Loading...
55 Maple St PlansLIST OF DRAWINGSL1A1.1A1.3A3.1A4.1A7.1SITE PLANFIRST FLOOR PLANROOF PLANELEVATIONSBUILDING SECTIONS & WALL SECTIONINTERIOR ELEVATIONS & SCHEDULES6 OCTOBER 2016SCHEMATIC DESIGNOWNERSJonathan Tauer55 Maple StreetNorthampton, MATAUER RESIDENCEACCESSORY APARTMENT NORTHAMPTON, MA Tauer Accessory ApartmentNew Construction55 Maple StreetNorthampton, MAA1.1File: 16-x_TauerAccessory.pln Print Date: 10/7/16 FIRST FLOOR PLAN6 October 2016Schematic DesignAPH 2'-10"2'-8" 3'-11"EPH 4'-0"4'-0" 1'-11"X43'-0" 6'-8"X36'-8" 3'-0" A PH 2'-10"2'-8"3'-11" D PH 3'-4"2'-8"3'-5"06 6'-8"3'-0"GPH 2'-10"3'-11"2'-8"CPH 1'-6"5'-2"3'-6" 03 6'-8"3'-0"026'-8" 3'-0" 013'-0"6'-8"046'-8" 3'-6"056'-8"3'-6" REFDW 33'-5"31'-3" 6'-2"31/2" 12'-11" 5'-6"9'-1"13'-0"5'-6"2A4.12A4.11A4.11A4.1SOUTHNORTHWESTEAST5876A7.1SHELVINGWALL MOUNTEDASHP CASSETTEWALL MOUNTEDASHP CASSETTEASPHALT DRIVESCORED CONCRETE PATIOHP1:14UPCAR PARKINGSPOTBPH 1'-6"5'-2"1'-10"CPH 1'-6"5'-2" 3'-6"CPH 1'-6"5'-2" 3'-6" A PH 2'-10"3'-11"2'-8" X13'-0"6'-8"X2 6'-8"3'-0" 073'-0"6'-8"A PH 2'-10"3'-11"2'-8"A PH 2'-10"3'-11"2'-8"3'-91/2"31/2"13'-31/2"51/2"12'-6"9'-61/2"51/2 "8'-7"51/2"13'-51/2"6'-1"31/2"5'-0"CLEAR10'-0"DIMENSION TBDCONFIRM WITH SETBACK REQUIREMENTS 4'-0"1A4.11432A7.1PLASTIC LUMBER DECKINGAT RAMP & LANDING N346781/4" = 1'-0"1001259MECHANICAL SYSTEMS NARRATIVEHOT WATER:ON DEMAND HOT WATER HEATERONE SMALL UNIT FOR BATHROOM AND ONE SMALL UNIT FORKITCHEN MOUNTED IN EACH OF THOSE ROOMSVENTILATION:ERV INSTALLED IN MECHANICAL CLOSETSUPPLY BEDROOMS, EXHAUST BATHROOM & KITCHENHEAT & AIR CONDITIONING:AIR SOURCE HEAT PUMPS(1) OUTDOOR UNIT TO SUPPLY (3) WALL MOUNTED CASSETTES Tauer Accessory ApartmentNew Construction55 Maple StreetNorthampton, MAA1.3File: 16-x_TauerAccessory.pln Print Date: 10/7/16 ROOF PLAN6 October 2016Schematic Design2A4.12A4.11A4.11A4.1SOUTHNORTHWESTEAST18"12"18"12"18"12"PLUMBING VENT STACKBOUNDARY OFROOF OVERHANGSHED ROOF OVER HEATPUMP COMPRESSOR"EXTENSIVEGARDEN ROOF"ASSEMBLY OVERCARPORT/PORCH"EXTENSIVEGARDEN ROOF"ASSEMBLY OVERCARPORT/PORCH6:124:12(12) PV PANELS, 3 .8 KW SYSTEM1/2:12N346781/4" = 1'-0"1001259 Tauer Accessory ApartmentNew Construction55 Maple StreetNorthampton, MAA3.1File: 16-x_TauerAccessory.pln Print Date: 10/7/16 ELEVATIONS6 October 2016Schematic Design±0"FIRST FLOOR PLAN+8'-1 1/8"TOP PLATEPLUMBING VENTX4AEFBCCFC(12) PV PANELS, 3.8 KW SYSTEM±0"FIRST FLOOR PLAN+8'-1 1/8"TOP PLATEADHEAT PUMP OUTDOOR UNIT ±0"FIRST FLOOR PLAN+8'-1 1/8"TOP PLATEERV INTAKE & EXHAUSTERV INTAKE & EXHAUSTX2AAASCALE: 1/4" = 1'-0"1NORTH ELEVATIONSCALE: 1/4" = 1'-0"2SOUTH ELEVATIONSCALE: 1/4" = 1'-0"3EAST ELEVATIONSCALE: 1/4" = 