Loading...
49-001 (2) 229 GLENDALE RD BP-2017-1504 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 49-001 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-1504 Project# JS-2017-002506 Est.Cost: $9856.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: VIVINT SOLAR DEVELOPER LLC 070940 Lot Size(sq. ft.): 42601.68 Owner: DORMAN ALAN T Zoning: Applicant: VIVINT SOLAR DEVELOPER LLC AT: 229 GLENDALE RD Applicant Address: Phone: Insurance: 150 PADGETTE ST UNIT B (413) 331-0769 WC CHICOPEEMA01022 ISSUED ON:6/23/2017 0:00:00 TO PERFORM THE FOLLOWING WORK INSTALLATION OF 16 ROOF MOUNTED SOLAR MODULES - 4.48KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occu•anc Si nature: FeeType: Date Paid: Amount: Building 6/23/2017 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1504 APPLICANT/CONTACT PERSON VIVINT SOLAR DEVELOPER LLC ADDRESS/PHONE 150 PADGETTE ST UNIT B CHICOPEE (413)331-0769 PROPERTY LOCATION 229 GLENDALE RD MAP 49 PARCEL 001 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST / ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid '\ Building Permit Filled out Fee Paid Typeof Construction: INSTALLATION OF 16 OOF TED SOLAR MODULES-4.48KW New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 070940 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: &Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Pennit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management a - ji 1-23 . ` rt. ding Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. Department use only City of Northampton Status of Permit Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Prooe Address: ThisNsection to be completed by office area d1d Mdd? ap Lot 00 / Unit alareaCel r ' 1.1 Zone Overlay District, Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 21 Owner of ecord: Al an IOrman 6Ienr a/e P4 Name(Print) / 73M/ndr7YO0 Telephone Signature 2.2 Authorized Agent: Savina Cervone 150 Padgette St, Chicopee, MA 01022 Nam Print) _ arm., Current Mailing Address: 413-331-0769 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building g; / 90 (a)Building Permit Fee • 2. Electrical n� (b)Estimated Total Cost of Fl (-(Ti.(-(Ti (�(/ Construction from(6) 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection J 4'9 pJ 6. Total =(1 +2+3+4+5) 99 q0•50 Check Number a#3.3 if ( 66 This Section For Official Use Only Building Permit Number: Date al ed: Signature: Building Commissioner/Inspector of Buildings Date 4 Section 4. ZONING Alt Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage Open Space Footage (Lot area minus bldg&paved parking) k of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Documental B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES © NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation, or filling)over 1 acre or is it part Ma common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. I SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House n Addition ❑ Replacement Windows Alteration(s) ri Roofing In Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [fl Siding[Pi Other[O] Brief Description of Proposed ork: Installation of roof mounted rhotovol •.c solar s stem #of modules / IA) ��/y/p(�QP A r AllPratio7(oYexis in �dro� �1 Yesn N. ••mg ne .ederoorFr^ Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa.If New house and or addition to existing housing, complete the following: a Use of building One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? IT Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, Vivint Solar Developer as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Savina Cervone Print,Ct e Qg a u- 0!- -40 • iV i Signa ure of Owner/Age t Date 1 SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: John A Jalbert CS070940 License Number 150 Padgette St Unit B, Chicopee, MA 01022 03/25/2017 Ad ress Expiration Date hr. 4 ?ageitt- 413-331-0769 azure Telephone • 9.Realstered Home Improvement Contractor: Not Applicable 0 VIVINT SOLAR DFVFT OPFR LLCJJohn A Jalbert 170848 Company Name Registration Number 1800 W Ashton Blvd Lehi UT 84043 1/5/2018 Address Expiration Date Telephone 413-331-0769 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes 0 No 0 11. - Home Owner Exemption The current exemption for"homeowners'was extended to include Owner-occupied Dwellings of one(I) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,Slate and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature _ The Commonwealth of Massachusetts Department ofIndustrial Accidents tC} 1 Congress Street,Suite 100 =?' Boston, MA 02114-2017 i ay: $r www.massgov/die W orkers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Lenjbix Name(Dusiness/Organizationindividua0:Vivint Solar Developer LLC Address_1800 W Ashton Blvd City/State/Zip:Lehi'UT Phone#:855-877-2974 Are you an employer?Check the appropriate box: Type of project(required): I Er I am a employer with 217 employees(Poll and/or part-time)." 7. ❑New construction 2 I am a sole propnemr or partnership and have no employees working for mein 8. ❑ Remodeling arlY capacity.[No workers compinsurance required./ 9 3 t am a homeowner doing all work mys 11 [No worker'romp Insuracce required./' ❑Demolition 4 r am a homeowner and will be hiring mmmcton an wok to conduct aon my property will 10❑ Building addition ensure that all contractors either have workers'compensation insurance or se sole ILID Electrical repairs or additions propnnnn with no employees. 12.❑Plumbing repairs or additions 5❑t am a general co tragi or and I have hired the subcontractors listed on the attached sheet. eP 13.❑Roof repairs These sub-contractors have employeesand have workers'comp.insurance) h❑Wearc corporation and as offcershavexercised their right of exemption per NGL c. 14.❑Other 152.4114),and we have no employeco-[No workers comp.insurance required.] *Any applicant hat checks box#Imust also Ell out he section below showing their workers'compensation policy information_ Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Ttontractors bat check this box must attached an additional sheet showing the name of the sub-contractors and state whetter or not those entities have employees. IC the sub-contractors have employees,they must provide their workers'comp.policy number. tam an employer that is providing workers'compensation insurance for my employees. Below is the policy and kb site information. Insurance Company Name'.Zurich American Insurance Company Policy#of Self-ins.Lie.#:WC509601302 Expiration Date:__________________ Job Site Addresv9 6/coda/to City/State/Zip: Qttt��� n^^ Attach a copy of the workers'compensation policy declaration page(showing the policy number and eapir on date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form ofa STOP WORK ORDER and a fine of up to$250.00 a day against the violator. A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification /do hereby cerciJ•y/,yd�- ins': . . a t rjury that the information provided above u true and correct Si agate: I/ ✓/ Date: 2-Di phone#.855-877- 4 Official use only. Do not write in this area,to be completed by city or town official City or Town: PermitfLicense# Issuing Authority(circle one): l 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector.Plumbing Inspector 6.Other Contact Person: Phone#: r et of Consumer Affairs&Rosiness Regulation ME IMPROVEMENT CONTRACTOR istratlon: 110808 Type: * Expiration: 1182018 Supplement Card VIVINT SOLAR DEVELOPER LLC JOHN JALBERT 3301 N THANKSGIVING MY SUI �....._‘.