Loading...
Attachment B - NOI Plans - February 2018.pdfNORTHAMPTON HADLEY C O N N E C T I C U T RI V E R BR I D G E S T . (R O U T E 9 ) I-9 1 D A M O N R O A D CO O L I D G E BRI D G E M A R S H A L L S T . SHELDON FIELD. K I N G S T . LENGTH OF PROJECT = 1412.07 FEET = 0.267 MILES MASSACHUSETTS DEPARTMENT OF TRANSPORTATION PROJECT END ROUTE 9 STA. 122+00.00 N 2948980.8463 E 353404.4928 PROJECT BEGIN ROUTE 9 STA. 107+50.00 N 2947841.7339 E 352645.3301 PROJECT LOCATION TITLE SHEET DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION APPROVED: DIVISION ADMINISTRATOR DATE DATE CHIEF ENGINEER DATE RECOMMENDED FOR APPROVAL APPROVED IN THE CITY OF HAMPSHIRE COUNTY I-91 INTERCHANGE 19 NORTHAMPTON FEDERAL AID PROJECT NO. HIGHWAY DIVISION PLAN AND PROFILE OF HIGHWAY ADMINISTRATOR 60 4 5 9 7 _ G E 1 ( T I T L E ) N O I . D W G 26 - F e b - 2 0 1 8 11 : 5 1 A M Pl o t t e d o n DATE DESCRIPTION REV # DESIGN DESIGNATION (DAMON ROAD) DESIGN SPEED 35 MPH ADT (2009)23,700 ADT (2034)31,100 K 7% D 52% T (PEAK HOUR)4% T (AVERAGE DAY)6% DHV 2,177 DDHV 1,133 FUNCTIONAL CLASSIFICATION URBAN MINOR ARTERIAL NOTICE OF INTENT N THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES DATED 1988, AS AMENDED, THE SUPPLEMENTAL SPECIFICATIONS DATED JULY 1, 2015, THE 2016 CONSTRUCTION STANDARD DETAILS, THE 1996 CONSTRUCTION AND TRAFFIC STANDARD DETAILS, (AS RELATED TO TRAFFIC STANDARD DETAILS ONLY), OVERHEAD SIGNAL STRUCTURE STANDARD DRAWINGS DATED DECEMBER 2015, THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS WITH MASSACHUSETTS AMENDMENTS, THE 1990 STANDARD DRAWINGS FOR SIGNS AND SUPPORTS, THE 1968 STANDARD DRAWINGS FOR TRAFFIC SIGNALS AND HIGHWAY LIGHTING, AND THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, WILL GOVERN. 1000 SCALE: 1" = 1000' 0 2000 3000 4000 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ G E 1 ( T I T L E ) N O I . D W G 26 - F e b - 2 0 1 8 11 : 5 1 A M Pl o t t e d o n 68 INDEX SHEET NO.DESCRIPTION 1 TITLE SHEET & INDEX 2 KEY PLAN 3 - 8 TYPICAL SECTIONS 9 - 18 CONSTRUCTION PLANS 19 - 30 DRAINAGE PLANS 31 - 68 CROSS SECTIONS DESIGN DESIGNATION (ROUTE 9) EAST OF DAMON RD.WEST OF DAMON RD. DESIGN SPEED 40 MPH 40 MPH ADT (2009)39,600 26,800 ADT (2034)52,700 35,400 K 8%8% D 51%71% T (PEAK HOUR)11%11% T (AVERAGE DAY)12%12% DHV 4,215 2,831 DDHV 2,150 2,011 FUNCTIONAL CLASSIFICATION PRINCIPAL ARTERIAL PRINCIPAL ARTERIAL 101 ARCH STREET, SUITE 301, BOSTON, MA 02110, (857) 453-5450 DESIGN DESIGNATION (NB OFF / SB ON) DESIGN SPEED 40 MPH ADT (2009)9300 / 9200 ADT (2034)9800 / 9700 K 8.5% / 8.8% D 100% / 100% T (PEAK HOUR)4.0% / 4.4% T (AVERAGE DAY)15.5% / 9.2% DHV 830 / 850 DDHV 830 / 850 FUNCTIONAL CLASSIFICATION URBAN MINOR ARTERIAL FEB. 2, 2018 NOTICE OF INTENT 0 PROJECT END DAMON RD STA. 205+93.50 N 2949095.4419 E 352766.2049 PROJECT END NB OFF RAMP STA. 296+85.31 N 2947250.3584 E 353870.6734 PROJECT END SB ON RAMP STA. 520+27.97 N 2946555.6629 E 3534055.0660 BRIDGE NO. N-19-62 1 SB O N R A M P NB O F F R A M P ROUTE 9 DA M O N R O A D CONNECTICUT RIVER NO R W O T T U C K R A I L T R A I L H U B B A R D S T . MA R S H A L L S T . I-9 1 S B I-9 1 N B RIVER R O A D BAN K 107 110 115 120 122 50 0 50 5 510 515 520 522 295 300 305 31 0 311 400 40 5 20 0 20 5 20 5 C O O L I D G E A V E SH E R M A N A V E GL E N W O O D A V E DA Y A V E KEY PLAN - 20 SCALE FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ G E 3 ( N O I K E Y P L A N ) . D W G 26 - F e b - 2 0 1 8 11 : 5 5 A M Pl o t t e d o n 68 N 0 SCALE IN FEET 00150 150 300 2 9 19 XX XX CONSTRUCTION PLANS DRAINAGE PLANS LEGEND 10 20 11 21 12 22 18 28 17 27 16 26 14 24 13 23 15 25 PROJECT END ROUTE 9 STA. 121+96.83 N 2948980.8528 E 353404.4984 PROJECT BEGIN ROUTE 9 STA. 107+76.50 N 2947841.7339 E 352645.3301 PROJECT END DAMON RD STA. 205+60.84 N 2949095.4419 E 352766.2049 PROJECT END NB OFF RAMP STA. 295+50.00 N 2947130.0812 E 353932.6640PROJECT END SB ON RAMP STA. 520+65.03 N 2946520.4418 E 354068.2655 ROUTE 9 10.00' LEFT TURN LANE 8' BICYCLE LANE 11.00' TRAVEL LANE STATION 111+75 TO 112+75 *TOLERANCE FOR CONSTRUCTION ±0.5% SH L O N O . 3 4 9 8 SH L O N O . 3 4 9 8 ROUTE 9 BL P.G.L. 58.3' RIGHT OF WAY VARIES 28.5' TO 25.10' RIGHT OF WAY 5.00'11.00' TRAVEL LANE 2%2% 2.00'10.00' LEFT TURN LANE 11.00' TRAVEL LANE 11.00' TRAVEL LANE 2.00' 5.00' BIKE LANE 6.00' SIDEWALK ROUTE 9 BL 5.00' BICYCLE LANE GORE VARIES VARIES 12' TO 21'GORE VARIES ROUTE 9 STATION 107+76.5 TO 109+23 * TOLERANCE FOR CONSTRUCTION ±0.5% VARIES TRAVEL LANE 6.00' BICYCLE LANE PROPOSED PAVEMENT MILLING & OVERLAY PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL EXIST. GROUND SA W C U T 2.0: 1 8' BICYCLE LANE 11.00' TRAVEL LANE 11.00' TRAVEL LANE 2.00' SHLD.MEDIAN VARIES 2.00' SHOULDER VARIES TRAVEL LANE 5.00' BIKE PATH ROUTE 9 BL ROUTE 9 STATION 109+23 TO 110+04 *TOLERANCE FOR CONSTRUCTION ±0.5% 5.50' SIDEWALK 2.0: 1 PROPOSED PAVEMENT MILLING & OVERLAY P.G.L. PROPOSED PAVEMENT MILLING & OVERLAY 2% 2% MATCH EXIST 2% 2%SA W C U T SA W C U T PR O P . S H L O 2.00' PROP. 4" CEMENT CONCRETE PROP. 4" LOAM & SEED TE M P E A S E M E N T 3% 1' (GRADE BREAK) 3%1' CEM. CONCRETE 6.00' SIDEWALK 1.50%* 5.50' SIDEWALK 1.50%* 6.00' SIDEWALK VARIES GRASS STRIP 1.50%* 2.0: 1 1.50%* 1.50%* MATCH EXIST PROP. GRANITE TYPE SB EDGING (TYP.) 2.0:1 ROUTE 9 8' BICYCLE LANE 11.00' TRAVEL LANE STATION 110+04 TO 111+75 *TOLERANCE FOR CONSTRUCTION ±0.5% SH L O N O . 3 4 9 8 SH L O N O . 3 4 9 8 ROUTE 9 BL P.G.L. VARIES RIGHT OF WAY VARIES 28.5' TO 25.10' RIGHT OF WAY 11.00' TRAVEL LANE 2%2% 2.00'11.00' TRAVEL LANE 11.00' TRAVEL LANE 2.00' 5.00' BIKE LANE 6.00' SIDEWALK 2.0: 1 PROPOSED PAVEMENT MILLING & OVERLAY 2%2%SA W C U T PR O P . S H L O 1.00' PROP.LOAM & SEED 3% 1' (GRADE BREAK) CEM. CONCRETE 6.00' SIDEWALK VARIES GRASS STRIP 1.50%*1.50%* MEDIAN VARIESTE M P E A S E M E N T PROP. FULL DEPTH WIDENING PROP. 8" GRAVEL BORROW TYPE C PROP. 8" GRAVEL BORROW TYPE C (RAISED MEDIAN ENDS AT STA 111+25) MEET EXIST. PROP. FULL DEPTH WIDENING (<4') PROP. 8" GRAVEL BORROW TYPE C R&R GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. FULL DEPTH WIDENING PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C EXISTING GROUND MEET EXISTING PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEM. CONC. PROP. 8" GRAVEL BORROW TYPE C EXIST. GROUND MEET EXIST. CEM. CONCRETE PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEM. CONC. PROP. 8" GRAVEL BORROW TYPE C EXIST. GROUND MEET EXIST. R&R GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C MEET EXIST. EXIST. GROUND PROPOSED PAVEMENT MILLING & OVERLAY PROP. GRANITE TYPE SB EDGING (TYP.) PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C MEET EXISTING EXISTING GROUND PROPOSED PAVEMENT MILLING & OVERLAY PROP. FULL DEPTH WIDENING PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEM. CONC. PROP. 8" GRAVEL BORROW TYPE C MEET EXIST. EXIST. GROUND PROPOSED PAVEMENT MILLING & OVERLAY PROP. 8" GRAVEL BORROW TYPE C PROP. 4" CEMENT CONCRETE P.G.L.1' 1' (GRADE BREAK) 2.0' 2.0' 2% EXISTING EDGE OF PAVEMENT EXISTING EDGE OF PAVEMENT PR O P . S H L O PR O P . S H L O PROP. 4" LOAM & SEED (TYP.) VARIES GRASS STRIP 5.50' SIDEWALK CEM. CONCRETE 1.50%* R&R GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. 4" LOAM & SEED (TYP.) VARIES GRASS STRIP VARIES TYPICAL SECTIONS 3 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 PAVEMENT NOTES PROPOSED FULL DEPTH CONSTRUCTION PROPOSED MILL AND OVERLAY SURFACE COURSE:5 3 4 IN. SUPERPAVE PLACED IN THREE (3) LAYERS: 1 12 IN. HMA GAP GRADED ASPHALT RUBBER (HMA_ARGG) OVER 1 3 4 IN. SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) OVER 2 12 IN. SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC-19.0) OVER BASE COURSE:4 12 IN. SUPERPAVE BASE COURSE - 37.5 (SBC-37.5) SUBBASE:4 IN. DENSE GRADED CRUSHED STONE FOR SUBBASE OVER 8 IN. GRAVEL BORROW FOR SUBBASE (TYPE C) SURFACE:1 12 IN. SUPERPAVE SURFACE COURSE - (HMA_ARGG) OVER 1 3 4 IN. SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) *** PAVEMENT MICROMILLING (2" MINIMUM DEPTH) TO MEET PROPOSED GRADING. LEVELING COURSE AS REQUIRED BY ENGINEER. TACK COAT:EXISTING ROADWAY WILL BE THOROUGHLY CLEANED PRIOR TO THE APPLICATION OF TACK COAT. ASPHALT EMULSION WILL BE APPLIED AT A RATE OF 0.05 GAL/SY BETWEEN NEW PAVEMENT LAYERS AND AT A RATE OF 0.07 GAL/SY FOR MILLED SURFACES PROPOSED CEMENT CONCRETE WALK / WHEELCHAIR RAMP / MEDIAN SURFACE:4" CEMENT CONCRETE AIR ENTRAINED 4000 PSI, 3 4" 610 FOUNDATION:8" GRAVEL BORROW (TYPE C) PROPOSED HMA DRIVEWAY SURFACE:3 34 IN. SUPERPAVE PLACED IN TWO (2) LAYERS: 1 12 IN. SUPERPAVE SURFACE COURSE - 12.5 (SSC-12.5) OVER 2 14 IN. SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC-19.0) FOUNDATION:8" GRAVEL BORROW (TYPE C) PROPOSED HOT MIX ASPHALT SHARED USE PATH SURFACE:4 IN. SUPERPAVE PLACED IN TWO (2) LAYERS: 1 12 IN. SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) OVER 2 12 IN. SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC-19.0) SUBBASE:8" GRAVEL BORROW (TYPE C) NOTES: 1.THE SURFACE COURSE FOR EACH OF THE PAVEMENT SECTIONS SHALL BE PLACED IN ONE CONTINUOUS LAYER. 2.HMA FOR PATCHING, ASPHALT EMULSION FOR TACK COAT AND HMA JOINT SEALANT SHALL BE USED IN ACCORDANCE WITH SECTION 450 QUALITY ASSURANCE OF HMA SPECIFICATION. ASPHALT EMULSION FOR TACK COAT SHALL BE APPLIED TO ALL SURFACES FOR 100% COVERAGE PRIOR TO PAVING WITH HMA. 3.HMA JOINT SEALANT SHALL BE APPLIED TO ALL PAVEMENT JOINTS. 4.TOLERANCE FOR CONSTRUCTION 0.5%± 5.EXISTING GRAVEL SUBBASE MATERIAL THAT IS DETERMINED TO BE SUITABLE SHALL REMAIN IN PLACE AS DIRECTED BY THE ENGINEER. PROPOSED INTERSTATE RESURFACING SURFACE:1 12 IN. HMA GAP GRADED ASPHALT RUBBER (HMA_ARGG) OVER 1 12 IN. PAVEMENT MICROMILLING PROPOSED FULL DEPTH WIDENING LESS THAN 4' SURFACE COURSE:3 14 IN. SUPERPAVE PLACED IN TWO (2) LAYERS: 1 12 IN. HMA GAP GRADED ASPHALT RUBBER (HMA_ARGG) OVER 1 3 4 IN. SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) BASE COURSE:6 IN. CEM. CONC. BASE COURSE SUBBASE:8 IN. GRAVEL BORROW (TYPE C) ROUTE 9 STATION 114+88 TO 115+42 * TOLERANCE FOR CONSTRUCTION ±0.5% SH L O N O . 2 9 6 2 ROUTE 9 BL 11.00' TRAVEL LANE 6.00' SIDEWALK PROP. 8" GRAVEL BORROW TYPE C PROP. GRANITE CURB WITH 6" REVEAL (TYP.) ROUTE 9 VARIES 20' TO 12' LEFT TURN LANE TRANSITION VARIES 2' TO 8' SHOULDER 11.00' TRAVEL LANE STATION 112+75 TO 113+35± *TOLERANCE FOR CONSTRUCTION ±0.5% SH L O N O . 5 2 6 2 SH L O N O . 5 2 6 2 2% ROUTE 9 BL P.G.L. 58.3' RIGHT OF WAY VARIES 28.5' TO 25.10' RIGHT OF WAY VARIES 11.00' TRAVEL LANE 2%2% 2.00'11.00' TRAVEL LANE 11.00' TRAVEL LANE 2.00' 5.00' BIKE LANE 5.50' SIDEWALK VARIES GRASS STRIP 1.50%* VARIES QUARRY STONE 5.00'' BIKE LANE 11.00' TRAVEL LANE 11.00' TRAVEL LANE VARIES 0' TO 12' LEFT TURN LANE TRANSITION VARIES MEDIAN/SPLITTER ISLAND VARIES TRAVEL LANE PROPOSED PAVEMENT MILLING & OVERLAY 2% ROUTE 9 2.00' 11.00' TRAVEL LANE STATION 113+35 TO 114+88 *TOLERANCE FOR CONSTRUCTION ±0.5% 2% ROUTE 9 BL P.G.L. VARIES EXIST. SURFACE 11.00' TRAVEL LANE 2%2% 2.00'11.00' TRAVEL LANE 11.00' TRAVEL LANE 2.00'5.00' BIKE LANE 6.00' SIDEWALK VARIES GRASS STRIP 1.50%* PROPOSED PAVEMENT MILLING & OVERLAY 2% 2.00' PROP. 4" CEMENT CONCRETE 3% 1' (GRADE BREAK) REM. GUARDRAIL 6.00' SIDEWALK 1.50%* 7.00' SIDEWALK 1.50%* REM GUARDRAIL 2%2% GUARDRAIL ENDS AT STA. 115+21 GUARDRAIL ENDS AT STA. 115+40 GUARDRAIL BEGINS AT STA. 113+67 GUARDRAIL BEGINS AT STA. 113+26 EXIST. COLUMN 2.30' MIN. VARIES 12' TO 0' LEFT TURN LANE TRANSITION EXIST. COLUMN EXIST. ABUTMENT PAVEMENT MILLING MULCH 7.00' SIDEWALK PAVEMENT MILLING MULCH EXIST. ABUTMENT PROP. GUARDRAIL (SEE DETAIL SHEET 158) SEE DETAIL SHEET 158 FULL DEPTH PAVEMENT PROP. FULL DEPTH WIDENING PROP. GRANITE TYPE SB EDGING (TYP.) PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C MEET EXISTING EXISTING GROUND PROPOSED PAVEMENT MILLING & OVERLAY PROP. 8" GRAVEL BORROW TYPE C CEM. CONCRETE R&R GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C EXIST. GROUND MEET EXIST. CEM. CONCRETE PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE CPROP. 4" CEMENT CONCRETE PROP. GUARDRAIL PROP. 8" GRAVEL BORROW TYPE C EXIST. COLUMN PROP. GRANITE EDGING TYPE SB (TYP.) PROP. FULL DEPTH WIDENING PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROPOSED PAVEMENT MILLING & OVERLAY PROP. GUARDRAIL PROP. 4" LOAM & SEED OR GRAVEL (SEE CONSTRUCTION PLANS) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. GUARDRAIL PROP. FULL DEPTH PAVEMENT PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. QUARRY STONE PAVING PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C REM. GUARDRAIL PROP. 4" CEMENT CONCRETE PROP. GRAVEL BORROW TYPE C PROP. 4" CEMENT CONCRETE EXIST. COLUMN EXIST. ABUTMENT EXIST. ABUTMENT PROP. 4" LOAM & SEED (TYP.) REM GUARDRAIL REM GUARDRAIL PROP. QUARRY STONE PAVING PROP. MODULAR BLOCK RET.WALL BACKFILL WITH CRUSHED STONE SEE SHEET 132 PAVEMENT MILLING MULCH 5:1 3.3:1 2.9:1 2.2:1 2:1 PROP.QUARRY STONE PAVING PROP.QUARRY STONE PAVING NOTE: BETWEEN STA. 114+00 AND 114+53 REPLACE ENTIRE SLOPE WITH A STONE PAVING (BOTH SIDES) MOD.BLOCK WALL BEGIN AT 113+86 SEE DETAIL ABOVE VARIES GRASS STRIP VARIES 2' TO 3' GORE VARIES TYPICAL SECTIONS 4 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 STATION 118+70 TO 120+51 * TOLERANCE FOR CONSTRUCTION ±0.5% **PROP. RAISED MEDIAN FROM STA. 110+75 TO STA. 112+85 SH L O N O . 3 3 2 9 2% P.G.L. ROUTE 9 BL VARIES 61.7' TO 47.9' RIGHT OF WAY VARIES 95' TO 140' RIGHT OF WAY 2% PROP. 8" GRAVEL BORROW (TYPE C) PROP. GRANITE CURB WITH 6" REVEAL (TYP.) MEET EXIST. EXIST. GROUND 5.00' BIKE LANE 4.00' SHOULDER VARIES 12.00' - 13.00' TRAVEL LANE 2.0: 1 12.00' PATH INSCRIBED CIRCLE DIAMETER P.G.L. ICD BL 16.00' TRAVEL LANE 100' LANDSCAPED CENTRAL ISLAND 2.00' SHOULDER 14.00' TRAVEL LANE 17.00' TRUCK APRON 1.00' SHOULDER ROUTE 9 2.0% CONST. BL 12' MIN. TRAVEL LANE 2% P.G.L. DAMON ROAD MEET EXISTING ROUNDED (TYP.) 2.0%± 2.0: 1 PROP. SLOPED GRANITE EDGING TYPE SB MEET EXIST. EXIST. GROUND 10.00' SHARED USE PATH PROP. 6" STAMPED AND COLORED CEM. CONC. PROP. 12" GRAVEL BORROW (TYPE C) 12' TRAVEL LANE 12' TRAVEL LANE VARIES' MEDIAN 10' SHARED USE PATH VARIES PAINTED MEDIAN VARIES SPLITTER ISLAND' 1.5%* 1.5%* 1.5%* 1.5%* STATION 400+00 TO 406+26 *TOLERANCE FOR CONSTRUCTION ±0.5% NOT TO SCALE STATION 200+33 TO 201+29 * TOLERANCE FOR CONSTRUCTION ±0.5% 6.00' BIKE PATH VARIES GRASS STRIP VARIES PROP. HIGH EARLY STRENGTH CEMENT. CONCRETE PROP. MODIFIED GRANITE CURB PR O P . S H L O 4' T Y P . FULL DEPTH PAVEMENT 2.0% FULL DEPTH PAVEMENT PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. 