12-029J fitzgerald lake conservation310 cMR 10.99
Dorm 3
NINE COPIES OF THIS FORM, COMPLETE
WITH PLANS, TO CONSERVATION COMMISSION
TTAO COMPLETE COPIES TO DEP, SPRINGFIELD
CoanonweaZ tb 3 A)
of Xassacbusetts
DEP 246 -
(To be P+aridai by DEP)
Clty(r Northampton
Applicant Of f irp Qf E velop.
Department of
Defense
Onited States.
Notice of Intent of Amerjca
Under the
Kassachusetts Wetlands Protection Act, c. 131, 5,fo
and
Application for a Department of the Army Permit
& NORTHAMPTON WETLANDS PROTECTION ORDINANCE
Part I: General Information
1. Location: Street Address North Farms Road
Assessor's Map ID - I
2. project: Type Description Provide h ndicao accessible Parki
the parkinq lot to the Lake,
3. Registry: County Ha mpshir e C•,2 =rent Book 1951 page 261
Certificate (if Registered Land)_I"
4. Applicant Office of Planning & Deve
Attn: Wayne Feiden
Address C'i t-T, u =i i ') n TA-,;
Te1.413- 586 -6950
t
5. property owner Conservation Commission, City of North o 586 -6950
Address City Hall, 210 Main St., NortharrTDton, MA 010601
6. Representati
Addres
(7. a. Have the conservation Commission and the Department
been sent, by certified mail or hand deliver, 2 copies
Intent, with supporting plans and documents?
Yes ® No ❑ (9 COPIES TO CONSERVATION COMMISSION)
b. Has the fee been submitted? Yes ® No ❑
C. Total Filing Fee submitted None - M un i . i pa_1 ayol i c-a
d. City /Town Share of Filing Fee 0 State Share c
(sent to City /Town) (S4 of fee in
- -a. Is a brief statement ati
fee? ❑ Yes a No
r• Per zit requested under.
Effective 11/20/92
Tel.
Regional office each
completed Notice.of
Filing Fee 0
:ess of S25, sent to DEP)
ached indicating how the appl cant calculated the
No fee
-Mass. Wetlands Protection Act (?10 C•IR 10) : LZ
Northampton Wetlands Protect- Ordinance • !/
3 -1
3. Have all obtainabla permit vamiarces and anprnvalc requ.red by local by -law
b ?en :btai::ed?
Yes No ❑ No other permits required
Obtained Applied for: Not Applied For:
9. Is any portion of the site subject to a Wetlands strict' n order pursuant
to G.L. c. 131, 540A or G.L. c. 130, 5105? Yes 1 No if
10. List all plans and supporting documents submitted with this Notice of
Intent.
Identifying
Number /Letter Title, Date
Fitzgerald Lake Conservation Area
GIS MAP Accessibility Improvement, - Marc -h �ga�
11. Check those resource areas within which work is proposed:
(a) ® Buffer Zone
(b) Inland:
® Bank* Land Subject to Flooding
® Bordering vegetated wetland* ❑ Bordering
® Land Under water Body & Waterway* ❑ Isolated
*Likely 'o involve U.S. Army Corps of Engineers concurrent jurisdiction.
See General Instructions for Completing Notice of Intent.
3 -2
12. is the proja:t within esi.imated habitat which is indicated on the most
recent Estimated Habitat Map of State - Listed Rare wetlands wildlife (if any)
published by the Natural Heritage and Endangered Species Program?
Only applies. to projects along Conn. River, Oxbow, rill River, the Conn. River flood -
YES f X i NO I 1
plain, or the V_A_ hospital at Route 9,
Date printed on Estimated Habitat Map: Oct6be-
If yes, have you sent a copy of the Notice of Intent to the Natural Heritage
and Endangered Species Program via the U.S. Postal Service by certified or S0J
priority mail (or otherwise sent it in a manner that guarantees delivery
within two days) no later than the date of the filing of this Notice of
Intent with the conservation commission and the DEP regional office?
YES [ Xl NO [ I
If yes please attach evidence of timely mailing or other delivery to the
Natural Heritage and Endangered Species Program.
Part Its Site Description
Indicate which of the following information has been provided (on a plan, in
narrative description or calculations) to clearly, completely and accurately
describe existing site conditions.
Identifying
Number /Letter
(of plan, narrative
or calculations)
Natural Features
Cnil Map soils
r
N/A
Vegetation
GIS MAP
Topography
GIS MAP Open water bodies(including ponds and lakes)
GIS MAP Flowing water bodies(including streams and rivers)
GIS MAP Public and private surface water and ground water supplies.