-y---- a1417,1JT86093 \Ilotlenesnrty 1 UMassachusetts Department of Public Safety Board of Building Regulations and Staralards License: CT, ry -070440 Constotlan Supervisor JOHN A JALALRRERTfee - 26 RATTLE MIS ROAQB SOUTHAMPTON MA O/S e 1'GTia. - Expiration. ar+t Commiaeiomr 83126/30111 d{`�L® CERTIFICATE OF LIABILITY INSURANCE DATEIMW9nNYYY) 0111912017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH USA INC. NAME. 1225 17TH STREET,SUITE 1300 q2 NE PHO (A/ No): DENVER,CO 90202-5534 E-MAIL Attn:DenverCertRequest@marsesem I Far 212-948-4351 AOD 55. INSURERSI AFFORDING COVERAGE RAC O INSURER A:Axis$peClally Europe INSURED INSURER B:Zunch Amencan Insurance Company 16535 Vora Solar,Inc - - VIVInt Solar Developer LLC INSURER c:American Zurich Insurance Company 40142 Vivinl Solar Prowler LLC INSURER D:N/A N/A 1800 W.Ashton B14 Lehi,UT 84043 INSURER E: . INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-002920387-14 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN 15 SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ExIo LTTRR TYPE OF INSURANCE Ilnto'vivo POUCY NUMBER IMMTbal , POU�ONYYYI EFFI IMSAWOY\YYIIUNITS A I X COMMERCIAL GENERAL LIABILITY 377650117EN 01/29/2017 111/0112018 I EACH OCCURRENCE S 1,003,000 _ 1AIMMAOE XOCCUR i DAMAGE TO RENTED CIS. PREMISES lEa occurrence) S 1,000.000 i MED EXP(Any one penin) S. 10,000 PERSONAL b ADV INJURY S 1,000,000. GEM,AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE _ $ 2,006000 X POLICY_ JECOT I LOC I PRODUCTS-COMP/OP AGG S 1,000,000 OTHER '.$ B AUTOMOBILE UAe1UTY BAP509601502 11/0112016 11/0112017 COMBINED SINGLE LIMIT $ 1,000,000(Ea codant) X ANY AUTO BODILY INJURY(Pet person) S I ALL OWNED SSCHEEDDULED BODILY INJURY(Per accident) S AUT X HIRED AUTOS X NON-C IED mPROPERTY DAMAGE S AUTOS , (Per edent) • COmf✓Cc fled S 1,000 A X UMBRELLA LIAB• �X OCCUR 3776500217EN 01129/2017 111/01/2018 :EACH OCCURRENCE _ _$ $,000,000 X EXCESS UAB CLAIMS.MADE CL Only AGGREGATE S 5,000,003 DED I 1 RETENTION $ C ,WORKERS CONPB SAJON WC509501302 11101/2016 111/01/2017 I X PER !AND EMPLOYERS'UABIUTY YIN STATUTE ER PROPR ETO EXECUTIVE AZ,CA,CT,FL,H,MA,MD,NJ, E.L.EACH ACCIDENT , $ 1,033,063 OFFICER/MEMeER EXCLUDED' N N IA ' (Mandatory in NH) NM,NY.PA,SC,TX,UT • i E L.DISEASE•EA EMPLOYEE S 1,000,000 B 'n desmee under WC509601402(MA) 11/01/2016 111/012017 DESCRIPTION OF OPERATIONS plowEL.DISEASE-POLICY UNIT S 1,63(1.063 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(ACORO 101,Additional Remarks Schedule,my i.vlbched IImore space le required) CERTIFICATE HOLDER CANCELLATION Town of Northampton SHOULD ANT OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 212 Main Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Northampton,MA 01060 ACCORDANCE WITH THE POLICY PROVISIONS. AUTNORMED REPRESENTATIVE of Mash USA Inc. Kathleen M.Parsloe -"iced/sic 22(. QJma. 01988-2016 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD vivint• l8C0 'W Ashton Blvd. Structural Group Lehi. UT 84043 Jon P. Ward, SE, PE J. Matthew Walsh, SE, PE Clint C. Karren, PE Structural Engineering Manager Senior Structural Engineering Manager Structural Engineering Manager jon.ward@vivintsolar.com james.walsh@✓ivintsolar.com clintkarren@vivintsolar.com June 23,2017 Re: Structural Engineering Services Dorman Residence 229 Glendale Rd. Florence, MA S-5606286; MA-04 To Whom It May Concern: We have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site VisitNerification Form prepared by a representative from our office under my supervision identifying specific site information including size and spacing of members for the existing roof structure. 2. Proposed layout of the system including connection details for the solar panels. 3. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information, we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with a maximum of two layers of composite shingle. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components and consists of the following: • Roof Section 1: Dimensional lumber - 2x6 at 16" on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof members. A. Loading Criteria 9.13 PSF= Dead Load (roofing/framing) 2.59 PSF= Dead Load (solar panels/mounting hardware) 11.72 PSF=Total Dead Load 40 PSF= Ground Snow Load (based on local requirements) Wind speed of 90 mph (based on Exposure Category B-the total area subject to wind uplift is calculated for the Interior, Edge, and Corner Zones of the dwelling.) B.Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Unirac, Inc. Installation Manual", which can be found on the Unirac, Inc. website (www.unirac.com). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. The solar panels are 11/2" thick and mounted 41/2" off the roof for a total height off the existing roof of 6". At no time will the panels be mounted higher than 6"above the existing plane of the roof. 3. Maximum allowable pullout per lag screw is 205 lbs/inch of penetration as identified in the National Design Specifications (NDS) of timber construction specifications for Spruce-Pine-Fir. Based on our evaluation, the Page 1 of vivintr Page 2 of 2 pullout value, utilizing a penetration depth of 2Y2", is less than the maximum allowable per connection and therefore is adequate. 4. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph A above, using the wind load uplift procedures of ASCE 7-10 and is specified below. The following values have been verified by in- house testing and the mounting hardware manufacturers' data, which are available upon request. Panel support connections shall be staggered to distribute load to adjacent members. Modules in Landscape Modules in Portrait Roof Zone Interior 1 Edge Corner Interior Edge Corner Max Vertical Spacing (in) 4011 40 40 66 66 66 Max Horizontal Spacing (in) 64 64 64 48 48 48 Max Uplift Load (lbs) 159 1 104 59 268 175 99 C.Summary Based on the above evaluation,with appropriate panel anchors being utilized the roof system designed on will adequately support the additional loading imposed by any solar array size and configuration. if installed correctly. This evaluation is in conformance with the 2009 International Residential Code with Massachusetts Amendments, current industry standards and practice, and the information supplied to us at the time of this report. If there are any questions regarding the above, or if more information is required, please contact me. 141 4 Regards, , / , •N PI` 111411/4, Jon P.Ward, SE, PE f , AN!*,ruj1 MA License No. 52584 NO• 52/ A1 • 0I3TERE �0G4 • 0SONAL EN .. vivint. a- I ip , al�ir �o moi/ - &if `/4 / - e< N // 2 or, O v ouX��.�..�,� g p o m Dawe, p0 4 S STEOMCSIZE_ _ M o "W"•• a a kW po_ I ,...G,T ",,n E,,,°""NE` City of Northampton Building Department I Plan Review • 1'°""""'° 212 Main Street N6 M Northampton, MA 01060 _— U� . .ROOF o.,�, I IC r Imo1 TVCB�Com❑p S�inBI: O • / / / ']° /2" .