4" HOT MIX ASPHALT ORDINARY BORROW PROP. GUARDRAIL PROP. GRANITE CURB WITH 6" REVEAL PROP. 8" GRAVEL BORROW (TYPE C) PROP. 4" HOT MIX ASPHALT ORDINARY BORROW ROUNDED (TYP.) PROP. GUARDRAIL PAVEMENT MILLINGS MULCH PAVEMENT MILLINGS MULCH PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. 8" GRAVEL BORROW TYPE C PROP. GRANITE CURB WITH 6" REVEAL (TYP.) FULL DEPTH PAVEMENT PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. GRANITE EDGING TYPE SB (TYP.) FULL DEPTH PAVEMENT 4" LOAM AND SEED 4" LOAM AND SEED WIDTH VARIES GORE1.00' VARIES 0.50' 1.00' SHOULDER PROP. 4" LOAM & SEED 4" LOAM AND SEED VARIES 12.00' - 13.00' TRAVEL LANE VARIES 12.00' - 13.00' TRAVEL LANE VARIES 12.00' - 13.00' TRAVEL LANE 2.0%± SH L O N O . 5 2 6 2 STATION 120+51 TO 122+00 * TOLERANCE FOR CONSTRUCTION ±0.5% P.G.L. ROUTE 9 BL VARIES 12.00' - 13.00' TRAVEL LANE ROUTE 9 VARIES 12.00' - 13.00' TRAVEL LANE VARIES 12.00' - 13.00' TRAVEL LANE VARIES 12.00' - 13.00' TRAVEL LANE NOTE: BIKE PATH ENDS AT STA 119+14 2.0%2.0%1.5%* PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C PROP. GRANITE CURB WITH 6" REVEAL FULL DEPTH PAVEMENT NOTE: 12' SHARED USE PATH IN SE QUADRANT 233.2:1 2.00' SHOULDER 2.00' SHOULDER 11' TRAVEL LANE 12' SHARED USE PATH VARIES GRASS STRIP 1.5%* PROP. GRANITE CURB WITH 6" REVEAL (TYP.) 100:1 10:1 MEDIAN VARIES GORE VARIES 6.00' BICYCLE LANE TYPICAL SECTIONS 5 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 4.0:12.00% SH L O N O . 5 2 7 7 SHARED USE PATH NTS 12.00' 2.0% CONST. BL VARIES 12' TO 15' 2% P.G.L. ORDINARY BORROW DAMON ROAD 4" LOAM AND SEED MEET EXISTING MEET EXISTING 11' TRAVEL LANE 11' TRAVEL LANE VARIES 0' - 11' BYPASS LANE VARIES' MEDIAN VARIES 10' SHARED USE PATH VARIES6' SIDEWALK 1.5%*1.5%* STATION 201+29 TO 202+80 * TOLERANCE FOR CONSTRUCTION ±0.5% FULL DEPTH PAVEMENT PROP. GRANITE CURB WITH 6" REVEAL (TYP.) 4" LOAM AND SEED PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" LOAM & SEED (TYP.) PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C RAMP CONST. BL 22' MIN. VARIES 28' TO 30' TRAVEL LANE 2% ROUNDED (TYP.)P.G.L. 3.00' NB OFF-RAMP STATION 296+85 TO 302+40 MEET EXISTING MEET EXISTING SH L O N O . 5 2 6 2 2.00'3.75'3.00' FULL DEPTH PAVEMENT PROP. TYPE A HMA BERM (TYP.) P.G.L. 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) SA W C U T INTERSTATE RESURFACING TOP OF SLOPE PROP W BEAM HIGHWAY GUARDRAIL EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL FACE OF MECHANICALLY STABILIZED EARTH SLOPE (SEE PLAN VIEW) EL. 125 (100 YEAR FLOOD ELEVATION) FLOODPLAIN MITIGATION AREA 1 1 2.00' 4.5:1 4.0:1 STATION 18+68 TO 25+12 * TOLERANCE FOR CONSTRUCTION ±0.5% 2 1 2" SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC-19.0) 1 12" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC-12.5) OVER 3.50% ORDINARY BORROW 1.30' EXISTING 2.00' MIN. CONST. BL VARIES 12' TO 15' TRAVEL LANE P.G.L. DAMON ROAD VARIES 15' TO 20' 5' BICYCLE LANE 6' SIDEWALK STATION 202+80 TO 206+06.8 * TOLERANCE FOR CONSTRUCTION ±0.5% 10.0:11.2%2.0%1.5%* PROP. GRANITE TYPE VA-4 CURB WITH 6" REVEAL PROP. 4" CEMENT CONCRETE PROP. 8" GRAVEL BORROW TYPE C FULL DEPTH PAVEMENT PROP. GRANITE CURB WITH 6" REVEAL (TYP.) MEET EXIST. EXIST. GROUND MEET EXISTING 8" GRAVEL BORROW TYPE C CEM. CONCRETE PROPOSED PAVEMENT MILLING & OVERLAY CEM. CONCRETE PROPOSED PAVEMENT MILLING & OVERLAY 5.00' BICYCLE LANE VARIES 1' TO 6' NOTE TO REVIEWER: BORINGS ARE SCHEDULED TO BE TAKEN IN JANUARY 2018 ON THE EXISTING SLOPES. 1:1 SLOPE WILL BE UPDATED WHEN RESULTS OF BORINGS ARE OBTAINED TYPICAL SECTIONS 6 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 RAMP CONST. BL 22' MIN. VARIES 28' TO 30' TRAVEL LANE 2% P.G.L. 3.00' NB OFF-RAMP STATION 302+40 TO 307+58 2.0: 1 4" LOAM AND SEED NB OFF-RAMP STATION 307+58 TO 311+00 RAMP CONST. BL 12.00' 30.00' TRAVEL LANE 2%4:1 P.G.L.4" LOAM AND SEED 12.00' TRAVEL LANE MEET EXISTING MEET EXISTING MEET EXISTING SH L O N O . 5 2 6 2 SH L O N O . 5 2 6 2 TE M P E A S E M E N T SA W C U T RAMP CONST. BL 12.00' 30.00' TRAVEL LANE 2.00' P.G.L. 2.00'3.75' 4" LOAM AND SEED 12.00' TRAVEL LANE 2.0:1 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.)SA W C U T FULL DEPTH PAVEMENT WIDENING SB ON-RAMP STATION 501+85 TO 502+75 PROP. MILL AND OVERLAY 4.00'6.0:1 3.00' 3.00'3.00' 2.00' 3.75' 2.00'3.75'3.00' FULL DEPTH PAVEMENT P.G.L. PROP. TYPE A HMA BERM (TYP.) P.G.L. SH L O N O . 5 2 6 2 FLOODPLAIN MITIGATION AREA EL. 125 (100 YEAR FLOOD ELEVATION) INFILTRATION BASIN J 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) FULL DEPTH PAVEMENT PROP. TYPE A HMA BERM (TYP.) 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) ORDINARY BORROW REM. GUARDRAIL FULL DEPTH PAVEMENT WIDENING PROP. TYPE A HMA BERM (TYP.) 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) PROP. SLOPED GRANITE EDGING TYPE SB 3.00' SHLDR 3.00' SHLDR TOP OF SLOPE TOP OF SLOPE TOP OF SLOPE PROP W BEAM HIGHWAY GUARDRAIL PROP W BEAM HIGHWAY GUARDRAIL PROP W BEAM HIGHWAY GUARDRAIL EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL FLOODPLAIN IMPACT AREA MEET EXISTING FLOODPLAIN MITIGATION AREA EL. 125 (100 YEAR FLOOD ELEVATION) EL. 125 (100 YEAR FLOOD ELEVATION) 1 1 1 1 1 1 SPECIAL BORROW ORDINARY BORROW MEET EXISTING PROP.SLOPED GRANITE EDGING TYPE SB PROP.4" LOAM & SEED PROP.4" LOAM & SEED 2. 0 0 ' TYPICAL SECTIONS 7 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 NOTE TO REVIEWER: BORINGS ARE SCHEDULED TO BE TAKEN IN JANUARY 2018 ON THE EXISTING SLOPES. 1:1 SLOPE WILL BE UPDATED WHEN RESULTS OF BORINGS ARE OBTAINED RAMP CONST. BL 21' MIN.2.00' VARIES 25' TO 30' TRAVEL LANE VARIES (4.3% MAX) P.G.L. EXIST. GROUND 2.00' SB ON-RAMP STATION 504+75 TO 510+50 3.75' SB ON-RAMP STATION 502+75 TO 504+75 RAMP CONST. BL 2.00' 30.00' TRAVEL LANE 4:1 MAX. P.G.L. 3.00'3.75' 4" LOAM AND SEED 12.00' TRAVEL LANE MEET EXISTING TE M P E A S E M E N T SH L O N O . 5 2 6 2 METHOD OF BANKING (SB ON RAMP) NTS SLOPE OF NORMAL CROWN FUL L B A N K ( 6 % ) LINE OF ROTATION AT PGL RAMP WIDTH e (%)STATION LEFT 507+78 3.0% 505+00 502+28 501+78 504+50 500+00 508+00 3.7% 3.7% 4.3% 4.3% 2.0% 2.0% VARIES (4.3% MAX) 2.00' 12.00' 3.00' SH L O N O . 5 2 6 2 FLOODPLAIN IMPACT AREA EL. 125 (100 YEAR FLOOD ELEVATION) EL. 125 (100 YEAR FLOOD ELEVATION) FLOODPLAIN IMPACT AREA EL. 125 (100 YEAR FLOOD ELEVATION) EX I S T . S H L O FLOODPLAIN IMPACT AREA RAMP CONST. BL VARIES 2.00' VARIES (4.3% MAX) P.G.L. ORDINARY BORROW SB ON-RAMP STATION 510+50 TO 520+65 3.75' MEET EXISTING 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) FULL DEPTH WIDENING PROP. TYPE A HMA BERM (TYP.) FULL DEPTH PAVEMENT PROP. TYPE A HMA BERM (TYP.) 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL FULL DEPTH PAVEMENT PROP. TYPE A HMA BERM (TYP.) 4" PAVEMENT MILLING MULCH UNDER GUARDRAIL (TYP.) 4" LOAM AND SEED MEET EXISTING 4:1 MAX.I-91 SB PROP. SLOPED GRANITE EDGING TYPE SB CEMENT CONCRETE I-91 SB EXIST. GROUND EXIST. GROUND TOP OF SLOPE TOP OF SLOPE TOP OF SLOPE PROP W BEAM HIGHWAY GUARDRAIL PROP W BEAM HIGHWAY GUARDRAIL PROP W BEAM HIGHWAY GUARDRAIL EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL MECHANICALLY STABILIZED EARTH SLOPE WITH PLANTABLE FACE FILL MEET EXISTING MEET EXISTING MEET EXISTING 1 1 1 1 1 1 ORDINARY BORROW SPECIAL BORROW ORDINARY BORROW SPECIAL BORROW FLOODPLAIN MITIGATION AREA PROP.4" LOAM & SEED PROP.4" LOAM & SEED FLOODPLAIN MITIGATION EXTEND GEOTEXTILE AND TERMINATE AT TOP OF LOAM & SEED TYPICAL SECTIONS 8 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 ( N O I T Y P I C A L S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 3 3 A M Pl o t t e d o n 68 NOTE TO REVIEWER: BORINGS ARE SCHEDULED TO BE TAKEN IN JANUARY 2018 ON THE EXISTING SLOPES. 1:1 SLOPE WILL BE UPDATED WHEN RESULTS OF BORINGS ARE OBTAINED BEGIN PROJECT STA. 107+76.50 (RTE 9) N 2947841.7339 E 352645.3301 50 1 50 2 2 9 . 0 0 ' 3 2 . 0 0 ' 30.00' 2 2 . 6 2 ' 30.00' 3 2 . 0 0 ' 4 9 . 0 0 ' SAWCUT; MEET EXISTING ROUTE 9 CONS T R U C T I O N B L SAWCUT SAWCUT 108 109 110 111 112 113PC +37.34 PC +52.57 PC +86.19 PT +40.29 PT +28.11 PRC +30.05 R&R GRANITE CURB (TYP) PROP. WCR R&D EXIST. MEDIAN PROP. MILL & OVERLAY R&R. GRAN. CURB (TYP.) PROP. CEM. CONC. SW (TYP.) R&R HYD. L FULL DEPTH WIDENING 6. 0 0 ' PROP. MILL & OVERLAY H U B B A R D A V E MEET EXIST. CURB REMOVE HEDGE N 25. 0 0 ' 20.00 ' PROP. SHLO ADJ. ADJ. R&R (BO) ADJ. ADJ. ADJ. PROP. MILL & OVERLAY PROP. HMA DRIVE PROP HMA DRIVE PC +87.79 R&D 4 5 15 7 R&D CBPROP. WCR PROP. CEM. CONC. SW (TYP.) PROP. CEM. CONC. SW (TYP.) 6 . 0 0 ' 6 . 0 0 ' PROP. CEM. CONC. SW (TYP.) BEGIN SHLO ALT. SECTION 1 R&R (BO) R&R (BO) R&R. GRANITE CURB (TYP.) R&R GRANITE CURB N 36° 32' 15" E 2 0 9 . 2 3 ' N 31° 07' 37" E 8.64' L=102.95'R=1042.00' S 60° 36' 35" E 187.79' 2 PROP. WCR 3 C O O L I D G E A V E . PROP. CEM. CONC. SW (TYP.) 5 . 5 0 ' 6 PROP. WCR PROP. WCR L=43.86' R=765.00' Δ=3° 17' 05" SAWCUT; MEET EXISTING 2 6 . 8 3 ' PROP TYPE A HMA BERM 1 13 12 11 8 9 10 16 17 14 REM. TREE PROP SHLO 1 PROP. WCR ROUTE 9 B STA. 111+29.27 = SB ON RAMP B STA. 500+00.00 L END SHLO ALT. SECTION 1 D D D D MEET EXIST. WALK; REM. CONC. WALK TO BACK OF SIDEWALK D INFILTRATION BASIN J SEE SHEET 48 FOR DETAIL END VERTICAL GRANITE CURB PROP. FULL DEPTH PAVEMENT FULL DEPTH WIDENING RECONSTRUCT CONC. WALK LOAM & SEED LOAM & SEED SAWCUT; MEET EXIST. RET. SHRUBS/ LANDSCAPED AREA RET. BUSINESS SIGN RET. CONC. WALL RET. AUXILIARY BASE LINE A ADJ. BRIDGE STREET (ROUTE 9) PROP. WCR RET. SHRUBS/ LANDSCAPED AREA RETAIN WOOD FENCE RETAIN SHRUBS ROUTE 9 SURVEY BL ADJ. TEMP. EASEMENT REM. CONC. CURB R&R REM. CONC. PAD BEGIN S.H.L.O. ALT. SECTION 2 MEET CONC. WALK R&R ROCK WALL R&R HYD. CAST IRON PLUG R&S BEGIN CITY LO ALT. SECTION 1 ADJ. ADJ. REM. SHRUBS TO L.O. LIMIT TEMP. EASEMENT PROP. FULL DEPTH CONSTRUCTION AT EXISTING ISLAND RET. TREE R&R OH WIRES (BO) MEET EXIST. WALK REM CONC. WALK TO BACK OF SW END CITY LO ALT. SECTION 1 WG RET. R&D CB R&D EXIST. MEDIAN & EDGING PROP LIMIT OF GRADING R&D EXIST. MEDIAN & EDGING PROP W BEAM GUARDRAIL PROP TYPE A HMA BERM BOTTOM OF SLOPE PROP. TANGENT END TREATMENT S A W C U T BEGIN TYPE A HMA BERM PROP. FLARED END R&D EDGING PROP. SLOPED GRANITE EDGING LIMIT OF GRADING PROP. COMPOST FILTER TUBE PROP. 4" LOAM & SEED PROP W BEAM GUARDRAIL PROP. 4" LOAM & SEED L SB ON RAMP CONSTRUCTION B RET.RET. REM. PROP. TANGENT END PROP. GRANITE CURB TYPE VA4 (TYP) REM./ TRIM TREES WITHIN TEMP. EASEMENT R&S CAST IRON PLUG BEGIN CITY L.O. ALT. SECTION 2 R&R OH WIRES (BO) END SHLO ALT. SECTION 2 RET. FENCE TEMP. EASEMENT I- 9 1 S B R&R ADJ. ADJ. PROP. MILL & OVERLAY R&R END . CITY L.O. ALT. SECTION 3 ADJ. ADJ. BEGIN CITY L.O. ALT. SECTION 3 END CITY L.O. ALT. SECTION 2 ADJ. M A R S H A L L S T R E E T REMOVE HEDGE TO LAYOUT LINE 2 9 . 0 0 ' 2 9 . 0 0 ' 2 9 . 0 0 ' 2 6 . 8 3 ' 2 6 . 8 3 ' 2 9 . 0 0 ' 2 9 . 0 0 ' 6 . 0 0 ' SAWCUTSAWCUT BRIDGE ST (RTE 9)PROP. 4" LOAM & SEED PROP. 4" LOAM & SEED PROP. 4" LOAM & SEED R&D EXIST. ISLAND & CURB PROP. HMA SHARED USE PATH END CEM CONC SW MEET PROP. SHARED USE PATH 32 PROP CBCI (TYP.), SEE DRAINAGE PLANS PROP DMH (TYP.), SEE DRAINAGE PLANS N 30° 52' 36" E 145.90' L=75.55'R=800.00' R&D EXIST GUARD RAIL S 6 0 ° 3 6 ' 3 5 " E 1 8 7 . 7 9 ' S B O N R A M P R&D GRANITE SLOPED EDGING PROP. CEM. CONC. MEDIAN PROP. SLOPED GRANITE EDGING PROP HMA SW PROP. CEM.CONC. CUT-THROUGH PROP. CEM.CONC. CUT-THROUGH 32 PROP. VERTICAL GRANITE CURB PROP. VERTICAL GRANITE CURB 12 5 14 5 CONSTRUCTION PLAN SHEET 1 OF 10 9 HIGHWAY GUARD DETAILS SEE SHEET 19 CO N T I N U E D O N SH E E T N O . 10 SEE SHEET 15 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 1: 3 3 P M Pl o t t e d o n 68 CONTINUED ON SHEET NO. 15 20 SCALE: 1" = 20' 0 40 80 DRAINAGE DETAILS KEY PLAN N LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 20 1 PC +25.12 PRC +81.06 40 1 4 0 2 403 404 40 5 40 6 4 9 . 0 ' 113 114 115 1 1 6 117 118 119 PC +60.54 PC +86.19 PC +01.59 P C + 4 7 . 6 9 PT +80.38 P T + 7 4 . 4 4 PT +2 5 . 7 9 PRC +30.05 3 2 . 0 ' SAWCUT PROP. FULL DEPTH PAVEMENT PROP. MODIFIED GRANITE CURB PROP. LANDSCAPE AREA. SEE SHEET 155 PROP. SLOPED GRANITE EDGING (TYP) R&D EXIST. MEDIAN, EDGING & GUARDRAIL PROP. STAMPED CEM. CONC. TRUCK APRON PROP. GRANITE CURB TYPE VA4 (TYP) PROP. 6' CEM. CONC. SW (TYP.) PROP. 4" LOAM & SEED PROP. MILL & OVERLAY ROUTE 9 CONSTRUCTION BL FULL DEPTH WIDENING PROP. COMPOST FILTER TUBE PROP. MILL AND OVERLAY I- 9 1 S B I- 9 1 N B PROP. SLOPED GRANITE EDGING (TYP) LIMIT OF GRADING 32. 0 ' PROP. FULL DEPTH PAVEMENT 31.06' 3 0 . 0 0 ' 12 . 0 0 ' 12.00' 1 7 . 0 0 ' PROP. LANDSCAPE AREA. SEE SHEET 155 PROP. LANDSCAPED CENTRAL ISLAND SEE SHEET 155 PROP. CEM. CONC. ISLAND PROP. W BEAM HIGHWAY GUARDRAIL PROP. SLOPED GRANITE EDGING BRIDGE S T R E E T ( ROUTE 9 L=82.29' R=100.00' PROP. SLOPED GRANITE EDGING PROP. SHARED USE PATH (TYP.) PROP. 4" LOAM AND SEED BOTTOM OF 1:1 SLOPE 31 0 311 NB O F F R A M P 3 6 . 0 ' PROP. MODULAR BLOCK WALL SEE SHEET 158 DAMON RD B STA. 200+00.00= ICD B STA. 402+98.09 ROUTE 9 B STA. 118+00.18 = ICD B STA. 401+48.31 L L PROP. COMPOST FILTER TUBE PROP. CEM. CONC. MEDIAN END GRANITE CURB; BEGIN SLOPED EDGING ADJ. WG ADJ. ADJ. ADJ. PROP. WCR PROP. WCR PROP. WCR R&R (BO) R&D CONTROL CABINET R&D SAWCUT PROP. TERMINAL END PROP. TANGENT END R&D GUARDRAIL TEMP. EASEMENT 18 19 31 29 23 20 PC + 1 5 . 4 0 PT +97.68 PT + 6 9 . 8 2 R&S SIGNAL CONTROL CABINET 30.0' 12.0' PROP. SLOPED GRAN. EDGING PROP. SLOPED GRAN. EDGING PROP. 6' CEM. CONC. SW 6 . 0 ' 20 R&R (BO) R&R (BO) R&D CURB R&D MEDIAN & EDGING R&R (BO) R&R CURB N 9° 2 5 ' 3 0 " E 1 3 4 . 7 5 ' L=248.72' R=450.02' L = 6 2 8 . 3 2' R = 10 0.00' BEGIN WALL STA 113+86.5, 65.7 LT END WALL STA. 19+00, 0.0' LT PROP. W BEAM HIGHWAY GUARDRAIL PROP. TERMINAL END PROP. W BEAM GUARDRAIL PROP. TANGENT END TREATMENT PROP. TANGENT END PROP. TANGENT END 7 ' N 31° 21' 40" E 121.21' L=50.32' R=765.00' Δ=3° 46' 09" PROP. 4" LOAM & SEED PROP. 4" LOAM & SEED L L 10.0 ' 16 17 400 PROP. TERMINAL END NB OFF RAMP B STA. 310+94.21 = ICD B STA. 406+12.57 L L ICD (BACK) B STA. 406+28.32 = ICD (AHEAD) B STA. 400+00.00 L L D D D D D D D D D D D D D MEET EXIST. WALK LIMIT OF MILL & OVERLAY PROP. SHLO ALT. PROP. GRANITE CURB BEGIN PROP. SLOPED EDGING PROP. SLOPED GRANITE EDGING BEGIN CITY L.O. ALT. SECTION 3 END CITY L.O. ALT. SECTION 2 N B O F F R A M P C O N S T R U C T I O N B L REM. DGCB PROP. SLOPED GRANITE EDGING R&R GRANITE CURB (TYP) ADJ. R&R HYD. BEGIN CITY L.O. ALT. SECTION 4 SEE SHEET 19 R&R SAWCUT; MEET EXISTING R&R BRIDGE STREET (ROU T E 9 ) SAWCUT RET. FENCE TEMP. EASEMENT REM.TREE R&R (BO) AUXILIARY BASE LINE A R&D EXIST. MEDIAN ROUTE 9 SURVEY BL 3 2 . 