Loading...
Attachment H - Stormwater Report - February 2018.pdf Stormwater Report Notice of Intent (NOI) Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA MassDOT Project No. 604597 February 2018 Prepared for: MassDOT—Highway Division 10 Park Plaza Boston, MA 02116 Prepared by: Michael J. Rieger, PE TranSystems 101 Arch Street, Suite 301 Boston, MA 02110 TABLE OF CONTENTS GENERAL PROJECT DESCRIPTION ................................................................................................................... 2 RECEIVING WATER BODY ................................................................................................................................... 3 EXISTING CONDITIONS....................................................................................................................................... 3 PROPOSED IMPROVEMENTS ............................................................................................................................... 4 COMPLIANCE WITH THE TEN STORMWATER MANAGEMENT STANDARDS ............................... 6 Standard 1- No New Untreated Discharges .................................................................................................. 6 Standard 2- Peak Rate Attenuation ................................................................................................................... 6 Standard 3- Groundwater Recharge ................................................................................................................. 8 Standard 4- TSS Removal and Long-Term Pollution Prevention Plan ...................................................... 9 Standard 5- Higher Potential Pollutant Loads ............................................................................................... 11 Standard 6- Critical Areas ................................................................................................................................. 11 Standard 7- Redevelopment .............................................................................................................................. 11 Standard 8- Construction Period Pollution Prevention and Erosion Control Plan ............................. 11 Standard 9- Operation and Maintenance Plan .............................................................................................. 11 Standard 10- Illicit Discharge Prevention ....................................................................................................... 12 Attachment A- Checklist for Stormwater Report ........................................................................ A-1 - A-8 Attachment B- NRCS Soil Survey....................................................................................................... B-1 - B-4 Attachment C- Existing and Proposed Catchment Maps ........................................................... C-1 - C-2 Attachment D- Splash Pad Sizing Calculations ......................................................................................... D-1 Attachment E- BMP Calculations ........................................................................................................ E-1 - E-3 Attachment F- Peak Rate Attenuation Modeling Output ........................................................... F-1 - F-99 Attachment G- Test Pit Logs ............................................................................................................. G-1 - G-8 Attachment H- Long Term Pollution Prevention Plan (LTPPP) ................................................ H-1 - H-4 Attachment I- Operation and Maintenance Plan (O&M Plan) ........................................................ I-1 - I-2 2 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA GENERAL PROJECT DESCRIPTION The Massachusetts Department of Transportation – Highway Division (MassDOT) is proposing improvements to the intersection of Route 9 (Bridge Street) and Damon Road in the city of Northampton (Project). The Project evolved from a regional transportation study that evaluated the potential need for an additional bridge over the Connecticut River. The study determined that no additional bridge is required, but instead recommended improved traffic operations at Interchange 19 of I-91. The Project is located just west of the Calvin Coolidge Memorial Bridge spanning the Connecticut River. It includes the intersection of Bridge Street and Damon Road/I-91 northbound (NB) off-ramp, and the intersection of Bridge Street and the I-91 southbound (SB) on-ramp. Figure 1 shows the project locus map. Figure 1 Locus Map The designed improvements include reconstruction of the intersection of Route 9 with the NB off- ramp and Damon Road as a two-lane roundabout with a 10-foot wide shared-use path. The SB on- ramp will be widened to two lanes prior to the merge with I-91. Both the NB off-ramp and the SB on-ramp will be lengthened to accommodate longer deceleration and acceleration lanes. The proposed stormwater management design includes two Best Management Practices (BMPs), which PROJECT LOCATION 3 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA are both infiltration basins. These infiltration basins will be located between the NB off-ramp and I- 91 and the SB on-ramp and I-91, respectively. Access for maintenance will be from Route 9. The proposed stormwater BMPs are described in more detail in the Proposed Improvements section of this report. Descriptions of how the Project complies with the Massachusetts Stormwater Standards are included in the section titled, Compliance with the Ten Stormwater Management Standards. Attachment A includes a stamped and signed Massachusetts Department of Environmental Protection Checklist for Stormwater Report. RECEIVING WATER BODY The Connecticut River flows from north to south, east of the Project site, and is listed in the Massachusetts Year 2012 Integrated List of Waters as impaired for Escherichia coli and PCB in Fish Tissue. No Total Maximum Daily Loads (TMDLs) have been reported to the United States Environmental Protection Agency (US EPA) by the Massachusetts Department of Environmental Protection (MassDEP) for the Connecticut River watershed. Stormwater from the project site enters the river via closed drainage systems. EXISTING CONDITIONS I-91 is the primary north-south thoroughfare through western New England beginning in New Haven, Connecticut at I-95 and terminating at the Canadian border in Derby Line, Vermont. The divided, limited-access highway generally follows the Connecticut River and has two lanes in each direction. Route 9, which runs in the east-west direction through Northampton, is a two-lane roadway that widens to four lanes plus turning lanes through the signalized intersection with I-91. Route 9 is a primary access route to the main campus of the University of Massachusetts at Amherst. The Calvin Coolidge Bridge carries Route 9 over the Connecticut River into Hadley, MA. The Norwottuck Rail Trail also crosses the Connecticut River just north of the project site. Damon Road runs parallel to I-91, on the north side of Route 9, between I-91 and the Connecticut River. Commercial properties occupy the west side of Damon Road near its intersection with Route 9. The Elwell Recreation Area of the Connecticut River Greenway State Park lies on the east side of Damon Road, along the western bank of the Connecticut River. A residential neighborhood of single family houses populates the area west and northwest of the project site. Agricultural land occupies both sides of I-91 on the south side of Exit 19. The project site within the limit of proposed work is currently 45% impervious. I-91 crosses over Route 9 with a high point in the profile just north of the project site. Route 9 generally rises to the east towards the Calvin Coolidge Bridge. On the west side of I-91, the neighborhood north of the project site gradually rises higher than Route 9. On the east side of I-91, the commercial properties and parkland gradually drop lower than Route 9. South of Route 9, the topography drops about ten feet at roughly a 15 percent grade on both sides of I-91, before reaching relatively flat agricultural land. One catch basin on the I-91 off-ramp and the infield area between the I-91 off-ramp and I-91discharge runoff into the woods west of the I-91 off ramp (an 18” culvert crosses under the off-ramp). All other runoff from the site is collected by an existing closed drainage network that discharges to the Connecticut River, through either a 24-inch outfall 25 feet south of the Calvin Coolidge Bridge, a 30-inch outfall 80 feet south of the Calvin Coolidge Bridge, or an 18-inch outfall 45 feet south of the bridge for the Norwottuck Rail Trail. 4 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Attachment B includes a Hydrologic Soil Group (HSG) Web Soil Survey from the National Resource Conservation Service (NRCS) that summarizes the area coverage for each soil type. Although a portion of the site has no HSG available, the HSG can be assumed to match the surrounding soil types, which is Hydrologic Soil Group B. Therefore, all soils within the limit of work of the Project are classified as Hydrologic Soil Group B for the purposes of this stormwater report. Attachment C shows an existing catchment map, with labels for total area, weighted average curve number (CN) and time of concentration. The CN values used for existing conditions are taken from Exhibit 8-18 from the 2006 MassDOT design guide. The value used for woods along I-91 is 55 (Good condition). The value used for grass throughout the site is 61 (Good condition). The value used for impervious area is 98. All catchment areas have times of concentration less than the minimum five minutes. Runoff from most of Route 9 and both barrels of I-91 north of Route 9 is designated as Catchment A and discharges to the 24-inch outfall. The infield area between I-91 and the NB off-ramp is Catchment B. The lower ends of the NB off-ramp and SB on-ramp, plus both barrels of I-91 south of Route 9, form Catchment C. Runoff from the middle section of the NB off-ramp is designated as Catchment D. The north end of the NB off-ramp and the eastbound side of Route 9 to the Calvin Coolidge Bridge is Catchment E. Catchment G includes both barrels of I-91, south of the ramp gores. These catchments combine and discharge to the 30-inch outfall. Catchment H represents Damon Road runoff that discharges to the 18-inch outfall south of the Rail Trail. Catchment K is the wooded area adjacent to NB off-ramp. Catchment F is the wooded area adjacent to SB on-ramp and also includes runoff from one catch basin on the SB-on ramp and the infield area between I-91 and the SB on-ramp (which also receives flow from one catch basin located on I-91 SB). PROPOSED IMPROVEMENTS The Project proposes the following improvements over existing conditions:  Deep sump catch basins  Forebays with Infiltration basins (Infiltration Basin B and Infiltration Basin J) All runoff is captured by deep sump catch basins, which improve upon existing conditions by removing more suspended solids and debris than existing standard catch basins. The proposed closed drainage system is designed to adhere to the MassDOT design guide including criteria for spread (ponding) at inlets, pipe sizing, and hydraulic grade line calculations. Calculations for the closed drainage system will be included with the 100% design submittal. Infiltration Basin B, proposed in the infield area between I-91 and the I-91 NB off-ramp, includes a forebay for pretreatment removal of debris. From the wetland forebay, runoff spills over a stone weir to a flat depression that is loamed and seeded to allow for infiltration. The basin holds and infiltrates the required water quality and recharge volumes. An outlet control structure with a 12 inch orifice and grate is proposed to mitigate peak flow rates during the 2 and 10 year storm events. The volume of storage below the orifice is the calculated recharge volume, and will drawdown 5 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA within 72 hours. The outlet control structure allows the basin to have a minimum of one foot of freeboard during the 100 year storm event. Infiltration Basin J, proposed in the infield area between I-91 and the I-91 SB on-ramp, includes a forebay for pretreatment removal of debris. From the wetland forebay, runoff spills over a stone weir to a flat depression that is loamed and seeded to allow for infiltration. The basin holds and infiltrates the required water quality and recharge volumes. In addition the basin holds the 2 year storm. An overflow stone weir is proposed to mitigate the 10 and 100 year storm events. The volume of storage below the weir elevation is the calculated recharge volume, and will drawdown within 72 hours. Attachment C shows a proposed catchment map, with labels for total area, weighted average curve number and time of concentration. The method for estimating runoff rates within the proposed catchments uses the same parameters as those used for existing conditions, with the exception that for the proposed conditions, the existing woods along I-91 are proposed to be cleared and grubbed. The existing 2:1 (H:V) side slopes will be loamed and seeded to allow for permanent erosion control and slope stabilization. These slopes are categorized as Grass with a CN value of 61. The proposed outside edges of the re-aligned 91 NB off-ramp and SB on-ramp will be Mechanically Stabilized Earth (MSE) which yields a 1:1 slope. The slope will grow brush over time. The CN value used is 48, which is categorized as brush-weed-grass mixture with brush the major element (good cover). These walls are proposed to allow for flood storage at the bottom of the slope. The bottom of the slopes are categorized as Woods – grass combination with good cover, which has a CN value of 58. Runoff from most of Route 9 and both barrels of I-91 north of Route 9 continues to discharge to the 24-inch outfall as Catchment A, while Catchment J represents the north end of the SB on-ramp that discharges to the proposed Infiltration Basin J. The infield area between I-91 and the SB on-ramp that is not occupied by the infiltration basin remains designated as a part of Catchment F. Likewise, the Damon Road runoff remains designated as Catchment H. The proposed condition reduces the sizes of Catchment A, Catchment F, and Catchment H, as compared to their existing condition counterparts. Catchment F and Catchment K discharge adjacent to SB on-ramp and NB off-ramp, respectively. The respective areas each decrease in size from existing conditions, and the peak flow rates are mitigated by replacing the existing woods with MSE walls which will fill out with brush once permanent erosion stabilization is established. All remaining catchment areas still discharge to the 30-inch outfall. Although the combined area of the remaining proposed catchment areas is larger than existing conditions, extended detention storage is included within the Infiltration Basin B area to mitigate peak flow rates. The majority of the proposed roundabout and both sides of Route 9 east of the roundabout are added to Catchment B, which discharges to the infiltration basin. Catchment B includes the area previously designated as existing Catchment E, therefore the proposed condition has no proposed Catchment E. The middle section of the NB off-ramp remains designated as Catchment D, and is slightly smaller than the existing Catchment D. The proposed Catchment C and Catchment G are moderately expanded in size, due to the roadway geometry that is required for the designed traffic and safety improvements. 6 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA COMPLIANCE WITH THE TEN STORMWATER MANAGEMENT STANDARDS The following low impact design (LID) measures are employed for this Project.  