- ///// A ' i5 It 0 E 0 2:I L - - - - - - - - - - - - - - - J e, SHEET NAME 229 GLENDALE RD, FLORANCE MA 01062 Lg �a sHEE NUMBER PV SYSTEM SITE PLAN SCALE 118"=1'0' a V , 1 I A og � vp V- 71•11,11141a A(-:ioz IL SFM -ROOF ATTACHMENT 5FM-3' RAIL SFM-9"ATTACHED SPLICE CI o SEM -9"SPLICE \')SFM-TRIMRAILSFM -ARIACHM WITH C oA. C :AL �s /�ROOFAT ACHMENT w�,a ^"' rv�.o w av ao „u ,za/NOT Tow.LE iiik Mr tctx NY CLAMP C__, > x 143 C' )SECTION VIEW OPV SYSTEM MOUNTING DETAIL ""SM3 ��I s = W w30 ®"O„ P t ATTACHMENT CINC,n/AP Al 111� PERP, Ica I X111 .�°,E �.�.aµa. �o..ruw."110111111. k..a. ME Mal � = a � w I _ OSGPFIL P SPASr�o C MODULES IN PORTRAIT/LANDSCAPE «.Mp$e "O Co)5FM LAYOUT N 'r'3 aJgoL d N \ ! 33Lii/ ay £ 3 a ! : \ a, { , � \ __,,,a i 1 la ; . p 2 - §\ I ; ; e ; \ 2 \ \\ R 4 .• \ 1 . q{ 0 \ \ R9 i _ w \ } ) j _ /- 2 © : ƒ } � \ , , e e .:, 1 e : 6 : :azg y eev. 96 , __. ; C - k« § � ,__ > . 2 d _ DCSafety Switch PV Module Rating @ STC — Conductor Calculations Rated for max operating condition of Module Make/Model IPMdBOMLOB .Wire gauge calculated from NEC code 310.1%8916)with ambient temperature calculations inverter - mplia Opens all Max. weCurrent(Imp) 8.01 Amps from NEC 310.151111a1 d s ungrounded conductors x.Pwe Voltage(Vmp 31 0 Volts For Roof'conductors we use the 90'C column ampatl05 5"offine-roof temperature LTi Ma Open-Circuit Voltage Woe] 38.6 Volts atlurtment tram IDto z fill adjustments from 310.15181115).Optimizer 6 0 m twe1W,the 75°C Solar Edge P300 ShonLlrtuitCumm(Izc 9.53 Amps for"OttRmIt conductors we usethe]SC column ampadry,mine 9e,"C column ampachy with i DC Power 300 Watts Max.Series wze pcpDl Is Amp. the relevant ambient temperature and raceway ng adjustments,whichever is less. € N o DC Max Input Voltage Volts Num.Max.Power at SIC((Wad) 280 Warts The rating of the conductor after adjustments MOST be greater than,or equal to,the continuous 0 DC Max.Input Current _ 12.5 Amps Max System Voltage 1000 V DC OA) duty uprated output current. DC Max Output Current 15 Amps Vac Temperature Coefficient 0.29 I %/CCalculation Raring(9Pgx t Temperature Adjustment Conduit Fill a ure . Max.string rating Inverter dependent.See SE documents. Adjustment =d].to gauge Duty Output Current n Inserter Make/Model AC Output Current According to NEC 69081811/1 15.83 Amps IOn Pool,Tag 21 10 wire rated for 40 A, AOAv0.)Iv12 Cpnductgrs -38A Aa=1B 75 CEC Eflleency 5E 99 0%�S Nominal AC Voltage 240 Volts A AC Operating Voltage 140 Volts THIS PANEL IS FED BY MULTIPLE SOURCES(UTILITY AND SOLAR) (Ott Roof,Tag gr. 0gauge wire rated for 35p 35 Aa=19]9A Cont Max.Output Current 16 Amps DC Max.Input Current ill Amps Rooftop conductor%%pafities designed in compliance with NFC Short Circuit Current 175 Amps Tables 310 1503112)(a),310 ss1B1131(a).310.13(8113119. Max Output Fault Current 17 5A/30 ms 310.15(8)06),Chapter 9 Tame 4.5,&9. Loacation specific temperature obtained from ASH RAE 2013 data tables. • ~^� ASHRAE 2013- ` Highest ET Monthly 2%OO.Oeei3. Design Temp.:32'C . o o Lowest Mm Mean Extreme D.13..16 9'C LI N OCPD Calculations S Breakersto accordingcontinuousduty output PV rnominalcurrent ased oft a , muerte,conwuousooc n current v u.231 EC code 110t$00IuttMl output=IS 83 Ax 1 n M¢rude 1tu.I91AHntau z 0 m— system output currrrent w/continuous duty='-'1]9 C 20A lsystem OCPOI me.Notes _ % m • interior y raceways carrying O t shall be metallic SHEET ▪ ampatlry calculations are made in compliance with NEC]20.5(8)..49 and below is rounded down to O,and 50 and Wove are NAME- rounded AMEro„ne.e up. Pr SHEET NUMBER. N ui 4 RESIDENTIAL SOLAR POWER PURCHASE AGREEMENT Vivi nt.Solar Customer Name and Contact Information: Name(s)Alan Dorman Installation Location Approximate Start and Completion Date 229 GLENDALE RD Primary Phone 4133877660 2017-11-25 FLORENCE E-Mail parkhillyd@comcast.net MA 01062-9784 $ O `.129 2Oyrs Up-Front Cost Energy Price($/kWh) Initial Term + We will design,install, maintain,repair, + We will not place a lien on Your Property Our Promises monitor,and insure the System at no + You are free to cancel this Agreement any additional cost to You. time prior to Our commencement of + We warranty all of Our work,and that Our any work at or near Your Property roof penetrations will be watertight,for the associated with installation of the System. initial 20 year term. + The Energy Price includes a$5 monthly + Your Energy Price will not increase by more discount for paying by automatic debit from than 2.9%per year. Your bank account. + If You need to make Property repairs,We + You will not be responsible for any property will remove and reinstall the System if You tax assessed on the System. pay Our estimated costs. + We will fix or pay for any damage We may cause to Your Property or belongings. Your Commitment • Pay for the Energy produced by the System. • Maintain a broadband Internet connection. • Keep Your roof in goad condition throughout • Continue service with Your Utility for any the Term. energy used above and beyond the System's • Respond to Our sales and support teams production. when scheduling and completing paperwork. •At the End of Your Initial Term You can renew the Agreement for a • You can request that We remove subsequent term; mats the System at no additional cost. • You can purchase the System;or If You Move • We guarantee You can transfer the • You can relocate the System to Your Agreement to the new home buyer, new home:or regardless of credit rating; • After the sixth anniversary,You can •You can prepay the Agreement; purchase the System. You may cancel this Agreement any time prior to commencement of any work at or near Your Property associated with installation of the System. Vivint Solar Developer, LLC(EIN: 80-0756438) is a licensed contractor in each state in which we operate, for information about our contractor licenses please visit www.vivintsolar.com/licenses. WE MAY HAVE PRESCREENED YOUR CREDIT. PRESCREENING OF CREDIT DOES NOT IMPACTYOUR CREDIT SCORE. YOU CAN CHOOSE TO STOP RECEIVING"PRESCREENED"OFFERS OF CREDIT FROM US AND OTHER COMPANIES BY CALLING TOLL-FREE 888.567.8688. SEE PRESCREEN &OPT-OUT NOTICE BELOW FOR MORE INFORMATION ABOUT PRESCREENED OFFERS. The Notice of Cancellation may be sent to this support@vivintsolar.com vivintsoiar.com address: 1800 W Ashton Blvd., Lehi, UT 84043 - -: 877.404.41291 - 801 765.5758 copes 20:e :wn ,ve floe . eseve 2 27!e7, f32 3. --e SIGNATURE PAGE AND NOTICE TO CUSTOMERS A. INCORPORATED DOCUMENTS. These documents Agreement, signed by both You and Us, before any are incorporated into this Agreement and apply to the work may be started. relationship between You and Us: (1) Residential Solar G. You have the right to require Us to have a Power Purchase Agreement, (2) Exhibit A: Notice of performance and payment bond. Cancellation, (3) Exhibit B: State Notices and Disclosures, (4) Exhibit C: Certificates of Insurance, H. CUSTOMER'S RIGHT TO CANCEL.YOU MAY CANCEL and (5) Customer Packet. THIS CONTRACT AT ANY TIME BEFORE THE LATER OF: B. WE HAVE NOT GUARANTEED, PROMISED OR (I) MIDNIGHT OF THE THIRD (3RD) BUSINESS DAY OTHERWISE REPRESENTED ANY REDUCTION IN AFTER THE TRANSACTION DATE, OR (II) THE START OF ELECTRICITY COSTS IN RELATION TO THE SYSTEM THAT ANY WORK AT OR NEAR YOUR PROPERTY ASSOCIATED WILL BE INSTALLED ON YOUR PROPERTY. WITH INSTALLATION OF THE SYSTEM. IF