1 ' 17.00' 17 . 0 ' ADJ. PROP. WCR R&S CAST IRON PLUG BEGIN CITY L.O. ALT. SECTION 3 END SHLO ALT. SECTION 2 END CITY L.O. ALT. SECTION 3 PROP. WCR R&S LIMIT OF GRADING PROP. 4" LOAM & SEED ICD CONSTRUCTION BL BEGIN S.H.L.O. ALT. SECTION 3 END S.H.L.O. ALT. SECTION 3 PROP. CEM. CONC. ISLAND 3 3 . 1 7 ' BRIDGE S T R E E T (ROUTE 9 ) LIGHTING LOAD CENTER PROP. SHARED USE PATH 33 . 9 2 ' 34 . 1 4 ' R&D CURB ADJ. ADJ. R&S REM. DMH REM. CB 20.80' 21.63' ADJ. ADJ. R&R HYD. DAMON ROAD CONSTRUCTION BL DA M O N R O A D R&S TEMP. EASEMENT R&R CURBSAWCUT RET R&D R&S DA M O N R O A D R&S PROP. WCR PROP. WCR PROP. SLOPED EDGING PROP. 6' CEM. CONC. SIDEWALK ADJ. R&D MEDIAN & EDGING PROP. GRANITE CURB ADJ. ADJ. ADJ. 15 . 0 ' 16 . 0 ' 15 . 8 ' L ROUTE 9 C O N S T R U C T I O N B SAWCUTSAWCUT 1 2 . 0 0 ' 6 . 0 0 ' PROP. 12' SHARED USE PATH END CEM CONC SW, MEET PROP. HMA SHARED USE PATH PROP. 6' HMA SHARED USE PATH END CEM CONC SW, MEET PROP. HMA SHARED USE PATH 30 21 22 D D 32 33 PROP. 8' WOOD STOCKADE FENCE LIMIT OF WORKLIMIT OF WORK PROP. QUARRY STONE PAVING, R&D EXISTING PROP. QUARRY STONE PAVING RET. EXIST. RIPRAP PROP. LIMIT OF WORK PROP. LIMIT OF WORK PROP. CLEARING AND GRUBBING 34 PROP. W BEAM GUARDRAIL STA. 114+70.79 TO STA. 115+32 PROP. W BEAM GUARDRAIL W/ WOOD BACKING STA. 113+24.91 TO STA. 115+05.93 PROP. CLEARING AND GRUBBING PROP. GRAVEL PROP. 4" LOAM & SEED RET. EXIST. STONE PAVING PROP. CLEARING AND GRUBBING PROP. DMH (TYP.), SEE DRAINAGE PLANS PROP. CBCI (TYP.), SEE DRAINAGE PLANS PROP. CLEARING AND GRUBBING PROP. SELECTIVE CLEARING AND GRUBBING PROP. SELECTIVE CLEARING AND GRUBBING L=72.85' R=91.00' L=78.11'R=66.00' N 7 7 ° 1 3 ' 4 6 " E 7 3 . 2 5 ' N 35° 04' 18" W 25.12' L=55.94' R=280.00' L =1 7 7 .8 0 ' R =3 6 0 .0 0 ' END PROP HMA BERM, MEET PROP GRANITE EDGING BEGIN PROP GRANITE CURB END SLOPED EDGING PROP. SLOPED GRANITE EDGING PROP. GRANITE CURB PROP 6' HMA ACCESS PATH PROP. WCR PROP. WCR, CEMENT CONC. CUT-THROUGH PROP. WCR, CEMENT CONC. CUT-THROUGH PROP. CEM. CONC. ISLAND PROP. BIKE RAMP 32 PROP. BIKE RAMP PROP. BIKE RAMP PROP SPLAYED GRANITE TRANSITION CURB PROP GRANITE TRANSITION CURB PROP SPLAYED GRANITE TRANSITION CURB (TYP.) 6 . 0 0 ' PROP. WOOD GATE PROP MAINTENANCE ACCESS PATH PROP. 4" LOAM AND SEED 32.05'ROUTE 9 B STA. 115+72.47 = ICD B STA. 404+92.08 BOT. SLOPE L L INSTALL RRFB (TYP.) 19 20 PC +88.77 PC +0 6 . 0 8 PT + 1 7 . 3 7 PCC +40.28 123.5 123 124 130 14 0 132 14 3 15 2 14 1 143 137 140 14 5 10 HIGHWAY GUARD DETAILS STEEL W BEAM TERMINAL SECTION STA 113+54.79, 51.2' LT STEEL W BEAM HIGHWAY GUARD STA 113+54.79 TO STA 114+94.89 LT STEEL W BEAM TANGENT END TREATMENT STA 114+94.89 TO STA 115+32.39 LT STEEL W BEAM TERMINAL SECTION STA 113+61.19, 7.8' LT STEEL W BEAM HIGHWAY GUARD STA 113+61.19 TO STA 115+15.85 LT STEEL W BEAM TANGENT END TREATMENT STA 115+15.85 TO STA 115+53.35 LT STEEL W BEAM TANGENT END TREATMENT STA 113+08.12 TO STA 113+45.70 LT STEEL W BEAM HIGHWAY GUARD STA 113+45.70 TO STA 115+24.63 LT STEEL W BEAM TERMINAL SECTION STA 115+24.63, 1.4' LT STEEL W BEAM TANGENT END TREATMENT STA 113+08.00 TO STA 113+45.50 RT STEEL W BEAM HIGHWAY GUARD STA 113+45.50 TO STA 115+05.93 RT STEEL W BEAM TERMINAL SECTION STA 115+05.93, 28.5' RT CO N T I N U E D O N SH E E T N O . 9 DRAINAGE DETAILS SEE SHEET 20 CO N T I N U E D O N SH E E T N O . 11 N CONTINUED ON SHEET NO. 12 CONTINUED ON SHEET NO. 13 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 1 P M Pl o t t e d o n 68 20 SCALE: 1" = 20' 0 40 80 CONSTRUCTION PLAN SHEET 2 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N END PROJE C TSTA. 121+96 . 8 3 ( R T E 9 ) N 2948980.852 8 E 353404.498 4 20 1 PC +25.12 PRC +81.06 401 40 2 403 118 119 120 121 122 PC +60.54 PT +09.27 PT +2 5 . 7 9 2 9 . 0 0 ' 31.06' 12 . 0 0 ' 12.00' BRIDGE S T R E E T ( ROUTE 9 ) PROP. 12' SHARED USE PATH PROP. LANDSCAPE AREA SEE SHEET 155 PROP. FULL DEPTH PAVEMENT 26 . 0 0 ' 26 . 6 5 ' PROP. SAWCUT PROP. MILL AND OVERLAY L=55.94' R=280.00' Δ=11° 26' 46" PROP. CEM. CONC.ISLAND PROP. SLOPED GRAN. EDGING PROP. SHARED USE PATH (TYP.) PROP. 4" LOAM AND SEED PROP. 4" LOAM AND SEED BOTTOM OF SLOPE DA M O N R O A D PROP. COMPOST FILTER TUBE BOTTOM OF SLOPE PROP. WCR PROP. WCR REM. ABAN. R&R HYD. PROP. COMPOST FILTER TUBE R&R CURB BEGIN CURB R&R END EDGING N 9° 2 5 ' 3 0 " E 1 3 4 . 7 5 ' L=248.72' R=450.02' N 41° 05' 32" E 124.60' 29 31 RIVERBANK ROAD R&R UTIL POLE (BO) BEGIN PROP CITY L.O. ALT. NO. XXXX SECTION 6 MEET EXIST. CURB MEET EXIST. CURB PROP. TANGENT END PROP. W BEAM GUARDRAIL R&R BRIDGE RAIL TO HIGHWAY GUARD TRANSTION MEET EXIST. BRIDGE RAIL TO HIGHWAY GUARD TRANSITION (RESET) D D D D D D PROP. SHLO ALT. LOAM & SEED MEET EXIST. WALK LIMIT OF FULL DEPTH CONSTRUCTION STA. 120+40 PROP. GRANITE CURB RET 17.00' BEGIN S.H.L.O. ALT. SECTION 3 END S.H.L.O. ALT. SECTION 3 PROP. SLOPED GRAN. EDGING 3 3 . 1 7 ' R&D MEDIAN & EDGING ADJ. PROP. 6' CEM. CONC. SIDEWALK 33 . 9 2 ' 34 . 1 4 ' R&D 20.80' 21.6 3 ' ADJ. ADJ. R&S DA M O N R O A D WG CAST IRON PLUG ADJ. R&S L BRIDGE STREET CONSTRUCTION B REM. DMH REM. CB TEMP. EASEMENT R&R CURB R&S SIGNAL CONTROL CABINET LIGHTING LOAD CENTER PROP. WCR BEGIN EDGING AUXILIARY BASE LINE B DAMON ROAD CONSTRUCTION BL SAWCUT PROP. CEM. CONC. ISLAND 23 21 ADJ. ADJ. BRIDGE S T R E E T ( ROUTE 9) R&S PROP. LANDSCAPED CENTRAL ISLAND SEE SHEET 155 PROP. STAMPED CEM. CONC. TRUCK APRON R&S R&D CURB R&D MEDIAN & EDGING PROP. 4" LOAM AND SEED PROP. FULL DEPTH PAVEMENT REM. MEET EXIST. PAVEMENT L ICD CONSTRUCTION B PROP. SLOPED GRANITE EDGING R&R (BO)R&D CURB (TYP.) ROUTE 9 SURVEY B L AUXILIARY BASE LINE A ADJ. PROP. 6' HMA WALK L 1 2 . 0 0 ' 6 . 0 0 ' 2 8 . 0 5 ' PROP. LANDSCAPE AREA. SEE SHEET 155 22 30 PROP. 6' HMA WALK 35 34 PROP. 8' WOOD STOCKADE FENCE END PROP. 8' WOOD STOCKADE FENCE, MEET EXIST. CLF BEGIN PROP. 8' WOOD STOCKADE FENCE PROP. CBCI (TYP), SEE DRAINAGE PLANS PROP. DMH (TYP), SEE DRAINAGE PLANS N 35° 04' 18" W 25.12' L=55.94' R=280.00' L =1 7 7 .8 0 ' R =3 6 0 .0 0 ' INSTALL RRFB INSTALL RRFB INSTALL RRFB PROP. SLOPED GRAN. EDGING PROP 6' HMA ACCESS PATH PROP. BIKE RAMP PROP. BIKE RAMP 6 . 0 0 ' PROP MAINTENANCE ACCESS PATH MEET EXIST. PAVEMENT 124 132 137 133 1 2 8 1 1 6 1 3 2 6854 SF within Riverfront 11 CO N T I N U E D O N SH E E T N O . 10 N FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 2 P M Pl o t t e d o n 68 SEE SHEET 21 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS DRAINAGE DETAILS STEEL W BEAM TANGENT END TREATMENT STA 119+65.10 TO STA 120+02.60 RT STEEL W BEAM HIGHWAY GUARD STA 120+02.60 TO STA 120+68.37 RT RESET EXIST. BRIDGE RAIL TO STA 120+68.37 TO STA 120+95.27 RT HIGHWAY GUARD TRANSITION CONSTRUCTION PLAN SHEET 3 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N END P R O J E C T STA. 2 0 5 + 6 0 . 8 4 ( D A M O N R O A D ) N 2949 0 9 5 . 4 4 1 9 E 3527 6 6 . 2 0 4 9 201 202 203 204 205 PC +25.12 PCC +20.22 PRC +81.06 PRC +58.85 N 4 0 3 1 5 . 0 0 ' 3 2 . 1 2 ' 17. 0 0 ' TEMP EASEMENT S A W C U T 2 1 . 5 9 ' DAMON R O A D ADJ. PROP. CITY LAYOUT RESTORE EXISTING PAVEMENT UPON COMPLETION OF SIDEWALK PROP. SHARED USE PATH ADJ. WG R&S 1 2 . 0 0 ' SHAR E D U S E P A T H MEET EXISTING NORWOTTUCK RAIL TRAIL STA 25+00 5 . 5 0 ' PROP. CEM. CONC. SW PROP. MILL AND OVERLAY ℄ DRAINAGE DITCH PROP DI SAW C U T 24 20 26 27 R&R CURB (TYP.) R&R CURB (TYP.) L =261.3 6 'R =4 10 .0 0 ' L =5 1 .7 3 'R =1 1 2 1 .8 6 ' END FULL DEPTH CONSTRUCTION STA 201+28.28 BEGIN MILL & OVERLAY MEET EXIST. 1 5 . 9 6 ' L =17 7 .8 0 'R =3 6 0 .0 0 ' BEGIN CITY L.O. ALT. SECTION 5 END CITY L.O. ALT. SECTION 5 D D D D D END FULL DEPTH CONSTRUCTION STA 202+50 BEGIN MILL & OVERLAY D SAW C U T PROP. COMPOST FILTER TUBE BOTTOM OF SLOPE 1 7 . 1 ' 7 . 9 ' 1 1 . 8 ' +36.87 +17.29 PROP. 4" LOAM & SEED 1 2 . 0 0 ' REM PAVEMENT PROP. WCRPROP. 4" LOAM & SEED R&D R&R (BO) CBCI PROP.CEM. CONC.ISLAND 1 5 . 8 0 ' BEGIN CITY L.O. ALT. SECTION 4 PROP. SLOPED GRAN. EDGING PROP. FULL DEPTH CONSTRUCTION ADJ. ADJ. R&D CONTROL CABINET PROP. SLOPED GRAN. EDGING PROP. CEM. CONC. ISLAND SAWCUT R&R (BO) R&R CURB PROP. LOAM & SEED END CITY L.O. ALT. SECTION 4 R&R CURB SAWCUT 25 REM. CB REM. DMH RET. TREE R&R RET. DECORATIVE FENCE; PROTECT TREE AND SHRUBS FULL DEPTH WIDENING L DAMO N R O A D CONS T R U C T I O N B SAWCUT RET. LANDSCAPED AREA RET. BUSINESS SIGN LIMIT OF GRADING TEMP. EASEMENT LIMIT OF GRADING RET. WOOD RAIL FENCE PROP. FULL DEPTH PAVEMENT RET. SIGN RET. TREE REM. CB PROP. CITY LAYOUT MEET EXIST. GROUND I-91 N B I-91 S B N O R W O T T U C K R A I L T R A I L L SHAR E D U S E P A T H CONS T R U C T I O N B D PROP. LANDSCAPED AREA, SAWCUT & REM EXIST HMA WALK 21 22 PROP. CBCI (TYP), SEE DRAINAGE PLANS L=55.94' R=280.00' L =1 7 7 .8 0 'R =3 6 0 .0 0 ' TEMP E A S E M E N T BEGIN PROJECT NO. 608236 1 9 . 0 0 ' MEET EXIST. WALK 2 6 . 0 1 ' 20 21 22 23 24 25 PC +88.77 PC + 0 6 . 0 8 PT +17 . 3 7 PCC +40.28 143 152 150 136 1 3 3 141 12 CO N T I N U E D O N SH E E T N O . 10 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 2 P M Pl o t t e d o n 68 SEE SHEET 22 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS NONE DRAINAGE DETAILS CONSTRUCTION PLAN SHEET 4 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N 401 405 40 6 11 6 1 1 7 PC + 4 7 . 6 9 PT + 7 4 . 4 4 P T + 2 5 . 7 9 12. 0 0 ' L=82.29' R=100.00' PROP. FULL DEPTH CONSTRUCTION PROP. 4" LOAM & SEED PROP. HMA BERM BOTTOM OF SLOPE PROP. COMPOST FILTER TUBE; PROP. W BEAM GUARD RAIL 306 307 308 309 310 31 1 I-91 NB 36 . 0 ' 10.0 0 ' PROP. SLOPED GRAN. EDGING MEET EXIST. EDGING STA:305+97.71 PC +15.40 PC +59.79PT +97.68 PT +69.82 PROP. COMPOST FILTER TUBE R&D EDGING N 9 ° 2 5 ' 3 0 " E 1 3 4 . 7 5 ' L =6 2 8 .3 2 ' R =1 0 0 .0 0 ' R&R OVERHEIGHT VEHICLE DETECTOR N 27° 11' 33" W 435.66' NB OFF RAMP 3 0 . 0 0 ' 4 0 0 L =11 0 .0 4 'R =5 5 0 .0 0 ' MEET EXIST. GUARDRAIL PROP. TERMINAL END D D D D D INFILTRATION BASIN B SEE SHEET 60 FOR DETAILS PROP. HMA SHARED USE PATH PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL R&D GUARDRAIL R&D GUARDRAIL PROP GUARDRAIL I-91 SB RET. REM. DMH LINTERSTATE ROUTE 91 SURVEY B NB OFF RAMP CONSTRUCTION BL REM. CB LIMIT OF GRADING PROP. SLOPED GRANITE EDGING PROP. COMPOST FILTER TUBE PROP. 4" LOAM & SEED PROP. SHARED USE PATH REM. DMH 19 18 PROP. WCR PROP. 4" LOAM & SEED LIMIT OF WORKL ICD CONSTRUCTION B R&D GUARDRAIL PROP. SLOPED GRANITE EDGING PROP. SHARED USE PATH REM. CB PROP. FULL DEPTH CONSTRUCTION 17.00 ' PROP. SLOPED GRANITE EDGING PROP. MODIFIED GRANITE CURB SAWCUT REM. DGCB PROP. SLOPED GRANITE EDGING 3 0 . 0 ' R&D SIGNS & EQUIPMENT ROUTE 9 CONSTRUCTION B L EXISTING 100 - YEAR FLOOD ELEV. 125' PROP. BOTTOM OF 1:1 SLOPE D PROP. LIMIT OF WORK BOTTOM OF SLOPE PROP. FES (TYP.), SEE DRAINAGE PLANS L=72.85' R=91.00' L =7 8 .1 1 ' R = 6 6 . 0 0 ' N 7 7 ° 1 3 ' 4 6 " E 7 3 . 2 5 ' PROP. CLEARING & GRUBBING R & S EXIST GUARDRAIL R & S EXIST GUARDRAIL REMOVE CONC. SWALE; REPLACE WITH 4" LAOM & SEED REMOVE EXIST. PAVEMENT REPLACE WITH LOAM & SEED OCS P R O P M A I N T E N A N C E A C C E S S P A T H 120.0 120.5121. 0121. 5 1 2 2 . 0 1 2 2 . 5 1 2 3 . 0 1 2 3 . 5 125.0 FLOODPLAIN MITIGATION; AREA 8,960 SF FLOODPLAIN IMPACT; AREA 14,985 SF 12 3 12 2 1 2 4 119 135 140 140 125 130 135 130 135 140 140 145 140 140 13 2 141 CO N T I N U E D O N SH E E T N O . 16 CO N T I N U E D O N SH E E T N O . 10 13 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 3 P M Pl o t t e d o n 68 SEE SHEET 23 20 SCALE: 1" = 20' 0 40 80 N HIGHWAY GUARD DETAILS DRAINAGE DETAILS CONSTRUCTION PLAN SHEET 5 OF 10 CONTINUED ON SHEET NO. 15 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N MEET EXISTING GUARDRAIL STA 297+78.06 RT STEEL W BEAM HIGHWAY GUARD STA 297.78.06 TO SAT 309+67.41 RT STEEL W BEAM TANGENT END TREATMENT STA 309+67.41 TO STA 310+04.91 RT 508 509 510 NB OFF RAMPPC +40.58 PROP. HMA BERM TEMP. EASEMENT PROP. BOTTOM OF 1:1 SLOPE I-91 SB I-91 NB PROP. W BEAM GUARD RAIL 300301302303304305 306 PROP. FULL D E P T H C O N S T R U C T I O N 2 5 . 0 0 ' REMOVE EXISTING PAVEMENT; REPLACE WITH LOAM & SEED PROP.COMPOST FILTER TUBE; PROP. SLOPED GRAN. EDGING PT +69.21 PT +24.12 R&D EDGING L=183.5 4'R=7 000.00'N 27° 11' 33" W 435.66' ℄ DITCH PROP. W BEAM GUARDRAIL PROP. TANGENT END TREATMENT PROP. FULL DEPTH CONSTRUCTION SAWCUT PROP. MILL & OVERLAY D D D D D PROP. SLOPED GRANITE EDGING PROP. COMPOST FILTER TUBE; NB OFF RAMP CONSTRUCTION BL MEET EXIST. EDGING PROP. 4" LOAM & SEED L INTERSTATE ROUT E 9 1 S U R V E Y B PROP. GRANITE EDGING LSB ON RAMP CONSTRUCTION B SB ON RAMP PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL PROP. BOTTOM OF 1:1 SLOPE PROP. SLOPED GRAN. EDGING MEET EXIST. EDGING STA. 305+97.71 R&D GUARDRAIL R&D GUARDRAIL R&D GUARDRAIL R&D GUARDRAIL I-91 SB PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL EXISTING 100 - YEAR FLOOD ELEV. 125' PROP. LIMIT OF WORK PROP. COMPOST FILTER TUBE PROP. LIMIT OF WORK PROP. DMH (TYP), SEE DRAINAGE PLANS PROP. CBCI (TYP), SEE DRAINAGE PLANS N 28° 41' 14" W 565.58' FLOODPLAIN IMPACT; AREA 14,985 SF FLOODPLAIN MITIGATION; AREA 31,313 SF 130 135 140 140 135 130 130 130 14 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 3 P M Pl o t t e d o n 68 CO N T I N U E D O N SH E E T N O . 17 CO N T I N U E D O N SH E E T N O . 13 SEE SHEET 24 CONTINUED ON SHEET NO. 23 20 SCALE: 1" = 20' 0 40 80 N DRAINAGE DETAILS CONSTRUCTION PLAN SHEET 6 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 HIGHWAY GUARD DETAILS MEET EXISTING GUARDRAIL STA 297+78.11 RT STEEL W BEAM HIGHWAY GUARD STA 297+78.11 TO STA 310+05.66 RT STEEL W BEAM TERMINAL SECTION STA 310+05.66 RT STEEL W BEAM TANGENT END TREATMENT STA 302+86.70 TO STA 303+24.20 LT STEEL W BEAM HIGHWAY GUARD STA 303+24.20 TO STA 306+81.48 LT MEET EXISTING GUARDRAIL STA 306+81.48 LT KEY PLAN N 501 502 503 504 505 506 25 . 0 0 ' 2 0 . 0 0 ' 29.00' 11 0 11 1 11 2 11 3 PC +37.34 PC +86.19 PT +40.29 PRC +30.05 PROP. HMA BERM PROP. 4" LOAM & SEED ROUTE 9 B STA. 111+29.25 = SB ON RAMP B STA. 500+00.00L PROP. MILL AND OVERLAY PROP FULL DEPTH CONSTRUCTION TEMP. EA S E M E N T SB ON RAMP CONSTRUCTION B REMOVE EXISTING PAVEMENT REPLACE WITH LOAM & SEED PROP. COMPOST FILTER TUBE 30 . 0 0 ' PROP. 4" LOAM & SEED PC +87.79 PCC +71.86 6.00' 12 14 13 R&D EDGING N 3 6 ° 3 2 ' 1 5 " E 2 0 9 . 