No disturbance to any wetland resource areas  Two infiltration basins with sediment forebays  Minimizing disturbance to existing trees and shrubs The proposed stormwater management design complies with the ten Massachusetts Stormwater Standards. Standard 1- No New Untreated Discharges This standard requires that the design provide water quality treatment to all proposed stormwater discharges, which improves the water quality of downstream receiving water bodies. The proposed stormwater management design meets the requirements of Standard 1. All stormwater runoff directed to existing outfalls is treated prior to passage offsite. The different levels of treatment are described in more detail in the description of compliance with Standard 4. The Project does not add any untreated discharges, because no new outfalls are proposed by this project. One outfall entering Catchment F from I-91 is being re-directed in order for Infiltration Basin J to be constructed. See Attachment D for splash pad calculations. Standard 2- Peak Rate Attenuation This standard requires that the design minimize the downstream impacts of peak flow rates during storm events by detaining stormwater onsite. The project reduces post construction peak runoff rates to below preconstruction peak runoff rates during the 2-year, 10-year, and 100-year storm events for project discharge points. The peak rate of runoff is a measure of how rapidly stormwater flows from a catchment area during specific storm events. Peak rates of runoff are reduced by detaining runoff during storm events and releasing the stormwater gradually as the storms subside. Massachusetts Stormwater Management Standard Number 2 requires that the post-construction discharge from a project match the discharge prior to construction, during the 2-year 24-hour and 10-year 24-hour Type III storm events. Standard 2 also requires that the project identify whether or not peak discharges from the 100-year 24-hour Type III storm increase off-site flooding. If increased flooding is found, then the project must attenuate peak flow from the 100-year storm event. Bentley PondPack V8i pond routing software was employed using the Unit Hydrograph method to route runoff hydrographs through flood storage facilities and to their outlets, compute the peak discharges through outlets, and determine the maximum high water elevation during storm events. This method calculates runoff rate using time of concentration, curve number, catchment acreage, and 24-hr precipitation for the selected return period and rainfall distribution. Rainfall data for the storm events were estimated from the Massachusetts Rainfall Data Maps derived from Technical Paper 40 (1961) and included as Appendix F-1 in the March 2002 Hydrology Handbook for 7 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Conservation Commissioners. The analysis uses 3.0 inches for the 2-year Type III 24-hour storm event, 4.5 inches for the 10-year, and 6.4 inches for the 100-year Type III 24-hour storm event. Curve numbers represent the relative permeability of local soil types, with 98 equal to the most impermeable pavement surfaces. Permeable areas are assigned curve numbers according to the hydrologic code of the soil type (A, B, C, or D) and whether it supports enough tree growth to qualify as woods or is covered with grass. As stated previously, all CN values are associated with hydrologic code B for this project. Times of concentration demonstrate the longest time that it takes runoff to drain from any point in a catchment area to the lowest point. Depending on the characteristics of the flow path, the time of concentration calculation will include some combination of sheet flow, shallow concentrated flow, flow in a pipe, or channel flow. Sheet flow lengths are limited to a maximum 50 feet. Flow in a pipe is conservatively estimated based on the length traveled times an assumed minimum velocity of 3 feet per second, since the project site is very flat. Other characteristics that define the time of concentration, such as slope, length, and Manning’s n are selected based on the actual conditions estimated along the flow path identified. Manning’s n values are selected in accordance with “Table 3-1 Roughness Coefficients (Manning’s n) For Sheet Flow” in 210-VI-TR-55, Second Ed., June 1986, with runoff over pavement, grass, and woods assigned a Manning’s roughness coefficient of 0.01, 0.15, and 0.40, respectively. The minimum time of concentration is five minutes, or 0.083 hours. All existing and proposed catchment areas within the project are found to have times of concentration less than the minimum five minutes. The project has a variety of design points within the project boundaries, however the five primary discharge points are the following:  DP – A, a 24” outfall to the Connecticut River  DP – H, an 18” outfall to the Connecticut River  30” outfall to the Connecticut River  DP – F, west side adjacent to Interstate 91 SB on-ramp  DP – K, east side adjacent to Interstate 91 NB off-ramp As shown in Table 1, the hydrologic model compares post construction runoff rates to preconstruction runoff rates for three different storm events at ten design points. Although flows increase at design points B, C, and G due to the required widening and lengthening of the I-91 on and off ramps, the design points discharging adjacent to the project and the Connecticut River are mitigated by the proposed infiltration basins and reduction in area. To accommodate the added flow generated from catchments B, C and G during a 10 Year storm, an existing 24” pipe will be upsized to a 30” pipe to handle the added flow. 8 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Table 1 Post-construction Runoff Rates Reduced to Below Pre-construction Rates 2-Year (CFS) 10-Year (CFS) 100-Year (CFS) Design Point PRE POST PRE POST PRE POST DP-A (24” Outfall) 6.66 5.01 11.59 8.84 17.85 13.75 DP-B 0.43 0.23 1.61 2.42 3.51 4.67 DP-C 3.68 3.70 6.71 7.00 10.65 11.32 DP-D 0.44 0.34 0.66 0.52 0.94 0.74 DP-E 1.79 0.00 2.73 0.00 3.91 0.00 DP-F (West of SB off-ramp) 0.77 0.67 3.58 2.52 8.23 5.49 DP-G 7.68 9.03 14.26 16.47 22.84 26.12 DP-H (18” Outfall) 1.81 1.47 2.85 2.38 4.15 3.51 DP-K (East of NB on-ramp) 0.19 0.18 1.68 1.39 4.63 3.68 30” Outfall 13.67 12.79 25.51 24.24 31.33 31.33 Attachment C shows the existing and proposed catchment maps. These maps are intended to show how the existing areas within a catchment change based on the proposed project (I.E. EX-A in existing is PR-A in proposed). These catchments are also shown in Attachment F, which shows the modeling analysis for existing and proposed conditions during each storm event. The outlet from Infiltration Basin B discharges to a closed drainage network that is well above the elevation of the river, so it is modeled as a free outfall tailwater condition. The infiltration basin holds the 100-year storm event with 15 inches of freeboard. Storms larger than the 100-year storm event overflow into the grate of the outlet control structure. Infiltration basin J holds the 100-year storm event with 13 inches of freeboard. Storms larger than the 100-year storm event overflow over the stone weir and water flows to the area adjacent to SB on-ramp via an existing 18” culvert. Standard 3- Groundwater Recharge This standard requires that the design encourage stormwater to infiltrate the ground to recharge groundwater. The proposed stormwater management design meets the requirements of Standard 3 to the maximum extent practicable. The recharge volume required to fully meet Standard 3 is equivalent to the recharge volume currently provided by existing soils that are covered by proposed impervious surfaces, minus the recharge volume that will be provided by removing existing paved surfaces. Attachment E includes the Water Quality and Recharge Summary, which provides a detailed calculation of the Required Recharge Volume. Since all soils within the project limit are classified as HSG B, the Required Recharge Volume is equivalent to the added 41,632 square feet of impervious area, multiplied by 0.35 inches, based on Table 2.3.2. Recharge Target Depth by Hydrologic Soil Group from Volume 3: Documenting Compliance with the Massachusetts Stormwater Management Standards of the Massachusetts Stormwater Handbook. The resulting Required Recharge Volume is 1,214 cubic feet. The proposed design exceeds the minimum Required Recharge Volume by providing 11,853 cubic feet of infiltration volume between each of the proposed infiltration basins. Test pits were conducted in the vicinity of the proposed infiltration basins. Test Pits 1-4 (TP-1, TP-2, TP-3, TP-4) 9 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA are included in Attachment G. Infiltration Basin J has a proposed bottom elevation of 123. Based on TP-1 and TP-2 the existing soil layer at elevation 123 is loamy sand. The saturated hydraulic conductivity for loamy sand from the Rawls Table is 2.41 inches per hour. The resulting drawdown calculation for the basin is 22 hours, which is less than the required 72 hour minimum. Infiltration Basin B has a proposed bottom elevation of 130. Based on TP-3 and TP-4 the existing soil layer at elevation 130 is sandy loam. The saturated hydraulic conductivity for sandy loam from the Rawls Table is 1.02 inches per hour. The resulting drawdown calculation for the basin is 57 hours, which is less than the required 72 hour minimum. It should be noted that there is a layer of loam (based on TP-4) that is 4.8 feet deep (elevation 130.0 and 129.2) that will need to be excavated. Prior to filling with 8 inches of loam borrow, the native sandy loam is required to be tilled to a depth of 18 inches. Capture area adjustment calculations are not provided to quantify the adjusted minimum storage volume because meeting that design goal for a project of this size and linear character is not practicable. Standard 4- TSS Removal and Long-Term Pollution Prevention Plan This standard requires that the stormwater design include features to remove sediment from the first flush of runoff, as well as a long-term pollution prevention plan that identifies feasible ways to minimize erosion and the release of sediment over the full operational life of the design. The proposed stormwater management design meets the requirements of Standard 4 to the maximum extent practicable. A long-term pollution prevention plan is included as Attachment H. Percent impervious is increased from 45% to 50% for the project. The proposed design includes deep sump catch basins, and two infiltration basins each with a sediment forebay. Deep sump catch basins (DSCB) provide 25% Total Suspended Solids (TSS) removal, and the infiltration basins (IB) with forebays each provide 80% TSS removal. As shown in Table 2 below, the proposed design includes two potential treatment trains. Type A provides 85% TSS removal and Type B provides 25% TSS removal. Table 2- Percent TSS Removal Treatment Train Type A Treatment Train Type B DSCB 25% 0.75 DSCB 25% 0.75 IB 80% 0.15 Removal 85% 25% Contributing Impervious 2.08 ac. 7.25 ac. The contributing impervious area of 2.08 acres shown for Treatment Train Type A is the sum of 1.70 acres entering into Infiltration Basin B and 0.38 acres entering into Infiltration Basin J. The contributing impervious area of 7.25 acres includes all catchment areas that will flow into deep sump catch basins and directly into the existing drainage system that will not enter a proposed BMP. The estimated TSS% removal provided by the treatment trains is shown in the following calculation. 10 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Estimated TSS% Removal = (2.08 ac.* 85% + 7.25 ac.* 25% + 0.79 ac. * 0%) / (10.12 ac.) = 35.4% The Design TSS% (Minimum) is based on the new (increased) impervious area for the project site. This area is calculated by the area of redevelopment impervious (total proposed impervious area) on site (10.12 acres) and subtracting the existing total impervious area on the site (9.16 acres), yielding 0.96 acres of new impervious. Design TSS% (Minimum) = (Area of New Impervious) x (80%) / ((Area of New Impervious) + Area of Redevelopment Impervious)) Design TSS% (Minimum) = (0.96 ac. * 80%) / (0.96 ac. + 10.12 ac.) = 6.9% The estimated TSS% removal of 35.4% is greater than the minimum requirement of 6.9%. The proposed Infiltration Basin J and Infiltration Basin B are designed to treat the required water quality volume (WQV), as shown in the BMP Calculations Water Quality and Recharge Summary included in Attachment E. The required WQV for each forebay is equivalent to one-tenth inch of rainfall over the contributing impervious drainage area. The required WQV for Infiltration Basin J is equivalent to one inch of rainfall over the contributing impervious drainage area since the layer of infiltration happens in loamy sand having a saturated hydraulic conductivity of 2.41 inches per hour, which is considered a rapid infiltration rate (over 2.40 inches per hour). The required WQV for Infiltration Basin B is equivalent to one-half inch of rainfall over the contributing impervious drainage area since the layer of infiltration happens in sandy loam having a saturated hydraulic conductivity of 1.02 inches per hour, which is not a rapid infiltration rate. Table 3 presents the contributing impervious areas for each treatment Best Management Practice (BMP), calculates the required WQV for each, and includes the water quality volume provided by each BMP. The water quality volume provided is equivalent to the volume of stormwater that is held below the lowest invert out of the basins. The provided WQV exceeds the required WQV in each case. Table 3- Required Water Quality Volumes Treatment BMP Sensitivity Depth (in.) Contributing Impervious Area (sf) Required WQV (cf) Provided WQV (cf) Forebay for Infiltration Basin B 0.1 73,887 616 875 Infiltration Basin B 0.5 73,887 3,079 7,246 Forebay for Infiltration Basin J 0.1 16,720 140 270 Infiltration Basin J 1.0 16,720 1,394 4,607 11 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Standard 5- Higher Potential Pollutant Loads This standard requires that the design remove more sediment from land uses with higher potential for pollutant loads such as high traffic parking lots. The proposed stormwater management design meets the requirements of Standard 5. The drainage system collects stormwater only from land used for vehicle and pedestrian traffic, which does not constitute a land use with higher potential pollutant loads. Standard 6- Critical Areas This standard requires that the design provide additional protection to sensitive areas such as public water supplies. The proposed stormwater management design meets the requirements of Standard 6. None of the Project’s outfalls discharge to a Zone II, Interim Wellhead Protection Area, Outstanding Resource Water, shellfish growing area, bathing beach, or cold-water fishery. Standard 7- Redevelopment This standard is included by MA DEP to allow projects within already developed areas more flexibility to improve upon existing conditions and meet some standards only to the maximum extent practicable (MEP). Because this Project corrects substandard intersections, it qualifies as a redevelopment project and meets Standards 2, 3, and 4 to the maximum extent practicable. Standard 8- Construction Period Pollution Prevention and Erosion Control Plan This standard requires that the design control the movement of sediment during construction. The proposed stormwater management design meets the requirements of Standard 8. The implementation of erosion and sediment controls during construction is considered a standard practice for MassDOT roadway projects. Prior to land disturbance, the contractor will prepare and submit a complete Stormwater Pollution Prevention Plan (SWPPP) for meeting the standards and requirements of the NPDES Construction General Permit. Standard 9- Operation and Maintenance Plan This standard requires that the design encourage proper long-term operation and maintenance of the proposed drainage system. The proposed stormwater management design meets the requirements of Standard 9. An Operation and Maintenance Plan is included as Attachment I. 12 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Standard 10- Illicit Discharge Prevention This standard requires that the design prevent illegal connections of non-stormwater pollutant sources to the drainage system. The proposed stormwater management design meets the requirements of Standard 10. No illicit connections are known at the project site. If any such connections are discovered during construction, the contractor will notify the applicant, who will implement appropriate enforcement actions. An Illicit Discharge Compliance Statement will be submitted prior to the discharge of any stormwater to post-construction BMPs. Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT A- MassDEP Checklist for Stormwater Report Pages A-1 - A-8 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 1 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report A. Introduction Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A Stormwater Report must be submitted with the Notice of Intent permit application to document compliance with the Stormwater Management Standards. The following checklist is NOT a substitute for the Stormwater Report (which should provide more substantive and detailed information) but is offered here as a tool to help the applicant organize their Stormwater Management documentation for their Report and for the reviewer to assess this information in a consistent format. As noted in the Checklist, the Stormwater Report must contain the engineering computations and supporting information set forth in Volume 3 of the Massachusetts Stormwater Handbook. The Stormwater Report must be prepared and certified by a Registered Professional Engineer (RPE) licensed in the Commonwealth. The Stormwater Report must include:  The Stormwater Checklist completed and stamped by a Registered Professional Engineer (see page 2) that certifies that the Stormwater Report contains all required submittals.1 This Checklist is to be used as the cover for the completed Stormwater Report.  Applicant/Project Name  Project Address  Name of Firm and Registered Professional Engineer that prepared the Report  Long-Term Pollution Prevention Plan required by Standards 4-6  Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan required by Standard 82  Operation and Maintenance Plan required by Standard 9 In addition to all plans and supporting information, the Stormwater Report must include a brief narrative describing stormwater management practices, including environmentally sensitive site design and LID techniques, along with a diagram depicting runoff through the proposed BMP treatment train. Plans are required to show existing and proposed conditions, identify all wetland resource areas, NRCS soil types, critical areas, Land Uses with Higher Potential Pollutant Loads (LUHPPL), and any areas on the site where infiltration rate is greater than 2.4 inches per hour. The Plans shall identify the drainage areas for both existing and proposed conditions at a scale that enables verification of supporting calculations. As noted in the Checklist, the Stormwater Management Report shall document compliance with each of the Stormwater Management Standards as provided in the Massachusetts Stormwater Handbook. The soils evaluation and calculations shall be done using the methodologies set forth in Volume 3 of the Massachusetts Stormwater Handbook. To ensure that the Stormwater Report is complete, applicants are required to fill in the Stormwater Report Checklist by checking the box to indicate that the specified information has been included in the Stormwater Report. If any of the information specified in the checklist has not been submitted, the applicant must provide an explanation. The completed Stormwater Report Checklist and Certification must be submitted with the Stormwater Report. 1 The Stormwater Report may also include the Illicit Discharge Compliance Statement required by Standard 10. If not included in the Stormwater Report, the Illicit Discharge Compliance Statement must be submitted prior to the discharge of stormwater runoff to the post-construction best management practices. 2 For some complex projects, it may not be possible to include the Construction Period Erosion and Sedimentation Control Plan in the Stormwater Report. In that event, the issuing authority has the discretion to issue an Order of Conditions that approves the project and includes a condition requiring the proponent to submit the Construction Period Erosion and Sedimentation Control Plan before commencing any land disturbance activity on the site. A - 1 A - 2 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 3 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) LID Measures: Stormwater Standards require LID measures to be considered. Document what environmentally sensitive design and LID Techniques were considered during the planning and design of the project: No disturbance to any Wetland Resource Areas Site Design Practices (e.g. clustered development, reduced frontage setbacks) Reduced Impervious Area (Redevelopment Only) Minimizing disturbance to existing trees and shrubs LID Site Design Credit Requested: Credit 1 Credit 2 Credit 3 Use of “country drainage” versus curb and gutter conveyance and pipe Bioretention Cells (includes Rain Gardens) Constructed Stormwater Wetlands (includes Gravel Wetlands designs) Treebox Filter Water Quality Swale Grass Channel Green Roof Other (describe): Two (2) Sediment Forebays with two (2) Infiltration Basins Standard 1: No New Untreated Discharges No new untreated discharges Outlets have been designed so there is no erosion or scour to wetlands and waters of the Commonwealth Supporting calculations specified in Volume 3 of the Massachusetts Stormwater Handbook included. A - 3 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 4 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 2: Peak Rate Attenuation Standard 2 waiver requested because the project is located in land subject to coastal storm flowage and stormwater discharge is to a wetland subject to coastal flooding. Evaluation provided to determine whether off-site flooding increases during the 100-year 24-hour storm. Calculations provided to show that post-development peak discharge rates do not exceed pre- development rates for the 2-year and 10-year 24-hour storms. If evaluation shows that off-site flooding increases during the 100-year 24-hour storm, calculations are also provided to show that post-development peak discharge rates do not exceed pre-development rates for the 100-year 24- hour storm. Standard 3: Recharge Soil Analysis provided. Required Recharge Volume calculation provided. Required Recharge volume reduced through use of the LID site Design Credits. Sizing the infiltration, BMPs is based on the following method: Check the method used. Static Simple Dynamic Dynamic Field1 Runoff from all impervious areas at the site discharging to the infiltration BMP. Runoff from all impervious areas at the site is not discharging to the infiltration BMP and calculations are provided showing that the drainage area contributing runoff to the infiltration BMPs is sufficient to generate the required recharge volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume only to the maximum extent practicable for the following reason: Site is comprised solely of C and D soils and/or bedrock at the land surface M.G.L. c. 21E sites pursuant to 310 CMR 40.0000 Solid Waste Landfill pursuant to 310 CMR 19.000 Project is otherwise subject to Stormwater Management Standards only to the maximum extent practicable. Calculations showing that the infiltration BMPs will drain in 72 hours are provided. Property includes a M.G.L. c. 21E site or a solid waste landfill and a mounding analysis is included. 1 80% TSS removal is required prior to discharge to infiltration BMP if Dynamic Field method is used. A - 4 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 5 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 3: Recharge (continued) The infiltration BMP is used to attenuate peak flows during storms greater than or equal to the 10- year 24-hour storm and separation to seasonal high groundwater is less than 4 feet and a mounding analysis is provided. Documentation is provided showing that infiltration BMPs do not adversely impact nearby wetland resource areas. Standard 4: Water Quality The Long-Term Pollution Prevention Plan typically includes the following:  Good housekeeping practices;  Provisions for storing materials and waste products inside or under cover;  Vehicle washing controls;  Requirements for routine inspections and maintenance of stormwater BMPs;  Spill prevention and response plans;  Provisions for maintenance of lawns, gardens, and other landscaped areas;  Requirements for storage and use of fertilizers, herbicides, and pesticides;  Pet waste management provisions;  Provisions for operation and management of septic systems;  Provisions for solid waste management;  Snow disposal and plowing plans relative to Wetland Resource Areas;  Winter Road Salt and/or Sand Use and Storage restrictions;  Street sweeping schedules;  Provisions for prevention of illicit discharges to the stormwater management system;  Documentation that Stormwater BMPs are designed to provide for shutdown and containment in the event of a spill or discharges to or near critical areas or from LUHPPL;  Training for staff or personnel involved with implementing Long-Term Pollution Prevention Plan;  List of Emergency contacts for implementing Long-Term Pollution Prevention Plan. A Long-Term Pollution Prevention Plan is attached to Stormwater Report and is included as an attachment to the Wetlands Notice of Intent. Treatment BMPs subject to the 44% TSS removal pretreatment requirement and the one inch rule for calculating the water quality volume are included, and discharge: is within the Zone II or Interim Wellhead Protection Area is near or to other critical areas is within soils with a rapid infiltration rate (greater than 2.4 inches per hour) involves runoff from land uses with higher potential pollutant loads. The Required Water Quality Volume is reduced through use of the LID site Design Credits. Calculations documenting that the treatment train meets the 80% TSS removal requirement and, if applicable, the 44% TSS removal pretreatment requirement, are provided. A - 5 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 6 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 4: Water Quality (continued) The BMP is sized (and calculations provided) based on: The ½” or 1” Water Quality Volume or The equivalent flow rate associated with the Water Quality Volume and documentation is provided showing that the BMP treats the required water quality volume. The applicant proposes to use proprietary BMPs, and documentation supporting use of proprietary BMP and proposed TSS removal rate is provided. This documentation may be in the form of the propriety BMP checklist found in Volume 2, Chapter 4 of the Massachusetts Stormwater Handbook and submitting copies of the TARP Report, STEP Report, and/or other third party studies verifying performance of the proprietary BMPs. A TMDL exists that indicates a need to reduce pollutants other than TSS and documentation showing that the BMPs selected are consistent with the TMDL is provided. Standard 5: Land Uses With Higher Potential Pollutant Loads (LUHPPLs) The NPDES Multi-Sector General Permit covers the land use and the Stormwater Pollution Prevention Plan (SWPPP) has been included with the Stormwater Report. The NPDES Multi-Sector General Permit covers the land use and the SWPPP will be submitted prior to the discharge of stormwater to the post-construction stormwater BMPs. The NPDES Multi-Sector General Permit does not cover the land use. LUHPPLs are located at the site and industry specific source control and pollution prevention measures have been proposed to reduce or eliminate the exposure of LUHPPLs to rain, snow, snow melt and runoff, and been included in the long term Pollution Prevention Plan. All exposure has been eliminated. All exposure has not been eliminated and all BMPs selected are on MassDEP LUHPPL list. The LUHPPL has the potential to generate runoff with moderate to higher concentrations of oil and grease (e.g. all parking lots with >1000 vehicle trips per day) and the treatment train includes an oil grit separator, a filtering bioretention area, a sand filter or equivalent. Standard 6: Critical Areas The discharge is near or to a critical area and the treatment train includes only BMPs that MassDEP has approved for stormwater discharges to or near that particular class of critical area. Critical areas and BMPs are identified in the Stormwater Report. A - 6 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 7 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 7: Redevelopments and Other Projects Subject to the Standards only to the maximum extent practicable The project is subject to the Stormwater Management Standards only to the maximum Extent Practicable as a: Limited Project Small Residential Projects: 5-9 single family houses or 5-9 units in a multi-family development provided there is no discharge that may potentially affect a critical area. Small Residential Projects: 2-4 single family houses or 2-4 units in a multi-family development with a discharge to a critical area Marina and/or boatyard provided the hull painting, service and maintenance areas are protected from exposure to rain, snow, snow melt and runoff Bike Path and/or Foot Path Redevelopment Project Redevelopment portion of mix of new and redevelopment. Certain standards are not fully met (Standard No. 1, 8, 9, and 10 must always be fully met) and an explanation of why these standards are not met is contained in the Stormwater Report. The project involves redevelopment and a description of all measures that have been taken to improve existing conditions is provided in the Stormwater Report. The redevelopment checklist found in Volume 2 Chapter 3 of the Massachusetts Stormwater Handbook may be used to document that the proposed stormwater management system (a) complies with Standards 2, 3 and the pretreatment and structural BMP requirements of Standards 4-6 to the maximum extent practicable and (b) improves existing conditions. Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan must include the following information:  Narrative;  Construction Period Operation and Maintenance Plan;  Names of Persons or Entity Responsible for Plan Compliance;  Construction Period Pollution Prevention Measures;  Erosion and Sedimentation Control Plan Drawings;  Detail drawings and specifications for erosion control BMPs, including sizing calculations;  Vegetation Planning;  Site Development Plan;  Construction Sequencing Plan;  Sequencing of Erosion and Sedimentation Controls;  Operation and Maintenance of Erosion and Sedimentation Controls;  Inspection Schedule;  Maintenance Schedule;  Inspection and Maintenance Log Form. A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan containing the information set forth above has been included in the Stormwater Report. A - 7 604597 Northamption sw checklist • 04/01/08 Stormwater Report Checklist • Page 8 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control (continued) The project is highly complex and information is included in the Stormwater Report that explains why it is not possible to submit the Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan with the application. A Construction Period Pollution Prevention and Erosion and Sedimentation Control has not been included in the Stormwater Report but will be submitted before land disturbance begins. The project is not covered by a NPDES Construction General Permit. The project is covered by a NPDES Construction General Permit and a copy of the SWPPP is in the Stormwater Report. The project is covered by a NPDES Construction General Permit but no SWPPP been submitted. The SWPPP will be submitted BEFORE land disturbance begins. Standard 9: Operation and Maintenance Plan The Post Construction Operation and Maintenance Plan is included in the Stormwater Report and includes the following information: Name of the stormwater management system owners; Party responsible for operation and maintenance; Schedule for implementation of routine and non-routine maintenance tasks; Plan showing the location of all stormwater BMPs maintenance access areas; Description and delineation of public safety features; Estimated operation and maintenance budget; and Operation and Maintenance Log Form. The responsible party is not the owner of the parcel where the BMP is located and the Stormwater Report includes the following submissions: A copy of the legal instrument (deed, homeowner’s association, utility trust or other legal entity) that establishes the terms of and legal responsibility for the operation and maintenance of the project site stormwater BMPs; A plan and easement deed that allows site access for the legal entity to operate and maintain BMP functions. Standard 10: Prohibition of Illicit Discharges The Long-Term Pollution Prevention Plan includes measures to prevent illicit discharges; An Illicit Discharge Compliance Statement is attached; NO Illicit Discharge Compliance Statement is attached but will be submitted prior to the discharge of any stormwater to post-construction BMPs. A - 8 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT B- NRCS Soil Survey Pages B-1 - B-4 Hydrologic Soil Group—Hampshire County, Massachusetts, Central Part (I-91 Northampton Hydrologic Soil Group) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/27/2015 Page 1 of 4 46 8 9 0 0 0 46 8 9 1 0 0 46 8 9 2 0 0 46 8 9 3 0 0 46 8 9 4 0 0 46 8 9 5 0 0 46 8 9 6 0 0 46 8 9 7 0 0 46 8 9 8 0 0 46 8 9 9 0 0 46 8 9 1 0 0 46 8 9 2 0 0 46 8 9 3 0 0 46 8 9 4 0 0 46 8 9 5 0 0 46 8 9 6 0 0 46 8 9 7 0 0 46 8 9 8 0 0 46 8 9 9 0 0 695300 695400 695500 695600 695700 695800 695900 696000 696100 696200 696300 696400 696500 696600 696700 695400 695500 695600 695700 695800 695900 696000 696100 696200 696300 696400 696500 696600 696700 42° 20' 13'' N 72 ° 3 7 ' 4 5 ' ' W 42° 20' 13'' N 72 ° 3 6 ' 4 3 ' ' W 42° 19' 43'' N 72 ° 3 7 ' 4 5 ' ' W 42° 19' 43'' N 72 ° 3 6 ' 4 3 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 300 600 1200 1800 Feet 0 50 100 200 300 Meters Map Scale: 1:6,480 if printed on A landscape (11" x 8.5") sheet. B - 1 MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Hampshire County, Massachusetts, Central Part Survey Area Data: Version 9, Sep 19, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Mar 28, 2011—Apr 18, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Hampshire County, Massachusetts, Central Part (I-91 Northampton Hydrologic Soil Group) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/27/2015 Page 2 of 4 B - 2 Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Hampshire County, Massachusetts, Central Part (MA609) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 1 Water 34.6 16.2% 8A Limerick silt loam, 0 to 3 percent slopes B/D 1.8 0.8% 30A Raynham silt loam, 0 to 3 percent slopes C/D 0.0 0.0% 96A Hadley silt loam, 0 to 3 percent slopes B 44.2 20.7% 98A Winooski silt loam, 0 to 3 percent slopes B 43.7 20.4% 225A Belgrade silt loam, 0 to 3 percent slopes C 29.1 13.6% 741A Amostown-Windsor silty substratum-Urban land complex, 0 to 3 percent slopes 50.2 23.5% 744A Hadley-Winooski-Urban land complex, 0 to 3 percent slopes B 10.0 4.7% Totals for Area of Interest 213.5 100.0% Hydrologic Soil Group—Hampshire County, Massachusetts, Central Part I-91 Northampton Hydrologic Soil Group Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/27/2015 Page 3 of 4 B - 3 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Hampshire County, Massachusetts, Central Part I-91 Northampton Hydrologic Soil Group Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/27/2015 Page 4 of 4 B - 4 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT C- Existing and Proposed Catchment Maps Pages C-1 - C-2 I-91 30" OUTFALL 24" OUTFALL 18" OUTFALL CONNEC T I C U T R I V E R DP-RIVER DP-F DP-B DP-C DP-D DP-E DP-A DP-G DP-H C R O S S P A T H R D R O U T E 9 OLD F E R R Y R D NB O F F R A M P SB ON R A M P DAMO N R D NO R W O T T U C K R A I L T R A I L DP-K 18" CMP CULVERT EXISTING CATCHMENTS NAME DP AREA (SF)CURVE NUMBERTc (MIN)IMPERVIOUS GRASS WOODS TOTAL EX-A A 113,768 33,902 13,512 161,182 87 5.0 EX-B B 3,940 48,910 9,354 62,204 62 5.0 EX-C C 63,951 37,201 0 101,152 84 5.0 EX-D D 7,609 0 0 7,609 98 5.0 EX-E E 30,813 910 0 31,723 97 5.0 EX-F F 14,448 34,483 109,887 158,818 60 5.0 EX-G G 133,678 87,395 0 221,073 83 5.0 EX-H H 30,976 3,398 0 34,374 94 5.0 EX-K K 0 6,365 108,236 114,601 55 5.0 LEGEND EX-A EX-C EX-E EX-G EX-H EX-K EX-B EX-D EX-F WOODS GRASS EXISTING DRAINAGE DP-A DISCHARGE POINT FOR EX-A FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D ( E X I S T I N G C A T C H M E N T S ) . D W G 27 - O c t - 2 0 1 7 9: 1 0 A M Pl o t t e d o n 197 100 SCALE: 1" = 100' 0 200 300 400 N EXISTING CATCHMENT MAP 21 C - 1 30" OUTFALL 24" OUTFALL CONNECTICUT RIVER C R O S S P A T H R D R O U T E 9 OLD F E R R Y R D 18" OUTFALL SB ON RAM P NO R W O T T U C K R A I L T R A I L XC11 RET DMH C01 RET DMH C02 RET DMH C03 DMH G01 REMODEL DMH REPLACE EXIST 24" RCP WITH 30" RCP DAM O N R D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D DD 18" CMP CULVERT POND-J POND-B NB O F F R A M P DP-RIVER DP-F DP-B DP-C DP-D DP-A DP-G DP-H DP-K PROPOSED CATCHMENTS NAME DP AREA (SF)CURVE NUMBERTc (MIN)IMPERVIOUS GRASS WOODS GRASS-WOODSBRUSH TOTAL PR-A A 84,893 38,361 2,908 0 0 126,162 86 5.0 PR-B Pond B 73,887 32,888 0 0 0 106,775 87 5.0 Pond B B 0 35,471 0 0 0 35,471 61 5.0 PR-C C 62,438 49,310 0 0 0 111,748 82 5.0 PR-D D 5,956 0 0 0 0 5,956 98 5.0 PR-F F 13,969 27,100 0 31,205 24,916 97,190 62 5.0 PR-G G 154,965 93,199 0 0 0 248,164 84 5.0 PR-H H 25,013 4,685 0 0 0 29,698 92 5.0 PR-J Pond J 16,720 4,224 0 0 0 20,944 91 5.0 Pond J F 0 21,547 0 0 0 21,547 61 5.0 PR-K K 2,974 0 0 54,713 28,655 86,342 56 5.0 LEGEND PR-A PR-C PR-F PR-H PR-K GRASS PR-B PR-D PR-G PR-J BRUSH WOODS GRASS - WOODS PROPOSED DRAINAGE EXISTING DRAINAGE DP-A DISCHARGE POINT FOR PR-A FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D ( P R O P O S E D C A T C H M E N T S ) . D W G 27 - O c t - 2 0 1 7 9: 0 6 A M Pl o t t e d o n 197 100 SCALE: 1" = 100' 0 200 300 400 N PROPOSED CATCHMENT MAP 22 C - 2 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT D- Splash Pad Sizing Calculations Page D1 604597 - Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA NOI Submittal Splash Pad Sizing Calculations 2/27/2018 By: MJR Checked by: RWH Splash Pad Sizing: Objective: To determine the size of the rip rap apron at then end of a flared end section to prevent scour or erosion. Riprap Size: D50 (in.) Apron Length: L (ft.) Apron Depth: H (ft.) Arpon Width: W (ft.) Known Information: Pipe Diameter: D (ft.) Design Discharge: Q (cfs)2.65 Specific Weight of Rock Actual Tailwater Depth: TWa (ft.)62.43 lb/ft^3 Unit Weight of Water Acceleration due to gravity, 32.2: g (ft/s^2) Table 10.1. Example Riprap Classes and Apron Dimensions Class D50 (in.) Apron Length (ft.)Apron Depth (in.) Weight (lb) 1 5 4D 3.5D50 12 2 6 4D 3.3D50 21 3 10 5D 2.4D50 96 M2.02.3 Stone fo Pipe Ends 4 14 6D 2.2D50 263 5 20 7D 2.0D50 766 6 22 8D 2.0D50 1019 Methodology: U.S. Federal Highway Administration, 2006, Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Center Circular No. 14 Tailwater Check: Tailwater Depth should be limited to between 0.4D and 1.0D. If Tailwater is unknown, use 0.4D. Therefore, if TWa < 0.4D; use TWu = 0.4D if TWa > D; TWu = D *Tailwater Depth to be used for Equation purposes, TWu Calculations: Use Equation (10.4) to determine rip rap size from Chapter 10 in HEC 14. LOCATION OUTFALL Pipe Dia.Design Discharge Tailwater Invert Actual TW Depth TW Depth Riprap Size Riprap Size Rip Rap Length Depth Width D Q Elev.Elev.TWa TWu D50 D50 Table Class L D W (ft.)(cfs)(ft)(ft)(ft)(ft)(in.)(in.)(ft.)(in.)(ft.) Example:HEC 14 5.00 85.00 943.23 941.23 0.00 2.0 5.2 6.0 2 20 20 28 Northampton F05 12 FES 1.00 1.17 122.40 122.00 0.00 0.4 0.7 5.0 1 4 18 6 Northampton J51 12 FES 1.00 2.49 129.40 129.00 0.00 0.4 2.0 5.0 1 4 18 6 Note: Apron will consist of M2. 02.4 Modified Rockfill Apron DimensionsDesign Criteria D - 1 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT E- BMP Calculations Volume Input Criteria - Infiltration Basin J ................................................................................................. E-1 Volume Input Criteria - Infiltration Basin B ............................................................................................... E-2 Water Quality and Recharge Summary ...................................................................................................... E-3 Pages E-1 - E-3 604597: I-91 Interchange 19 Northampton, MA NOI Submission BMP Calculations Volume Input Criteria Infiltration Basin J 2/27/2018 By: MJR Checked by: DPL Infiltration Basin J Forebay: Elevation (FT) Delta Elev. (FT) Area (SF) Volume (CF) Void Ratio Volume w/Ratio (CF) Cumulative Volume (CF) Water Quality Volume (CF) 128.00 183 0 100%0 0 1.00 270 129.00 356 270 100%270 270 270 1.00 471 130.00 586 471 100%471 740.5 Infiltration Basin J: Elevation (FT) Delta Elev. (FT) Area (SF) High Marsh Area (SF) Net Area (SF) Volume (CF)Void Ratio Volume w/Ratio (CF) Cumulative Volume (CF) Water Quality Volume (CF) 123.00 1035 0 1035 0 100%0 0 1.00 1254 124.00 1472 0 1472 1254 100%1254 1254 1.00 1721 125.00 1970 0 1970 1721 100%1721 2975 0.75 2177 125.75 2383 0 2383 1632 100%1632 4607 4607 0.25 2453 126.00 2522 0 2522 613 100%613 5220 1.00 2643 127.00 3130 0 2763 2643 100%2643 7863 E - 1 604597: I-91 Interchange 19 Northampton, MA NOI Submittal BMP Calculations Volume Input Criteria Infiltration Basin B 2/27/2018 By: MJR Checked by: DPL Infiltration Basin B Forebay: Elevation (FT) Delta Elev. (FT) Area (SF) Volume (CF) Void Ratio Volume w/Ratio (CF) Cumulative Volume (CF) Water Quality Volume (CF) 130.00 196 0 100%0 0 1.00 307 131.00 418 307 100%307 307 1.00 568 132.00 717 568 100%568 875 875 1.00 885 133.00 1053 885 100%885 1760 1.00 1221 134.00 1388 1221 100%1221 2980 1.00 1576 135.00 1764 1576 100%1576 4556 1.00 1972 136.00 2180 1972 100%1972 6528 Infiltration Basin: Elevation (FT) Delta Elev. (FT) Area (SF) Volume (CF) Void Ratio Volume w/Ratio (CF) Cumulative Volume (CF) Water Quality Volume (CF) 130.00 1495 0 100%0 0 1.00 1894 131.00 2292 1894 100%1894 1894 1.00 2729 132.00 3166 2729 100%2729 4623 0.75 3498 132.75 3829 2623 100%2623 7246 7246 0.25 3937 133.00 4045 984 100%984 8230 1.00 4482 134.00 4918 4482 100%4482 12711 1.00 5371 135.00 5823 5371 100%5371 18082 1.00 6292 136.00 6761 6292 100%6292 24374 E - 2 604597: I-91 Interchange 19 Northampton, MA NOI Submittal BMP Calculations Water Quality and Recharge Summary 2/27/2018 By: MJR Checked by: DPL Infiltration Basin J Forebay Total Contributing Impervious Area:16,720 SF Forebay Volume Required: (0.1 inch x Area)140 CF Forebay Volume Provided:270 CF Infiltration Basin: Total Contributing Impervious Area:16,720 SF Required Water Qualtiy Volume: (1 inch x Area)1,394 CF Required Recharge Volume (0.35 inches x Impervious Area)488 CF Provided Water Quality / Recharge Volume:4,607 CF Required 72 Hour Drawdown: Rv:4,607 CF K (Saturated Hydraulic Conductivity, Rawls Table for Loamy Sand):2.41 IN/HR Bottom Area of Basin (elevation 123):1,035 SF Drawdown Time:22 HR Infiltration Basin B Forebay Total Contributing Impervious Area:73,887 SF Forebay Volume Required: (0.1 inch x Area)616 CF Forebay Volume Provided:875 CF Infiltration Basin: Total Contributing Impervious Area:73,887 SF Required Water Qualtiy Volume: (1/2 inch x Impervious Area)3,079 CF Required Recharge Volume (0.35 inches x Impervious Area)2,155 CF Provided Water Quality / Recharge Volume:7,246 CF Required 72 Hour Drawdown: Rv:7,246 CF K (Saturated Hydraulic Conductivity, Rawls Table for Sandy Loam):1.02 IN/HR Bottom Area of Basin (elevation 130):1,495 SF Drawdown Time:57 HR Recharge Volume for Entire Site: Total Existing Impervious Area:399,183 SF Total Proposed Impervious Area:440,815 SF Net Total Additional Impervious Area:41,632 SF Required Recharge Volume (0.35 inches x Additional Impervious Area)1,214 CF Provided Water Quality / Recharge Volume:11,853 CF E - 3 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT F- Peak Rate Attenuation Modeling Output Existing Model Output ........................................................................................................................ F-1 - F-45 Proposed Model Output ................................................................................................................... F-46 - F-99 (The model outputs included in this report are the summaries only. Hydrograph Tables and associated graphs for existing and proposed are 596 and 1,686 pages, respectively. These full outputs are available if requested.) Pages F-1 - F-99 604597 - Existing Drainage Model Project Summary 604597 NorthamptonTitle Michael Rieger, PEEngineer TranSystemsCompany 10/25/2017Date Notes Page 1 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 Sc e n a r i o : 2 - Y e a r E X -P I P E -D EX-PIPE-E 2 5 Pa g e 1 o f 1 27 S i e m o n C o m p a n y D r i v e S u i t e 2 0 0 W W a t e r t o w n , C T 0 6 7 9 5 U S A +1 - 2 0 3 - 7 5 5 - 1 6 6 6 10 / 2 5 / 2 0 1 7 Be n t l e y P o n d P a c k V 8 i [0 8 . 1 1 . 0 1 . 5 6 ] Be n t l e y S y s t e m s , I n c . H ae s t a d M e t h o d s So l u t i o n C e n t e r No r t h a m p t o n E x i s t i n g . p p c F - 2 40Runoff CN-Area, 2 years EX-K 39Runoff CN-Area, 2 years EX-H 38Runoff CN-Area, 2 years EX-G 37Runoff CN-Area, 2 years EX-F 36Runoff CN-Area, 2 years EX-E 35Runoff CN-Area, 2 years EX-D 34Runoff CN-Area, 2 years EX-C 33Runoff CN-Area, 2 years EX-B 32Runoff CN-Area, 2 years EX-A 30Time of Concentration Calculations, 2 years EX-K 28Time of Concentration Calculations, 2 years EX-H 26Time of Concentration Calculations, 2 years EX-G 24Time of Concentration Calculations, 2 years EX-F 22Time of Concentration Calculations, 2 years EX-E 20Time of Concentration Calculations, 2 years EX-D 18Time of Concentration Calculations, 2 years EX-C 16Time of Concentration Calculations, 2 years EX-B 14Time of Concentration Calculations, 2 years EX-A 11Time-Depth Curve, 2 years 8Time-Depth Curve, 10 years 5Time-Depth Curve, 100 years Type III 24-hr Northampton 2Master Network Summary Table of Contents F - 3 Table of Contents 40Runoff CN-Area, 2 years EX-K 39Runoff CN-Area, 2 years EX-H 38Runoff CN-Area, 2 years EX-G 37Runoff CN-Area, 2 years EX-F 36Runoff CN-Area, 2 years EX-E 35Runoff CN-Area, 2 years EX-D 34Runoff CN-Area, 2 years EX-C 33Runoff CN-Area, 2 years EX-B 32Runoff CN-Area, 2 years EX-A 30Time of Concentration Calculations, 2 years EX-K 28Time of Concentration Calculations, 2 years EX-H 26Time of Concentration Calculations, 2 years EX-G 24Time of Concentration Calculations, 2 years EX-F 22Time of Concentration Calculations, 2 years EX-E 20Time of Concentration Calculations, 2 years EX-D 18Time of Concentration Calculations, 2 years EX-C 16Time of Concentration Calculations, 2 yearsEX-B 14Time of Concentration Calculations, 2 yearsEX-A 11Time-Depth Curve, 2 years 8Time-Depth Curve, 10 years 5Time-Depth Curve, 100 yearsType III 24-hr Northampton 2Master Network Summary F - 4 604597 - Existing Drainage Model Subsection: Master Network Summary Catchments Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 6.66726.5023,33922-YearEX-A 11.59726.0041,5921010-YearEX-A 17.85726.0065,781100100-YearEX-A 0.43727.502,06122-YearEX-B 1.61727.005,9021010-YearEX-B 3.51726.5012,264100100-YearEX-B 3.68726.5012,77022-YearEX-C 6.71726.0023,7231010-YearEX-C 10.65726.0038,511100100-YearEX-C 0.44726.001,75422-YearEX-D 0.66726.002,7021010-YearEX-D 0.94726.003,905100100-YearEX-D 0.77728.004,40422-YearEX-F 3.58727.0013,4781010-YearEX-F 8.23726.5028,924100100-YearEX-F 1.79726.007,02322-YearEX-E 