YOU WISH TO C. IT IS NOT LEGAL FOR US TO ENTER YOUR PREMISES CANCEL THIS CONTRACT,YOU MUST EITHER: (1)SEND UNLAWFULLY OR COMMIT ANY BREACH OF THE A SIGNED AND DATED WRITTEN NOTICE OF PEACE TO REMOVE GOODS INSTALLED UNDER THIS CANCELLATION BY MAIL, E-MAIL, OR FM; OR AGREEMENT. (2) PERSONALLY DELIVER A SIGNED AND DATED D. DO NOT SIGN THIS AGREEMENT BEFORE YOU WRITTEN NOTICE OF CANCELLATION TO: VIVINT HAVE READ ALL OF ITS PAGES. You acknowledge that SOLAR DEVELOPER, LLC, 1800 W ASHTON BLVD, LEHI, You have read and received a legible copy of this UT 84043, ATTN: PROCESSING DEPARTMENT. IF YOU Agreement, that We have signed the Agreement, and CANCEL THIS CONTRACT WITHIN SUCH PERIOD, YOU that You have read and received a legible copy of every ARE ENTITLED TO A FULL REFUND OF YOUR MONEY. document that We have signed during the REFUNDS MUST BE MADE WITHIN 10 DAYS OF OUR negotiation. RECEIPT OF THE CANCELLATION NOTICE. SEE THE E. YOU RISK THE LOSS OF ANY PAYMENTS MADE TO ATTACHED NOTICE OF CANCELLATION FOR AN A SALES REPRESENTATIVE. EXPLANATION OF THIS RIGHT. DO NOT SIGN BELOW F. DO NOT SIGN THIS AGREEMENT IF THIS UNLESS WE HAVE GIVEN YOU THE "NOTICE OF AGREEMENT CONTAINS ANY BLANK SPACES. You are CANCELLATION". entitled to a completely filled in copy of this VIVI NT SOLAR DEVELOPER, LLC CUSTOMER(S): Signature: Signature: Printed Name: Susan Zegarra Printed Nome: Alan Dorman Salesperson No, 200221 Date: 2017-05-29 Dare: 2017-05-29 Signature: Printed Nome: Date 2017-05-29 cc solar - • • = w IV SolarEdge Power Optimizer Module Add-On For North America P300 / P400 / P405 O CC • W O . „ PV power optimization at the module-level - Up to 25%more energy — Superior efficiency 1995%I — Mitigates all types of module misnmrd lassos,from 01an ufarturi ug mlerance to partial sFading — Flexible system Design for max mum space udotavor — Fast instaf'ation with a singe bolt — Next generation maintenance with module-level monitoring — Module-level voltage shutdown for installer and firefighter safety USA - GERMANY - ITALY - FRANCE - JAPAN CH NA ISRAEL AUS rpqua www.solaredge.us solar - • • k SolarEdge Power Optimizer Module Add-On for North America P300 / P400 I P405 P300 P400 P405 lar 64aI module/ (Sr n&easel nodules) Ihr thin nim modulo) INPUT Rated Input DC Powell 300 400 405 W Absolute Maximum input Voltage 48 80 125 Vdc (Voc at lowest temperature) MPPT Operating Range 8-48 3-80 12.5.105 Vdc Maximum Short ercuit Current(Isc) 10 Adc Maximum DC Input Current 12.5 Adc Maximum Efficiency 99.5 % Weighted Efficiency 98.8 % Overvoltage Category _ II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current i 15 Adc Maximum Output Voltage I 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) _.. Safety Output Voltage per Power Optimizer _I 1 i Vdc STANDARD COMPLIANCE EMC FCL Yart1S Cassia,IEC61000-6-2,IEC61UC0-6-3 Safety IEC52109-1(class ll safety,Unlit] IONS Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltam 1000 Vdc Pxxx 2 series 141 x 212 x 405/5.55 x834x 1.59 mm/in Dimensions(W a 1x H) pxxx-Sones 128x152 x27.5/ 128x15'2x35/ 128x152 x48/ mm/in 5x5.97 x1.08 5x5.97m1.37 Sx5.9]x1.89 Weight(including cables' Pxxx-1 series 950/2.1 gr/Ib PnxSones ]]0/1] 930/2.05 . ._I 93012.05 gr/lb Input Connector MC4 Compatible Output Wire Type/Connector Double Insulatetl;MCO Compatible Output Wire length _, 0.95/30 I 1.2/3.9 in/ft Operating Temperature Range 40-T85/-40-7185 'C/'F Pxxx-2 series 1P65/NEMA4 Protection Rating Pond series IP68/NEMA6P Relative Humidity 0-100 % .in.4 ne r.....&the module Modulo el so to.5•403•1[11131031.C•AIIMONI PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V AinimumSOLAREDGE I NVERTLength RIa Minimum String Length 8 10 18 'Power Opti mUerz) Maximum String Length 25 25 50 (Power Optimizers) Maximum Power per String 5250 6000 12750 W Parallel Strings of Different Lengths Yes or Orientations i ismallowed kr sir win win noui4La/Pial/nW...r un.e CE Eii solar cc W SolarEdge Single Phase Inverters CC For North America W SE3000A-US/ SE3800A-US/SE5000A-US/SE6000A-US/ SE7600A-US/ SE10000A-US/SE11400A-US z rrr • w • • • •' The best choice for SolarEdge enabled systems • Integrated arc fault protection(Type 11 for NEC 2011 690.11 compliance - Superior efficiency(98%) - Small,lightweight and easy to install on provided bracket - Built-in module-level monitoring - Internet connection through Ethernet or Wireless - Outdoor and indoor installation - Fixed voltage inverter,OC/AC convrsion only - Pre-assembled Safety Switch for faster Installation - Optional -revenue g-ade data,ANSI C12.1 OSA-GERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS ISRAEL www.solaredge.us solar • 9 Z Single Phase Inverters for North America SE3000A-US/SE3600A-US I SE5000A-US I SE6000A-US/ SE7600A-US I SE10000A-US/SE11400A-US 5E30004-US 5f3g00A-U5 SES000AUS 5E60004-US $E7600A-US ' 5610000A-US SEI1400A'US OUTPUT Nominal AC Power Output 3000 3y00 -icon 6000 7600 99811®1013V 11400 VA 11,0011@AOV Max.AC Power Output 3300 4150 now pv LlXV 6000 8350 I0800@209V 12000 VA 5460 6240V t0950 124-0V AC Output Voltage Min.-Nun-MaaP1 ! ! 183•208-229 Vac AC Output Voltage Mm.-Nom-Maxln / / / / / ! ! 211-240-264 Vac AC Frequency Mln..Nom.Maxl^ 59.3 60 60.5{with HI Country seM08 57'60'Wi) N4 Mar Coorinuuus Output Current12.5 Ifi 11@2400 ES 32 43@34CV 4]5 A GM A Utility Mnmtotleg,ISlanomg Protopam,Country Cuntguraule Thresholds vus Yes INPUT Recommentle0 Max.DC Powerm 3750 4750 61C /500 9500 12400 14250 W raq Transformer-less,ungrounded Mat Input Voltage WO Vdc Nom.DC Input Voltage 325 @ 208V/350 QD 240V Vda Max]0001 Cunent`r 95 13 165 @ 108VI 1B 23 33 @ 208V 345 Ad[ 15501240V I 305@240V Max.Input Short Clrtml Current 45 Ada Reverse-Poia t Protection yes Ground-Ea wt Weladnn Detection 600k.. st n imly Inverter Maximum'Inverfflioenry 8 977 982 9B3 4198 98 98 % CEC Weighted Efficiency 975 98 975@208J 975 975 97p208J 975 N 980240V 97 5@240V Nrghtume Power Consumpnun a 2.5 c4 W ADDITIONAL FEATURES Supported Communication I ntenaaes 85485,RS232,Ethernet,2lgeee lopnonaq Revenue Gude Data.ANSI Cl2.1 Optional^ 3aprd Shutdown -NEC 2014 69012 Functionality enabled when Sold oft/8r rapid snutdowo PA is Installed" STANDARD COMPLIANCE Solely 011741,0116998,011998,CSA 12.2 Grid Connection Standards IEE62547 EmIsSlons FCC p.rr115 class e INSTALLATION SPECIFICATIONS AC output conduit size 7 AWG ortge 3)4"minimum/16-6 AWG 3/4'minimum/8-3 AWG DC input conduit sue/p of strings/ 3/4'mn'mul/1-2 strings/16.6 AWG 3/4"minimum/1 2 strings/14-6 AWL AWG range, Dimensions with Safety Su/Oak 37.5612.5 Y7/ 3056125675/ 10 S*1256105/775x315 K260 emm Weight 'S]75 x 3x172 775x3156191 mm wM Safety Switch 512/233 54 7/24.7 804/401 lb/AR Cooling Natural Convection „no(„ser teplafeahle) Noise t2 457 dgA Mu'-Max Operating TempeAWrc -13 to 6140/-2510'60(-40:o MO version 662614Mei'q Range PmkCnon Rating NEMA 3R ..I€d.'wPA, Ivo in'roi..4...u2 Won irW25e A mem Eunen„Enree on be won we Avow no imp 2.12021 wnenno the winn„EnEd (11 = RoHS 2/20/2015 Power Optimizer l SolarEdge Mc, Eo 'cr.:I Lay' n..encu Pyr.r Engltlh(North Ameba) Seiron Fallow Us CORPORATE SOLUTIONS PRODUCTS TO ORDER SLOG V. Cr .411 al(171())); IRMOtt Ca Ail / / • der Power Optimizer Inverter Monitoring Power Optimizer ne=ammona 