAX 5 AND EMPLOYERSIIA&LIT' Y N 5'Alu, EFF ANY HeINBETORPARTNELL ME' 'uin" A UFFICE11H.IREREBh+nEv1+ - a ❑ N,A EWGCR0002412118 01012018 01017019 EIEAC`ac 'OENT B 1900.990 ,aR.amLarY H NNAe+ F'.,rnE£ASE.£V NnncoYEE S 10(iPscRlPipN OFOPERamrvece�o. _ m E,. asE.e POJOYLIrnF 51000000 ommQrfui Property It"I' ess Pers Praoeny 51 750 we CPRIBE17901 0101,2018 01012019 InslaIDWY $350 Ow OESCIPROBOFDEERANSrLGCATNMSrYENNi£S idCORR SM,Tt101gpul Ranarlis XnsptiN.mry Le aMNMrtmoreggeenrtyr/Me0) CERTIFICATE HOLDERCANCELLATION 9NOULDANYOF THEA9OVC OESCRISEOPOI,IC(E58&CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NpTM.E WAL BE DELNEREO IN 5v.NJE Ppi InyUNM', ACCORDANCE WITH THE POLICY PROVISIONS, AUM1ggREDR PRESENTRNE ''/qq/ //�� 14- (1191 ACORD CORPORATION. All rights reserved. ACORD28(2016grSl The ACORD nems end bgo em rogieteW mark.of ACORD �\ The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street,Suite 100 Boston,MA 02114-10/7 www.mastegov/dia IN writers'Compensation Insurance Affidavit: Builders/Contractore/Electricians/Plumbers. TO BE FILED WITH THP.PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organaannnondividual): Pioneer Valley PholoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone #:413-772-8788 Are you an employer!creak the appropriate boa: T,vpc of project(required): I.0 I am a empinytt with 48 employees(full and/or pert-time), 7. 0 New construction 2 1 a club p,prgumm rephrasing and have no employees working forme In 8. Remodeling any carries LSowoderi comp.insurance normal o. 3.0 I am a homeowner doing all work No workem'cont insurance - d 9. ❑DemOngin 6 Y L P lu ereywrc ]' 4.E]l am a homeowner and will be hiringtractors to conduct all work on m n Iwillmar10❑Building indent on ran Y property rmhot all eomramomeimee have workers'wmpena-auov insurance ur are aura I LEJ Electrical repairs or additions proprietors with no employees- 12.[]Plumbing repairs or additions 5❑ m 1 aa general mavacror and I have hired the,cm corw dors].,led on the an-lbod sheet. These whaontmdors have employees and have workers'comp.insurance. 13.�Roof rfip lar 14.[Z]Other Solar PV 6 Wemeawryoraehaveand itsmpccn have ,[Nowmisedtcomp right insurance ption shuted MGL c. - -- 152.;](4).and we have no employees[Vo workers'wrap-imvrevce regoirethl Any applicant that checks box pl must also 611 out the section below showing their workers'compensation policy information. e Homeowners who submit this amdavit indicating Iney are doing all work and then him outside cnntracturs must mount a new andavit indicating such. :Cwhave rs that check this box must aaached an additional sheet showing the name of the sub-contmaom and state whether or not those more,have employees. If the sub-carreUors have employees,they most provide their workms'comp,policy number. 7 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and joh.site information. Insurance Company Name:HDI Global Insurance Co/Energi _ EWGCR0002412118 12/31/2018 Policy#or Self-ins. Lic.