2.73726.0010,9621010-YearEX-E 3.91726.0015,966100100-YearEX-E 1.81726.006,72722-YearEX-H 2.85726.0010,9221010-YearEX-H 4.15726.0016,297100100-YearEX-H 7.68726.5026,62422-YearEX-G 14.26726.5050,1711010-YearEX-G 22.84726.0082,177100100-YearEX-G 0.19740.001,85622-YearEX-K 1.68727.507,0791010-YearEX-K 4.63727.0016,720100100-YearEX-K Page 2 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 5 604597 - Existing Drainage Model Subsection: Master Network Summary Node Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 0.77728.004,40422-YearDP-F 3.58727.0013,4781010-YearDP-F 8.23726.5028,924100100-YearDP-F 1.81726.006,72722-YearDP-H 2.85726.0010,9221010-YearDP-H 4.15726.0016,297100100-YearDP-H 0.44726.001,75422-YearDP-D 0.66726.002,7021010-YearDP-D 0.94726.003,905100100-YearDP-D 3.68726.5012,77022-YearDP-C 6.71726.0023,7231010-YearDP-C 10.65726.0038,511100100-YearDP-C 11.30727.0039,36922-YearDP-CG1 20.87726.5073,8581010-YearDP-CG1 26.62726.50121,221100100-YearDP-CG1 7.68726.5026,62422-YearDP-G 14.26726.5050,1711010-YearDP-G 22.84726.0082,177100100-YearDP-G 11.26727.5039,34722-YearDP-CG2 20.83727.0073,8261010-YearDP-CG2 26.60726.50121,178100100-YearDP-CG2 0.43727.502,06122-YearDP-B 1.61727.005,9021010-YearDP-B 3.51726.5012,264100100-YearDP-B 1.79726.007,02322-YearDP-E 2.73726.0010,9621010-YearDP-E 3.91726.0015,966100100-YearDP-E 13.78727.5050,15422-YearDP-BCDEG Page 3 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 6 604597 - Existing Drainage Model Subsection: Master Network Summary Node Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 25.66727.5093,3471010-YearDP-BCDEG 34.54726.50154,049100100-YearDP-BCDEG 13.71728.0050,11822-Year12+85 MH 25.57728.0093,2961010-Year12+85 MH 31.33721.50154,971100100-Year12+85 MH 6.66726.5023,33922-YearDP-A 11.59726.0041,5921010-YearDP-A 17.85726.0065,781100100-YearDP-A 13.67728.5050,08722-Year30" Outfall 25.51728.0093,2511010-Year30" Outfall 31.33738.00154,911100100-Year30" Outfall 20.01727.5073,42622-YearDP-River 36.70727.00134,8431010-YearDP-River 49.18726.00220,692100100-YearDP-River 0.19740.001,85622-YearDP-K 1.68727.507,0791010-YearDP-K 4.63727.0016,720100100-YearDP-K Page 4 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 7 604597 - Existing Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve Time-Depth Curve: 100-year, 24-hr rainfall 100-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years100Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.10.10.00.00.030.00 0.10.10.10.10.160.00 0.10.10.10.10.190.00 0.20.10.10.10.1120.00 0.20.20.20.20.2150.00 0.20.20.20.20.2180.00 0.30.30.30.20.2210.00 0.30.30.30.30.3240.00 0.40.30.30.30.3270.00 0.40.40.40.40.4300.00 0.50.40.40.40.4330.00 0.50.50.50.50.5360.00 0.60.60.50.50.5390.00 0.60.60.60.60.6420.00 0.70.70.70.70.7450.00 0.80.80.80.70.7480.00 0.90.90.90.80.8510.00 Page 5 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 8 604597 - Existing Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 1.01.01.01.00.9540.00 1.21.11.11.11.1570.00 1.31.31.31.21.2600.00 1.61.51.51.41.4630.00 1.81.81.71.61.6660.00 2.72.42.22.01.9690.00 4.44.24.03.73.2720.00 4.84.74.64.64.5750.00 5.04.94.94.84.8780.00 5.25.15.15.15.0810.00 5.35.35.35.25.2840.00 5.45.45.45.45.3870.00 5.65.55.55.55.5900.00 5.75.65.65.65.6930.00 5.75.75.75.75.7960.00 5.85.85.85.85.7990.00 5.95.95.85.85.81,020.00 5.95.95.95.95.91,050.00 6.06.06.05.95.91,080.00 6.06.06.06.06.01,110.00 6.16.16.16.06.01,140.00 6.16.16.16.16.11,170.00 6.26.16.16.16.11,200.00 6.26.26.26.26.21,230.00 6.26.26.26.26.21,260.00 6.36.36.36.26.21,290.00 Page 6 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 9 604597 - Existing Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 6.36.36.36.36.31,320.00 6.36.36.36.36.31,350.00 6.46.46.46.36.31,380.00 6.46.46.46.46.41,410.00 (N/A)(N/A)(N/A)(N/A)6.41,440.00 Page 7 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 0 604597 - Existing Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve Time-Depth Curve: 10-year, 24-hr rainfall 10-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years10Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.00.00.00.00.030.00 0.10.10.10.00.060.00 0.10.10.10.10.190.00 0.10.10.10.10.1120.00 0.10.10.10.10.1150.00 0.20.20.10.10.1180.00 0.20.20.20.20.2210.00 0.20.20.20.20.2240.00 0.20.20.20.20.2270.00 0.30.30.30.30.3300.00 0.30.30.30.30.3330.00 0.40.30.30.30.3360.00 0.40.40.40.40.4390.00 0.40.40.40.40.4420.00 0.50.50.50.50.5450.00 0.60.60.50.50.5480.00 0.60.60.60.60.6510.00 Page 8 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 1 604597 - Existing Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 0.70.70.70.70.7540.00 0.80.80.80.80.7570.00 0.90.90.90.90.9600.00 1.11.11.01.01.0630.00 1.31.21.21.21.1660.00 1.91.71.51.41.3690.00 3.13.02.82.62.2720.00 3.33.33.33.23.2750.00 3.53.53.43.43.4780.00 3.63.63.63.63.5810.00 3.73.73.73.73.6840.00 3.83.83.83.83.8870.00 3.93.93.93.93.8900.00 4.04.03.93.93.9930.00 4.04.04.04.04.0960.00 4.14.14.14.14.0990.00 4.14.14.14.14.11,020.00 4.24.24.24.14.11,050.00 4.24.24.24.24.21,080.00 4.24.24.24.24.21,110.00 4.34.34.34.34.21,140.00 4.34.34.34.34.31,170.00 4.34.34.34.34.31,200.00 4.44.44.34.34.31,230.00 4.44.44.44.44.41,260.00 4.44.44.44.44.41,290.00 Page 9 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 2 604597 - Existing Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 4.44.44.44.44.41,320.00 4.54.54.44.44.41,350.00 4.54.54.54.54.51,380.00 4.54.54.54.54.51,410.00 (N/A)(N/A)(N/A)(N/A)4.51,440.00 Page 10 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 3 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve Time-Depth Curve: 2-year, 24-hr rainfall 2-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years2Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.00.00.00.00.030.00 0.00.00.00.00.060.00 0.10.10.10.00.090.00 0.10.10.10.10.1120.00 0.10.10.10.10.1150.00 0.10.10.10.10.1180.00 0.10.10.10.10.1210.00 0.10.10.10.10.1240.00 0.20.20.20.20.1270.00 0.20.20.20.20.2300.00 0.20.20.20.20.2330.00 0.20.20.20.20.2360.00 0.30.30.30.20.2390.00 0.30.30.30.30.3420.00 0.30.30.30.30.3450.00 0.40.40.40.30.3480.00 0.40.40.40.40.4510.00 Page 11 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 4 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 0.50.50.50.40.4540.00 0.60.50.50.50.5570.00 0.60.60.60.60.6600.00 0.70.70.70.70.6630.00 0.90.80.80.80.7660.00 1.21.11.00.90.9690.00 2.12.01.91.81.5720.00 2.22.22.22.12.1750.00 2.32.32.32.32.2780.00 2.42.42.42.42.4810.00 2.52.52.52.42.4840.00 2.62.52.52.52.5870.00 2.62.62.62.62.6900.00 2.72.62.62.62.6930.00 2.72.72.72.72.7960.00 2.72.72.72.72.7990.00 2.82.72.72.72.71,020.00 2.82.82.82.82.81,050.00 2.82.82.82.82.81,080.00 2.82.82.82.82.81,110.00 2.82.82.82.82.81,140.00 2.92.92.92.92.91,170.00 2.92.92.92.92.91,200.00 2.92.92.92.92.91,230.00 2.92.92.92.92.91,260.00 2.92.92.92.92.91,290.00 Page 12 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 5 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 3.03.02.92.92.91,320.00 3.03.03.03.03.01,350.00 3.03.03.03.03.01,380.00 3.03.03.03.03.01,410.00 (N/A)(N/A)(N/A)(N/A)3.01,440.00 Page 13 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 6 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-A Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 14 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 7 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-A Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 15 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 8 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-B Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 16 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 1 9 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-B Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 17 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 0 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-C Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 18 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 1 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-C Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 19 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 2 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-D Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 20 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 3 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-D Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 21 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 4 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-E Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 22 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 5 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-E Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 23 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 6 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-F Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 24 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 7 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-F Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 25 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 8 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-G Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 26 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 2 9 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-G Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 27 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 0 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-H Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 28 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 1 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-H Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 29 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 2 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-K Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 30 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 3 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-K Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 31 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 4 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-A Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.0113,76898.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.033,90261.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 55.0000.00.013,51255.000Woods - good - Soil B 86.613(N/A)(N/A)161,182(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 32 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 5 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-B Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.03,94098.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.048,91061.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 55.0000.00.09,35455.000Woods - good - Soil B 62.441(N/A)(N/A)62,204(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 33 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 6 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-C Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.063,95198.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.037,20161.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 84.392(N/A)(N/A)101,152(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 34 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 7 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-D Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.07,60998.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 98.000(N/A)(N/A)7,609(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 35 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 8 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-E Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.030,81398.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.091061.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 96.939(N/A)(N/A)31,723(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 36 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 3 9 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-F Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.014,44898.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.034,48361.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 55.0000.00.0109,88755.000Woods - good - Soil B 60.215(N/A)(N/A)158,818(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 37 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 0 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-G Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.0133,67898.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.087,39561.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 83.373(N/A)(N/A)221,073(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 38 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 1 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-H Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.030,97698.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.03,39861.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 94.342(N/A)(N/A)34,374(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 39 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 2 604597 - Existing Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: EX-K Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 61.0000.00.06,36561.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 55.0000.00.0108,23655.000Woods - good - Soil B 55.333(N/A)(N/A)114,601(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 40 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 3 Type III 24-hr Northampton (Time-Depth Curve, 2years)...11, 12, 13 Type III 24-hr Northampton (Time-Depth Curve, 100 years)...5, 6, 7 Type III 24-hr Northampton (Time-Depth Curve, 10 years)...8, 9, 10 T Master Network Summary...2, 3, 4 M EX-K (Time of Concentration Calculations, 2 years)...30, 31 EX-K (Runoff CN-Area, 2 years)...40 EX-H (Time of Concentration Calculations, 2 years)...28, 29 EX-H (Runoff CN-Area, 2 years)...39 EX-G (Time of Concentration Calculations, 2 years)...26, 27 EX-G (Runoff CN-Area, 2 years)...38 EX-F (Time of Concentration Calculations, 2 years)...24, 25 EX-F (Runoff CN-Area, 2 years)...37 EX-E (Time of Concentration Calculations, 2 years)...22, 23 EX-E (Runoff CN-Area, 2 years)...36 EX-D (Time of Concentration Calculations, 2 years)...20,21 EX-D (Runoff CN-Area, 2 years)...35 EX-C (Time of Concentration Calculations, 2 years)...18, 19 EX-C (Runoff CN-Area, 2 years)...34 EX-B (Time of Concentration Calculations, 2 years)...16, 17 EX-B (Runoff CN-Area, 2 years)...33 EX-A (Time of Concentration Calculations, 2 years)...14,15 EX-A (Runoff CN-Area, 2 years)...32 E 604597 - Existing Drainage Model Index Page 41 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 4 604597 - Existing Drainage Model Type III 24-hr Northampton (Time-Depth Curve, 2 years)...11, 12, 13 Type III 24-hr Northampton (Time-Depth Curve, 100 years)...5, 6, 7 Type III 24-hr Northampton (Time-Depth Curve, 10 years)...8, 9, 10 T Master Network Summary...2, 3, 4 M EX-K (Time of Concentration Calculations, 2 years)...30,31 EX-K (Runoff CN-Area, 2 years)...40 EX-H (Time of Concentration Calculations, 2 years)...28, 29 EX-H (Runoff CN-Area, 2 years)...39 EX-G (Time of Concentration Calculations, 2 years)...26, 27 EX-G (Runoff CN-Area, 2 years)...38 EX-F (Time of Concentration Calculations, 2 years)...24, 25 EX-F (Runoff CN-Area, 2 years)...37 EX-E (Time of Concentration Calculations, 2 years)...22, 23 EX-E (Runoff CN-Area, 2 years)...36 EX-D (Time of Concentration Calculations, 2 years)...20, 21 EX-D (Runoff CN-Area, 2 years)...35 EX-C (Time of Concentration Calculations, 2 years)...18,19 EX-C (Runoff CN-Area, 2 years)...34EX-B (Time of Concentration Calculations, 2 years)...16,17EX-B (Runoff CN-Area, 2 years)...33EX-A (Time of Concentration Calculations, 2 years)...14,15EX-A (Runoff CN-Area, 2 years)...32E Page 42 of 4227 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Existing.ppc F - 4 5 604597 - Proposed Drainage Model Project Summary 604597 NorthamptonTitle Michael Rieger, PEEngineer TranSystemsCompany 10/25/2017Date Notes Page 1 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 4 6 Sc e n a r i o : 2 - Y e a r E X -P I P E -D P R - P I P E - C G 2 2 4 Pa g e 1 o f 1 27 S i e m o n C o m p a n y D r i v e S u i t e 2 0 0 W W a t e r t o w n , C T 0 6 7 9 5 U S A +1 - 2 0 3 - 7 5 5 - 1 6 6 6 10 / 2 5 / 2 0 1 7 Be n t l e y P o n d P a c k V 8 i [0 8 . 