5"am r'SolarEdge Power Optimizers The SolarEdge power optimizer a a DC/DC converter which is connected by'netallers to each PV module or embedded by module manufacturers. replacing the traditional solar lundon box.The SolarEdge power optimizers increase energy output for PV systems Dy constantly backing the award maximum power point(MPPT) of each module Individually. Furthermore, the power optimizers monrbr the performance of each module and communicate performance data to the SolarEdge monitoring portal br enhanced.cost-effective nodule-level maintenance.Each power atomizer is equipped with the unique SafeDC'•feature which automatically shuts down nodules'DC voltage whenever the lnvetter Or grid power is shutdown. The MPPT per nodule allows for flexible installation design with muliple orientations,lilt and module types in We same string. When working with SolarEdge Inverters,SolarEdge power optimizer automatically maintain a fixed Shing voltage,allowing installerseven greaterlexiblity with longer sbiegs and strops of different lengths in order b design optimal PV systems. The SolarEdge power optimizers are compatible with c-Si and thin-film nodules and nave a 25 year warranty. The Felawing Power OPUmber models are neietla' P-Sariea Module Add-Oft Payee Ougnerere Connected by Installers to tie P'a module inc oOmpntible wlb a wide range o'mon ides Power Optimizer P Model Module Power Module Voc P300 5300W <48V P400 5400W <80V 0405 5405W <125V Download danstflel Pderiee C Pmrrmrciel Power Oadmher Commenal son.l on m rmaaring Iwo rood.ues per sower noun xer Power Optimizer Model Module Paver Module Vac P600 S600W' <96V P700 s70OW <1259 'Rated walked STC power of modules connected'n series Mod4e of up to.5%power tolerance allowed CuatifIGAIPALuibtol hXp:lAvcow.sdzredge.uslgolpaeluslpowerbax-paver-optimizer 1/2 220/2015 Paver Opdmizsr I SolarEdge Feature highlights of SolerEdge Power optim ere: Pay-module Maximum Power Point Track ng IMPPT Seperlar efficiency 169.5N neck atPacncy,de Mk welghlee ell cony) MPigates ad types of modules miamatcwoss,ham n-allyfactunngtlerance m Dart&shaoirg Designed'or extreme environmental mndrmns 26 year rallablllLy and Neese try Advanced,real-time nar ormence measu sment Automanc module CC vclbge shutdown'or natallar dna firelighter safety Emoeddad by module manereotutars,or connac ed oy mslellers to asi and rrr-nim modules aaueeea Tnnmlepae mo.CAll MOS Resolved Careers 1 Contac I Subscribe I RSB Feeds I Tenn&Conditions http./Iwww.solaredge uargraMlue/pavabox-Powe--gptlmlxer 22 SFNISRN SYSTEM APPLICATION RULES 28 MSIGRORAIL DESIGN & ENGINEERING GUIDE PTE NI}Ion Tile Root installs file Roof lnatalis �I�IIIIi�YYY++ y :1I ll�Ehl ia Overhang{in) Span{in) ap ®® lateral 1 IMO24 72 26.4 ® 9.7 2.9 1 2 21 64 28.6 41.8 12.3 ® I © 18 48 10111 59.8 us 4.3 THE SEM TILE ntax SOLUTION IS a, ,d! AwiI CURRENTLY BEING down REVIEWED AND Span tin) up down3 lope VALIDATED VALIDATED 24�I�I ® 38.1 46,9 9.1 nja 2 38.1 59.7 MU® © 18 � 38.1 59.8 ®® gip` Iii.;. ' )1 e,,th, Ui f"aktckate,n hnWMIkNt{provieno portion of soars that may kit within mileones and 3 that Ylefd Annum Ayr AAA Mow k provided toggle inswaRu lleinEUQOS.✓te to 5X4 landscam MOV on theiptiowina A Modiste Overhang-Length of module extending past the first or last root attaehrrmt of the row. 9 Max.Span The sped between MieroRi4 roof attachmMs. C Max.Tom Rail 4verhanq-Length of ldm Rad extending gm the first or last roof attachment of the row. f) Max.Spar,for Trim Rad (Measured between TOM Rai Rooi Attachment) E trim Rai is not required to be ituti with the edge of the mndj{e-Q/-2 s acteptebled F Trim Rag averheno from edge of him Rail to edge of Trim Rail Root Attachment.jV min) G Module width is limted to 39.37 in 11 meter Wide spans Gnearlykr nndptes wider than tins N Each setting of ttim Rail and each module must be supported by at leaul attXkment US SISD" SYSTEM APPLICATION RULES 27 M MICRD AIL DESIGN & ENGINEERING GUIDE PAGE See Installation Guide for detailed system layout procedure. •indicates-SUNFRAME MicroraiLTM 3' A 7- •indicates-SUNFRAME MicroraiLTM T Splice 9 •indicates-SUNFRAME MicroraliT 9'Attached Splice :,,,,,, •indicates-Trim Rail Roof Attachment 8 C 41--',. .., ---22--- E 3x4 Landscape Array 4.Z4 •• SUN SYSTEM LAYRUT RULES28 NOS I FRAME DESIGN & ENGINEERING GUIDE PAGE Basic Layouts The Pa ss application rales for the SFM system are extremely simple. j 2h Ant ' % .111`..yi Base Rules: at AR mantles must be sapaort d al roW(*men an the BMth an South edges. Except at row i.where the south edge of earn tint row mode wgi be suggone hylnRa:d- DetaR A an page a My intersection of module comersmust be wppoted acwrdmg to the fotiowmp tonnectioMAtxachment Ratesas . 2v 4 � x -2vf • A?t MkmRais aoe oriented in an cart-we:S direction @erpnnA`udar to moi slope). TtBn Rail Connection/Attachment Butes: x 3'Miczviailv Suppnrtmg attachments imtatled m apptiearts spans per design ru{az{See table on Page 26.) �_ -vh- .:-artay with tote l Any nvter edge module mate,rrPsst be suppnted attM first rafter integgr(n Me grin 2v i Modules Vertical:3'Mitnfhail-Irterface betweentwo nvot Ies orie't?dIn the north-south direction in relation to each other whose;.most east or west edges are eapased �..1 rd S j jh 2 Modules Horimntat:9'Splice.Interfacebetween any two modules merited 4)theeastweest directtw,In relation to each other ainng the exposed north edge {Rant attachment not regoked. See detail Aon page 29.1 Detail Bon - page 29 3 5 Modote Imersection worn two Horizontal.9'Spike-Interlace between any three modules where /IS p two cafe oriented in the east-west direction in relation to each other. (Roof attachment not reouirtd. 2v 5 2v- ca.tkml A on page 29.) 44 Modules 1mm-ening at their corners:9'Splice ntedace between lout nodules m a grid pattern Trim Rail {Roof attachment not re9Wled See detail Ann page 29-) s 5 9'Attached Splice: $lmiVar iv 2h.2v,,&4,root attachment is requited {See demi B on page 2s.) Tom Rag:Must be installed at the southern-most edge(first row)or modules.iA miring!'"of(1)I Ani SdmpletayoutA.t: % Ianp •`: Ran o&att&hment required per tenqth of Trim. sot table on page 264 .:: SFM FRAME SYSTEM LAYOUT RULES 29 MO MICRORAII DESIGN & ENGINEERING GUIDE PAGE Module intersection •5from Q of :after Ilk I kiStuir3 relle x iii 1 5- 1 i ri [ ' Spike i i _ (4) Modldes i;... . ,-Detail i r _ Detail a av a t-r-�—�.v x 1`�V agaJtn_s fct 4.muault tailor zv. It I / �zv r,kyidt° in{es,tt, burr pc 1 i '1 in S' 0r Q of 'ail E4' 1 Trim Rail � F‘...4 I rq a`?':! Trim Raft-ti ll sanw Le Ate 'ieci -pk'e 5~,Satsut B^k 2x2P `it nith (4' NAiLiiliPa s,ir. -Lao,r.0-2. JO oortait arravwith 4` Spike e - StAldittSpii_Cg Pec ll 8`9'M aModiplkt_itimdote ktlsusstka li, sFm. SDN SYSTEM LAYOUT RULES 30 ali' SUN MICRORAIL DESIGN & ENGINEERING GUIDE PAGE a. mak rte. = -"-'` I a..1 TJrlk.x ....kms:. 1als Z+r' 3 v .__ ` i Trim Rall Th., I Trim Rall r Samvteleyea.Laniltcave with 3 i MkroRait $Rlke atl4Ghmenti only anla -1 -1 Mk AIN Ilk 1 2h x �- i �1 'L-1it, Al 1- � , 1 `/� TrimlaRaI�� Rail , 'f- _- -2v Ice ��Y 9- 4 x.. Trail Rail-i, Trim Rail - Ili) Sym[ [omit& MtSM arae MmM tavaut F: $ en aim ■r•■ s f NI FRAME TECHNICAL SUPPORT; 31 �■ MICRORAIL DESIGN & ENCINEERINI; I;UInr, PAGE Technical Support tt you'have further questions regarding the kmtrause Microftail product,please contact Unirac at info@uniraccom or 505-248-2702. The Unirac website has an online calculator(U-Builder)which when used,will direct you to a page with additional information regarding the SW product. SrML.