2 3 ' L =1 0 2 .9 5 ' R =1 0 4 2 .0 0 ' S 60° 36' 35" E 187.79' T E M P . E A S E M E N T END S.H.L.O. ALT. SECTION 1 L L PROP. TANGENT END TREATMENT 11 FLOODPLAIN MITIGATION PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL D D D D D PROP W BEAM GUARDRAIL I-91 S B I-91 N B MEET EXIST. EDGING R&D EDGING INTERSTATE ROUTE 91 SURVEY BL BOTTOM OF SLOPE 526.83' R&R REM CONC. PAD PROP. WCR MEET CONC. WALK RET. RET. SAWCUT; MEET EXISTING 6.00' PROP. CEM. CONC. SW (TYP.) MEET EXISTING WALK; REM. CONC. WALK TO BACK OF SIDEWALK PROP LIMIT OF GRADING PROP. COMPOST FILTER TUBE END GRANITE CURB BEGIN TYPE A HMA BERM PROP. TANGENT END TREATMENT PROP. SLOPED GRANITE EDGING PROP. LIMIT OF WORK BOTTOM OF SLOPE PROP. 4" LOAM & SEED PROP. FULL DEPTH PAVEMENT PROP W BEAM GUARDRAIL PROP FULL DEPTH WIDENING PROP. HMA BERM PROP. COMPOST FILTER TUBE; AU X I L I A R Y B A S E L I N E A SAWCUT PROP FULL DEPTH WIDENING 30 . 0 0 ' SAWCUT R&D EDGING R&D EXIST. MEDIAN 30 . 0 0 ' PROP. DMH (TYP), SEE DRAINAGE PLANS PROP. 4" LOAM & SEED BOTTOM OF SLOPE REM. HDW PROP. CEM. CONC. SW (TYP.) PROP. FULL DEPTH CONSTRUCTION AT EXISTING ISLAND R&D EXIST. MEDIAN ADJ. ADJ. SA W C U T PROP. MILL & OVERLAY PROP. MILL & OVERLAY R&D SIGNS RO U T E 9 CO N S T R U C T I O N B L RO U T E 9 S U R V E Y B L ADJ.BR I D G E S T ( R T E 9 ) SA W C U T 29.00' 32.00' 32.00' 49.00' ADJ. REM. CONC. CURB ADJ. SA W C U T ADJ. 15 R&D CB PROP. WCR 10 9 PROP. WCR SB ON RAMP 8 PROP. WCR R&D CB R&D EXIST. MEDIAN & EDGING SA W C U T ADJ. REM. CB R&D R&D EXIST. MEDIAN & EDGING ADJ. EXIST. 100 - YEAR FLOOD ELEV. 125' PROP. BOTTOM OF 1:1 SLOPE PROP PROP. BOTTOM OF 1:1 SLOPE SEE TRAFFIC SIGNAL PLAN FOR DISPOSITION OF TRAFFIC SIGNAL EQUIPMENT (TYP.) PROP. DMH (TYP), SEE DRAINAGE PLANS N 3 0 ° 5 2 ' 3 6 " E 1 4 5 . 9 0 ' S 60° 36' 35" E 187. 7 9 ' L=284.07' R=1300.00' L=397.35' R=1700.00' PROP. CLEARING & GRUBBING PROP. CLEARING & GRUBBING R&D GUARDRAIL PROP. TERMINAL END FLOODPLAIN MITIGATION; AREA = 3,276 SF FLOODPLAIN IMPACT; AREA = 10,999 SF 122 123 124 125 140 140145 140 130 140 140 135 125 12 0 145 15N FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 3 P M Pl o t t e d o n 68 CO N T I N U E D O N SH E E T N O . 9 CO N T I N U E D O N SH E E T N O . 16 SEE SHEET 25 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS DRAINAGE DETAILS CONTINUED ON SHEET NO. 13 CONSTRUCTION PLAN SHEET 7 OF 10 CONTINUED ON SHEET NO. 10 CONTINUED ON SHEET NO. 9 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N STEEL W BEAM TANGENT END TREATMENT STA 500+77.41 TO STA 501+14.91 RT STEEL W BEAM HIGHWAY GUARD STA 501+14.91 TO STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 297+78.06 RT STEEL W BEAM HIGHWAY GUARD STA 297.78.06 TO SAT 309+67.41 RT STEEL W BEAM TANGENT END TREATMENT STA 309+67.41 TO STA 310+04.91 RT 506 507 508 509 510 511 NB OFF R A M P PC +40.58 SB ON RAMP 20 . 0 0 ' 21 . 5 1 ' L SAWCUT PROP. HMA BERM PROP. 4" LOAM & SEED I-91 NB 299 300 301 302 303 304 PROP. W BEAM GUARDRAIL PROP. BOTTOM OF 1:1 SLOPE PROP. GRANITE EDGING TEMP. EASEMENT PROP. COMPOST FILTER TUBE PROP. 4" LOAM & SEED PC +31.23 PT +69.21 2 9 . 7 6 ' L=183.54'R=7000.00' PROP. MILL & OVERLAY PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL D D D D TOP OF SLOPE PROP. W BEAM GUARDRAIL R&R SAWCUT INTERSTATE ROUTE 91 SURV E Y B L MEET EXIST. EDGING R&D EDGING PROP. TANGENT END TREATMENT PROP. SLOPED GRAN. EDGING R&D GUARDRAIL R&D GUARDRAIL R&D GUARDRAIL I-91 SB PROP. FULL DEPTH CONSTRUCTION NB OFF R A M P NB OFF RA M P C O N S T R U C T I O N B L 100 - YEAR F L O O D E L E V . 1 2 5 ' PROP. BOTTOM OF 1:1 SLOPE PROP. LIMIT OF WORK D PROP. DMH (TYP), SEE DRAINAGE PLANS PROP. CB (TYP), SEE DRAINAGE PLANS L=397.35' R=1700.00' S 33° 59' 22" E 262.02' L=397.35' R=1700.00' N 28° 41' 1 4 " W 5 6 5 . 5 8 ' SB ON RAMP CONSTRUCTION B 12 0 . 0 EXIST. 100- YEAR FLOOD ELEV. 125'121 120 1 1 9 135 130 130 130 125 125 16 N FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 4 P M Pl o t t e d o n 68 SEE SHEET NO. 26 CO N T I N U E D O N SH E E T N O . 17 CONTINUED ON SHEET NO. 14 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS STEEL W BEAM TANGENT END TREATMENT STA 500+77.41 TO STA 501+14.91 RT STEEL W BEAM HIGHWAY GUARD STA 501+14.91 TO STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 519+24.23 RT DRAINAGE DETAILS CONSTRUCTION PLAN SHEET 8 OF 10 KEY PLAN N CO N T I N U E D O N SH E E T N O . 15 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 END PROJECT STA. 295+50.00 (NB OFF RAMP) N 2947130.0812 E 353932.6640 511 512 513 514 515 516 517 PI +75.00 PROP. HMA BERM PROP. 4" LOAM & SEED FULL DEPTH WIDENING 296297298299 SB ON RAMP I-91 SB I-91 NB MEET EXISTING GUARDRAIL PROP. 4" LOAM & SEED PROP W BEAM GUARDRAIL PC +31.23 PT +58.68 PCC +30.96 SAWCUT FLOODPLAIN MITIGATION D D D PROP. W BEAM GUARDRAIL BOTTOM OF SLOPE SAWCUT INTERSTATE ROUTE 91 SURVEY BL RET. TFCC SB ON RAMP CONSTRUCTION BL R&R TFCC R&R SAWCUT PROP. 1:1 MECHANICALLY STABILIZED EARTH SLOPE W/ PLANTABLE FACE FILL PROP. COMPOST FILTER TUBE; MEET EXIST. EDGING/ END MILL & OVERLAY STA.296+95.46 FLOODPLAIN MITIGATION NB OFF RAMP CONSTRUCTION BL 100 - YEAR FLOOD ELEV. 125' EXIST. 100 - YEAR FLOOD ELEV. 125' PROP. BOTTOM OF 1:1 SLOPE PROP. BOTTOM OF 1:1 SLOPE FLOODPLAIN MITIGATION PROP. LIMIT OF WORK D D D PROP. BOTTOM OF SLOPE PROP. PROP. BOTTOM OF 1:1 SLOPE PROP. BOTTOM OF SLOPE PROP. CB (TYP), SEE DRAINAGE PLANS PROP. DMH (TYP), SEE DRAINAGE PLANS L=299.73' R=2598.00'L=227.73' R=5583.00' S 24° 47' 28" E 268.49' N 27° 12' 23" W 125.00'N 28° 41' 14" W 565.58' PROP. MILL & OVERLAY FLOODPLAIN MITIGATION AREA = 10,738 SF FLOODPLAIN MITIGATION AREA = 31,313 SF 125.0124.0123.0122.0121.012 1 . 5 12 1 . 5 121 . 5 1 2 1 . 0 12 0 . 5 120. 0 121.5 122. 0 12 2 122.0 121.5 121.5 11 9 12 0 125 125 130 130 120 130 125 1 2 0 FLOODPLAIN MITIGATION; AREA 31,313 SF 17 N FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 4 P M Pl o t t e d o n 68 SEE SHEET 27 CO N T I N U E D O N SH E E T N O . 16 CO N T I N U E D O N SH E E T N O . 25 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS STEEL W BEAM TANGENT END TREATMENT STA 500+77.41 TO STA 501+14.91 RT STEEL W BEAM HIGHWAY GUARD STA 501+14.91 TO STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 297+78.06 RT STEEL W BEAM HIGHWAY GUARD STA 297.78.06 TO SAT 309+67.41 RT STEEL W BEAM TANGENT END TREATMENT STA 309+67.41 TO STA 310+04.91 RT DRAINAGE DETAILS CONTINUED ON SHEET NO. 14 CONSTRUCTION PLAN SHEET 9 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N END PROJECT STA. 520+65.03 (SB ON RAMP) N 2946521.4418 E 354068.2655 516 517 518 519 520 521 SAWCUT PROP. COMPOST FILTER TUBE; SB ON RAMP I-91 SB I-91 NB PC +27.17 PT +58.68 BOTTOM OF SLOPE R&R TFCC FLOODPLAIN MITIGATION LSB ON RAMP CONSTRUCTION B I-91 SB I-91 NB LINTERSTATE ROUTE 91 SURVEY B SAWCUTFULL DEPTH WIDENING PROP. HMA BERM PROP. 4" LOAM & SEED MEET EXIST GUARDRAIL & BERM STA. 519+24.23 RET. TFCC EXIST. 100 - YEAR FLOOD ELEV. 125' BOTTOM OF 1:1 OF SLOPE PROP. LIMIT OF WORK D PROP. PROP. BOTTOM OF 1:1 SLOPEPROP. BOTTOM OF SLOPE PROP. DMH (TYP), SEE DRAINAGE PLANS PROP. CB (TYP), SEE DRAINAGE PLANS S 24° 47' 28" E 268.49' FLOODPLAIN MITIGATION; AREA = 10,738 SF 122.0 122 122.0 121.5 125.0 124.0 123.0 122.0 121.0 120.0 130 130 120 130 125 18 N FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 2 ( N O I C O N S T R U C T I O N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 4 P M Pl o t t e d o n 68 SEE SHEET 28 CO N T I N U E D O N SH E E T N O . 17 20 SCALE: 1" = 20' 0 40 80 HIGHWAY GUARD DETAILS STEEL W BEAM TANGENT END TREATMENT STA 500+77.41 TO STA 501+14.91 RT STEEL W BEAM HIGHWAY GUARD STA 501+14.91 TO STA 519+24.23 RT MEET EXISTING GUARDRAIL STA 519+24.23 RT DRAINAGE DETAILS CONSTRUCTION PLAN SHEET 10 OF 10 LEGEND FULL DEPTH CONSTRUCTION 1:1 MSE SLOPE FLOODPLAIN MITIGATION FLOODPLAIN IMPACT PROPOSED CONTOUR EXISTING CONTOUR 123.5 123 KEY PLAN N 108 109 110 111 112 113 ROUTE 9 SB O N R A M P 50 1 50 2 BEGIN PROJECT STA. 107+76.50 (RTE 9) N 2947841.7339 E 352645.3301 N D D D D D D XA26 ADJ DMH RIM=136.70 J08 DMH XA25 CIT RIM=136.20 A24 CIT J14 DMH A22 CBCI XA18 CIT RIM=136.08 J20 CBCI A17 CIT A47 CBCI J12 CBCI XA19 ADJ DMH RIM=135.56 J34 CBCI XA07 CIT RIM=135.16 XA49 REM CBA11 CBCI J13 CB XA09 CIT RIM=134.88 J48 CBCI J16 DMH J15 CBCI XA10 ADJ DMH RIM=134.71 A05 CBCI J51 12 FES F04 DMH F05 12 FES 7 LF - 12" RCP 36 LF - 12" RCP 3 LF - 12" RCP 9 LF - 12" RCP 12 LF - 12" RCP 45 LF - 12" RCP 76 LF - 12" RCP 20 LF - 12" RCP45 LF - 12" RCP 49 LF - 12" RCP 53 LF - 12" RCP PROP INFILTRATION BASIN J (SEE SHEET 61) REM CB REM CB REM CB REM CB 25 FT - 12" RCP T P - 1 T P - 2 135 13 4 1 3 3 1 3 2 136 1 3 1 1 3 0 1 2 9 1 2 8 128 129 130 131 132 133 134 135 1 2 3 1 2 4 1 2 5 1 2 6 1 2 7 1 2 8 1 2 9 1 3 0 127 126 125 124 123 122 A33 ADJ DMH A32 CBCI 41 LF - 12" RCP 4 LF - 12" RCP 86 LF - 12" RCP 2 LF - 12" RCP XA04 ADJ DMH RIM=133.93 A02 DMHA01 CBCI XF01 RET CB XA03 ADJ CBCI RIM=133.66 PROP. LIMIT OF WORK F02 18 HDW F03 18 SME F06 12 HDW COMPOST FILTER TUBES (CLASS V) C O O L I D G E S T R E E T H U B B A R D A V E M A R S H A L L S T R E E T I- 9 1 S B (5' DIA.) (CLASS V) REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE DRAINAGE PLANS SHEET 1 OF 12 19 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 8 P M Pl o t t e d o n 68 CO N T I N U E D O N SH E E T N O . 20 N 20 SCALE: 1" = 20' 0 40 80 CONTINUED ON SHEET NO. 25 KEY PLAN N 20 1 113 114 115 1 1 6 117 118 119 40 1 4 0 2 403 404 40 5 40 6 ROUTE 9 NB O F F R A M P 31 0 311 D D D D D D D D D D D D D D B24 CBCI B23 DMHB22 DMH B27 CBCI B20 CBCI B34 CBCI B21 CBCI B06 CBCI B02 CBCI B03 DMH B01 CBCI XA30 ADJ DMH RIM=137.28 A33 ADJ DMH B29 CBCI A21 CBCI A35 CBCIA31 ADJ DMH B04 CBCI A23 DMH A50 CBCI A27 CBCI A28 CIT B40 DMH B37 DMH B38 12 FES B36 24 FESXC10 RET PWW 19 LF - 12" RCP 7 LF - 12" RCP 27 LF - 12" RCP 48 LF - 15" RCP 83 LF - 12" RCP 118 LF - 18" RCP 25 LF - 12" RCP 34 LF - 12" RCP 7 LF - 12" RCP 62 LF - 12" RCP 12 LF - 12" RCP 14 LF - 12" RCP 18 LF - 12" RCP 4 LF - 12" RCP 21 LF - 12" RCP 3 LF - 12" RCP 19 LF - 12" RCP (REM EXIST DMH) ASPHALT PWW (A53 PWW) T P - 3 T P - 1 1 3 6 1 3 5 1 3 4 1 3 3 1 3 2 1 3 1 1 3 0 135 13 4 1 3 3 1 3 2 136 1 3 1 1 3 0 REM CB D REM CB REM DMH REM CB REM DMH 76 FT - 24" RCP 9 FT - 12" RCP REM DGCB A32 CBCI REM CB REM CB REM DMH REM CB REM CB REM CB REM CB D D 18 LF - 12" RCP 8 LF - 12" RCP 3 LF - 12" RCP 23 LF - 12" RCP 24 LF - 12" RCP 65 LF - 12" RCP 51 LF - 15" RCP 123 LF - 15" RCP 4 LF - 12" RCP 4 LF - 12" RCP 29 LF - 12" RCP 33 LF - 12" RCP 70 LF - 12" RCP 22 LF - 12" RCP 3 LF - 12" RCP B19 DMH XA45 REMODEL DMH RIM=140.38 B31 CBCI B18 DMH B17 CBCI B09 DI B35 CBCI B14 DMH B12 CBCI B26 DMH B11 DMH B13 CBCI XA43 REMODEL DMH RIM=139.26 B08 DI B10 CBCI B07 DMH XA42 ADJ DMH RIM=138.23 B05 CBCI A36 ADJ DMH A46 ADJ CBCI XA41 ADJ DMH RIM=137.41 A38 CIT A37 CBCI XA40 ADJ DMH RIM=137.17 A06 DI XA44 RET CBCI XA39 RET DI XA29 RET DI XB01 RET CB XF01 RET CB LIMIT OF WORK L I M I T O F W O R K PROP INFILTRATION BASIN B (SEE SHEET 60) B42 CBCI 45 LF - 12" RCP B30 DMH 12 LF - 12" RCP B41 CB 53 LF - 12" RCP 12 LF - 12" RCP B28 CBCI (CLASS V) (CLASS V) (CLASS V) (CLASS V) P R O P . C O M P O S T F I L T E R T U B E 48 LF - 12" RCP 36 LF - 18" RCP 45 LF - 12" RCP B25 CBCI (5' DIA.) (5' DIA.) (CLASS V) M A R S H A L L S T R E E T I- 9 1 N B I- 9 1 S B DA M O N R O A D 53 LF - 12" RCP (CLASS V) (CLASS V) (CLASS V) 31 LF - 12" RCP B43 DMH 19 20 REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 9 P M Pl o t t e d o n 6820 CO N T I N U E D O N SH E E T N O . 19 CO N T I N U E D O N SH E E T N O . 21 N CONTINUED ON SHEET NO. 22 CONTINUED ON SHEET NO. 23 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 2 OF 12 KEY PLAN N 20 1 118 119 120 121 122 401 40 2 403 DA M O N R O A D ROUTE 9 END PROJE C TSTA. 121+96 . 8 3 ( R T E 9 ) N 2948980.852 8 E 353404.498 4 D D D D D D B33 DMH B32 CBCI 4 LF - 12" RCP EXIST DRAIN PIPE CROSSING: 12" RCP INV. = 135.97 24" CIP INV. = 115.43 ASP H A L T P W W (H1 0 P W W ) D (REM EXIST DMH) B04 CBCI 83 LF - 12" RCP REM CB REM CB REM DMH REM CB REM DMH REM CB REM CB REM DMH REM CB REM CB18 LF - 12" RCP 8 LF - 12" RCP 3 LF - 12" RCP 23 LF - 12" RCP 24 LF - 12" RCP 65 LF - 12" RCP 51 LF - 15" RCP 123 LF - 15" RCP 4 LF - 12" RCP 29 LF - 12" RCP 33 LF - 12" RCP 70 LF - 12" RCP 22 LF - 12" RCP XB16 ADJ DMH RIM=144.88 B15 ADJ CBCI B19 DMH XA45 REMODEL DMH RIM=140.38 B31 CBCI B18 DMH B17 CBCI B09 DI B35 CBCI B14 DMH B12 CBCI B11 DMH B13 CBCI XA43 REMODEL DMH RIM=139.26 B08 DI B10 CBCI B07 DMH B05 CBCI XA44 RET CBCI XC11 RET DMH 12 LF - 12" RCP B28 CBCI DA M O N R O A D (CLASS V) (CLASS V) (CLASS V) REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 21 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 9 P M Pl o t t e d o n 68 CO N T I N U E D O N SH E E T N O . 20 N 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 3 OF 12 KEY PLAN N 201 202 203 204 205 4 0 3 DAMON R O A D END P R O J E C T STA. 2 0 5 + 6 0 . 8 4 ( D A M O N R O A D ) N 2949 0 9 5 . 4 4 1 9 E 3527 6 6 . 2 0 4 9 ℄ DITCH D D D D D D UTILITY CROSSING: PROP 12" RCP DRAIN INV. = 130.09 EXIST 1" WATER INV. = 128.62 (SEE UTILITY NOTE 4 ON SHEET 139) ASPHALT PWW (H10 PWW) ASPHALT PWW (H11 PWW) B01 CBCI 19 LF - 12" RCP 62 LF - 12" RCP B29 CBCI B03 DMH 7 LF - 12" RCP B02 CBCI 48 LF - 15" RCP 83 LF - 12" RCP B04 CBCI 27 LF - 12" RCP B06 CBCI REM CB REM DMH 14 LF - 12" RCP D 7 LF - 12" RCP 10 LF - 12" RCP 8 LF - 12" RCP 19 LF - 12" RCP 75 LF - 12" RCP 51 LF - 12" RCP 34 LF - 12" RCP H09 DMH H06 CBCI XH02 RET CB H07 DI H05 DMH H04 DMH H02 CBCI H03 DMH H01 CBCI H08 DI XH01 RET CB XH03 RET DMH 12 LF - 12" RCP B28 CBCI 31 LF - 12" RCP B43 DMH (CLASS V) (CLASS V) (CLASS V) (CLASS V) (CLASS V) (CLASS V) (CLASS V) (CLASS V) (5' DIA.) DAMO N R O A D 20 21 22 23 24 25 REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 22 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 9 P M Pl o t t e d o n 68 CO N T I N U E D O N SH E E T N O . 20 N 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 4 OF 12 KEY PLAN N 11 6 1 1 7 401 405 40 6 306 307 308 309 310 31 1 D D D D D D D 76 FT - 24" RCP 9 FT - 12" RCP 10FT - 15" RCP ( A 5 3 P W W ) TP - 3 TP - 4 130 131 132 133 134 135 136 136 135 134 133 132 131 130 13 6 13 5 13 4 13 3 13 2 13 1 130 B24 CBCI B27 CBCI 14 LF - 12" RCP 118 LF - 18" RCP 34 LF - 12" RCP 18 LF - 12" RCP 12 LF - 12" RCP 25 LF - 12" RCP B20 CBCI B21 CBCI B34 CBCI B22 DMH B36 24 FES B38 12 FES B37 DMH B40 DMH B39 OCS B23 DMH REM CBDG REM CB REM CB REM DMH REM CB REM DMH REM CB 28 LF - 12" RCP 36 LF - 18" RCP 45 LF - 12" RCP 48 LF - 12" RCP 234 LF - 30" RCP255 LF - 30" RCP D02 DMH D01 CB B25 CBCI XA42 ADJ DMH RIM=138.23 C02 DMH C01 RET DMH XC05 RET CB XC07 RET DGDI XC06 RET DMH XC09 RET CB XB01 RET CB PROP. COMPOST FILTER TUBE PROP. COMPOST FILTER TUBE 100 - YEAR FLOOD ELEV. 125' L I M I T O F W O R K PROP. COMPOST FILTER TUBE B42 CBCI 45 LF - 12" RCP PROP INFILTRATION BASIN B (SEE SHEET 60) D D03 DMH 42 LF - 18" RCP 29 LF - 18" CMP 39 LF - 18" RCP PROP. COMPOST FILTER TUBE BOTTOM OF SLOPE BOTTOM OF SLOPE B25 CBCI B26 DMH REM 12" ACCM REM 18" ACCM REM 12" CPP (CORRUGATED POLYETHYLENE PIPE) REM CB REM CONCRETE SWALE (5' DIA.) I - 9 1 N B REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 23 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 0 9 P M Pl o t t e d o n 68 N 20 SCALE: 1" = 20' 0 40 80 CO N T I N U E D O N SH E E T N O . 