1 1 . 0 1 . 5 6 ] Be n t l e y S y s t e m s , I n c . H ae s t a d M e t h o d s So l u t i o n C e n t e r No r t h a m p t o n P r o p o s e d . p p c F - 47 48Runoff CN-Area, 2 years PR-Pond J 47Runoff CN-Area, 2 years PR-Pond B 46Runoff CN-Area, 2 years PR-K 45Runoff CN-Area, 2 years PR-J 44Runoff CN-Area, 2 years PR-H 43Runoff CN-Area, 2 years PR-G 42Runoff CN-Area, 2 years PR-F 41Runoff CN-Area, 2 years PR-D 40Runoff CN-Area, 2 years PR-C 39Runoff CN-Area, 2 years PR-B 38Runoff CN-Area, 2 years PR-A 36Time of Concentration Calculations, 2 years PR-Pond J 34Time of Concentration Calculations, 2 years PR-Pond B 32Time of Concentration Calculations, 2 years PR-K 30Time of Concentration Calculations, 2 years PR-J 28Time of Concentration Calculations, 2 years PR-H 26Time of Concentration Calculations, 2 years PR-G 24Time of Concentration Calculations, 2 years PR-F 22Time of Concentration Calculations, 2 years PR-D 20Time of Concentration Calculations, 2 years PR-C 18Time of Concentration Calculations, 2 years PR-B 16Time of Concentration Calculations, 2 years PR-A 13Time-Depth Curve, 2 years 10Time-Depth Curve, 10 years 7Time-Depth Curve, 100 years Type III 24-hr Northampton 2Master Network Summary Table of Contents F - 4 8 48Runoff CN-Area, 2 years PR-Pond J 47Runoff CN-Area, 2 years PR-Pond B 46Runoff CN-Area, 2 years PR-K 45Runoff CN-Area, 2 years PR-J 44Runoff CN-Area, 2 years PR-H 43Runoff CN-Area, 2 years PR-G 42Runoff CN-Area, 2 years PR-F 41Runoff CN-Area, 2 years PR-D 40Runoff CN-Area, 2 years PR-C 39Runoff CN-Area, 2 years PR-B 38Runoff CN-Area, 2 years PR-A 36Time of Concentration Calculations, 2 years PR-Pond J 34Time of Concentration Calculations, 2 years PR-Pond B 32Time of Concentration Calculations, 2 years PR-K 30Time of Concentration Calculations, 2 years PR-J 28Time of Concentration Calculations, 2 years PR-H 26Time of Concentration Calculations, 2 years PR-G 24Time of Concentration Calculations, 2 years PR-F 22Time of Concentration Calculations, 2 years PR-D 20Time of Concentration Calculations, 2 years PR-C 18Time of Concentration Calculations, 2 yearsPR-B 16Time of Concentration Calculations, 2 yearsPR-A 13Time-Depth Curve, 2 years 10Time-Depth Curve, 10 years 7Time-Depth Curve, 100 yearsType III 24-hr Northampton 2Master Network Summary Table of Contents F - 4 9 Table of Contents 48Runoff CN-Area, 2 years PR-Pond J 47Runoff CN-Area, 2 years PR-Pond B 46Runoff CN-Area, 2 years PR-K 45Runoff CN-Area, 2 years PR-J 44Runoff CN-Area, 2 years PR-H 43Runoff CN-Area, 2 years PR-G 42Runoff CN-Area, 2 years PR-F 41Runoff CN-Area, 2 years PR-D 40Runoff CN-Area, 2 yearsPR-C 39Runoff CN-Area, 2 yearsPR-B 38Runoff CN-Area, 2 yearsPR-A 36Time of Concentration Calculations, 2 yearsPR-Pond J 34Time of Concentration Calculations, 2 yearsPR-Pond B 32Time of Concentration Calculations, 2 yearsPR-K 30Time of Concentration Calculations, 2 yearsPR-J 28Time of Concentration Calculations, 2 yearsPR-H 26Time of Concentration Calculations, 2 yearsPR-G 24Time of Concentration Calculations, 2 yearsPR-F 22Time of Concentration Calculations, 2 yearsPR-D 20Time of Concentration Calculations, 2 yearsPR-C 18Time of Concentration Calculations, 2 yearsPR-B 16Time of Concentration Calculations, 2 yearsPR-A 13Time-Depth Curve, 2 years 10Time-Depth Curve, 10 years 7Time-Depth Curve, 100 yearsType III 24-hr Northampton 2Master Network Summary F - 5 0 604597 - Proposed Drainage Model Subsection: Master Network Summary Catchments Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 5.01726.5017,46322-YearPR-A 8.84726.0031,5501010-YearPR-A 13.75726.0050,329100100-YearPR-A 4.42726.5015,46122-YearPR-B 7.68726.0027,5531010-YearPR-B 11.83726.0043,576100100-YearPR-B 3.70726.5012,82922-YearPR-C 7.00726.5024,5271010-YearPR-C 11.32726.0040,539100100-YearPR-C 0.34726.001,37322-YearPR-D 0.52726.002,1151010-YearPR-D 0.74726.003,056100100-YearPR-D 0.67727.503,22022-YearPR-F 2.52727.009,2221010-YearPR-F 5.49726.5019,163100100-YearPR-F 1.47726.005,34422-YearPR-H 2.38726.008,9081010-YearPR-H 3.51726.0013,511100100-YearPR-H 9.03726.5031,32822-YearPR-G 16.47726.0058,2001010-YearPR-G 26.12726.0094,483100100-YearPR-G 1.01726.003,61222-YearPR-J 1.65726.006,1011010-YearPR-J 2.45726.009,330100100-YearPR-J 0.13728.0065422-YearPR-Pond J 0.52727.001,9351010-YearPR-Pond J 1.17726.504,085100100-YearPR-Pond J 0.21728.001,07722-YearPR-Pond B Page 2 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 1 604597 - Proposed Drainage Model Subsection: Master Network Summary Catchments Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 0.86727.003,1861010-YearPR-Pond B 1.92726.506,725100100-YearPR-Pond B 0.18739.501,57822-YearPR-K 1.39727.505,7131010-YearPR-K 3.68727.0013,208100100-YearPR-K Node Summary Peak Flow(ft³/s)Time to Peak(min)Hydrograph Volume(ft³)ReturnEvent(years) ScenarioLabel 0.67727.503,22022-YearDP-F 2.52727.009,2221010-YearDP-F 5.49726.5022,764100100-YearDP-F 1.47726.005,34422-YearDP-H 2.38726.008,9081010-YearDP-H 3.51726.0013,511100100-YearDP-H 0.34726.001,37322-YearDP-D 0.52726.002,1151010-YearDP-D 0.74726.003,056100100-YearDP-D 3.70726.5012,82922-YearDP-C 7.00726.5024,5271010-YearDP-C 11.32726.0040,539100100-YearDP-C 12.66727.0044,12822-YearDP-CG1 23.38726.5082,6851010-YearDP-CG1 43.37723.00135,294100100-YearDP-CG1 9.03726.5031,32822-YearDP-G 16.47726.0058,2001010-YearDP-G Page 3 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 2 Page 4 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i[08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc 604597 - Proposed Drainage Model Subsection: Master Network Summary Node Summary Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel 26.12726.0094,483100100-YearDP-G 12.61727.5044,10222-YearDP-CG2 23.33727.0082,6481010-YearDP-CG2 29.63720.00136,216100100-YearDP-CG2 0.23852.003,40822-YearDP-B 2.42747.0016,7341010-YearDP-B 4.67743.0035,460100100-YearDP-B 12.89728.0048,85522-YearDP-BCDEG 24.43728.00101,4541010-YearDP-BCDEG 34.34740.00175,563100100-YearDP-BCDEG 12.83728.5048,82122-Year12+85 MH 24.32728.50101,4021010-Year12+85 MH 31.33721.50176,477100100-Year12+85 MH 5.01726.5017,46322-YearDP-A 8.84726.0031,5501010-YearDP-A 13.75726.0050,329100100-YearDP-A 12.79729.0048,79122-Year30" Outfall 24.24729.00101,3561010-Year30" Outfall 31.33738.50176,414100100-Year30" Outfall 17.48727.5066,25422-YearDP-River 32.44727.50132,9061010-YearDP-River 45.08726.00226,743100100-YearDP-River 0.18739.501,57822-YearDP-K 1.39727.505,7131010-YearDP-K 3.68727.0013,208100100-YearDP-K Pond Summary F - 5 3 604597 - Proposed Drainage Model Subsection: Master Network Summary Pond Summary Maximum Pond Storage (ft³) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel (N/A)(N/A)3.98727.0015,15722-YearInfiltration BasinB (IN) 8,258133.010.23852.003,40822-YearInfiltration BasinB (OUT) (N/A)(N/A)6.86726.5029,2831010-YearInfiltration Basin B (IN) 11,368133.712.42747.0016,7341010-YearInfiltration Basin B (OUT) (N/A)(N/A)11.53726.5048,788100100-YearInfiltration BasinB (IN) 16,703134.754.67743.0035,460100100-YearInfiltration Basin B (OUT) (N/A)(N/A)4.42726.5015,46122-YearForebay B (IN) 1,759133.023.78727.0014,08022-YearForebay B (OUT) (N/A)(N/A)7.68726.0027,5531010-YearForebay B (IN) 2,608133.716.01726.5026,0971010-YearForebay B (OUT) (N/A)(N/A)11.83726.0043,576100100-YearForebay B (IN) 4,146134.769.61726.5042,062100100-YearForebay B (OUT) (N/A)(N/A)1.01726.003,61222-YearForebay J (IN) 29128.111.00726.503,61222-YearForebay J (OUT) (N/A)(N/A)1.65726.006,1011010-YearForebay J (IN) 48128.181.64726.506,1001010-YearForebay J (OUT) (N/A)(N/A)2.45726.009,330100100-YearForebay J (IN) 71128.272.44726.509,329100100-YearForebay J (OUT) (N/A)(N/A)1.12727.004,26622-YearInfiltration Basin J (IN) 1,911124.390.000.00022-YearInfiltration BasinJ (OUT) Page 5 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 4 604597 - Proposed Drainage Model Subsection: Master Network Summary Pond Summary Maximum Pond Storage (ft³) Maximum Water Surface Elevation (ft) Peak Flow (ft³/s) Time to Peak (min) Hydrograph Volume (ft³) Return Event (years) ScenarioLabel (N/A)(N/A)2.16726.508,0361010-YearInfiltration Basin J (IN) 4,198125.580.000.0001010-YearInfiltration BasinJ (OUT) (N/A)(N/A)3.61726.5013,414100100-YearInfiltration Basin J (IN) 4,952125.891.66736.003,602100100-YearInfiltration Basin J (OUT) Page 6 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 5 604597 - Proposed Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve Time-Depth Curve: 100-year, 24-hr rainfall 100-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years100Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.10.10.00.00.030.00 0.10.10.10.10.160.00 0.10.10.10.10.190.00 0.20.10.10.10.1120.00 0.20.20.20.20.2150.00 0.20.20.20.20.2180.00 0.30.30.30.20.2210.00 0.30.30.30.30.3240.00 0.40.30.30.30.3270.00 0.40.40.40.40.4300.00 0.50.40.40.40.4330.00 0.50.50.50.50.5360.00 0.60.60.50.50.5390.00 0.60.60.60.60.6420.00 0.70.70.70.70.7450.00 0.80.80.80.70.7480.00 0.90.90.90.80.8510.00 Page 7 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 6 604597 - Proposed Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 1.01.01.01.00.9540.00 1.21.11.11.11.1570.00 1.31.31.31.21.2600.00 1.61.51.51.41.4630.00 1.81.81.71.61.6660.00 2.72.42.22.01.9690.00 4.44.24.03.73.2720.00 4.84.74.64.64.5750.00 5.04.94.94.84.8780.00 5.25.15.15.15.0810.00 5.35.35.35.25.2840.00 5.45.45.45.45.3870.00 5.65.55.55.55.5900.00 5.75.65.65.65.6930.00 5.75.75.75.75.7960.00 5.85.85.85.85.7990.00 5.95.95.85.85.81,020.00 5.95.95.95.95.91,050.00 6.06.06.05.95.91,080.00 6.06.06.06.06.01,110.00 6.16.16.16.06.01,140.00 6.16.16.16.16.11,170.00 6.26.16.16.16.11,200.00 6.26.26.26.26.21,230.00 6.26.26.26.26.21,260.00 6.36.36.36.26.21,290.00 Page 8 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 7 604597 - Proposed Drainage Model Storm Event: 100-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 100 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 6.36.36.36.36.31,320.00 6.36.36.36.36.31,350.00 6.46.46.46.36.31,380.00 6.46.46.46.46.41,410.00 (N/A)(N/A)(N/A)(N/A)6.41,440.00 Page 9 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 8 604597 - Proposed Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve Time-Depth Curve: 10-year, 24-hr rainfall 10-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years10Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.00.00.00.00.030.00 0.10.10.10.00.060.00 0.10.10.10.10.190.00 0.10.10.10.10.1120.00 0.10.10.10.10.1150.00 0.20.20.10.10.1180.00 0.20.20.20.20.2210.00 0.20.20.20.20.2240.00 0.20.20.20.20.2270.00 0.30.30.30.30.3300.00 0.30.30.30.30.3330.00 0.40.30.30.30.3360.00 0.40.40.40.40.4390.00 0.40.40.40.40.4420.00 0.50.50.50.50.5450.00 0.60.60.50.50.5480.00 0.60.60.60.60.6510.00 Page 10 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 5 9 604597 - Proposed Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 0.70.70.70.70.7540.00 0.80.80.80.80.7570.00 0.90.90.90.90.9600.00 1.11.11.01.01.0630.00 1.31.21.21.21.1660.00 1.91.71.51.41.3690.00 3.13.02.82.62.2720.00 3.33.33.33.23.2750.00 3.53.53.43.43.4780.00 3.63.63.63.63.5810.00 3.73.73.73.73.6840.00 3.83.83.83.83.8870.00 3.93.93.93.93.8900.00 4.04.03.93.93.9930.00 4.04.04.04.04.0960.00 4.14.14.14.14.0990.00 4.14.14.14.14.11,020.00 4.24.24.24.14.11,050.00 4.24.24.24.24.21,080.00 4.24.24.24.24.21,110.00 4.34.34.34.34.21,140.00 4.34.34.34.34.31,170.00 4.34.34.34.34.31,200.00 4.44.44.34.34.31,230.00 4.44.44.44.44.41,260.00 4.44.44.44.44.41,290.00 Page 11 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 0 604597 - Proposed Drainage Model Storm Event: 10-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 10 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 4.44.44.44.44.41,320.00 4.54.54.44.44.41,350.00 4.54.54.54.54.51,380.00 4.54.54.54.54.51,410.00 (N/A)(N/A)(N/A)(N/A)4.51,440.00 Page 12 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 1 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve Time-Depth Curve: 2-year, 24-hr rainfall 2-year, 24-hr rainfallLabel min0.00Start Time min6.00Increment min1,440.00End Time years2Return Event CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth(in)Depth(in)Depth(in)Depth(in)Depth(in)Time(min) 0.00.00.00.00.00.00 0.00.00.00.00.030.00 0.00.00.00.00.060.00 0.10.10.10.00.090.00 0.10.10.10.10.1120.00 0.10.10.10.10.1150.00 0.10.10.10.10.1180.00 0.10.10.10.10.1210.00 0.10.10.10.10.1240.00 0.20.20.20.20.1270.00 0.20.20.20.20.2300.00 0.20.20.20.20.2330.00 0.20.20.20.20.2360.00 0.30.30.30.20.2390.00 0.30.30.30.30.3420.00 0.30.30.30.30.3450.00 0.40.40.40.30.3480.00 0.40.40.40.40.4510.00 Page 13 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 2 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 0.50.50.50.40.4540.00 0.60.50.50.50.5570.00 0.60.60.60.60.6600.00 0.70.70.70.70.6630.00 0.90.80.80.80.7660.00 1.21.11.00.90.9690.00 2.12.01.91.81.5720.00 2.22.22.22.12.1750.00 2.32.32.32.32.2780.00 2.42.42.42.42.4810.00 2.52.52.52.42.4840.00 2.62.52.52.52.5870.00 2.62.62.62.62.6900.00 2.72.62.62.62.6930.00 2.72.72.72.72.7960.00 2.72.72.72.72.7990.00 2.82.72.72.72.71,020.00 2.82.82.82.82.81,050.00 2.82.82.82.82.81,080.00 2.82.82.82.82.81,110.00 2.82.82.82.82.81,140.00 2.92.92.92.92.91,170.00 2.92.92.92.92.91,200.00 2.92.92.92.92.91,230.00 2.92.92.92.92.91,260.00 2.92.92.92.92.91,290.00 Page 14 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 3 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: Type III 24-hr Northampton Return Event: 2 yearsSubsection: Time-Depth Curve CUMULATIVE RAINFALL (in) Output Time Increment = 6.00 min Time on left represents time for first value in each row. Depth (in) Depth (in) Depth (in) Depth (in) Depth (in) Time (min) 3.03.02.92.92.91,320.00 3.03.03.03.03.01,350.00 3.03.03.03.03.01,380.00 3.03.03.03.03.01,410.00 (N/A)(N/A)(N/A)(N/A)3.01,440.00 Page 15 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 4 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-A Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 16 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 5 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-A Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 17 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 6 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-B Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 18 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 7 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-B Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 19 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 8 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-C Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 20 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 6 9 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-C Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 21 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 0 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-D Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 22 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 1 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-D Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 23 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 2 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-F Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 24 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 3 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-F Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 25 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 4 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-G Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 26 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 5 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-G Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 27 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 6 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-H Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 28 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 7 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-H Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 29 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 8 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-J Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 30 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 7 9 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-J Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 31 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 0 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-K Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 32 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 1 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-K Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 33 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 2 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond B Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 34 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 3 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond B Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 35 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 4 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond J Return Event: 2 yearsSubsection: Time of Concentration Calculations Time of Concentration Results Segment #1: User Defined Tc min5.00Time of Concentration Time of Concentration (Composite) min5.00Time of Concentration (Composite) Page 36 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 5 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond J Return Event: 2 yearsSubsection: Time of Concentration Calculations ==== User Defined Value entered by userTc = Tc= Time of concentration, hoursWhere: Page 37 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 6 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-A Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.084,89398.