#: Expiration Date: Job Site Address:54 E Center St City/State/Zip:Leeds, MA 01053 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the forth of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 7 do hereby certify under thepains and penalties of perjury that the information provided above is true and correct. r Sienatum Date. 5l3/18 Phone#:413-772-8788 Official use only. Do not write in this area,to be completed by city or town oJrciai City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.Cityrl'own Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: COLLINS,54 E CENTER ST, LEEDS, MA 01053 SOLAR ARRAY LAYOUT W ARRAY ON GARAGE/BREEZE WAY ROOF �sZ d 2 Owner: CAROLE COLLINS Address: 54 E CENTER ST, LEEDS, MA 01053 V i I Phone: 413.210.7284 e-mall: caroleimllinsPemaiLcom System Size: 5.04 kW-DC I� PV Array: SunPower%22-360(14 total) 2 rows of 7 modules,all in portrait Mountin¢: SunPower Invisimount Rails on L-feet on Quickfoot bases Roof Structure: 2x6 nom rafters @18"oc. See PE SOUTH ROOF ON GARAGE/BREEZEWAY letter with SK-1 drawing. Roofin¢Material: asphalt shingles over board sheathing New England Construction Engineering, PLC 436 Campbell Street (NECE)Structural Construction Solutions White River Junction,VT 05001 Jonathan Rugg, P.E. 6039039798 j.mgg�NewEnglanticonsW lion Engineenng.wm April 12, 2018 Ms.Jeannine Haendiges Pioneer Valley PhotoVoltaics Cooperative, Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re:Collins Residence,Leeds, MA PV Squared Project No.12013 NECE Project No.38-001 T-102 Dear Ms.Haendiges, At your request New England Construction Engineering, PLC(NECE) has reviewed the information that Pioneer Valley PhotoVoltaics Cooperative,Inc. (PV Squared) provided on the roof and supporting structure of the of the Collins residence, at 54 East Center Street, in Leeds (Northampton),MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV) array.The information that you provided is attached to this letter for reference. You are proposing to erect PV panels on the south facing roof of the house and attached garage. The house is a single-story ranch with attached garage.The area of roof where the array is proposed measures approximately 24'06.The roof has a 27-degree pitch and is symmetric about the peak.The roof is supported by 2x6 rafters at 18"O.C.These rafters span approximately 12'on the horizontal.The roof has a plywood deck and asphalt shingles. Our analysis includes controlling roof gravity loads(dead load and snow load). In considering snow loads,or analysis includes balanced and unbalanced snow load conditions.Our analysis assumes that the wall with the garage door openings has sufficient lateral load resistance.Wind loads are excluded from this analysis. Recommendations: Under controlling design gravity load conditions(dead load plus unbalanced snow load)the rafters are slightly overstressed. In order to resist the design snow load and the increased dead load of the proposed PV array,we recommend reinforcing the existing 2x6 rafters with 2x4s flush with the bottom of the existing rafters on both sides of the peak.The attached Roof Reinforcement Sketch provided details for installation of this reinforcement. New England Construction Engineering, PLC PV Squared Collins Residence Jonathan Rugg, P.E. Leeds, MA Page 2 of 2 Conclusion: Based on the information that you provided,we conclude that,once the existing rafters are reinforced as described above and as shown on the attached Roof Reinforcement Sketch,the ' roof will adequately support the design snow load and the additional dead load of the proposed PV array.We base this opinion on the assumptions already stated and the following additional assumptions.We assume that,owing to their smooth surface,the PV panels will shed snow more readily than the existing asphalt shingles.We further assume that that the PV panels will be installed parallel to the roof,eliminating any