20 CO N T I N U E D O N SH E E T N O . 24 NB OFF RAMP DRAINAGE PLANS SHEET 5 OF 12 KEY PLAN N 508 509 510 NB OFF RAMP SB ON RAM P 300301302303304305306 D D D D D G18 CBCI REM DMH 329 LF - 30" RCP 234 LF - 30" RCP 4 LF - 12" RCP 143 LF - 12" RCP 24 LF - 12" RCP 36 LF - 15" CMP 41 LF - 15" RCP 130 LF - 12" RCP 107 LF - 12" RCP 39 LF - 12" RCP 5 LF - 12" RCP 8 LF - 12" RCP 26 LF - 12" RCP 4 LF - 12" RCP 14 LF - 12" RCP 22 LF - 12" RCP C06 RET DMH C05 CB C09 DI C10 CBCI C04 DMH C07 CIT G08 DI G06 DMH G07 CB G04 CB G03 DMH G10 CB G02 DMH G11 CIT G09 CBCIG24 CB G05 CBCI G01 ADJ DMH C03 DMH XC01 RET CB XC02 RET DMH XC05 RET CB XG02 RET DGDI XC03 RET DGDI XC04 RET CB XG01 RET DMH PROP. COMPOST FILTER TUBE; 100 - YEAR FLOOD ELEV. 125' PROP. LIMIT OF WORK (CLASS V) (CLASS V) (CLASS V) G29 CB 33 LF - 12" RCP 20 LF - 12" RCP BOTTOM OF SLOPE BOTTOM OF SLOPE PROP COMPOST FILTER TUBES PROP. BOTTOM OF SLOPE RET 24" RCP PROP BOTTOM OF 1:1 SLOPE REM 24" RC RET 24" RCP RET 24" RCPREM 12" CMP REM CB RET 12" RCP RET 12" RCP I-91 NB I-91 SB REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 0 P M Pl o t t e d o n 6824 CO N T I N U E D O N SH E E T N O . 23 CO N T I N U E D O N SH E E T N O . 27 N 20 SCALE: 1" = 20' 0 40 80 CONTINUED ON SHEET NO. 26 DRAINAGE PLANS SHEET 6 OF 12 KEY PLAN N 11 0 11 1 11 2 11 3 R O U T E 9 501 502 503 504 505 506 SB ON RAMP 30 5 D D D D D F01 CB A32 CBCI 41 LF - 12" RCP TP-1 TP-2 13 5 134 133 132 13 6 131 130 129 128 12 8 12 9 13 013 1 13 2 13 3 13 4 13 5 123 124 125 126 127 128 129 130 12 7 12 6 12 5 12 4 12 3 12 2 J13 CB J15 CBCI J16 DMH J48 CBCI 76 LF - 12" RCP 36 LF - 12" RCP J34 CBCI J14 DMH J12 CBCI 7 LF - 12" RCP12 LF - 12" RCP 3 LF - 12" RCP 45 LF - 12" RCP J51 12 FES J08 DMH J20 CBCI REM CB REM CB REM CB PROP INFILTRATION BASIN J (SEE SHEET 61) 25 FT - 12" RCP F04 DMH F05 12 FES REM HDW REM CB 114 LF - 15" RCP C08 CB XC05 RET CB XC04 RET CB XC07 RET DGDI XC06 RET DMH XC08 RET CB XF01 RET CB PROP. COMPOST FILTER TUBE PROP. LIMIT OF WORK 100 - YEAR FLOOD ELEV. 125' LIMIT OF WORK REM 12"RCP F06 12 HDW 19 LF - 12" RCP PROP BOTTOM OF 1:1 SLOPE PROP BOTTOM OF SLOPE PROP BOTTOM OF SLOPE PROP. COMPOST FILTER TUBE PROP. COMPOST FILTER TUBE PROP BOTTOM OF 1:1 SLOPE BO T T O M O F S L O P E PR O P C O M P O S T FIL T E R T U B E S F03 18 SME RET 18" CMP F02 18 HDW RET 12" CMP I - 9 1 S B (C L A S S V ) (CLASS V) (5' DIA.) REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 25 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 0 P M Pl o t t e d o n 68 N CO N T I N U E D O N SH E E T N O . 19 CO N T I N U E D O N SH E E T N O . 26 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 7 OF 12 KEY PLAN N 506 507 508 509 510 511 NB OFF R A M P SB ON RAMP 299 300 301 302 303 304 D D D D G18 CBCI 8 LF - 12" RCP 28 LF - 12" RCP 4 LF - 12" RCP 143 LF - 12" RCP 114 LF - 15" RCP 130 LF - 12" RCP 107 LF - 12" RCP 39 LF - 12" RCP 5 LF - 12" RCP 8 LF - 12" RCP 26 LF - 12" RCP 4 LF - 12" RCP 14 LF - 12" RCP 22 LF - 12" RCP C06 RET DMH C09 DI C10 CBCI C08 CB C07 CIT G08 DI G06 DMH G07 CB G04 CB G03 DMH G10 CB G02 DMH G11 CIT G09 CBCI G24 CB G05 CBCI G19 DMH G13 CB G01 ADJ DMH XC01 RET CB XC02 RET DMH XG02 RET DGDI XC03 RET DGDI XC04 RET CB XG01 RET DMH PROP. COMPOST FILTER TUBE PROP. LIMIT OF WORK (CLASS V) (CLASS V) (CLASS V) (CLASS V) D G29 CB 33 LF - 12" RCP G30 DMH G35 CB 58 LF - 12" RCP 20 LF - 12" RCP (CLASS V) (CLASS V) PROP BOTTOM OF 1:1 SLOPE I-91 NB I-91 SB REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 26 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 0 P M Pl o t t e d o n 68 N CO N T I N U E D O N SH E E T N O . 25 CO N T I N U E D O N SH E E T N O . 27 20 SCALE: 1" = 20' 0 40 80 CONTINUED ON SHEET NO. 24 DRAINAGE PLANS SHEET 8 OF 12 KEY PLAN N 511 512 513 514 515 516 517 END PROJECT STA. 295+50.00 (NB OFF RAMP) N 2947130.0812 E 353932.6640 296297298299 D D D 73 LF - 12" RCP 8 LF - 12" RCP REM CB REM DMH REM CB REM CB I-91 SB I-91 NB 6 LF - 12" RCP 38 LF - 12" RCP 51 LF - 12" RCP 15 LF - 12" RCP 30 LF - 12" RCP 102 LF - 12" RCP 5 LF - 12" RCP G28 CITG16 CB XG08 RET CB XG07 RET CB G22 CB G23 DMH G19 DMH G13 CB G15 CB G12 DMH G20 CB G21 CB G14 CB XG03 RET DMH XG06 RET DMH XG04 RET DGDI XG05 RET CB XG10 RET DGDI XG11 RET CB XG12 RET DMH PROP. COMPOST FILTER TUBE; 100 - YEAR FLOOD ELEV. 125' 100 - YEAR FLOOD ELEV. 125' PROP. LIMIT OF WORK (5'DIA.) D G30 DMH 58 LF - 12" RCP 6 LF - 12" RCP G27 CBD D 127 LF - 12" RCP G32 DMH(CLASS V) G34 DMH G33 CB 7 LF - 12" RCP 36 LF - 12" RCP RET RCP 28 LF - 12" RCP G35 CB 33 LF - 12" RCP 20 LF - 12" RCP (CLASS V) PROP. BOTTOM OF SLOPE PROP. BOTTOM OF 1:1 SLOPE PROP. BOTTOM OF SLOPE PROP. BOTTOM OF 1:1 SLOPE PROP. TOP OF SLOPE PROP. BOTTOM OF SLOPE PROP. BOTTOM OF 1:1 SLOPE PROP. TOP OF SLOPEPROP. BOTTOM OF SLOPE RET 24" RCP 56 LF - 12" RCP REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 27 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 0 P M Pl o t t e d o n 68 N CO N T I N U E D O N SH E E T N O . 26 CO N T I N U E D O N SH E E T N O . 28 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 9 OF 12 KEY PLAN N 516 517 518 519 520 521 END PROJECT STA. 520+65.03 (SB ON RAMP) N 2946521.4418 E 354068.2655 I-91 SB I-91 NB 51 LF - 12" RCP G26 CIT G28 CITG16 CB XG10 RET DGDI XG11 RET CB XG12 RET DMH XG13 RET DMH XG14 RET DGDI XG15 RET CB XG17 RET PWW PROP. COMPOST FILTER TUBE; 100 - YEAR FLOOD ELEV. 125' PROP. LIMIT OF WORK 6 LF - 12" RCP G27 CB G25 CB 24 LF - 12" RCP 89 LF - 12" RCP G17 CBD G31 CB 127 LF - 12" RCP G32 DMH PROP. BOTTOM OF 1:1 SLOPE PROP. TOP OF SLOPE PROP. BOTTOM OF SLOPE PROP. BOTTOM OF 1:1 SLOPE PROP. BOTTOM OF SLOPE 56 LF - 12" RCP REMOVE EXISTING DRAIN PIPE ABANDON EXISTING DRAIN PIPE DRAINAGE NOTES & LEGEND: 1.ALL EXISTING PIPES SHOWN ON THE PLANS WITHOUT A DISPOSITION ABOVE (REMOVE, ABANDON, ETC.) ARE TO BE RETAINED. RETAIN EXISTING DRAIN PIPE 28 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 0 P M Pl o t t e d o n 68 N CO N T I N U E D O N SH E E T N O . 27 20 SCALE: 1" = 20' 0 40 80 DRAINAGE PLANS SHEET 10 OF 12 KEY PLAN N DRAINAGE STRUCTURE TABLE NAME A01 CBCI A02 DMH A05 CBCI A06 DI A11 CBCI A17 CIT A21 CBCI A22 CBCI A23 DMH A24 CIT A27 CBCI A28 CIT A31 ADJ DMH A32 CBCI A33 ADJ DMH A35 CBCI A36 ADJ DMH A37 CBCI A38 CIT A46 ADJ CBCI A47 CBCI A50 CBCI B01 CBCI B02 CBCI B03 DMH B04 CBCI B05 CBCI B06 CBCI B07 DMH B08 DI B09 DI B10 CBCI B11 DMH B12 CBCI B13 CBCI BASELINE ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD ICD DAMON ROAD ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 STATION 108+44.89 108+52.28 109+42.19 115+02.99 110+51.75 110+62.32 113+43.63 112+17.05 113+45.24 111+93.26 113+32.17 113+21.06 113+22.63 112+74.35 113+28.19 113+67.76 114+97.29 115+03.41 114+97.25 114+91.34 111+10.93 113+37.91 200+35.83 200+27.38 200+20.94 200+91.11 200+21.61 403+88.78 200+08.19 118+56.92 118+78 118+74.47 118+72.56 118+55.37 118+29.65 OFFSET 25.35 R 23.34 R 28.00 R 13.86 L 48.03 L 6.25 L 1.00 R 5.00 L 7.06 L 1.54 L 50.70 L 50.11 L 18.39 L 31.00 R 15.33 R 11.55 L 17.47 L 51.94 L 49.01 L 0.08 R 1.00 R 6.14 L 70.63 L 40.17 L 50.45 L 20.04 R 34.53 R 16.56 R 0.60 R 66.99 L 58.31 L 41.56 L 53.16 L 27.07 R 28.04 R RIM ELEV. 133.50 133.58 134.22 136.98 135.11 135.78 136.81 136.09 136.73 136.16 136.63 136.49 136.83 136.60 136.96 136.84 137.25 137.27 137.29 137.53 135.64 136.86 137.39 138.04 138.13 137.06 138.48 137.95 139.06 139.54 139.89 139.14 139.74 139.36 139.26 INV. ELEV. IN I=129.60' (A01 CBCI) I=129.60' (A05 CBCI) I=130.50' (A47 CBCI) I=132.35' (A21 CBCI) I=132.35' (A50 CBCI) I=132.10' (A35 CBCI) I=131.50' (A22 CBCI) I=131.60' (A27 CBCI) I=129.50' (A28 CIT) I=130.25' (A23 DMH) I=127.50' (XA30 ADJ DMH) I=121.20' (XA26 ADJ DMH) I=132.70' (A32 CBCI) I=120.80' (A31 ADJ DMH) I=133.20' (A06 DI) I=132.90' (A37 CBCI) I=132.90' (A36 ADJ DMH) I=132.70' (B01 CBCI) I=133.10' (B02 CBCI) I=132.70' (B43 DMH) I=132.70' (B29 CBCI) I=133.90' (B28 CBCI) I=132.30' (B03 DMH) I=132.40' (B04 CBCI) I=134.50' (B05 CBCI) I=135.00' (B08 DI) I=135.00' (B09 DI) I=135.20' (B10 CBCI) I=135.20' (B31 CBCI) INV. ELEV. OUT I=130.03' (A02 DMH) I=129.50' (XA04 ADJ DMH) I=131.23' (A02 DMH) I=133.48' (A36 ADJ DMH) I=129.60' (XA49 REM CB) I=130.40' (XA18 CIT) I=132.40' (A23 DMH) I=131.69' (A24 CIT) I=130.50' (A31 ADJ DMH) I=131.30' (XA25 CIT) I=131.70' (A28 CIT) I=131.50' (A31 ADJ DMH) I=121.10' (A33 ADJ DMH) I=133.10' (A33 ADJ DMH) I=120.60' (XA41 ADJ DMH) I=132.34' (A23 DMH) I=133.10' (A38 CIT) I=133.27' (A38 CIT) I=132.90' (XA40 ADJ DMH) I=132.80' (XA42 ADJ DMH) I=131.14' (A17 CIT) I=132.40' (A23 DMH) I=132.89' (B03 DMH) I=133.26' (B03 DMH) I=132.60' (B07 DMH) I=133.16' (B07 DMH) I=134.84' (B07 DMH) I=133.45' (B43 DMH) I=132.20' (B19 DMH) I=136.04' (B11 DMH) I=135.39' (B11 DMH) I=135.64' (B11 DMH) I=134.90' (B18 DMH) I=135.86' (B14 DMH) I=134.76' (B14 DMH) REMARKS E 203.6.0 5' DIA. E 203.6.0 E 203.6.0 B14 DMH B15 ADJ CBCI B17 CBCI B18 DMH B19 DMH B20 CBCI B21 CBCI B22 DMH B23 DMH B24 CBCI B25 CBCI B26 DMH B27 CBCI B28 CBCI B29 CBCI B30 DMH B31 CBCI B32 CBCI B33 DMH B34 CBCI B35 CBCI B36 24 FES B37 DMH B38 12 FES B39 OCS B40 DMH B41 CB B42 CBCI B43 DMH C01 RET DMH C02 DMH C03 DMH C04 DMH C05 CB C06 RET DMH ROUTE 9 ROUTE 9 ICD ROUTE 9 ICD NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP ICD ICD ICD NB OFF RAMP ICD DAMON ROAD ICD ROUTE 9 ROUTE 9 ROUTE 9 NB OFF RAMP ROUTE 9 NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP ICD ICD ICD NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP 118+29.61 120+73.45 401+83.83 118+23.28 401+38.19 310+11.63 310+49.04 310+44.35 310+91.14 400+42.34 405+41.18 405+86.11 310+96.68 403+10.53 200+90.65 404+05.12 119+37.48 119+27.21 119+23.88 310+70.98 118+04.70 310+10.93 309+92.25 309+98.33 309+56.14 309+62.41 403+88.96 404+45.72 403+62.41 309+36.15 306+91.14 304+53.22 304+36.67 304+64.82 304+09.95 20.74 R 25.52 R 14.01 L 6.78 L 35.50 L 29.20 R 32.16 R 16.22 R 16.34 R 3.71 R 4.09 R 12.39 R 34.16 R 1.61 L 27.08 L 35.41 L 30.70 L 26.54 R 19.53 R 33.35 R 29.09 R 48.46 L 71.87 L 56.40 L 26.64 L 16.45 L 48.99 L 0.58 R 9.49 R 97.47 R 69.35 R 62.00 R 29.00 R 29.00 R 7.39 L 139.35 144.71 139.81 139.95 140.31 138.56 138.49 138.79 139.13 139.52 138.82 139.22 138.99 138.70 136.95 139.24 140.57 140.31 140.38 138.69 139.46 132.75 135.06 131.67 133.74 136.10 138.97 138.42 138.44 122.14 120.18 120.05 136.76 137.37 139.60 I=134.70' (B13 CBCI) I=134.95' (B12 CBCI) I=134.70' (B35 CBCI) I=134.05' (B14 DMH) I=134.30' (B11 DMH) I=135.10' (B17 CBCI) I=131.70' (B33 DMH) I=131.60' (B07 DMH) I=131.35' (B18 DMH) I=134.10' (B20 CBCI) I=134.10' (B21 CBCI) I=130.75' (B19 DMH) I=133.60' (B22 DMH) I=134.30' (B24 CBCI) I=134.20' (B27 CBCI) I=134.00' (B34 CBCI) I=130.50' (B23 DMH) I=133.90' (B25 CBCI) I=133.55' (B42 CBCI) I=134.20' (B41 CB) I=135.26' (XB16 ADJ DMH) I=135.70' (B32 CBCI) I=130.00' (B26 DMH) I=131.10' (XB01 RET CB) I=130.00' (B37 DMH) I=129.70' (B39 OCS) I=133.20' (B06 CBCI) I=133.05' (B30 DMH) I=110.10' (C02 DMH) I=116.60' (D03 DMH) I=111.34' (C03 DMH) I=112.50' (G01 ADJ DMH) I=118.20' (C04 DMH) I=132.40' (C05 CB) I=129.80' (C06 RET DMH) I=133.80' (XC01 RET CB) I=130.20' (XC02 RET DMH) I=134.60' (B18 DMH) I=140.40' (XB16 ADJ DMH) I=135.35' (B18 DMH) I=131.60' (B19 DMH) I=131.25' (B23 DMH) I=134.38' (B22 DMH) I=134.24' (B22 DMH) I=134.00' (B23 DMH) I=130.65' (B26 DMH) I=134.80' (B23 DMH) I=134.36' (B26 DMH) I=130.40' (B36 24 FES) I=134.38' (B23 DMH) I=134.09' (B07 DMH) I=133.06' (B03 DMH) I=133.45' (B43 DMH) I=136.07' (B11 DMH) I=135.81' (B33 DMH) I=135.12' (B18 DMH) I=134.28' (B23 DMH) I=134.96' (B14 DMH) I=131.00' (B38 12 FES) I=129.90' (B40 DMH) I=129.60' (D02 DMH) I=134.41' (B30 DMH) I=133.92' (B30 DMH) I=132.95' (B03 DMH) I=110.00' (XC11 RET DMH) I=111.24' (C01 RET DMH) I=112.40' (C02 DMH) I=129.70' (C03 DMH) I=132.87' (C04 DMH) I=130.10' (C04 DMH) ITEM 202.2 5' DIA. ITEM 202.2 E 206.8.0 E 206.8.0 ITEM 904.01 (N/A) (N/A) DRAINAGE STRUCTURE TABLE NAME BASELINE STATION OFFSET RIM ELEV.INV. ELEV. IN INV. ELEV. OUT REMARKS STRUCTURE TABLE NOTES: 1.ALL PROPOSED CATCH BASIN AND CATCH BASIN CURB INLETS, UNLESS OTHERWISE NOTED, ARE MASSDOT CONSTRUCTION STANDARD DRAWING NUMBER E. 201.4.0 2.DRAWING NUMBER E. 201.4.0 SHOWING A DEEP SUMP STRUCTURE DEPTH EQUAL TO 7.5 FEET IS REVISED TO 7.5 FEET MINIMUM. THE SUMP DEPTH SHALL BE A MINIMUM DEPTH OF 4 FT TO MEET WATER QUALITY STANDARDS. 3.STATION, OFFSETS, AND RIMS FOR CATCH BASINS (CB), CATCH BASIN CURB INLETS (CBCI), DRAIN MANHOLES (DMH), AND DROP INLETS (DI) REFER TO THE CENTER OF THE STRUCTURE. 