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.038,36161.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 55.0000.00.02,90855.000Woods - good - Soil B 85.759(N/A)(N/A)126,162(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 38 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 7 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-B Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.073,88798.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.032,88861.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 86.604(N/A)(N/A)106,775(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 39 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 8 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-C Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.062,43898.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.049,31061.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 81.673(N/A)(N/A)111,748(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 40 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 8 9 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-D Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.05,95698.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 98.000(N/A)(N/A)5,956(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 41 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 0 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-F Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.013,96998.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 48.0000.00.024,91648.000Brush - brush, weed, grass mix - good - Soil B 61.0000.00.027,10061.000Pasture, grassland, or range - good - Soil B 58.0000.00.031,20558.000Woods - grass combination - good - Soil B 62.022(N/A)(N/A)97,190(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 42 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 1 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-G Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.0154,96598.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.093,19961.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 84.104(N/A)(N/A)248,164(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 43 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 2 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-H Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.025,01398.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.04,68561.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 92.163(N/A)(N/A)29,698(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 44 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 3 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-J Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.016,72098.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 61.0000.00.04,22461.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 90.538(N/A)(N/A)20,944(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 45 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 4 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-K Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 98.0000.00.02,97498.000Impervious Areas - Paved parking lots, roofs, driveways, Streets and roads - Soil B 48.0000.00.028,65548.000Brush - brush, weed, grass mix - good - Soil B 58.0000.00.054,71358.000Woods - grass combination - good - Soil B 56.059(N/A)(N/A)86,342(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 46 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 5 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond B Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 61.0000.00.035,47161.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 61.000(N/A)(N/A)35,471(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 47 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 6 604597 - Proposed Drainage Model Storm Event: 2-year, 24-hr rainfallLabel: PR-Pond J Return Event: 2 yearsSubsection: Runoff CN-Area Runoff Curve Number Data Adjusted CNUC (%) C (%) Area (ft²) CNSoil/Surface Description 61.0000.00.021,54761.000Open space (Lawns,parks etc.) - Good condition; grass cover > 75% - Soil B 61.000(N/A)(N/A)21,547(N/A)COMPOSITE AREA & WEIGHTED CN ---> Page 48 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 7 Type III 24-hr Northampton (Time-Depth Curve, 2 years)...13, 14, 15 Type III 24-hr Northampton (Time-Depth Curve, 100 years)...7, 8, 9 Type III 24-hr Northampton (Time-Depth Curve, 10 years)...10, 11, 12 T PR-Pond J (Time of Concentration Calculations, 2years)...36, 37 PR-Pond J (Runoff CN-Area, 2 years)...48 PR-Pond B (Time of Concentration Calculations, 2 years)...34, 35 PR-Pond B (Runoff CN-Area, 2 years)...47 PR-K (Time of Concentration Calculations, 2 years)...32, 33 PR-K (Runoff CN-Area, 2 years)...46 PR-J (Time of Concentration Calculations, 2 years)...30, 31 PR-J (Runoff CN-Area, 2 years)...45 PR-H (Time of Concentration Calculations, 2 years)...28, 29 PR-H (Runoff CN-Area, 2 years)...44 PR-G (Time of Concentration Calculations, 2 years)...26, 27 PR-G (Runoff CN-Area, 2 years)...43 PR-F (Time of Concentration Calculations, 2 years)...24, 25 PR-F (Runoff CN-Area, 2 years)...42 PR-D (Time of Concentration Calculations, 2 years)...22, 23 PR-D (Runoff CN-Area, 2 years)...41 PR-C (Time of Concentration Calculations, 2 years)...20, 21 PR-C (Runoff CN-Area, 2 years)...40 PR-B (Time of Concentration Calculations, 2 years)...18,19 PR-B (Runoff CN-Area, 2 years)...39 PR-A (Time of Concentration Calculations, 2 years)...16, 17 PR-A (Runoff CN-Area, 2 years)...38 P Master Network Summary...2, 3, 4, 5, 6 M 604597 - Proposed Drainage Model Index Page 49 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 8 604597 - Proposed Drainage Model Type III 24-hr Northampton (Time-Depth Curve, 2 years)...13, 14, 15 Type III 24-hr Northampton (Time-Depth Curve, 100years)...7, 8, 9 Type III 24-hr Northampton (Time-Depth Curve, 10 years)...10, 11, 12 T PR-Pond J (Time of Concentration Calculations, 2years)...36, 37 PR-Pond J (Runoff CN-Area, 2 years)...48 PR-Pond B (Time of Concentration Calculations, 2 years)...34, 35 PR-Pond B (Runoff CN-Area, 2 years)...47 PR-K (Time of Concentration Calculations, 2 years)...32, 33 PR-K (Runoff CN-Area, 2 years)...46 PR-J (Time of Concentration Calculations, 2 years)...30, 31 PR-J (Runoff CN-Area, 2 years)...45 PR-H (Time of Concentration Calculations, 2 years)...28, 29 PR-H (Runoff CN-Area, 2 years)...44 PR-G (Time of Concentration Calculations, 2 years)...26, 27 PR-G (Runoff CN-Area, 2 years)...43 PR-F (Time of Concentration Calculations, 2 years)...24,25 PR-F (Runoff CN-Area, 2 years)...42 PR-D (Time of Concentration Calculations, 2 years)...22, 23 PR-D (Runoff CN-Area, 2 years)...41 PR-C (Time of Concentration Calculations, 2 years)...20, 21 PR-C (Runoff CN-Area, 2 years)...40 PR-B (Time of Concentration Calculations, 2 years)...18,19 PR-B (Runoff CN-Area, 2 years)...39PR-A (Time of Concentration Calculations, 2 years)...16,17PR-A (Runoff CN-Area, 2 years)...38PMaster Network Summary...2, 3, 4, 5, 6M Page 50 of 5027 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 10/25/2017 Bentley PondPack V8i [08.11.01.56]Bentley Systems, Inc. Haestad Methods Solution CenterNorthampton Proposed.ppc F - 9 9 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT G- Test Pit Logs Pages G-1 - G-8 PROJECT TEST PIT NO. SHEET 1 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 12:45 Weather Reach ~12 feet Date 2/1/2017 Depth Strata Below Change &Subsurface Description Excavation Boulder Grade Water Effort Qty/Class(ft)Level 3 4 7 8 10 11 12 13 14 15 Notes:WATER SYMBOLS Groundwater Estimated Seasonal High Groundwater BOULDER CLASS PROPORTIONS USED EXCAVATION EFFORT 12" - 24" A 0-10% Trace E = Easy N 24" - 36" B 10-20% Little M = Moderate >36" C 20-35% Some D = Difficult 35-50% And Snow, 30°'s TEST PIT LOG TP-1 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~135 New England Boring NAVD88 John Galvin USDA Textural Class 1 TOPSOIL Dark brown, SILT, trace fine to medium Sand, moist (TOPSOIL). - - FILL ~14' ~4' E Loamy Sand G-1) Light brown, fine SAND, some Silt, dry (FILL). [Laboratory Analysis Performed: Grain Size Analysis (Sieve & Hydrometer) - Gravel = 0.0%, Sand = 73.2%, Silt & Clay = 26.8%]. Groundwater table not encountered. Test pit terminated at approximately 10 feet below ground surface. 1.) Test pit backfilled with excavated soils and compacted with excavator bucket at ground surface. 2.) Ground surface elevation interpolated from provided plans and should be considered approximate. 2 5 6 9 0.3' 10' G - 1 PROJECT TEST PIT NO. SHEET 2 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 12:45 Weather Reach ~12 feet Date 2/1/2017 Notes: N Snow, 30°'s TEST PIT LOG TP-1 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~135 New England Boring NAVD88 John Galvin 1.) Photo of in-progress TP-1. ~14' ~4' TOPSOIL G-1 G - 2 PROJECT TEST PIT NO. SHEET 1 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 11:45 Weather Reach ~12 feet Date 2/1/2017 Depth Strata Below Change &Subsurface Description Excavation Boulder Grade Water Effort Qty/Class(ft)Level 3 4 7 8 10 11 12 13 14 15 Notes:WATER SYMBOLS Groundwater Estimated Seasonal High Groundwater BOULDER CLASS PROPORTIONS USED EXCAVATION EFFORT 12" - 24" A 0-10% Trace E = Easy 24" - 36" B 10-20% Little M = Moderate N >36" C 20-35% Some D = Difficult 35-50% And Snow, 30°'s TEST PIT LOG TP-2 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~122 New England Boring NAVD88 John Galvin USDA Textural Class 1 TOPSOIL Dark brown, SILT, trace fine to medium Sand, moist (TOPSOIL). - - FILL E MG-1) Brown, fine to coarse SAND, some fine to coarse Gravel, little Silt, very few asphalt particles, very few roots, moist (FILL). G-2) Brown, fine to coarse SAND, some fine to coarse Gravel, trace Silt, very few cobbles, dry to wet (FILL). Perched water infiltrating corner of excavation at depth of approximately 5 feet below ground surface. G-3) Brown, SILT & CLAY, trace fine Sand, wet (FILL). [Laboratory Analysis Performed: Grain Size Analysis (Sieve & Hydrometer) - Gravel = 0.0%, Sand = 2.1%, Silt & Clay = 97.9%]. Sandy Loam Silt Loam Gravelly Sand Gravelly, Loamy Sand E G-4) Brown, fine SAND and Silt, dry (FILL). Groundwater table not encountered. Test pit terminated at approximately 10 feet below ground surface. 1.) Test pit backfilled with excavated soils and compacted with excavator bucket at ground surface. 2.) Ground surface elevation interpolated from provided plans and should be considered approximate. ~13' ~3' 2 5 6 9 0.3' 10' 1.5' 5.5' 8.5' G - 3 PROJECT TEST PIT NO. SHEET 2 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 11:45 Weather Reach ~12 feet Date 2/1/2017 Notes: N Snow, 30°'s TEST PIT LOG TP-2 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~122 New England Boring NAVD88 John Galvin 1.) Photo of completed TP-2. ~13' ~3' TOPSOIL G-1 G-3 G-2 G-4 Very few cobbles Perchedwater infiltration G - 4 PROJECT TEST PIT NO. SHEET 1 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 10:30 Weather Reach ~12 feet Date 2/1/2017 Depth Strata Below Change &Subsurface Description Excavation Boulder Grade Water Effort Qty/Class(ft)Level 3 4 7 8 10 11 12 13 14 15 Notes:WATER SYMBOLS Groundwater Estimated Seasonal High Groundwater BOULDER CLASS PROPORTIONS USED EXCAVATION EFFORT 12" - 24" A 0-10% Trace E = Easy 24" - 36" B 10-20% Little M = Moderate N >36" C 20-35% Some D = Difficult 35-50% And Snow, 30°'s TEST PIT LOG TP-3 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~127 New England Boring NAVD88 John Galvin USDA Textural Class 1 TOPSOIL Dark brown, SILT, some fine to coarse Sand, trace fine Gravel, moist (TOPSOIL).- G-1) Brown, fine to coarse SAND, little fine to coarse Gravel, trace Silt, very few cobbles, dry (FILL). E G-3) Brown, fine to coarse SAND, some fine to coarse Gravel, trace Silt, dry (FILL). 9 -FILL Sand Gravelly Sand 5 6 2 1.) Test pit backfilled with excavated soils and compacted with excavator bucket at ground surface. 2.) Ground surface elevation interpolated from provided plans and should be considered approximate. ~17.5' ~2.5' Silt Loam Groundwater table not encountered. Test pit terminated at approximately 10 feet below ground surface. 0.3' 7.3' 8' 10' G-2) Gray to dark gray, Clayey SILT, some fine to medium Sand, very few roots, organic-like odor, dry (FILL). [Laboratory Analysis Performed: Grain Size Analysis G - 5 PROJECT TEST PIT NO. SHEET 2 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 10:30 Weather Reach ~12 feet Date 2/1/2017 Notes: N Snow, 30°'s TEST PIT LOG TP-3 Interstate 91 and Route 9 Intersection Reconstruction 92470.00 Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~127 New England Boring NAVD88 John Galvin 1.) Photo of completed TP-3. ~17.5' ~2.5' TOPSOIL G-1 G-3 G-2 G - 6 PROJECT TEST PIT NO. SHEET 1 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 9:30 Weather Reach ~12 feet Date 2/1/2017 Depth Strata Below Change &Subsurface Description Excavation Boulder Grade Water Effort Qty/Class(ft)Level 3 4 7 8 10 11 12 13 14 15 Notes:WATER SYMBOLS Groundwater Estimated Seasonal High Groundwater BOULDER CLASS PROPORTIONS USED EXCAVATION EFFORT 12" - 24" A 0-10% Trace E = Easy 24" - 36" B 10-20% Little M = Moderate N >36" C 20-35% Some D = Difficult 35-50% And Snow, 30°'s USDA Textural Class Patrick Clarke ~134 New England Boring NAVD88 John Galvin TEST PIT LOG TP-4 Interstate 91 and Route 9 Intersection Reconstruction Northampton, Massachusetts Jorge Fuentes 92470.00 1.) Test pit backfilled with excavated soils and compacted with excavator bucket at ground surface. 