additional wind load.The ground snow load (Pg) for Northampton is 40 psf.According to information that you have provided,the proposed PV panels weigh approximately 2.6 psf. In summary,once the roof is reinforced as shown on the attached Roof Reinforcement Sketch, the roof will support the design snow load and the additional dead load of the proposed roof mounted PV array. Thank you for the opportunity to assist with this project. If we can be of further assistance, please contact Jonathan Rugg at NECE. otxor Wss'c: Sincerely, .xuunu9 A, � NOG ao `jathn a . 51981 otng,;OE .%J New England Construction Engineering,PLC. Jg Attachments: -Roof Reinforcement Sketch -Building information i J 2%4 RAFTER REINFORCEMENT MAY STOP MA%. 12" FROM PEAK TYE, E%60N; 2x6 - 77RAKERS 0 16" OC, INSTALL 2%4 RAFTER FASTENERS 12" 0-L ttP. EXISTING 2x6 RAFTER REINFORCEMENT FLUSH WITH SEE NOTES THIS SHEET, BOTTOM OF 2%6 RAFTER BOTH EXISTAAG 2x< RENFORCING SIDES OF PEAK AS SHOWN. SEE x` ` (FIUSt WITH BOTTOM OF NOTES THIS SHEE*. A 2x6 RAFIEe) A AF 2%4 RAFTER REINFORCEMENT MAY STOP MARL tY FROM SUPPORT AT WALL TYP. SECTION A—A RAFTER REINFORCEMENT NOTES FASTENING NOTES L 2x4 RARER REINFORCEMENT MAY TERMINATE NO MORE THAN 12" 1. FASTEN 2.4 RAFTER REINFORCEMENT TO EXISTING 2,6 RAFTERS WITH FROM PEAK AND/OR BEARING SUPPORT AT WALLS AS SHOWN_ (2) 100 (0.146"x3") NAILS OR (2) #IOx 2—]" STRUCTURAL SCREWS. L FASTEN 2x4 RAFTER REINFORCEMENT TO EXISTING 2,6 RAFTERS SEE DRAWING AND RAFTER REINFORCEMENT NOTES FOR FASTENER WITH (2) FASTENERS AT MAX. 12" O.C. —SEE FASTENING NOTES SPACING. FOR FASTENERS. 2. FASTENERS SHOULD BE PLACED NEAR TOP AND BOTTOM OF 2x4 2. INSTALL 2x4 RAFTER REINFORCEMENT TO EACH EXISTING 2x6 REINFORCING.AS SHOWN. RAFTER, BOTH SIDES OF PEAK AS SHOWN_ 3. INSTALL 2x4 REINFORCEMENT FLUSH WITH BOTTOM OF EXISTING 2x6 RAFTERS AS SHOWN. ROOF REINFORCEMENT DETAIL - SECTION VIEW SCALE: NONE 9 SK-1 DATE. 4/12/2018 PREPARED FOR'. PV SQUARED f 12013;COLLINS RESIDENCE SCALE: NONE x • 54 EAST CENTER STREET,LEEDS.MA PRO.; N U0-1T102 PREPARED BY: ROOF REINFORCEMENT SKETCH NEW ENGLAND CONSTRUCTION ENGINEERING,PLC W W W.NE W ENGLANDCONSTRUCTIONENGINEERING.COM PROJECT INFORMATION: N OQUq • Owner. Carole Collins !, • Address: 54 E Center Street Leeds,MA 01053 • Phone: (413)772-1412 W Squares sdar • 31 ells it3B Email: carolejcollins@gmaiL "cpne'd.lu0 com Greee�e. t3m de,,,@ esquareampp • System Size: 5.04 kW 413-772-87ee • Modules: SunPower X22-360-D-AC JOB: Collins • Rail: SunPower Invisimount ---- • Bases: Ecofasten Quikfoot SITE Bn E Center Street • Snow Load: 40 lbs ceeds,MA01053 • Wind Speed: 117 mph BEvaious: ROOF STRUCTURE: I i �/ 27°2x6 rafters @ 18"O.C. ROOF MATERIAL: Space Array reserved Asphalt shingles forfuture PROJECT NOTES: expansion 1. Framing location to be verified on site. 2. Slide rail assembly as needed to avoid interfering with splices or bases. /15ite Plan 3. Unless otherwise noted bases are staggered Nn kale and spaced at 48"O.C. 4. Additional or alternative bases may be used to meet actual roof conditions. BILL OF MATERIALS TITLE: Site Plan C!f PART MAKE MODEL 28 Base Ecofasten Quikfoot roN.: 12013 BY: )G 10 Rail SunPower Invisimount Dare: M17/2018 8 Rail Splice SunPower Invisimount SULE Aangwn 24 Midclamp SunPower Invisimount Size. es..en. 8 Endclamp SunPower Invisimount 14 Module SunPower X22-360-D-AC A-01 (Sheet 1 of 2) gau44 3��C i Pv Square"Solar 311 Wells Street.Swte B Greenfield,MA 01301 de518n@pvsquar