1'-0"4WEST ELEVATION Tauer Accessory ApartmentNew Construction55 Maple StreetNorthampton, MAA4.1File: 16-x_TauerAccessory.pln Print Date: 10/7/16 BUILDINGSECTIONS & WALLSECTION6 October 2016Schematic Design7'-6"12'-0"0'-0"-0'-6"8'-1 1/8"TOP PLATEFIRST FLOORCARPORTTOP PLATEMECHANICAL CLOSET WITH ACCESS DOORSURFACE MOUNTED LIGHTS AND DEVICESWITH GASKETED AIRTIGHT BOXES1X STRAPPINGZIP-R SHEATHING ON 2" POLYISOINSULATION, SEE MANUFACTURER'SGUIDELINES FOR FASTENING & BRAC ING 1X VERTICAL STRAPPINGPRIMED PINE CLAPBOARD SIDING2X6 WALL, FILL CAVITY WITH DENSE PACK CELLULOSEFLASHING/TERMITE GUARDCAPPILARY BREAK4" XPS RIGID FOAMCONTINUOUS BEAD OF CONSTRUCTION ADHESIVEGLUE-DOWN ENGINEERED WOOD FLOORINGWRAP 2" RIG ID FOAM INSULAT ION AT SLAB EDGECAST IN PLACE SLAB ON GRADE4" CRUSHED STONEVAPOR BARRIERAIR SEAL TAPE ZIP SHEATHING1/2" GWB12" WIDE PANEL OF 1/2" ZIP SHEATHING ON TOPPLATE, INSTALLED PR IOR TO TRUSSESOUTRIGGER ROOF OVERHANGAIR SEAL TAPE TOP OF WALL TOEXTERIOR ZIP SHEATHINGRAISED HEEL TRUSSLOOSE FILL CELLULOSE TO MIN R-601/2" Z IP SHEATH ING AIR BARRIER,TAPE ALL SEAMS4" XPS R IG ID FOAM WITH COVERBOARDVAPOR RETARDERSCALE: 1/4" = 1'-0"1NORTH-SOUTH SECTIONSCALE: 1/4" = 1'-0"2EAST-WEST SECTIONSCALE: 3/4" = 1'-0"1WALL SECTION Tauer Accessory ApartmentNew Construction55 Maple StreetNorthampton, MAA7.1File: 16-x_TauerAccessory.pln Print Date: 10/7/16 INTERIORELEVATIONS &SCHEDULES6 October 2016Schematic Design1'-6"7'-3"WALL MOUNTED ASHP CASSETTE29" MIN 34"PANTRY7'-6"ACCESS DOOR TO MECHANICAL CLOSETSOFFIT FOR HVACDISTR IBUTION 1'-4" 33"-36" 17"-19"1'-0"3'-0" 1'-9"2'-4" 2'-3" 2'-4" 3'-4"6"1'-6"DOOR SCHEDULENO.01020304050607X1X2X3X4WIDTH3'-0"3'-0"3'-0"3'-6"3'-6"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"HEIGHT6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"6'-8"THK.0'-13/4"0'-13/4"0'-13/4"0'-13/8"0'-13/8"0'-13/4"0'-13/4"0'-13/4"0'-03/4"0'-13/4"0'-03/4"AREA21.0321.0321.0324.3924.3921.3821.0321.3821.3821.3821.38239.80 sq ft REMARKSBI-FOLD DOORBI-FOLD DOORPOCKET DOORSTORM DOORSTORM DOORWINDOW SCHEDULE*MARKABCDEFGQUANTITY513112114AREA10.669.7318.379.317.836.5710.66159.08 sq ftUNIT SIZE2'-8"x3'-11"1'-10"x5 '-2"3'-6"x5'-2"2'-8"x3'-5"4'-0"x1'-11"3'-6"x1'-10"2'-8"x3'-11"TYPECASEMENTCASEMENTCASEMENTCASEMENTCASEMENTFIXEDFIXTEDREMARKSMUST MEET EGRESS REQUREMENTS FORMINIMUM OPENING CLEAR D IMENSIONS SCALE: 3/8" = 1 '-0"1KITCHEN NORTHSCALE: 3/8" = 1'-0"3KITCHEN SOUTHSCALE: 3/8" = 1'-0"4KITCHEN EASTSCALE: 3/8" = 1'-0"2KITCHEN WESTSCALE: 3/8" = 1'-0"5BATH NORTHSCALE: 3/8" = 1 '-0"7BATH SOUTHSCALE: 3/8" = 1'-0"8BATH EASTSCALE: 3/8" = 1 '-0"6BATH WEST*WINDOW NOTE: REVIEW ALL WINDOWSFOR SAFETY GLASS REQUIREMENTS