Loading...
246-0713.pdfDATE:March 19, 2018 Municipality NORTHAMPTON (city/town) RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER The Department of Environmental Protection has received a Notice of Intent filed in accordance with the Wetlands Protection Act (M.G.L. c. 131, §40): Applicant: Address: LOCUS: MASSDOT 10 PARK PLAZA INTERSTATE 91 INTERCHANGE AT RT. 9 AND DAMON ROAD Owner: Address: This project has been assigned the following file # :WE 246-0713 Although a file # is being issued, please note the following: Commissioner MARTIN SUUBERG Secretary MATTHEW A. BEATON Lieutenant Governor KARYN E. POLITO Governor CHARLES D. BAKER A FILE NUMBER ONLY INDICATES THAT THE APPLICATION CONTAINS THE MINIMAL SUBMITTAL REQUIREMENTS AND IS ADMINISTRATIVELY COMPLETE - NOT THAT THE INFORMATION IN THE APPLICATION IS ADEQUATE FOR ISSUANCE OF AN ORDER OF CONDITIONS. 436 DWIGHT STREET, SPRINGFIELD, MA 01103 413-784-1100 WESTERN REGIONAL OFFICE DEPARTMENT OF ENVIRONMENTAL PROTECTION EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS COMMONWEALTH OF MASSACHUSETTS BOSTON, MA 02116 [1] Please explain the significant post construction runoff vs. pre, for Design Point G and why this is or is not an issue. [2] A CB provides 25%TSS and a sediment forebay provides 25%. An infiltration basin requires that total of 44% TSS removal prior to the water entering the basin for HSG A or B soils. One only gets a total of 80% for an infiltration basin. One does not add the pretreatment TSS removal to the 80%. [3] Are the soils test pit locations shown on the plan and if so, were they taken in the area of the basins as required? [4] There should be a statement somewhere in the stormwater report, that the soils found onsite are, or are not, as those reported in the NRCS soil survey especially regarding HSG information. Please review figure 2.3.1, page 8, Determining HSG, from Volume 3, Chapter 1 of the Stormwater Handbook. [5] All Stormwater BMP's must be designed, constructed, operated and maintained per the Stormwater Handbook Volume 2 Chapter 2 in order to receive any presumptive TSS removal credit. It is recommended that the relevant This information is available in alternate format. Call Donald M. Gomes, ADA Coordinator at 617-556-1057. TDD# 1-866-539-7622 or 1-617-574-6868. http://www.mass.gov/dep Printed on Recycled Paper MASSDOT 10 PARK PLAZA BOSTON, MA 02116 sections of the handbook pertaining to each individual BMP be cut and pasted into the Stormwater report, to assist in Commission review of the stormwater management system. [6] The Commission should wait to close the public hearing until NHESP has issued its Determination. If you have any questions regarding this letter, please contact: MARK STINSON @ (413)-755-2257 Cc: Northampton Conservation Commission, CITY HALL, 210 MAIN STREEET RM 11, Northampton, MA, 01060 Natural Heritage & Endangered Species Program, Div of Fisheries & Wildlife Route 135, North Drive, Westborough, MA, 01581 Representative: TranSystems, 101 Arch Street, BOSTON, MA, 02110 This information is available in alternate format. Call Donald M. Gomes, ADA Coordinator at 617-556-1057. TDD# 1-866-539-7622 or 1-617-574-6868. http://www.mass.gov/dep Printed on Recycled Paper