4.STATION AND OFFSETS FOR REINFORCED CONCRETE PIPE FLARED ENDS (FES) AND STANDARD METAL ENDS (SME) REFER TO THE CENTER END OF THE STRUCTURE FURTHEST FROM THE PIPE. 29 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 1 P M Pl o t t e d o n 68 DRAINAGE PLANS DRAINAGE STRUCTURE TABLE 1 SHEET 11 OF 12 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 1 P M Pl o t t e d o n 68 G24 CB G25 CB G26 CIT G27 CB G28 CIT G29 CB G30 DMH G31 CB G32 DMH G33 CB G34 DMH G35 CB H01 CBCI H02 CBCI H03 DMH H04 DMH H05 DMH H06 CBCI H07 DI H08 DI H09 DMH J08 DMH J12 CBCI J13 CB J14 DMH J15 CBCI J16 DMH J20 CBCI J34 CBCI J48 CBCI J51 12 FES SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD DAMON ROAD ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 ROUTE 9 SB ON RAMP 509+13.81 519+10 519+37.51 516+60 515+94.51 510+64.80 510+94.90 517+85 516+54.04 512+79.47 512+73.24 511+05 202+75.97 203+02.59 202+87.44 202+66.93 202+86.50 201+92.23 201+99.22 202+52.99 202+52.85 111+71.50 111+31.96 110+96.46 111+22.72 110+62.33 110+91.82 111+71.55 111+13.89 110+45.20 500+72.81 1.00 L 1.00 L 0.07 L 1.00 L 5.68 L 1.00 L 22.76 L 1.00 L 8.77 L 1.00 L 9.86 L 1.00 L 25.53 L 23.89 L 22.37 L 23.38 L 10.78 L 27.44 L 28.03 R 26.22 R 7.90 R 44.19 R 49.99 R 81.45 R 44.63 R 51.77 R 75.99 R 31.00 R 31.00 R 42.57 R 59.72 L 132.05 133.51 133.69 131.52 131.18 129.68 129.96 132.61 131.72 128.80 128.99 129.25 133.48 133.54 133.54 133.55 133.77 134.33 133.40 133.73 133.95 135.91 135.56 135.02 135.97 134.69 134.90 135.92 135.55 134.82 133.00 I=128.80' (G17 CB) I=128.80' (G25 CB) I=126.60' (G16 CB) I=126.20' (G32 DMH) I=125.45' (G18 CBCI) I=125.45' (G29 CB) I=125.40' (G35 CB) I=126.90' (G31 CB) I=126.90' (G27 CB) I=124.20' (G23 DMH) I=124.40' (G33 CB) I=129.31' (H01 CBCI) I=129.31' (H02 CBCI) I=129.38' (XH01 RET CB) I=129.62' (XH02 RET CB) I=129.33' (H06 CBCI) I=129.08' (H03 DMH) I=129.08' (H04 DMH) I=129.10' (H09 DMH) I=129.39' (H07 DI) I=129.39' (H08 DI) I=130.20' (J20 CBCI) I=129.40' (J14 DMH) I=131.47' (J12 CBCI) I=130.90' (J34 CBCI) I=129.80' (J48 CBCI) I=129.80' (J16 DMH) I=130.40' (J15 CBCI) I=130.40' (J13 CB) I=129.00' (J08 DMH) I=128.49' (G11 CIT) I=129.10' (G26 CIT) I=128.00' (XG13 RET DMH) I=127.03' (G32 DMH) I=125.70' (XG12 RET DMH) I=126.09' (G30 DMH) I=125.30' (G19 DMH) I=128.06' (G32 DMH) I=126.80' (G28 CIT) I=124.64' (G34 DMH) I=124.10' (G12 DMH) I=125.65' (G30 DMH) I=129.49' (H03 DMH) I=129.55' (H03 DMH) I=129.21' (H05 DMH) I=129.23' (H05 DMH) I=128.98' (XH03 RET DMH) I=130.41' (H04 DMH) I=129.87' (H09 DMH) I=130.23' (H09 DMH) I=129.29' (H05 DMH) I=129.30' (J51 12 FES) I=132.06' (J14 DMH) I=130.52' (J16 DMH) I=129.70' (J08 DMH) I=131.19' (J16 DMH) I=130.30' (J14 DMH) I=130.30' (J08 DMH) I=131.05' (J14 DMH) I=130.32' (J14 DMH) E 203.6.0 E 203.6.0 5' DIA. E 206.8.0 DRAINAGE STRUCTURE TABLE NAME BASELINE STATION OFFSET RIM ELEV.INV. ELEV. IN INV. ELEV. OUT REMARKS DRAINAGE STRUCTURE TABLE NAME BASELINE STATION OFFSET RIM ELEV.INV. ELEV. IN INV. ELEV. OUT REMARKS C07 CIT C08 CB C09 DI C10 CBCI D01 CB D02 DMH D03 DMH F01 CB F02 18 HDW F03 18 SME F04 DMH F05 12 FES F06 12 HDW G01 ADJ DMH G02 DMH G03 DMH G04 CB G05 CBCI G06 DMH G07 CB G08 DI G09 CBCI G10 CB G11 CIT G12 DMH G13 CB G14 CB G15 CB G16 CB G17 CB G18 CBCI G19 DMH G20 CB G21 CB G22 CB G23 DMH SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP NB OFF RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP SB ON RAMP 506+56.38 505+44.03 506+50.60 506+68.99 309+28.04 309+58.41 309+51.04 502+15.58 502+07.38 502+08.28 501+53.83 502+00.58 502+13.25 301+19.74 301+12.32 302+45.92 302+53.98 299+65.85 302+55.98 302+49.32 302+67.55 509+46.07 507+95.40 509+03.40 512+32.73 511+49.45 512+29.47 513+18.16 515+40 520+30 510+62.64 511+55.21 512+00 512+49.47 514+20.76 513+14.92 32.77 L 1.01 L 39.74 L 45.35 L 29.00 R 29.00 R 58.14 R 1.01 L 65.75 L 36.22 R 116.67 L 92.96 L 17.89 R 41.28 R 19.42 R 24.62 R 25.39 R 15.22 R 3.38 L 8.25 L 3.68 L 29.26 L 0.96 L 24.45 L 11.15 L 1.00 L 1.00 L 1.00 L 1.00 L 1.00 L 25.41 L 10.99 L 1.00 L 1.00 L 1.00 L 9.05 L 137.78 138.11 139.11 139.10 139.75 139.17 122.00 138.03 0.00 0.00 127.00 126.00 124.00 120.22 133.15 134.92 134.98 130.79 135.84 136.51 135.96 132.42 133.99 133.12 128.84 128.91 128.67 129.01 130.56 134.46 130.41 129.24 128.70 128.69 129.63 129.24 I=133.90' (C08 CB) I=133.90' (C09 DI) I=133.90' (C10 CBCI) I=135.00' (D01 CB) I=129.10' (B40 DMH) I=117.10' (D02 DMH) I=120.12' (F02 18 HDW) I=123.07' (XF01 RET CB) I=122.00' (F04 DMH) I=125.00' (F01 CB) I=115.80' (G02 DMH) I=114.00' (XG06 RET DMH) I=128.80' (G03 DMH) I=124.90' (G05 CBCI) I=117.15' (XG01 RET DMH) I=130.40' (G04 CB) I=130.40' (G06 DMH) I=131.51' (G08 DI) I=131.51' (G07 CB) I=128.80' (G10 CB) I=128.00' (G09 CBCI) I=127.90' (G24 CB) I=123.70' (G19 DMH) I=123.80' (G14 CB) I=123.70' (G34 DMH) I=121.70' (G21 CB) I=121.70' (G20 CB) I=124.50' (G13 CB) I=124.50' (G30 DMH) I=124.70' (G22 CB) I=124.70' (G15 CB) I=133.80' (XC02 RET DMH) I=134.58' (C07 CIT) I=134.11' (C07 CIT) I=134.10' (C07 CIT) I=135.36' (D02 DMH) I=129.00' (D03 DMH) I=117.00' (C01 RET DMH) I=133.52' (F06 12 HDW) I=120.30' (F03 18 SME) I=122.80' (F05 12 FES) I=113.90' (C03 DMH) I=116.92' (G01 ADJ DMH) I=130.30' (G02 DMH) I=130.48' (G03 DMH) I=126.33' (G02 DMH) I=131.41' (G03 DMH) I=132.01' (G06 DMH) I=132.46' (G06 DMH) I=128.92' (G11 CIT) I=130.44' (G11 CIT) I=127.80' (XG01 RET DMH) I=121.58' (XG03 RET DMH) I=124.91' (G19 DMH) I=124.04' (G12 DMH) I=125.01' (G23 DMH) I=127.06' (G28 CIT) I=129.96' (G26 CIT) I=125.91' (G30 DMH) I=124.40' (G12 DMH) I=124.07' (G12 DMH) I=124.05' (G12 DMH) I=126.09' (G23 DMH) I=124.60' (G34 DMH) E 203.6.0 ITEM 202.2 CONC. E 206.4.0 E 206.9.0 E 206.8.0 CONC. E 206.4.0 ITEM 202.3 E 203.6.0 5' DIA. FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 5 ( N O I D R A I N A G E P L A N ) . D W G 26 - F e b - 2 0 1 8 12 : 1 1 P M Pl o t t e d o n 68 DRAINAGE PLANS DRAINAGE STRUCTURE TABLE 2 SHEET 12 OF 12 30 295+50 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 295+75 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 13 0 . 8 13 0 . 6 Material(s) at Station 295+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 Material(s) at Station 295+75.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 17.683 0.000 25.665 0.000 18.303 Volume 0.0 8.2 0.0 11.9 0.0 8.5 Cumulative Volume 0.0 8.2 0.0 11.9 0.0 8.5 Material(s) at Station 295+75.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 16.229 0.000 14.154 0.000 12.080 Volume 0.0 7.5 0.0 6.6 0.0 5.6 Cumulative Volume 0.0 7.5 0.0 6.6 0.0 5.6 Material(s) at Station 295+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 4 P M Pl o t t e d o n 6831 NB OFF RAMP CROSS SECTIONS SHEET 1 OF 17 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 296+00 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 296+50 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 13 0 . 5 13 0 . 1 Material(s) at Station 296+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 8.992 0.000 29.023 0.000 19.995 Volume 0.0 12.4 0.0 25.3 0.0 17.7 Cumulative Volume 0.0 20.5 0.0 37.2 0.0 26.2 Material(s) at Station 296+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 12.798 0.000 22.134 Volume 0.0 8.3 0.0 38.7 0.0 39.0 Cumulative Volume 0.0 28.9 0.0 75.9 0.0 65.2 Material(s) at Station 296+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 19.326 0.000 16.658 0.000 13.990 Volume 0.0 34.2 0.0 29.6 0.0 24.9 Cumulative Volume 0.0 57.4 0.0 49.7 0.0 42.1 Material(s) at Station 296+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 17.613 0.000 15.266 0.000 12.918 Volume 0.0 15.7 0.0 13.6 0.0 11.6 Cumulative Volume 0.0 23.2 0.0 20.2 0.0 17.2 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 5 P M Pl o t t e d o n 68 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 32 NB OFF RAMP CROSS SECTIONS SHEET 2 OF 17 297+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 297+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 12 9 . 9 13 0 . 0 2 12 9 . 7 12 9 . 9 0 Material(s) at Station 297+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 6.818 0.000 23.472 Volume 0.0 0.0 0.0 18.2 0.0 42.2 Cumulative Volume 0.0 28.9 0.0 94.1 0.0 107.4 Material(s) at Station 297+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 11.656 0.000 26.021 Volume 0.0 0.0 0.0 17.1 0.0 45.8 Cumulative Volume 0.0 28.9 0.0 111.2 0.0 153.3 Material(s) at Station 297+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 18.226 0.000 15.439 0.000 12.653 Volume 0.0 34.8 0.0 29.6 0.0 24.5 Cumulative Volume 0.0 128.0 0.0 110.1 0.0 92.3 Material(s) at Station 297+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 19.331 0.000 16.548 0.000 13.778 Volume 0.0 35.8 0.0 30.7 0.0 25.7 Cumulative Volume 0.0 93.2 0.0 80.5 0.0 67.8 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 6 P M Pl o t t e d o n 68 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 33 NB OFF RAMP CROSS SECTIONS SHEET 3 OF 17 298+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 298+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 12 9 . 6 12 9 . 8 4 13 0 . 0 12 9 . 9 7 Material(s) at Station 298+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 6.356 0.000 22.532 Volume 0.0 0.0 0.0 16.7 0.0 45.0 Cumulative Volume 0.0 28.9 0.0 127.9 0.0 198.2 Material(s) at Station 298+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 31.786 Volume 0.0 0.0 0.0 5.9 0.0 50.3 Cumulative Volume 0.0 28.9 0.0 133.8 0.0 248.5 Material(s) at Station 298+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 18.841 0.000 12.451 0.000 9.780 Volume 0.0 34.5 0.0 25.9 0.0 20.6 Cumulative Volume 0.0 196.4 0.0 164.6 0.0 136.2 Material(s) at Station 298+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 18.446 0.000 15.473 0.000 12.496 Volume 0.0 34.0 0.0 28.6 0.0 23.3 Cumulative Volume 0.0 161.9 0.0 138.7 0.0 115.6 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 7 P M Pl o t t e d o n 6834 NB OFF RAMP CROSS SECTIONS SHEET 4 OF 17 299+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 299+50 108 112 116 120 124 128 132 136 140 108 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0%2.0% 13 0 . 4 13 0 . 3 2 13 0 . 9 13 0 . 8 7 Material(s) at Station 299+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 29.4 Cumulative Volume 0.0 28.9 0.0 133.8 0.0 278.0 Material(s) at Station 299+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 28.9 0.0 133.8 0.0 278.0 Material(s) at Station 299+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 1.918 0.000 6.727 Volume 0.0 5.7 0.0 10.2 0.0 12.4 Cumulative Volume 0.0 225.3 0.0 194.7 0.0 163.8 Material(s) at Station 299+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 6.167 0.000 9.107 0.000 6.668 Volume 0.0 23.2 0.0 20.0 0.0 15.2 Cumulative Volume 0.0 219.6 0.0 184.5 0.0 151.4 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 7 P M Pl o t t e d o n 6835 NB OFF RAMP CROSS SECTIONS SHEET 5 OF 17 300+00 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 50.0:1 1 . 0 : 1 2.0%0.5% 300+50 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0%0.8% 13 1 . 6 13 1 . 6 4 13 2 . 4 13 2 . 4 9 Material(s) at Station 300+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 28.9 0.0 133.8 0.0 278.0 Material(s) at Station 300+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 2.497 0.000 Volume 0.0 0.0 0.0 0.0 2.3 0.0 Cumulative Volume 0.0 28.9 0.0 133.8 2.3 278.0 Material(s) at Station 300+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.053 0.504 0.040 2.134 0.000 Volume 0.0 0.0 0.5 1.8 2.0 6.2 Cumulative Volume 0.0 225.4 0.5 196.6 2.0 170.0 Material(s) at Station 300+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 5.562 0.000 6.764 0.000 7.966 0.000 Volume 5.2 0.0 6.7 0.0 9.4 0.0 Cumulative Volume 5.2 225.4 7.2 196.6 11.3 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 8 P M Pl o t t e d o n 6836 NB OFF RAMP CROSS SECTIONS SHEET 6 OF 17 301+00 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0%2.0%2.0% 301+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0%2.0%3.0% 13 3 . 3 13 3 . 3 3 13 4 . 5 13 4 . 1 8 Material(s) at Station 301+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.062 0.000 9.066 0.000 Volume 0.0 0.0 0.1 0.0 10.7 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 13.0 278.0 Material(s) at Station 301+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 6.140 0.000 Volume 0.0 0.0 0.1 0.0 14.1 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 27.1 278.0 Material(s) at Station 301+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 10.513 0.000 11.759 0.000 13.005 0.000 Volume 14.9 0.0 17.2 0.0 19.4 0.0 Cumulative Volume 20.0 225.4 24.3 196.6 30.7 170.0 Material(s) at Station 301+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 10.769 0.000 12.128 0.000 13.487 0.000 Volume 19.7 0.0 22.1 0.0 24.5 0.0 Cumulative Volume 39.7 225.4 46.5 196.6 55.3 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 1: 5 9 P M Pl o t t e d o n 6837 NB OFF RAMP CROSS SECTIONS SHEET 7 OF 17 302+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0%2.0%5.3% 302+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0% 4.0:1 13 4 . 8 13 4 . 9 0 13 5 . 2 13 5 . 4 5 Material(s) at Station 302+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 1.127 0.000 Volume 0.0 0.0 0.0 0.0 6.7 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 33.8 278.0 Material(s) at Station 302+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 6.419 0.000 Volume 0.0 0.0 0.0 0.0 7.0 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 40.8 278.0 Material(s) at Station 302+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 14.337 0.000 15.966 0.000 17.415 0.000 Volume 23.2 0.0 26.0 0.0 28.6 0.0 Cumulative Volume 63.0 225.4 72.5 196.6 83.9 170.0 Material(s) at Station 302+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 13.056 0.000 14.426 0.000 15.797 0.000 Volume 25.4 0.0 28.1 0.0 30.8 0.0 Cumulative Volume 88.4 225.4 100.6 196.6 114.6 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 0 P M Pl o t t e d o n 6838 NB OFF RAMP CROSS SECTIONS SHEET 8 OF 17 303+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1. 0 : 1 2.0% 4.0:1 303+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1. 0 : 1 2.0% 4.0:1 13 5 . 0 13 5 . 8 8 13 4 . 9 13 6 . 3 0 Material(s) at Station 303+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 11.225 0.000 Volume 0.0 0.0 0.0 0.0 16.3 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 57.2 278.0 Material(s) at Station 303+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 17.390 0.000 Volume 0.0 0.0 0.0 0.0 26.5 0.0 Cumulative Volume 0.0 28.9 0.1 133.8 83.6 278.0 Material(s) at Station 303+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 18.756 0.000 19.955 0.000 21.153 0.000 Volume 29.5 0.0 31.8 0.0 34.2 0.0 Cumulative Volume 117.8 225.4 132.5 196.6 148.9 170.0 Material(s) at Station 303+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 20.727 0.000 21.969 0.000 23.212 0.000 Volume 36.6 0.0 38.8 0.0 41.1 0.0 Cumulative Volume 154.4 225.4 171.3 196.6 189.9 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 1 P M Pl o t t e d o n 6839 NB OFF RAMP CROSS SECTIONS SHEET 9 OF 17 304+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 50.0:1 2.0%2.0% 4.0:1 304+50 116 120 124 128 132 136 140 144 148 116 120 124 128 132 136 140 144 148 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 0. 9 : 1 50.0:1 2.0%2.0% 4.0:1 13 5 . 9 13 6 . 7 6 13 6 . 7 13 7 . 6 0 Material(s) at Station 304+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 11.330 0.000 18.919 0.000 Volume 0.0 0.0 10.5 0.0 33.6 0.0 Cumulative Volume 0.0 28.9 10.6 133.8 117.3 278.0 Material(s) at Station 304+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 11.926 0.000 15.841 0.000 Volume 0.0 0.0 21.5 0.0 32.2 0.0 Cumulative Volume 0.0 28.9 32.1 133.8 149.5 278.0 Material(s) at Station 304+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 20.097 0.000 21.275 0.000 22.457 0.000 Volume 37.8 0.0 40.0 0.0 42.3 0.0 Cumulative Volume 192.2 225.4 211.3 196.6 232.2 170.0 Material(s) at Station 304+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 17.100 0.000 18.360 0.000 19.620 0.000 Volume 34.4 0.0 36.7 0.0 39.0 0.0 Cumulative Volume 226.6 225.4 248.0 196.6 271.2 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 1 P M Pl o t t e d o n 6840 NB OFF RAMP CROSS SECTIONS SHEET 10 OF 17 305+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 50.0:1 2.0%2.0% 4.0:1 305+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 50.0:1 2.0%2.0% 4.0:1 13 8 . 