N/A on or within 100 feet of.site
Maximum annual ground water elevations with dates and
GI MAP location of test
Boundaries of resource areas checked under Part 1, item 11
above
.other
Man -made Features•
NSA Structures (such as buildings, g Piers, towers and
headwalls)
N/A Drainage and flood control facilities at the site and
i— diately off the site, including culverts and open
N/A channels (with inverts), dams and dikes
Subsurface sewage disposal systems •'
N/A Underground utilities
3 -3
GIS MAP
Roadways and parking areas
G MAP Pr, r _t bouncari e4 . 3a3:. - aentm and rii hts -of -:Jay
GIS MAP other
Part III: work Description
Indicate which of the following information has been provided (on a plan, in
narrative description or calculations) to clearly, completely and accurately
describe work proposed within each of the resource areas checked in Part I,
item 11 above.
identifying
Number /Letter
(of plan, narrative
or calculations)
Planview and Cross Section of:
GIS MAP Structures (such as buildings, piers, towers and headwalls)
NSA Drainage and flood control facilities, including culverts
and open channels(with inverts), dams and dikes
N / A subsurface sewage disposal systems & underground utilities
N/A Filling, dredging and excavating, indicating volume and
composition of material
NZA compensatory storage areas, where required in accordance
with Part III, Section 10.57(4) of the regulations.
wildli`_e habitat restozarion or tep_ic3:icn areas
Other
Point source Discharge
N / A Description of characteristics of discharge from point
source (both closed and open channel), when point of
discharge falls within resource area checked under Part I,
item 11 above, as supported by standard engineering
calculations, data and plans, including but not limited to
the following:
1.
2.
3.
4.
Detineation of the drainage area contributing to the point of discharge;
Pre -and Post- devetopment peak run -off from the drainage area, at the point of discharge, for at Least
the 10 -year and 100 -year frequency storm;
Pre - and post -deve t opment rate of infittration contributing to the resource area checked under Part I,
item 11 above;
Estimated meter quatity characteristics of pre- and post- devetopim t run -off at the point of
discharge.
3 -4
Part IV: Mitigating Measures
i. Ctea.:v. - to.nletety s: d arcura'ely descr +`+e, with reference to supporting ptans and catcutations where
necessary:
(a) ALL measures and designs proposed to met the performance standards set forth under each
resource area specified in Part II or Part III of the reputations; or
(b) Why the presumptions set forth under each resource area specified in Part II or Part III of the
regulations do not apply.
S
- Resource Area Type: identifying number or
■ Inland letter of support
BANK
documents
Bank be crossed by 4' boardwalk /dock.
Boardwalk will span bank with no contact.
Boardwalk is narrow enough that vegetation
will be able to grow underneath it and
recieve adequate light.
'=': Resource Area Type:
Inland -
Boardwalk will span B.V.W. and is narrow
enough that vegetation will be able to grow
underneath it. Only direct contact will be
concrete bumpers or wooden piers apr. 6 feet
on- center that support boardwalk.
Identifying number or
letter of support
documents
3 -5
2. Clearly, completely and accurately describe, with reference to supporting plans and calculations where
necessary:
(a) all measures and designs to regulate work within the Buffer Zone so as to ensure that said work
does not alter an area specified in Part I, Section 10-020)(a) of these regulations; or
(b) if work in the Buffer Zone will alter such an area, all measures and designs proposed to meet
'I perf,)r::ance standards zsr.?t Hshea for th- adjacen* resource area, specified in Part I1 or
?ar: 1:1 cf these reguiaticna.
Resource Area Type Bordered Identifying number or
Inland By 100 -Feet Discretionary Zone: letter of support
documents
Proper erosion control will be used
to prevent constructing impacts. No
ongoing impacts are anticipated.
3 -6
Part v: Additional Information for a Department of the Army Permit
1. COE Application No.
(to be provided by COE)
2.
(Name of waterway)
3. Names and addresses of property owners adjoining your property:
4. Document other project alternatives (i.e., other locations and /or
construction methods, particularly those that would eliminate the
discharge of dredged or fill material into waters or wetlands).
5. 8h° x 11" drawings in planview and cross - section, showing the resource
area and the proposed 'activity within the resource area. Drawings must be
to scale and should be clear enough for photocopying.
Certification is required from the Division of water Pollution Control before
the Federal permit can be issued. Certification may be obtained by contacting
the Division of Water Pollution Control, 1 Winter Street, Boston,
Massachusetts 02108.
Where the activity will take place within the area under the Massachusetts
approved Coastal Zone Management Program, the applicant certifies that his
proposed activity complies with and will be conducted in a manner that is
.;onsistent with the approved program.
Information provided will be used in evaluating the application for a permit
and is made a matter of public record through issuance of a public notice.
Disclosure of this information is voluntary; however, if necessary information
is not provided, the application cannot be processed nor can a permit be
issued.
I hereby certify under the pains and penalties of perjury that the foregoing
Notice of Intent and accompanying plans, documents and supporting data are
;true and complete, to the best of my knowledge.
March 1, 1993
Signature of Applicant Date
Wayne Feiden, for the Office of Planning & Development
Signature of Applicant's Representative Date
FORM "Exception to EMG Form 4365 approved by HQUSACE, 6 May 1982°
■ED 100 (TEST)
1 MAY 82 "This document contains a joint Department of the Army and State of
Massachusetts apptication for a permit to obtain permission to perform
activities in United States waters. The Office of Management and
Budget(OMS) has approved those questions required by the US Army Corps of
Engineers. OMs Number 0702 -0036 and expiration date of 30 September 1983
applies ". This statement wilt be set in 6 point type.
3 -7