d.coop Roof 438" 413 7724788 JOB: Collins -}— Arra 2933/4" L �— 9Y,. --- Future Array 125Y4° Y SITE 54 curer sneer Leeds MA 01013 PENSIONS: m N N T O a K i i I Reserve Use blocking or L-Feet above rail at space for 6 decking attachments bottom of array only. TITLE: Array Layout module at edges as needed Below rail otherwise. future rona1zg13 expansion Array to be-6"from ridge and 2x6 rafters @ 18"O.C. Br �c centered on framing allowing space DATE, unrzole for 6 module future expansion Clamp Torque: 85 in-lbs sae B.s vn' L-Foot Torque: 375 in-lbs Max Span: 48" A _O� Max Cantilever: 1/3 adjacent span A e.g 32"span= 10-2/3"cantilever Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) (short 2 of 2) SunPowerDModule Design-Driven Advantages h1 module aesthetics aad efficiency' Unmatched module reliability' SERIES No eleGrol jic'apa(ft0 byes�Combinec Power a^.h Prouuc. War-a n-ry Ca ear r I,Rule 'I POoe 1 compliant Maximize value for Roof )serrfor mnnot string inverter Op imine cerfonnance of each monele Expand Deployment Options Complex roofs and partial s-�ading Small sys,ems Optimize System and Installation Efficiency System exp tom lity Po < r-cm-Iflu,, It r.maea r t.,tet nP Simplify&Speed Installation a rrt .r - f ,jt , to w,y-Integr reo microi-vertex ia6i Lc a oo We le ^I Jt AC pc',, Rcous;double-IockingAC connectors Des,n lexrbil ry fres Le and onsite aperi It c,r.isc k,,h It e i ,youn, sna tr r,1, Power No fir wring ciT rig proc,s •.ori': r,1, - v rt( otlur r ,LI, c ,at,W,r cost w+er lista Jacor ceps than coarcting rF, . ..in, c , I,,do rysteas r nu:ice,ommissorn is t Uer - .be=rduscy. Component of Complete System 9a1L for use with rummol InvisiMounP" at J roe Suntl Monitoring System(allS5o 6r id Support Utility-Interactive Smart l nverter Superior system reliability and center es _ Sr n.e r, ^prCn[ , d „s J. f u ealc t 1 i ,c cJ V aean. , , :erte f r t ny,S.ln I T ;a D.0 Ii e' ly rrrp r t o, I 1, . 'all , vEu >iPr'd5s 0 nelu s ctrr s c d_ rn ^ g rnd,r,. krvyr sunpower.com . LL J p4':VVI 1 I "'r l .I 22 _ L� LL c P' AL, �P 1 L . '1 ta 'MI La ntll IPJ .VV _ jL I ,I 1 J A,z r„ 1r1 �a _. I 01r ,3N 1 LLL11f, .- _u0L 7- [� � It i FTN ' 9 - 1 I� .. rlwY ielV Ai,.n L :lr .i I c �'� J SRI i lP 1F1dCI(} 'I I .. i... lGYee14'SOL 1 I1F� n/5'1, •_•� Ifl __ k] ' I 1 11n 1 - , ti di[ c'_ .aP' P to J 1 I {vdl _L._ InC9�- ' L A L " JY0-09E ELX adS 11111ISL ' ])9 iagQ d POP , ,I ✓u)OI 1 30 1 1L-=4 0 r "V9 i9b Ono 8j- j0- 1 SO 1 vLl7 41 0,7" r I _ io ulo onI II 0 1 , a r< < 5 _. lrinv • . . DV-(1-09Dduns 14Residential Mounting System and Fast Installation integrated niell mrail gmundng Pre assembled mid and e to clamps emt ing m d clan poreorlacent nt evev ti lamp wd facilitates mnsi«ent en ,dd le sDac,-g snpie,pre-dried ivispl t 1 2203 Lined mtegrateu grounding Flexible Design r1^^5sesne ^all s opec rer'I'L lrone Design it lanascape and portaii Rams enable easy obsta:le ma,agemert CustomerPreferredAesthetics k1 module and ui mounting aesthetics Bestitdci,s Aston aes;heiss Elegant Simplicity Pren'wrn.has,cfde desgn Black anodized components Sun ower' InvisiMou":a Is a Sun Power-designed H. den r,id cnmpsanoend camps Dal based mounting system.The lnvisitsourr cyvem and tanned f^ush raih addresses residential slopea roofs and combines faster Part of Superior System installer on ume,design nesbility,and supeoor aesthetics Sa: ,,1 R( d Rules The lnvislMount orodurt ;pacifically ervsiooed and Best in lass ss