•• INSTALLATION GUIDE TABLE OF CONTENTS A-Toot.A R AM(IFK A1I0NS H-SYSTEM CONIPONf NTS 1 SYSI FM COMPONFNIIS )-P'STR4 COMPONENT' C IAYOUT ' HASHINGSLIUEHS t3.-'AT HOW INATAI I ATION H-NIC RONAII INS IAI I A'10r4 I MODULE rtICU UNFINA 1 M IAPO IN VF RICH P.WIPO MMMT V.MH PNINVFkIH:h Miff NAM L-PNI SWIG TOUCHES NI MN I I M BONDING a:GROUNDING N-I-NoHA'I SYSTEM MN?O INVFHI ER('RU INDING (IL COOL COMPJANCL N0TE5 '-'ESN II C1k]111F0 MOIJWF 1151 Q-MODIII F MINI FNANCE PUR2016APR26 as an s Fm FRAME TOOLS & SPECIFICATIONS ■ M■ MICRDRAIt`P INSTAL! ATION GUIDE PAGE ____ r �"�r► TECHNICAL SPECIFICATIONS: TOOLS REQUIRED OR RECOMMENDED FOR LAYOUT, SAFETY: Ail applicahte OSHA safety guideline Material Types FLASHINGS&ROOF ATTACHMENTS: should be observed when working on a PV MI extruded components: • Hammer installation joo site. The mstallatten and handling tiC104A-Tel nroU61={t Aluminum • Marker}crayon of PV solar modules:etectricar insmIt tson and PV • Measuring tape racking systems involves handling components Hardware:St in ess Stew • Ovid with potentially sharp metat edges Rutrc regarding Bonding and Grounding:Integrated$n • Pitot diel be the use of gloves and ether personal. protect34e Miaorair (Tnmrdir°"' and row to row bonding • Pry bar equipment should he observed. requires additional components) String tine TOOLS FOR MODULE INSTALL: AL SFM Hardware 20ft-Lbs • Orltt and socket adapter nr rocket wrench Grounding tugs Per Pa4e'M' • 112'Socket • i./A'GC%driver • Torque wrench Io' FMSDN SYSTEM COMPONENTS ■ MICRORAIL'" INSTALLATION GUIDE PAGE - r / - % / - ! \F7) SUNFRAME MicrorailTM-3• SUNFRAME Microrail•T 9"Splice SUNFRAME Microrail^'9"Attached Splice Sub-Components: Sub-Components: Sub-Components: I ='BASO I. 9"Base 1. 9pew 2 5'Cap 2 9'Cap 2 9"Cap • Clamp 5w het[lead Lap Screw -• (3)Clanipliq Soc<et Heed Cap Sc'ews S. I2 (Iacep Sod,t t lead Cap S u CWS 4 Bonding Pin Bonding Pins 4. Bonding Plrrs 5. Helix 5. Hell. 6 Tower Functions: 6 Tower 1. 615'slider • 2:_t Of 4 module support&connection z s.z SI der • F NV module to mocu le bonding Functions- Functions: • 1 or 2 module aupport to-not etteameenl Features: • Module to roof attachment(w hen attachment is necessary • An^?son-site prraccembled and ready for installation at splice peintl Features: Cheek{in to determine m nd u e Comeau hpity • r module to IT odnle bnmeng • Ace IVES onsite mea;senbled and ready eh installation • Soppons discrete module thickness trod 32mm to • (heck cap':n determine mocu F corm-nth-aloe semm Features: • Snupuns d6crete n10111110 thin menses ppm 32mm to • ROC..vino feature that allows Simple module placement • Airivec on site preassembled and ready for inctallatio', 46mm tightening of fasteners and eliminates wnuicege'er • diet k tap m delerm:ne module conryaublrt) • Re.e sing lea's re that allows simple module placemen[ rociul snppnrts discrete modme thickness from ;2mm to tighteners)of lasterrers and eIMO,ALS wwkln9 uel • Does not recu a tiadnnernt to toot 46rnni modules • Receiving featwe that allows simple niodulu placement, tightening of fasteners and eliminates wurknig ever modules. :' sfm SUN SYSTEM COMPONENTS IN NM MICRORAILim INSTALLATION GUIDE PAGE CHECK 5r --...., C IHKKDL01 NE I I‘i, tFiIXHLS=, I I TriimraitlM Roof Attachment TrimrailT" TrimraiWTM Spike Sub-Components: FuncUom; Functions: j r . .ni c of.H mro, w 5rrt•'nrlwppar0 Pon{rrm f . r. TR,* ir3 - triy -),N,• • tl'rinndfd t,JU,t.VIN n.b WetP".it ,war aweta!t roes ^c'tbeua um Keaton*c.; artx¢ • Ftatures a ywarl t a M l 1:" o coo it .0l n u$4&S r w�<r Rtun ar•l r,y¢ t• 41•1•.lc» + Yi;li4 l < Lss 4rCraiNIN,N Furctoflr • A t 1 no i ] • "fit-mil el lonf.01„2Ume'r`•f fld5npiq 0 r nt' ntll.ct.:I H•1` • Nilll l•... 4y"n Features. ,y.SlN04m ss Rt reml mat• l:vnar;aJoe f on- l°win'cc`1,Pf or •• 1R" SYSTEM COMPONENTS ■ RI SFS ICRURAI[TM INSTALLATION GUIDE PAGE v.> P � \ `` -_ , � �� � \ V �. Y �T\ -- o ..„-- ,,,e .. <. Wire Bonding Clip w/8AWG MtPE Mounting Assembly Enphase Engage Cable Clip Functions: Functions: Functions- • Fcx to row bawling • `re wrty nrrrt Mitt-to mad¢{e fames • Strucej attaches EnrM1ase Engage;rim t,moduli. • Mod.ne[a tsito{'°halm • MLP to.Nnle bonding nage, • 4towSthree to miming po5rtoM1c tc 50 fly Features: Features: ormataron • in foterers temntel MourtR Sty to typical nmdtie flT9e Features: ML4E-Mcaarr:eesl Pmuet Etc bona- • R!Itis 9idtnn to rh9vm rate-.NI I. r-g..m g roim:ato.m orw< onttimIr a. SFSON SYSTEM LAYOUT ■ M MICRORAILt INSTALLATION GUIDE PAGE iii 1.Determine appropriate array location on • • roof. ' t 2. Select starting course of shingles (or t! t tiles) . , • ; 3. Mark next row of attachments and I r I repeat for remaining rows E I I © -NS distance equals module width a1' I • • + lik • • i 4. Locate 1st rafter closest to array edge T (and inside array footprint)and mark i t 4......N.41 •I I t 5.Find next rafter for attachment based on I i appropriate span I -Continue to end of array a —.-44 — ►_ +h V a i - • • r -Mark last rafter before end or array r Span 6.Mark attachment points on rafters along TO STAGGER ATTACHMENTS:Shift each subsequent • each NS module grid line t ,4• • 1 0 • row of attachments one rafter over. 1 I I ��; 7. Verify design based on span and �• I • I 1 • • overhang rules 4• I S • I See the Design and Engineering Guide for details on regional max spans and overhang. *00s f m FRAME FLASHING & SLIDERS III I MICRORAIL'" INSTALLATION GUIDE PAGE 411 ---ROOF RIDGE-- _ a a 1 PLOT HOLES: Doll pilot holes for lag FLASHINGS:Place Rashings ___-- screws orstructural screws(asnecessary) —Mod NS•1'(( l 1 ini 1. c:> \ INSTALL SLIDERS AND Mod NS+1' \ TRIMRAILW ROOF ATTACHMENTS: Hollow manufacturer instructions for flashing installation procedures • t INSTALL SLIDERS AND TRtMRAIL ROOF ATTACHMENTS: `I • Insert flashings per manufacturer instructions - e • Attach sttders to rafters • Verify proper row to row spacing for module size(Mod NS a 17 EAVE • Ensure that Trimrair roof attachments in each row have sufficient engagement with slider dovetails for proper attachment. + 4 I • mi. SFNI FRAME 1ST ROW INSTALLATION ■ •a MICRORAILTM INSTALLATION GUIDE PAGE i1 \\ —+ -\ ALIGN FRONT ROW: TIGHTEN SLIDER: TRIMRAIL PREPARATION: Align front row TrimrailTM roof attachments with Tighten front row lag screw and Trimrailt" roof Determine overall length of Trimrail'" for front row. string line attachments dovetail clamp bolt. Determine splice locations (if any) and Trimrailm Lengths required. INSTALL TRIMRAIL SPLICE BARS: Place Trimrail' ATTACH SPLICE BARS: White holding Trimrail'" with front side up and firmly insert splice bar into sections in alignment, join sections together with Trimrail'",as required. splice bar centered at joint. See the Design and Engineering Guide for details on regional max spans and overhang. ■iiSFM FRAME MIGRORAIL INSTALLATION II ■s MICRORAILTM INSTALLATION GUIDE PAGE TRIMRAIL ROOF ATTACHMENTS & TRIMRAIL ATTACH TRIMRAIL TO ROOF ATTACHMENT: Attach INSTALL MICRORAILS: Install remaining Microraits ORIENTATION: TrimraiU1 roof attachment should rail using 3/R`T-bolts and serrated flange nuts.Make at marked attachment points. Loosen dovetail have horizontal Range facing uphill for uniform row sure Tdmrad M is tenet across all TrimraitW roof retaining fastener and push Microrair to top of spacing and ease of lag screw assembly On first row, attachments.After rail is level,tighten dovetail bolts slider,DO NOT SLIDE ALL THE WAY OFF SLIDER. position TrimraitTM with module catch side facing to secure TrimrallTM roof attachments to sliders. uphitt. aye esr�i�.,-'moi .v— ....