2 13 8 . 8 9 14 0 . 4 14 0 . 4 2 Material(s) at Station 305+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 4.937 0.000 16.699 0.000 17.733 0.000 Volume 4.6 0.0 26.5 0.0 31.1 0.0 Cumulative Volume 4.6 28.9 58.6 133.8 180.5 278.0 Material(s) at Station 305+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 6.637 0.000 14.722 0.000 15.759 0.000 Volume 10.7 0.0 29.1 0.0 31.0 0.0 Cumulative Volume 15.3 28.9 87.7 133.8 211.5 278.0 Material(s) at Station 305+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 18.767 0.000 19.801 0.000 20.835 0.000 Volume 33.2 0.0 35.3 0.0 37.5 0.0 Cumulative Volume 259.8 225.4 283.3 196.6 308.6 170.0 Material(s) at Station 305+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 16.795 0.000 17.832 0.000 18.868 0.000 Volume 32.9 0.0 34.8 0.0 36.8 0.0 Cumulative Volume 292.7 225.4 318.2 196.6 345.4 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 2 P M Pl o t t e d o n 6841 NB OFF RAMP CROSS SECTIONS SHEET 11 OF 17 306+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1. 0 : 1 2.0: 1 50.0:1 2.0%2.0% 306+50 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0: 1 50.0:1 2.0%2.0% 14 1 . 9 14 1 . 7 7 14 2 . 9 14 2 . 6 8 Material(s) at Station 306+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.673 0.000 10.982 0.000 12.445 0.000 Volume 6.8 0.0 23.8 0.0 26.1 0.0 Cumulative Volume 22.1 28.9 111.5 133.8 237.7 278.0 Material(s) at Station 306+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 3.961 0.000 6.888 0.000 Volume 0.6 0.0 13.8 0.0 17.9 0.0 Cumulative Volume 22.7 28.9 125.4 133.8 255.6 278.0 Material(s) at Station 306+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 13.400 0.000 14.356 0.000 15.311 0.000 Volume 28.0 0.0 29.8 0.0 31.6 0.0 Cumulative Volume 320.7 225.4 348.0 196.6 377.0 170.0 Material(s) at Station 306+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 7.989 0.000 9.091 0.000 10.193 0.000 Volume 19.8 0.0 21.7 0.0 23.6 0.0 Cumulative Volume 340.5 225.4 369.7 196.6 400.7 170.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 3 P M Pl o t t e d o n 6842 NB OFF RAMP CROSS SECTIONS SHEET 12 OF 17 307+00 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 1 . 0 : 1 2.0: 1 50.0:1 2.0%2.0% 307+50 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0: 1 50.0:1 2.0%2.0% 14 3 . 1 14 3 . 1 5 14 3 . 0 14 3 . 1 8 Material(s) at Station 307+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.092 0.000 0.987 0.000 2.045 0.000 Volume 0.1 0.0 4.6 0.0 8.3 0.0 Cumulative Volume 22.8 28.9 130.0 133.8 263.8 278.0 Material(s) at Station 307+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.389 0.000 3.738 0.000 5.348 Volume 0.1 0.4 0.9 3.5 1.9 5.0 Cumulative Volume 22.9 29.2 130.9 137.2 265.7 282.9 Material(s) at Station 307+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 3.102 0.000 4.159 0.000 5.216 0.000 Volume 10.3 0.0 12.3 0.0 14.3 0.0 Cumulative Volume 350.8 225.4 382.0 196.6 414.9 170.0 Material(s) at Station 307+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 4.368 0.000 3.319 0.000 2.264 Volume 2.9 4.0 3.9 3.1 4.8 2.1 Cumulative Volume 353.7 229.4 385.8 199.7 419.8 172.1 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 4 P M Pl o t t e d o n 6843 NB OFF RAMP CROSS SECTIONS SHEET 13 OF 17 308+00 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0: 1 50.0:1 2.0%2.0% 308+50 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0% 14 2 . 6 14 2 . 7 7 14 1 . 9 14 1 . 9 3 Material(s) at Station 308+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 1.200 Volume 0.0 0.4 0.0 3.5 0.0 6.1 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 289.0 Material(s) at Station 308+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 1.1 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 308+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 9.896 0.000 8.820 0.000 7.743 Volume 0.0 13.2 0.0 11.2 0.0 9.3 Cumulative Volume 353.7 242.7 385.8 210.9 419.8 181.4 Material(s) at Station 308+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 11.777 0.000 14.508 0.000 13.507 Volume 0.0 20.1 0.0 21.6 0.0 19.7 Cumulative Volume 353.7 262.7 385.8 232.5 419.8 201.1 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 4 P M Pl o t t e d o n 6844 NB OFF RAMP CROSS SECTIONS SHEET 14 OF 17 309+00 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0% 309+50 116 120 124 128 132 136 140 144 148 116 120 124 128 132 136 140 144 148 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 2.0%2.0% 14 0 . 9 14 0 . 9 0 13 8 . 9 13 9 . 8 9 Material(s) at Station 309+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 309+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 309+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 25.650 0.000 24.995 0.000 23.787 Volume 0.0 34.7 0.0 36.6 0.0 34.5 Cumulative Volume 353.7 297.4 385.8 269.1 419.8 235.6 Material(s) at Station 309+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 19.232 0.000 37.340 0.000 36.297 Volume 0.0 41.6 0.0 57.7 0.0 55.6 Cumulative Volume 353.7 338.9 385.8 326.8 419.8 291.2 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 5 P M Pl o t t e d o n 6845 NB OFF RAMP CROSS SECTIONS SHEET 15 OF 17 310+00 118 120 124 128 132 136 140 144 118 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100 104 108 1120-4-8 2.0%2.0% 310+50 116 120 124 128 132 136 140 144 148 116 120 124 128 132 136 140 144 148 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 100 104 108 1120-4-8 2.0%2.0% 13 4 . 0 13 9 . 2 1 13 1 . 7 13 9 . 0 5 Material(s) at Station 310+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 310+50.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 310+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.332 18.011 0.000 54.737 Volume 0.0 17.8 0.3 51.3 0.0 84.3 Cumulative Volume 353.7 356.7 386.1 378.1 419.8 375.5 Material(s) at Station 310+50.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 0.000 6.589 Volume 0.0 0.0 0.3 16.7 0.0 56.8 Cumulative Volume 353.7 356.7 386.4 394.7 419.8 432.3 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 6 P M Pl o t t e d o n 6846 NB OFF RAMP CROSS SECTIONS SHEET 16 OF 17 311+00 112 116 120 124 128 132 136 140 144 112 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 24.8:1 1.5%3.0:1 1.1% 13 7 . 1 13 9 . 3 9 Material(s) at Station 311+00.00 Material Name Impact 119 - 120 Mitigation 119 - 120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Mitigation 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 22.9 29.6 130.9 140.7 265.7 290.1 Material(s) at Station 311+00.00 Material Name Impact 122 -123 Mitigation 122 - 123 Impact 123 - 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.367 0.000 6.708 Volume 0.0 0.0 0.0 0.3 0.0 12.3 Cumulative Volume 353.7 356.7 386.4 395.1 419.8 444.6 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 3 ( N O I N B O F F R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 2: 0 7 P M Pl o t t e d o n 6847 NB OFF RAMP CROSS SECTIONS SHEET 17 OF 17 500+00 128 132 136 140 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 500+50 128 132 136 140 144 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 28.9:11.1%1.1%1.1% 501+00 120 124 128 132 136 140 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 2.0%2.0% 13 4 . 1 13 4 . 1 4 13 5 . 9 13 5 . 8 7 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 1 P M Pl o t t e d o n 6848 SB ON RAMP CROSS SECTIONS SHEET 1 OF 21 501+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 2.0%2.0%2.0% 502+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.0%3.0%3.0% 13 4 . 8 13 4 . 8 2 13 5 . 8 13 5 . 7 9 Material(s) at Station 501+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Material(s) at Station 502+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.719 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.7 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.7 Material(s) at Station 501+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.010 0.848 0.000 10.752 0.000 9.137 Volume 0.0 0.0 0.8 0.0 10.0 0.0 8.5 Cumulative Volume 0.0 0.0 0.8 0.0 10.0 0.0 8.5 Material(s) at Station 502+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.139 0.075 3.160 0.000 7.329 0.000 8.796 Volume 0.1 0.1 3.7 0.0 16.7 0.0 16.6 Cumulative Volume 0.1 0.1 4.5 0.0 26.7 0.0 25.1 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 2 P M Pl o t t e d o n 6849 SB ON RAMP CROSS SECTIONS SHEET 2 OF 21 502+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 4.3% 4.3% 4.3% 503+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 4.3% 13 7 . 0 13 7 . 0 0 13 8 . 0 13 8 . 0 3 Material(s) at Station 502+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.7 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 1.3 Material(s) at Station 503+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.0 1.3 Material(s) at Station 502+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.128 0.000 6.182 0.000 10.279 Volume 0.1 0.1 3.0 0.0 12.5 0.0 17.7 Cumulative Volume 0.3 0.2 7.5 0.0 39.2 0.0 42.7 Material(s) at Station 503+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 4.469 0.000 9.786 Volume 0.0 0.0 0.1 0.0 9.9 0.0 18.6 Cumulative Volume 0.3 0.2 7.7 0.0 49.1 0.0 61.3 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 3 P M Pl o t t e d o n 6850 SB ON RAMP CROSS SECTIONS SHEET 3 OF 21 503+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 23.3:1 4.3% 504+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 23.3:1 4.3% 13 6 . 5 13 6 . 4 8 13 6 . 4 13 6 . 4 0 Material(s) at Station 503+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.763 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.7 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 0.7 1.3 Material(s) at Station 504+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.7 0.0 Cumulative Volume 0.0 0.0 0.0 0.0 0.0 1.4 1.3 Material(s) at Station 503+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 8.880 0.000 5.370 0.000 4.079 0.000 2.841 Volume 8.2 0.0 5.0 0.0 7.9 0.0 11.7 Cumulative Volume 8.5 0.2 12.6 0.0 57.0 0.0 73.0 Material(s) at Station 504+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 0.000 0.100 0.072 Volume 8.2 0.0 5.0 0.0 3.8 0.1 2.7 Cumulative Volume 16.7 0.2 17.6 0.0 60.8 0.1 75.7 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 4 P M Pl o t t e d o n 6851 SB ON RAMP CROSS SECTIONS SHEET 4 OF 21 504+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 27.0:1 4.3% 1 . 0 : 1 505+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 27.0:1 3.7% 1. 0 : 1 13 5 . 8 13 5 . 7 6 13 4 . 9 13 4 . 9 4 Material(s) at Station 504+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.234 0.000 1.566 Volume 0.0 0.0 0.0 0.0 0.2 0.0 1.5 Cumulative Volume 0.0 0.0 0.0 0.0 0.2 1.4 2.8 Material(s) at Station 505+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 1.152 0.000 5.372 Volume 0.0 0.0 0.0 0.0 1.3 0.0 6.4 Cumulative Volume 0.0 0.0 0.0 0.0 1.5 1.4 9.2 Material(s) at Station 504+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 2.729 0.000 3.892 0.000 5.054 0.000 Volume 0.0 2.5 0.0 3.6 0.0 4.8 0.1 Cumulative Volume 16.7 2.7 17.6 3.6 60.8 4.9 75.8 Material(s) at Station 505+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 6.550 0.000 7.729 0.000 8.907 0.000 Volume 0.0 8.6 0.0 10.8 0.0 12.9 0.0 Cumulative Volume 16.7 11.3 17.6 14.4 60.8 17.8 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 4 P M Pl o t t e d o n 6852 SB ON RAMP CROSS SECTIONS SHEET 5 OF 21 505+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 27.0:1 3.7% 1 . 0 : 1 506+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 27.0:1 3.7%3.7% 1 . 0 : 1 13 4 . 1 13 4 . 1 2 13 3 . 3 13 3 . 3 1 Material(s) at Station 505+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.449 0.000 8.989 Volume 0.0 0.0 0.0 0.0 1.5 0.0 13.3 Cumulative Volume 0.0 0.0 0.0 0.0 3.0 1.4 22.5 Material(s) at Station 506+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.168 0.000 10.805 Volume 0.0 0.0 0.0 0.0 0.6 0.0 18.3 Cumulative Volume 0.0 0.0 0.0 0.0 3.6 1.4 40.8 Material(s) at Station 505+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 10.110 0.000 11.231 0.000 12.351 0.000 Volume 0.0 15.4 0.0 17.6 0.0 19.7 0.0 Cumulative Volume 16.7 26.7 17.6 31.9 60.8 37.5 75.8 Material(s) at Station 506+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 12.233 0.000 13.327 0.000 14.421 0.000 Volume 0.0 20.7 0.0 22.7 0.0 24.8 0.0 Cumulative Volume 16.7 47.4 17.6 54.7 60.8 62.3 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 5 P M Pl o t t e d o n 6853 SB ON RAMP CROSS SECTIONS SHEET 6 OF 21 506+50 112 116 120 124 128 132 136 140 144 112 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 27.0:1 3.7% 3.7% 1 . 0 : 1 507+00 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 5.4:1 27.0:1 3.7%3.7% 1 . 0 : 1 13 2 . 5 13 2 . 4 9 13 1 . 7 13 1 . 6 7 Material(s) at Station 506+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 2.272 0.000 12.543 Volume 0.0 0.0 0.0 0.0 2.3 0.0 21.6 Cumulative Volume 0.0 0.0 0.0 0.0 5.8 1.4 62.4 Material(s) at Station 507+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 8.237 0.000 13.562 Volume 0.0 0.0 0.0 0.0 9.7 0.0 24.2 Cumulative Volume 0.0 0.0 0.0 0.0 15.5 1.4 86.6 Material(s) at Station 506+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 13.623 0.000 14.702 0.000 15.782 0.000 Volume 0.0 23.9 0.0 26.0 0.0 28.0 0.0 Cumulative Volume 16.7 71.3 17.6 80.6 60.8 90.2 75.8 Material(s) at Station 507+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 14.706 0.000 15.850 0.000 16.995 0.000 Volume 0.0 26.2 0.0 28.3 0.0 30.3 0.0 Cumulative Volume 16.7 97.6 17.6 108.9 60.8 120.6 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 6 P M Pl o t t e d o n 6854 SB ON RAMP CROSS SECTIONS SHEET 7 OF 21 507+50 116 120 124 128 132 136 140 144 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 6.4:1 27.0:1 3.7%3.7% 1 . 0 : 1 508+00 112 116 120 124 128 132 136 140 144 112 116 120 124 128 132 136 140 144 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 8.3:1 33.3:1 3.0% 1 . 0 : 1 13 0 . 9 13 0 . 8 5 13 0 . 0 13 0 . 0 3 Material(s) at Station 507+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 5.532 Volume 0.0 0.0 0.0 0.0 7.6 0.0 17.7 Cumulative Volume 0.0 0.0 0.0 0.0 23.2 1.4 104.3 Material(s) at Station 508+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 3.394 Volume 0.0 0.0 0.0 0.0 0.0 0.0 8.3 Cumulative Volume 0.0 0.0 0.0 0.0 23.2 1.4 112.6 Material(s) at Station 507+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 8.937 0.000 10.705 0.000 12.473 0.000 Volume 0.0 21.9 0.0 24.6 0.0 27.3 0.0 Cumulative Volume 16.7 119.5 17.6 133.5 60.8 147.9 75.8 Material(s) at Station 508+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 5.908 0.000 7.542 0.000 9.176 0.000 Volume 0.0 13.7 0.0 16.9 0.0 20.0 0.0 Cumulative Volume 16.7 133.2 17.6 150.4 60.8 167.9 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 7 P M Pl o t t e d o n 6855 SB ON RAMP CROSS SECTIONS SHEET 8 OF 21 508+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 7.6:1 50.0:1 2.0% 1 . 0 : 1 509+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 8.7:1 50.0:1 2.0% 1 . 0 : 1 12 9 . 2 12 9 . 2 2 12 8 . 4 12 8 . 4 0 Material(s) at Station 508+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 4.403 0.000 7.728 Volume 0.0 0.0 0.0 0.0 4.1 0.0 10.3 Cumulative Volume 0.0 0.0 0.0 0.0 27.2 1.4 122.9 Material(s) at Station 509+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 1.176 0.000 6.451 0.000 7.810 Volume 0.0 0.0 1.1 0.0 10.0 0.0 14.4 Cumulative Volume 0.0 0.0 1.1 0.0 37.3 1.4 137.2 Material(s) at Station 508+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 9.095 0.000 10.461 0.000 11.827 0.000 Volume 0.0 13.9 0.0 16.7 0.0 19.4 0.0 Cumulative Volume 16.7 147.1 17.6 167.1 60.8 187.4 75.8 Material(s) at Station 509+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 9.170 0.000 10.530 0.000 11.890 0.000 Volume 0.0 16.9 0.0 19.4 0.0 22.0 0.0 Cumulative Volume 16.7 164.0 17.6 186.5 60.8 209.3 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 7 P M Pl o t t e d o n 6856 SB ON RAMP CROSS SECTIONS SHEET 9 OF 21 509+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 8.6:1 50.0:1 2.0% 1 . 0 : 1 510+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 6.5:1 40.0:1 2.5% 1 . 0 : 1 12 7 . 6 12 7 . 5 8 12 6 . 8 12 6 . 7 6 Material(s) at Station 509+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 1.269 0.000 5.344 0.000 6.836 Volume 0.0 0.0 2.3 0.0 10.9 0.0 13.6 Cumulative Volume 0.0 0.0 3.4 0.0 48.2 1.4 150.8 Material(s) at Station 510+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 1.051 0.000 4.614 0.000 6.022 Volume 0.0 0.0 2.1 0.0 9.2 0.0 11.9 Cumulative Volume 0.0 0.0 5.5 0.0 57.4 1.4 162.7 Material(s) at Station 509+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 8.329 0.000 9.822 0.000 11.314 0.000 Volume 0.0 16.2 0.0 18.8 0.0 21.5 0.0 Cumulative Volume 16.7 180.2 17.6 205.3 60.8 230.8 75.8 Material(s) at Station 510+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 7.430 0.000 8.838 0.000 10.247 0.000 Volume 0.0 14.6 0.0 17.3 0.0 20.0 0.0 Cumulative Volume 16.7 194.8 17.6 222.6 60.8 250.8 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 8 P M Pl o t t e d o n 6857 SB ON RAMP CROSS SECTIONS SHEET 10 OF 21 510+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 2.3: 1 33.3:1 3.0% 1 . 0 : 1 511+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 1. 0 : 1 2.9% 12 6 . 0 12 5 . 9 9 12 7 . 4 12 7 . 4 1 Material(s) at Station 510+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.275 0.000 2.148 0.000 3.660 Volume 0.0 0.0 1.2 0.0 6.3 0.0 9.0 Cumulative Volume 0.0 0.0 6.7 0.0 63.7 1.4 171.7 Material(s) at Station 511+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.001 0.040 0.105 0.034 0.190 Volume 0.0 0.0 0.3 0.0 2.1 0.0 3.6 Cumulative Volume 0.0 0.0 7.0 0.0 65.8 1.4 175.2 Material(s) at Station 510+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 5.173 0.000 6.686 0.000 8.199 0.000 Volume 0.0 11.7 0.0 14.4 0.0 17.1 0.0 Cumulative Volume 16.7 206.5 17.6 237.0 60.8 267.8 75.8 Material(s) at Station 511+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.062 0.000 1.137 0.000 3.239 0.000 Volume 0.0 4.8 0.0 7.2 0.0 10.6 0.0 Cumulative Volume 16.7 211.3 17.6 244.2 60.8 278.4 75.8 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 3 9 P M Pl o t t e d o n 6858 SB ON RAMP CROSS SECTIONS SHEET 11 OF 21 511+50 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.7% 512+00 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 2.4% 12 7 . 0 12 7 . 0 2 12 6 . 8 12 6 . 8 2 Material(s) at Station 511+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 3.497 0.000 10.863 0.000 Volume 0.0 0.0 0.0 3.3 0.1 10.1 0.2 Cumulative Volume 0.0 0.0 7.0 3.3 65.9 11.5 175.4 Material(s) at Station 512+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 4.778 0.000 Volume 0.0 0.0 0.0 3.2 0.0 14.5 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 26.0 175.4 Material(s) at Station 511+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 8.452 0.000 6.041 0.000 3.631 0.000 1.220 Volume 7.8 0.1 5.6 1.1 3.4 3.0 1.1 Cumulative Volume 24.5 211.4 23.2 245.3 64.1 281.4 76.9 Material(s) at Station 512+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 11.581 0.000 8.946 0.000 6.311 0.000 3.676 Volume 18.5 0.0 13.9 0.0 9.2 0.0 4.5 Cumulative Volume 43.1 211.4 37.1 245.3 73.3 281.4 81.4 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 0 P M Pl o t t e d o n 6859 SB ON RAMP CROSS SECTIONS SHEET 12 OF 21 512+50 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 1.2% 513+00 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.2% 12 6 . 8 12 6 . 8 2 12 7 . 0 12 7 . 0 1 Material(s) at Station 512+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 4.4 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 513+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 512+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 1.447 0.000 12.119 0.000 9.204 0.000 6.289 Volume 12.1 0.0 19.5 0.0 14.4 0.0 9.2 Cumulative Volume 55.1 211.4 56.6 245.3 87.7 281.4 90.7 Material(s) at Station 513+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 4.875 0.000 11.009 0.000 8.735 0.000 6.411 Volume 5.9 0.0 21.4 0.0 16.6 0.0 11.8 Cumulative Volume 61.0 211.4 78.0 245.3 104.3 281.4 102.4 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 0 P M Pl o t t e d o n 6860 SB ON RAMP CROSS SECTIONS SHEET 13 OF 21 513+50 112 116 120 124 128 132 136 112 116 120 124 128 132 136 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.4% 514+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 0.1% 12 7 . 3 12 7 . 3 1 12 7 . 6 12 7 . 6 3 Material(s) at Station 513+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 514+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 513+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 13.124 0.000 11.056 0.000 9.007 0.000 6.960 Volume 16.7 0.0 20.4 0.0 16.4 0.0 12.4 Cumulative Volume 77.7 211.4 98.4 245.3 120.7 281.4 114.8 Material(s) at Station 514+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.961 0.000 11.768 0.000 9.674 0.000 7.579 Volume 13.0 0.0 21.1 0.0 17.3 0.0 13.5 Cumulative Volume 90.7 211.4 119.6 245.3 138.0 281.4 128.3 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 1 P M Pl o t t e d o n 6861 SB ON RAMP CROSS SECTIONS SHEET 14 OF 21 514+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.0% 515+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.3% 12 8 . 0 12 7 . 9 5 12 8 . 4 12 8 . 3 5 Material(s) at Station 514+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 515+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 514+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 2.682 0.000 8.158 0.000 6.598 0.000 5.038 Volume 3.4 0.0 18.5 0.0 15.1 0.0 11.7 Cumulative Volume 94.1 211.4 138.0 245.3 153.1 281.4 139.9 Material(s) at Station 515+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 2.630 0.000 8.127 0.000 6.554 0.000 4.982 Volume 4.9 0.0 15.1 0.0 12.2 0.0 9.3 Cumulative Volume 99.0 211.4 153.1 245.3 165.3 281.4 149.2 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 2 P M Pl o t t e d o n 6862 SB ON RAMP CROSS SECTIONS SHEET 15 OF 21 515+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 4.2% 516+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.4% 12 8 . 7 12 8 . 7 5 12 9 . 1 12 9 . 1 5 Material(s) at Station 515+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 516+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 515+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 1.693 0.000 7.714 0.000 6.186 0.000 4.659 Volume 4.0 0.0 14.7 0.0 11.8 0.0 8.9 Cumulative Volume 103.0 211.4 167.8 245.3 177.1 281.4 158.1 Material(s) at Station 516+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 1.195 0.000 4.237 0.000 2.915 Volume 1.6 0.0 8.2 0.0 9.7 0.0 7.0 Cumulative Volume 104.6 211.4 176.0 245.3 186.7 281.4 165.2 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 3 P M Pl o t t e d o n 6863 SB ON RAMP CROSS SECTIONS SHEET 16 OF 21 516+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.0% 517+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.2% 12 9 . 5 12 9 . 5 4 13 0 . 0 13 0 . 0 1 Material(s) at Station 516+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 517+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.4 175.4 Material(s) at Station 516+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 1.445 0.000 6.042 0.000 5.626 0.000 4.334 Volume 1.3 0.0 6.7 0.0 9.1 0.0 6.7 Cumulative Volume 105.9 211.4 182.7 245.3 195.9 281.4 171.9 Material(s) at Station 517+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 2.489 0.000 8.972 0.000 8.637 0.000 6.969 Volume 3.6 0.0 13.9 0.0 13.2 0.0 10.5 Cumulative Volume 109.5 211.4 196.6 245.3 209.1 281.4 182.3 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 4 P M Pl o t t e d o n 6864 SB ON RAMP CROSS SECTIONS SHEET 17 OF 21 517+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.0% 518+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.3% 13 0 . 5 13 0 . 4 7 13 0 . 8 13 0 . 8 3 Material(s) at Station 517+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.264 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.2 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 30.7 175.4 Material(s) at Station 518+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.003 0.894 0.000 Volume 0.0 0.0 0.0 0.0 0.0 1.1 0.0 Cumulative Volume 0.0 0.0 7.0 6.5 65.9 31.8 175.4 Material(s) at Station 517+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 2.959 0.000 5.790 0.000 5.123 0.000 3.772 Volume 5.0 0.0 13.7 0.0 12.7 0.0 9.9 Cumulative Volume 114.6 211.4 210.3 245.3 221.8 281.4 192.3 Material(s) at Station 518+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 4.633 0.000 8.553 0.000 8.006 0.000 6.714 Volume 7.0 0.0 13.3 0.0 12.2 0.0 9.7 Cumulative Volume 121.6 211.4 223.6 245.3 234.0 281.4 202.0 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 4 P M Pl o t t e d o n 6865 SB ON RAMP CROSS SECTIONS SHEET 18 OF 21 518+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 4.1% 519+00 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.0% 13 1 . 2 13 1 . 1 9 13 1 . 6 13 1 . 5 6 Material(s) at Station 518+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.185 0.000 2.131 0.000 Volume 0.0 0.0 0.0 0.2 0.0 2.8 0.0 Cumulative Volume 0.0 0.0 7.0 6.7 65.9 34.6 175.4 Material(s) at Station 519+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.893 0.000 3.466 0.000 Volume 0.0 0.0 0.0 1.0 0.0 5.2 0.0 Cumulative Volume 0.0 0.0 7.0 7.7 65.9 39.7 175.4 Material(s) at Station 518+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 4.513 0.000 6.894 0.000 9.201 0.000 9.011 Volume 8.5 0.0 14.3 0.0 15.9 0.0 14.6 Cumulative Volume 130.1 211.4 237.9 245.3 249.9 281.4 216.5 Material(s) at Station 519+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 6.079 0.000 8.691 0.000 11.223 0.000 11.094 Volume 9.8 0.0 14.4 0.0 18.9 0.0 18.6 Cumulative Volume 139.9 211.4 252.3 245.3 268.8 281.4 235.2 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 5 P M Pl o t t e d o n 6866 SB ON RAMP CROSS SECTIONS SHEET 19 OF 21 519+50 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 3.4% 520+00 116 120 124 128 132 136 140 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 800-4-8-12-16-20-24-28-32-36-40 0.6% 13 1 . 9 13 1 . 9 2 13 2 . 3 13 2 . 2 9 Material(s) at Station 519+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.211 0.000 2.431 0.000 5.151 0.000 Volume 0.0 0.2 0.0 3.1 0.0 8.0 0.0 Cumulative Volume 0.0 0.2 7.0 10.8 65.9 47.7 175.4 Material(s) at Station 520+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 1.070 0.000 3.529 0.000 5.995 0.000 Volume 0.0 1.2 0.0 5.5 0.0 10.3 0.0 Cumulative Volume 0.0 1.4 7.0 16.3 65.9 58.0 175.4 Material(s) at Station 519+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 7.870 0.000 10.590 0.000 13.226 0.000 13.109 Volume 12.9 0.0 17.9 0.0 22.6 0.0 22.4 Cumulative Volume 152.8 211.4 270.1 245.3 291.4 281.4 257.6 Material(s) at Station 520+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 8.460 0.000 10.926 0.000 13.314 0.000 13.155 Volume 15.1 0.0 19.9 0.0 24.6 0.0 24.3 Cumulative Volume 167.9 211.4 290.1 245.3 316.0 281.4 281.9 SB ON RAMP CROSS SECTIONS SHEET 20 OF 21 67 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 28 - F e b - 2 0 1 8 11 : 4 5 A M Pl o t t e d o n 68 520+50 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 521+00 112 116 120 124 128 132 136 140 112 116 120 124 128 132 136 140 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 68 72 76 80 84 88 92 96 1000-4-8-12-16-20 Material(s) at Station 520+50.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 1.0 0.0 3.3 0.0 5.6 0.0 Cumulative Volume 0.0 2.4 7.0 19.6 65.9 63.6 175.4 Material(s) at Station 521+00.00 Material Name Impact 118 - 119 Mitigation 118 - 119 Impact 119 - 120 Mitigation 119 -120 Impact 120 - 121 Mitigation 120 - 121 Impact 121 - 122 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 0.0 2.4 7.0 19.6 65.9 63.6 175.4 Material(s) at Station 520+50.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 7.8 0.0 10.1 0.0 12.3 0.0 12.2 Cumulative Volume 175.8 211.4 300.2 245.3 328.3 281.4 294.1 Material(s) at Station 521+00.00 Material Name Mitigation 121 - 122 Impact 122 - 123 Mitigation 122 - 123 Impact 123- 124 Mitigation 123 - 124 Impact 124 - 125 Mitigation 124 - 125 Area 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Volume 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cumulative Volume 175.8 211.4 300.2 245.3 328.3 281.4 294.1 0 HOR. SCALE IN FEET VER. SCALE IN FEET 00 0 8 8 16 8 8 16 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS NORTHAMPTON I-91 INTERCHANGE 19 STATE MA PROJECT FILE NO. - 604597 60 4 5 9 7 _ H D 1 4 ( N O I S B O N R A M P C R O S S S E C T I O N S ) . D W G 26 - F e b - 2 0 1 8 12 : 4 7 P M Pl o t t e d o n 6868 SB ON RAMP CROSS SECTIONS SHEET 21 OF 21