Loading...
79 Construction Permit 2017 Commonwealth of Massachusetts W0/7-`7 iw.yiitwl City/Town of Northampton Number 't1 ,� Application for Disposal System $ /5Q GConstruction Permit Fee ' ~ Form 1A B. Agreement The undersigned agrees to ensure the construction and maintenance of the aforedescribed on-site sewage disposal system in accordance with the provisions of Title 5 of the Environmental Code and not to place the s stem in operation until a Certificate of Compliance has been issued by this Board of git / // Signature Date Application Approved By: 7///7 Name Date Application Disapproved for the following reasons: Ap-poryricifi • Conditions: 1).Sv<tcm Designer must inspect and verify in writing That the sewage disposal system was installed In accordance with the approved plans and Title S. 2).If this is a system with the S.A.S.constructed in Title 5 fill the System Designer must conduct a bottom inspection of the excavated area prior to the placement of the fill. 3).No changes can be made during construction by the Installer without prior approval by both the System Designer and the Board of Health Agent. 4).Other conditions: t5formla.doc•06/03 Application for Disposal System Construction Permit•Page 3 of 3