�����... .n�ra. —..QST �A' IRS sF� FR4ME MODULE MOUNTING 111ii MICRORAIUTM INSTALLATION GUIDE PAGE ` ° t IAY IN MODULE(S): install.first two(2)modules on LAY IN MODULE(S): Module should stile inm catch SEAT MODULE(S): Ensure that modules are property bottom row,Instal downhill end of module into the feature of the Trimraii", seated in top cap and base. SdmraivM first and then position uphill 3`microraits to support modules. Y+4r r r bort rower 31+Fr =acrr rt`w of {nom lPc '4 rnStAUi n R, r r tO wt(+•nwtlndgtln.ut section (Pus t N. Ki +m r1('133 it ve trucIIuu, 1r IC raja ATTACH SPLICE:Attach splice at intersection of two FASTEN MODULES:Finish installing modules along TIGHTEN FASTENERS: lighten fasteners to required (2)modutesrow and tighten fastening bolts after entire row 3s torque_ • Use attached splice it necessary installed. • Ensure minimum module engagement using indicator mares. ®rim SFS FRAME MICROINVERE w�� MT. IIII SR MICR(ORAft ' INSTALLATION GUIDE PAGE liallAdia . IMMO • irt i j}• 1 4 5t ttrT Me° t. PRE•INSTALL MICROINVERTERS: Install MLPE in a ,�fi/s t location on the mndote that will not interfere with micro)eRsor grourxtlnq iugsTo use trunk cable most r efficiently, install WYE components in the same locations no alt modules in the same row. SRI SF�VI FRAME MICROINVERTER & WIRE MGMT. 1111as MICRORAIr INSTALLATION GUIDE PAGE 1 fr LI, NM /v MICRQINYERTER:Before installing a row of modules MICROINVERTER CONNECTION: Before securing MIRE MANAGEMENT: Verify wire management is piece microinvertertrunk cable, a module to the Microrails, install trunk cable comptete after each row is installed. mounting clip on the connector block.Attach clip to module flange,Plug microinverter into connector. 7J O,. /7*t Yid Orr OP ec.: Pr i?". - V !Rose knot$nThe micr&Mverter MICROINVERTER TRUNK CABLE The trunk cable UPS t. thr es Twisting the PV module wires Engage connector wire to help manage the length. can be managed securely by using stainless steer and[or tying a loose knot can also help manage wire management clips attached to the module these wires frame. .;; SFS FRAME FINISHING TOUCHES II .s MICRORAIU" INSTALLATION GUIDE PAGE .� 0 40 TRIMRAILBONDING: Attach a bonding clip from the 0 , Bim ail"to an adjacent module.Fully seat bonding <Up until radws portion is In contact with trim mating surface and module flange, i o r dui '1: I 11 � . li .urr� . III o;% ,"''''''..„..-'7' - ` C, 7,7 ONigiSafe; z.,...-7' �. __ NIS Bonding Clip:A WS bonding clip must be used POST INSTALL HEIGHT ADJUSTMENT: He{gttt adjustment of each attached Microrail'" assembly can be to bond adjacent rows of modules together, performed by Inserting a long 1/4"hex drive Uxough the cap and into the helix CAUTION:DO NOT RAISE THE BASE HIGHER THAN THE TOP OF THE TOWER. .:: SFM FRAME SYSTEM BONDING & GROUNDING ■ .. MICRORAIUTM INSTALLATION GUIDE PAGE I' 1 ii I 1 y/ i - -- __. - w. _... m I - • ' :I ' E-WRONDING PATH:E-W module to module bonding T is accomplished with 2 pre-installed bonding clips �: which engage on the secure side of the MicroraiITM and splice. 1_ II h i 11 . 1 - 11 iII L1i3i1i iTfili t:1:Ta. b SIJ LUG DETAIL&TORQUE INFO LUG DETAIL&TORQUE INFO LUG DETAIL&TORQUE INFO N-S BONDING PATH: N-S system bonding is itsco Lorin tug{GBL-4DRT) lbw flange Lug(SGB-4) Wiley WEEWyg(6.7) ac• 10-32 mounting hardware • 1/4-mounting hardware • 1/4"mounting hardware each end of through a bondingN- banding dip. Insert • Torque= 5 ft-lb • Torque=75 in-lb • Torques 10 ft-Ib each end the N-5 clip onto a module • AWG4-14-Solid or Stranded • AWE 414-saki or Stranded • AYMG6-14-Said Only frame flange, it n rewrnmendeo. that N-5 trondncry clips be installed on both Mrs of hip m rav NOTE:ISOLATE COPPER FROM ALUMINUM CONTACT TO PREVENT CORROSION System bonding is accomplished through modutes.System grounding accomplished byattaching a ground lug to any module. ■UM RAME ES S EM MICROINVERTER GROUNDING ■ is MICRORAII' INSTALLATION GUIDE PAGE SEM EQUIPMENT GROUNDING THROUGH ENPHASE MICRDINVERTERS The Enphase M215 and M250 microinverters have integrated grounding capabilities built in. In this case,the DC circuit is isolated from the AC circuit,and the AC equipment grounding conductor(EGC) G huitt into the Enphase Engage Integrated grounding;IG)cabling. In order to ground the SunFrame Kuwait racking system through the Enphase Microinverter and Engage cabte assembly re must be a minimum of three PV F 1 modules connected tothesametrunkcable within a continuous array. Continuous array is defined as a grouping of modules installed and electrically bonded per scr the requirements of this installation guide.The microinvertersare bonded to the La:_ ._ � .s.. SunFrame Mierora8 via the mounting hardware. Complete equipment grounding is achieved through the Enphase Engage cabling with integrated grounding(%G). No additional EGC grounding cables are required,as Mt fault current is carried to 410 ground through the Engage cable. N: UL CODE COMPLIANCE NOTES ash IUIsty MICRORAIt'R INSTAUATION GUIDE PAGE SYSTEM LEVEL FIRE UAS51WICAIION The system fire class rating requires-instet[ation in the manner specified in the SUNFRAME MICRORAIL(SEM)installation COMe,SAM has been classified to the rwstena eve fin)porton of UL 1703. Pus UL 1703 classification has been incorporated into the UL 2703 product certification. SAM has achieved Class A.R & C system levet performance Fir steep stoped roofs when used in conjunction with hoot and type 2 const ucticns.Class A,E& C system Level lac performance is inherent in the SFM (resign_and no addtional mitigation measures are required.The fire classification rating is only valid on root pitches greater than or equal to 2:12 slopes h 2 inches per hoot,or c c,dew ens) There is no required minlmon ha maximum height(Imitation above the roof deck to maintain the Class A,B & C fiw ratng for SFM.SLINFRAML MICRORA{1 components that be mounted over a fire resistant root covering rated to.the application Module type System Level Fire Rating I Microrait Direction -Module Orientation Mitigation Required Type 1 and Type 2 Claw A.A &it i East-West ,Landscape OR Portrait !None Required UL2703 TEST MODULES See page•P•tot a Ust of modules that were etectrcaity and mechanically tested or qualified with the SUNFRAME MICRORML(SF,)components outlined within this Installation Guide- • Maxum Area of Module 17.9Ssgitre'[0 • 112/03 Design load tiro: • 'c.> - ,j al Downward Pressure-33 95F ,X� /'� b) Upward Pressu e-31 PSE .+a"7 c) Down-Mope toad -10 PSF �� • Tested toads- _ tr t a 50 Fit/Zir7:7 Pa Downward Pressure- � ���' b) Upward Pressure- 50 PSF/2400Pa �((�,fifi� {yy{ 7 "' C) Down-Slope Load-15PSF/720Pa F,y, 3' ,i • Maximum Span ah s1 a • Use with a maximum over current protection device OCPD of WA • �l ant LABELMARKINGS :r • System fire class raring Seensallationinstructions tor nstalation requirements �.1).tyelp� to achieve a spedfied sysmr he class rating with Univac a• t ((Jit • Univac SUNFRAME MICRORa1L Is fisted to UL 2703. a � s', • All splices within a system are shipped with marking indicating cafe and location as �. of manufacture, ewe a ` oc,,,o1 1'4. "to, . , e. f r memo"-r L1 1 �( 6 t 1 J� I •_—x MnWaMM MWUr9NdfHM ( "'vi- °' SO" TESTED / CERTIFIED MODULE LIST ■ ••° MICRORAII.'M INSTALLATION GUIDE PAGE Module Manufacturer I Module Series I Model No.poOQQoocw) Part No. 1 Gina ISM PAO5 'a )40 160W TEM xxx PAO5.1 R TSM-P001 Ui/PP11518 155-2(,5W 1-11-xxx P005.10 NEA 155-265W ISM xsx P005.1R Canal ion S)ar (5611+1 125 )50 CSOV-XXX," (SEP P 2)0.255,260 (SOP-XXXP CSik-M )65,1)0 (S6K-X/XM (5 A-PI 1601110 (SSA-XXX (55A-XXX I I0-(ale R.1 INE PLO'RFR CA 1 Inl.1 a,2'N BE NF PI US SIR 64.I XXX e.LINE PRP RIR G11 14].262,2// RUNE PRO SFR G4.1 XXX 0 P US 04 2'0 2'5.280 0 'I I.SCA Xxx ()PI IN RIR 641 '10 NE) 0 nI .c RFR(,41 XXX MRO RFR 64.1 160-']0 0 PRO BFR 64.1 XX% Q PRO-C4 )55.260,265 0 PRO-64 XXX QPRI)RFR 643 260,265 0PRO BFR(M S XXX i lmko IKN201',-1GP-611 10UJ05,210.)15./20)15-1;0-136.240,145, IKV XXX P-1,0 /50,155.260./6S I1(11)00265PP 40 11205.210.)15.220.2/5 '50 •740,215. IKN XXX PP 60 RX 2') 260 )65 1104200-21E014-50 200.)05,210,215.220,225,230.235.LEO,245. IKN XXX(1-60 250,155,2611,/N5.210,)75.280 Iwo r e, KUNO260,265 KUXXX-6M(A LG MrnmX 28C.285.290 L6 XXX SIC-L4 NeON "U),510,315.320 IG XXX NIC-Ca Yingli vG '70 116E,/60,>ES,'50 Vi XXX P-)9h IA Solar IAP, 245-265 IAP6 60 XXXISPR ]AME 25(1-))0 IAM6-60 XXX/SI Rrnesnla All n0 cell nod" es 15i.'_E,260 Vim Us II I'6 Series 'monk' MV Selir.60 210-255 ME%XXX-60 Pplimus 721 220.)8S,790 OP'XXX 4 100 !' 5"npower E-Sell(s 32/.90 120 XXX COM X-Series 3;5•,45 X21 XXX H-Sri les 36I %22-XXX-C-A( III SUN ... ��� FRAME MODULE MAINTENANCE IN.. MICRURAIUTM INSTALLATION GUIDE PAGE a s. „tr., �` t r +7"r z r ,,1. 1 Loosen 9'sptice Notts approximately 2. Remove bolts and caps from r 3.Slide spaces away from the module 4. Lift module and disconnect MI.PE 3 turns.DO NOT REMOVE. Microrails and attached splices to De removed cables iC -,/. ; yC. x-- -ii." S. Remove Modute. Reverse steps to 'cam ,,:. , replace module removed. Bonding note. If both sides of array ` ,�^ are bonded with NS Rending ems,, .r as recommended,then no additional bonding is required for module ff'rs ,---4-'->". maimenance. R necessary, on the row of modules 7:;: ,v'' � '''. containing the module being /:;: _ -,��' tmnuved,one additional.bonding dip •-• - yyY. y can be added to the edge of the array Y"+ - opposite of the edge with Bonding "' ' ".r/may'` dips already installed. CONSIDERATIONS & MAINTENANCE ■ ••' FM MICRDRAIL'" INSTALLATION GUIDE PAGE ELECTRICAL CONSIDERATIONS SUNFRAME Microrail is intended to be used with PV modules that have a system voltage less than or equal to that allowable by the NEC.A minimum 10AWG,105°C copper grounding conductor should be used to ground a system,according to the National Electric Code (NEC).It is the installer's responsibility to check local codes, which may vary. INTERCONNECTION INFORMATION There is no size limit on how many SUNFRAME Microraits & PV modules can be mechanically interconnected for any given configuration,provided that the installation meets the requirements of applicable building and fire codes. GROUNDING NOTES:The installation must be conducted in accordanre with the Nationat Electric Code (NEC) and the authority having jurisdiction.Please refer to these resources in your location for required grounding lug quantities specific to your project.The grounding/bonding components may overhang parts of the array so care must be taken when walking around the array to avoid damage.Conductor fastener torque values depend on conductor size. See product data sheets for correct torque values.This racking system may he used to ground and/or mount a PV module complying with UL 1703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instruction PERIODIC INSPECTION:Conduct periodir inspections for loose components,loose fasteners or any corrosion,i mmediatety replace any affected components. AUTHORIZATION TO MARK This authorizes the application of the Certification Mark(s) shown below to the models described in the Product(s) Covered section when made in accordance with the conditions set forth in the Certification Agreement and Listing Report. This authorization also applies to multiple listee model(s) identified on the correlation page of the Listing Report. This document is the property of Intertek Testing Services and is not transferable. The certification mark(s) may be applied only at the location of the Parry Authorized To Apply Mark. Applicant: Unirac, Inc Manufacturer: Jiaxing Pacific Energy Equipment Corp. No. 8 Haiwan Ave 1411 Broadway Blvd NE Hangzhou Bay Ddao New Area Address. Albuquerque, NM 87102 Address: Haiyan Economic Development Area Jiaxing City, Zhejiang Province Country: USA Country: China Contact: Klaus Nicolaedis Contact: Lili Zeng Phone: 505-301-3605 Phone: 510-979-1920 FAX: NA FAX: NA Email: klaus.nicolaedis@unirac.com Email: Izeng@ccmfg.com Party Authorized To Apply Mark: Same as Manufacturer Report Issuing Office: Lake Forest, CA ma /� N�i cif L Control Number: 5003278 Authorized by: (�y, 0�( for Thomas J.Patterson, Certification Manager GDS Intertek This document supersedes all previous Authorizations to Mark for the noted Report Number. This AUIMI:aan to Mark is for the exclusive use of Medan Glom and is provided pursuant lithe Certification agreement between Imenek and res client ImmMs reywmlb lily and liability are Iimrled to the terms anacondoions of the agreement hearth assumes no liab*ty to any party,other than to the Client n accordance mak Me agreement.ter any loss.expense or damage occasioned by the Me M this Authorization to Mak.Only thau Chant tluto a Keanntt copying or distribution of this authorization o Mark and then only in its enlrery.Use al NCertificationfekCertification clads is restncts1 to the min Mid out in the agreement- in IM Authorisation la Mad.Any further use al IMYrMak name for the Sate or edrenrsenanr of the resod Malan*product or service must 11s1 be approved in writing by Intertek kaliat Factory AsseameMs and Follow up Services am or the purpose of assuring appropriate usage of the Certllcsan mark in accordance wm the agreement.they are not far the purposes of prodmton quality control and do not relieve ale Client of their otlg&Ions in this respect. Intertek Testing Services NA Inc. 545 East Algonquin Road, Arlington Heights, IL 60005 Telephone 800-345-3851 or 847-439-5667 Fax 312-283-1672 Standard(s): UL 2703 Issued:2015/01/28 Ed: 1 Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat-Plate PhotovoRaic Modules and Panels Product: Sun Frame Micro Rail Brand Name: Unirac Models: Unirac SFM ATM for Report 102393982LAX-002 Page 1 of 1 ATM Issued: 5-May-2016 ED 153.151LJen-tai MBMatoy