2.) Ground surface elevation interpolated from provided plans and should be considered approximate. ~13' ~4' 9 5 6 FILL Dark brown, SILT, trace fine to medium Sand, moist (TOPSOIL). G-1) Brown/gray, fine to coarse SAND and Clayey Silt, little fine to coarse Gravel, very few cobbles, very few roots, moist (FILL). Groundwater table not encountered. Test pit terminated at approximately 8.8 feet below ground surface. G-2) Reddish brown, fine to medium SAND, some Silt, trace fine Gravel, moist (FILL). [Laboratory Analysis Performed: Grain Size Analysis (Sieve & Hydrometer) - Gravel = 2.9%, Sand = 73.1%, Silt & Clay = 24.0%]. G-1) Brown, fine to coarse SAND and Clayey Silt, little fine to coarse Gravel, very few cobbles, very few roots, moist (FILL). G-2) Reddish brown, fine to medium SAND, some Silt, trace fine to coarse Gravel, moist (FILL). G-3) Reddish brown, fine to coarse SAND, little fine to coarse Gravel, trace Silt, dry (FILL). G-4) Reddish brown, fine to coarse SAND and fine to coarse Gravel, trace Silt, dry (FILL). - Loam Sandy Loam 2 TOPSOIL 1 - D E Very Gravelly Sand M Loam M D Sandy Loam Gravelly Sand 0.3' 2.5' 4' 4.8' 5.8' 7' 8.8' G - 7 PROJECT TEST PIT NO. SHEET 2 of 2 FILE NO. CHKD BY Engineer Make Kobelco Ground El. Contractor Model SK55SRX Datum Operator Capacity ~5.7 Cubic Feet Time Start 9:30 Weather Reach ~12 feet Date 2/1/2017 Notes: N Snow, 30°'s TEST PIT LOG TP-4 Interstate 91 and Route 9 Intersection Reconstruction Northampton, Massachusetts Jorge Fuentes Patrick Clarke ~134 New England Boring NAVD88 John Galvin 92470.00 1.) Photo of completed TP-4. ~13' ~4' G-2 TOPSOIL G-1 G-3 G-1 G-2 G-4 G - 8 Stormwater Report Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA ATTACHMENT H- Long Term Pollution Prevention Plan (LTPPP) Pages H-1 - H-4 H - 1 LTPPP Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Long Term Pollution Prevention Plan (LTPPP) Highway Plans The highway plans and details include erosion and sediment control measures that will be installed. Materials Covered The following materials or substances are expected to be present onsite during construction.  Concrete/Additives/Wastes  Petroleum based products  Solid and construction wastes  Sanitary wastes Materials Management Practices The following material management practices will be implemented onsite during construction to reduce the risk of spills or other accidental exposure of materials and substances to stormwater runoff. The contractor’s superintendent will be responsible for ensuring that these procedures are followed. 1. Good Housekeeping The following good housekeeping practices will be implemented onsite during construction. a. An effort will be made to store only enough products required to do the job. b. All materials onsite will be stored in a neat and orderly manner. If possible, materials will be stored under a roof or in a containment area. At a minimum, all containers will be covered with proper lids when not in use, and drip pans will be provided under all dispensers. c. Products will be kept in their original containers, with the original manufacturer’s label in legible condition. d. Substances will not be mixed with one another unless recommended by the manufacturer. e. Whenever possible, all products will be used before disposing the container. f. Manufacturer’s recommendations for proper use and disposal will be followed. g. The Contractor’s superintendent will be responsible for daily inspections to ensure proper use and disposal of materials. 2. Hazardous Substances The following practices will be implemented to reduce the risks associated with hazardous substances. Material Safety Data Sheets (MSDS’s) will be obtained for each product onsite that has hazardous properties, and used for the proper management of potential wastes that may result from these products. Each employee who must handle a hazardous substance will be instructed on the use of MSDS sheets and the specific information in the applicable MSDS for the product he/she is using, particularly regarding spill control techniques. a. Products will be kept in original containers with the original labels in legible condition. H - 2 LTPPP Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA b. Original labels and MSDS’s will be procured and used for each product. c. If surplus product must be disposed, it will be disposed according to manufacturer’s and local/state/federal methods for proper disposal. 3. Hazardous Waste All hazardous waste must be properly identified and handled in accordance with all applicable hazardous waste standards, including the storage, transport and disposal of the hazardous wastes. There are significant penalties for the improper handling of hazardous wastes. It is important that the site superintendent seek appropriate assistance in making the determination of whether a substance or material is a hazardous waste. 4. Product Specific Practices The following product specific practices will be implemented on the job site. a. Petroleum Products—All onsite vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers that are clearly labeled. b. Concrete Wastes—Concrete trucks will be allowed to wash out or discharge surplus concrete or drum wash water on the project site, but only in specifically designated diked and impervious washout areas, which are prepared to prevent contact between the concrete wash and stormwater. Waste generated from concrete wash water must not be allowed to flow into drainage ways, inlets, receiving waters or any location other than the designated concrete washout area. Waste concrete may be poured into forms to make riprap or other useful concrete products. Concrete washouts must be located at least 100 feet from drainage ways, inlets and surface waters. The hardened residue from the concrete washout areas will be disposed in the same manner as other non-hazardous construction waste. 5. Solid and Construction Wastes All waste materials will be collected and transported to an appropriate solid waste disposal area. 6. Sanitary Wastes A minimum of one portable sanitary unit will be provided for every ten (10) workers on the site. All sanitary waste materials will be collected from the portable units at least weekly by a licensed portable facility provider in complete compliance with local and state regulations. All sanitary waste units will be located in an area where the likelihood of the unit contributing to stormwater discharges is negligible. If necessary to prevent wastes from contributing to stormwater discharges, additional containment BMPs must be implemented, such as gravel bags or specially designated plastic skid containers around the base. 7. Contaminated Soils Any contaminated soils, either resulting from spills of hazardous substances or discovered during the course of construction, must be contained and cleaned up immediately in accordance with the procedures outlined in the Materials Management Plan and in accordance with applicable state and federal regulations. Contaminated soils not resulting from construction activities, which pre-existed H - 3 LTPPP Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA construction activities and are discovered by virtue of construction activities, should be reported in the same manner as spills, but with sufficient information to specify that an existing condition discovery is being reported. If there is a release that occurs by virtue of the discovery of existing contamination and it otherwise meets the requirements for a reportable spill, then the release must be reported as a spill. Spill Prevention Procedures The Contractor will train all personnel in the proper handling and cleanup of spilled hazardous substances or oil. In order to prevent or minimize the potential for a spill of hazardous substances or oil to come into contact with stormwater, the following steps will be implemented. 1. All hazardous substances, such as oil, pesticides, petroleum products, fertilizers, detergents, construction chemicals, will be stored in a secure location. 2. Only the minimum practical quantity of such materials will be kept at the project site. 3. The contractor must have a readily available spill prevention kit and materials on site at all times. The contractor’s onsite spill prevention storage location shall be stocked at all times with a suitable quantity of absorbent and containment materials to address multiple spills in a single day. At a minimum the spill prevention storage location shall include the following materials:  Absorbent pads  Absorbent boom  55-gallon drums with sealable lid  Speedy-dry  Goggles  Plastics or trash containers, etc. 4. Manufacturer’s recommended methods for spill cleanup will be clearly posted, and site personnel will be trained regarding these procedures and the location of the cleanup supplies. 5. It is the contractor’s responsibility to ensure that all hazardous waste discovered or generated at the project site is disposed properly by a licensed hazardous material disposal facility. Spill Response Procedures In the event of a spill of hazardous substances or oil, the following procedures must be followed: 1. All measures must be taken to contain and abate the spill and to prevent the discharge of the hazardous substance or oil to stormwater, or off-site. The spill area must be kept well ventilated and personnel must wear appropriate protective clothing to prevent injury from contact with the hazardous substances. 2. For spills of less than five (5) gallons of material, proceed with source control and containment, clean-up with absorbent materials or other applicable means unless an imminent hazard or other circumstances dictate that the spill should be treated by a professional emergency response contractor. 3. For spills greater than five (5) gallons of material, immediately contact the MA DEP Hazardous Waste Incident Response Group, and an approved emergency response contractor. Provide information on the type of material spilled, the location of the spill, the quantity spilled, and the H - 4 LTPPP Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA time of the spill to the emergency response contractor or coordinator, and proceed with prevention, containment and/or clean-up. 4. If there is a Reportable Quantity (RQ) release during the construction period, then the National Response Center will be notified immediately. Within 14 days a report will be submitted to the EPA regional office describing the release, the date and circumstances of the release and the steps taken to prevent another release. This Stormwater Pollution Prevention Plan must be updated to reflect any such steps or actions taken and measures to prevent the same from reoccurring. 5. The contractor’s superintendent will be the spill prevention and response coordinator. He will designate the individuals who will receive spill prevention and response training. These individuals will each become responsible for a particular phase of prevention and response. The names of these personnel will be posted in the material storage area and in the office trailer onsite. Illicit Discharge Statement-Control of Non-Stormwater Discharges Certain types of discharges are allowable under the U.S. EPA Construction General Permit, and it is the intent of this LTPPP to allow such discharges. These types of discharges will be allowed under the conditions that no pollutants will be allowed to come in contact with that water prior to or after its discharge. The control measures that have been outlined previously in this LTPPP will be followed strictly to ensure that no contamination of these non-stormwater discharges takes place. Stormwater Report I-91/Route 9 & Damon Road Interchange Improvements Northampton, MA ATTACHMENT I- Operation and Maintenance Plan (O&M Plan) Pages I-1 - I-2 I - 1 Operation and Maintenance Plan Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Stormwater Management Operation and Maintenance Plan (O&M Plan) Description of the Stormwater Management System The stormwater management system for this project collects runoff from the roadways for treatment prior to discharge to water bodies. The system includes the following features: pavement edging, deep sump catch basins, pipes, drop inlets, manholes, paved waterway, flared end sections, and sediment forebays with associated infiltration basins. During Construction The site contractor, who will be selected by the standard bidding process established by the Massachusetts Department of Transportation (MassDOT), will be responsible for all operation and maintenance (O&M) from the initial ground disturbance through final stabilization and project closeout. Those responsibilities will include: 1. Construct all erosion and sedimentation control measures in accordance with MassDEP Erosion and Sediment Control Guidelines for Urban and Suburban Areas dated May 2003 and the U.S. EPA Developing Your Stormwater Pollution Prevention Plan dated May 2007. 2. Install erosion and sediment control measures prior to any ground disturbance. Continuously maintain the erosion and sediment control measures so that they remain functional until final stabilization is established. 3. Install perimeter erosion and sediment controls, such as compost filter tubes, around all stockpiles. 4. Seed or mulch stockpiles and other disturbed or exposed areas for temporary stabilization, prior to exposure of fourteen days or more. 5. At any portion of the site where construction activities have permanently ceased, or where final grades are reached, implement stabilization practices within three days. 6. Conduct earthwork activity so that runoff is directed away from resources areas. 7. Relocate temporary drainage swales and sediment traps as construction progresses, so that they continue to provide their intended function throughout all phases of construction. 8. Inspect all erosion and sedimentation control measures at least every seven days, and after each rainfall event that exceeds a quarter inch. If the function of any feature is found to be compromised, take action within three days to clean, repair, or replace the compromised erosion and sedimentation control measure. Adhere to the Stormwater Pollution Prevention Plan (SWPPP). 9. Upon completion of all work, inspect all catch basins and remove all accumulated sediment and trash debris. 10. Meet or exceed MassDOT’s specifications. 11. As the project progresses and site drainage conditions change, relocate or augment the erosion and sediment control measures to meet or exceed the minimum measures shown on the highway plans and details. I - 2 Operation and Maintenance Plan Improvements on I-91 Interchange 19 at Route 9 and Damon Road Northampton, MA Post Construction MassDOT will be responsible for post-construction O&M activities, which will be undertaken at a statewide programmatic level under the State’s highway operation and maintenance program. In addition to MassDOT’s standard O&M activities, MassDOT will implement the following stormwater maintenance plan: Inspections  Check deep sump catch basins, manholes, paved waterways, drop inlets, flared end sections, headwalls, sediment forebays, and overflow spillways for blockage, erosion, and structural deficiency.  Remove trash, debris, and decaying vegetation. Clear blockages.  Repair eroded channels or holes. Add protection, as necessary to prevent further erosion.  Conduct inspections according to the frequencies outlined below. First Year Post-Construction  Conduct inspections at least once per season.  Re-vegetate poorly established areas as necessary. After the First Year Post-Construction  Conduct inspections every six months.  Following two years of monitoring that produce no special cleaning or repair, reduce the inspection frequency to annual inspections.  Remove accumulated sediment that exceeds six inches at least annually from all catch basins, drop inlets, paved waterways, sediment forebays, infiltration basins and outlet control structures.  Clear sediment forebays, and infiltration basins of any vegetation or debris that compromises its functional storage volume.  Do not use heavy equipment within the infiltration basins. Heavy equipment must remain on the maintenance shelf.