run rel^bllyano nes hai cs Combine with Sun°ower mocuIts,arid engineered to pair wth SunPower roodules. Tne resuhirg monimr:ngapp system-level approach will amplify the aesthetic and i rsvalla[ion benefits to,both homeommei-s and installer,. r; sunpower.com r7 V� NIM dNnS sa�let�,e+�aremp,eH waww�zny�cou cool aSaap masR$tuna�isinu, ' .1yp ,cry a�eFRF s u{,rov,c., - scopp)J1I, D,'V SaIlup�2,M Wno,ry S r „une,a0 .t — ra� 1 1. Sssew.suauodma; wais (S SuijunoW jeijuapisad Juno�ISiIAL j _aannoduns _ QLC uikFoot PRODUCTGUIDE Exploded Prodi,_,,ViewB.O.M. - 1 ' Installaton Instructions -2 Cut Sheets-3 Specifications-4 i o EcoFasten Solar` = Quik Foot— Product Guide Exploded Product Vlew. Biu of i,4„tel lah — 1 -- Materials Needed for Assembly �i s I Item No. Description of Material/Part Quantity t ,+ 1 QUIkPoot Base Plate 1 6 2 Fastener(Length to be determined) 2 �1 3 QuikFoot Flashing 1 5 4 EPDM Washer 1 , I 5 L-102-3"Bracket*(other options available) 1 q 6 5/16"EPDM Banded 18.8 SS Washer 1 !++^� 7 1 3/8"Stainless Steel Hex Nut 1 Required Tools Z 1 WA ,tl ' ��' I f }(331 t• �/ , 1 g ' ix 877-859-3947 E uct le S lar All m Ip 1 ietlu.tl� 51 UI.1 n11hb'resr lv*111109/14 LI �i. E F 1 Sderp� p Icletl by ip. I 8U- Velenl B 511542 B20J9]�O P9 B.1p13Ytl E21116113132 8146[3Btl28209 914B2 8,245651028272174 B23225 557 32 � . \ TIN, �) y�wQF-Al-Base� c /} ya>- �a :� \: + \ j a « \� } >am; { y < 5 / \ \ 22t Cu Uri & / {} > « ^ CO «/ < > z � \ . \\ / y � . ± � :6 ±a \ƒ� » - . . : E / a < '/ \ \ om «z Q\ � 7 877 859 3947 EwFasdn Solar A I I content uStacad under dopynght A I nghts ddrSed 10,09114 31 No, � rI'. 'E' QuikPoot—Product Guide Cut S1,,Lc, Qri 81 s R.38in x 9.53mm .032in 0.81 mm r` 12.00i n 304.80mm rP ` 3.001n 76.20mm 50in 8.00in 1270mmj �— `Jra 203.20mm '� - , ,4 877-851 3947 EcoFes,an Sol Bf All content pm,I I I.t,nI, III I2ht P,111117 .1 3 o3. 1.132 4 12 EmF-.5Wt5olerpmpuds are pmeGep py,Pe(ollomny LLS.Ga,ens tl151$Y4B2tli£i]W B28J81399 B201G5.]i3[i281G6YJ9BP 0109910 E20$0.5,d5A tl28 172 17492 B'[255W fl'( 1"P 1 ,11 Qu7kFoot—Product Guide Cut Sheets: Bracket Optione -SCL101-3 z` 46 SERRATIONS j c3 (I i Y r 1/16 R.005 1 R.01 O 2XR.01 � 1 P 60 00° 006 ^ !t 3/8 .002 DETAIL A 7/8"X 82° SCALE 3:1 x v u 8 959 3947 E F 1 Solar All content protected undercopyright All nghot reserved_10109/14 37 F EF en Solerprod Ir,pmnEClbYh,orl—:yUSFanem81111.B Z2 ,153.709 tl1 tl 101➢9BB20166713112 B 146290 B292W 91482824545452 8$R 174 928285557 B2 jt t r t Quik Foot— Product Guide SL,r-hI, UJIo LA R1 I—(bENERAI i' 1.1 SUMMARY i.3 SUBMII rAl. A WORK we LUDES A Su on It ma nufacturer'swritten speaficatlons. B. Ba se plate is 6000 series aluminum with one if =f it 1. QulkFoot base all attachment bracket that B- Submit standard product cut sheets. PEM Type Press-In Stud 188 SS. I. attaches diral to the roof deck C Submit installation instructions. C Fasteners to be compatible with chosen roof " 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values T� for the mofsysremultimate and allowable bad values specific to as shown in load test data, p k1 e. RELATED SE71ONS the roof deck specified for the project. D. Counter flashing is.032 gauge aluminum am- I.Section o760P.FIasding amATaKt Metal bossed to accept shape of stainless steel base 2.Search 07500'.Roofing 14 QUALITY ASSURANCE plate 3.Division 1:Adminavative and Procedural r. Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 FINISH 4-0vision 77hermal and Moisture Protection the a rea of the project �.. r 1 [ SYSTE M D FSCR I PT IO N A. Bracht is m ill finish alum inum I A. COMPONENTS: 1.5 NFL(VERY/STORAGE;HANDLING B. Base flashing-Black-what painted f 4 Inspect material upon delivery.Notify manufacturer 1. QulkFoot system consists ofaiummum within 24 hours ofany,missing or defective Items. PART3-EXECUTION s. e bracket and base plate with(1)stainless steel stud,(1)stainless steel n ut(1)E PD M washer Keep material dry,covered,and off the ground until / I enter)bonded stainless steel and EPDM Installed- 3.1 EXAMINATION t,_ washer. PART PRCiD A. Substrate:Inspect structure on which brackets Y5 q 2. Fasteners 2- UC 1S are to be installed and verify that it will with- IF +" ATo be of metal compatible with QURFOot stand bracket 2-1 MANUFACTURER any additional loading that maybe incurred. B.Fasteners should be selected for compat- EcpFasten Solar d ibility with the matters, 289 Harrel Street,Morrisville,Vf05661 8. Notify General Contractor of any deficiencies CFastener strength shoultl exceed or be (877)859-3947 before installing Eco Fasten Solar brackets. equal to that of the allowable load of the www.ecofastensolaccom �} C. Verily that roofing material has been installed system See test data at www.eif required Icor com 1-2 MATERIALS correctly prior to installing solar attachment 3- Sealant(If required by roof manufaaurep'. A. Attachment Bracket brackets. to be roof manufacturer approved. 6000 Series Aluminum(choose one) 3.2 1 NSTALLAI ION 4.'tAluminum counter-flashing LCP-SpSlotted" A engine is recchimendalons fo drawings and project S. Aluminum attachment bracket 2.F-111-A engineer's recommendations for location of 3.P-3LSK system Comply with Manufacturer's written In- s B. DESIGN REQUIREMENTS: 4.L-102- " stallation instructions for installation and layout. f 1. Bracket spacing to be recommended by 5.L-102-8" project engineer. 61-102-6" 2. Irecall a minim u m of two fasteners per 7.Z-101 i• y.. baseplate. 8.Comp Slide 3. It is important to design new structures that 8.Custom ' theyc existing structures d make sure that they can withstand retained loads. r 1. 877 859-3947 Ecucts am Solar All in r i P I ded under copyn2M All rightly reBerveo.IDlo9114 4.r Ecorulen solar Products ere pmlec etl by in,Idl 9l'9.Pu ons AA51522 B2819900 B28.IP1 d90 a2 a)hb'13626.166 aY6 a2 a$o9i91d ap fl215 AX a282]b r4 f26P2aS5]6$ � lar Pioneer Valley Photovoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 S53 through 5560 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: Structural improvements Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT#9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy k 9 Installation Crew Operating Policy Non Electrical Work at a typical RV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift set up o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities' o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenchingidigging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Will options o Any"plug and play devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misr o Truck Organizing o Material List,ordering o Daily check-in o Customer interaction and training activities gpuq 4 RRQ PV Squared Solar)wwwpvsquaredcoop Phone:413-772-8788(Fax,413-772-8668 311 Wells St.,Ste 8)Greenfield,MA 01301 MA Elec.Lic.A13764)MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers,such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager -