Loading...
43-178 (2) 395 PARK HILL RD BP-2017-1403 GIS It: COMMONWEALTH OF MASSACHUSETTS Map:Block:43 - 178 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-1403 Project# JS-2017-002337 Est. Cost: $41000.00 Fee: 560.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: ASTRUM SOLAR 109668 Lot Size(sq.ft.): 87120.00 Owner: HABER WILLIAM J JR&ANDREA L Zoning: Applicant: ASTRUM SOLAR AT: 395 PARK HILL RD Applicant Address: Phone: Insurance: 15 AVENUE E (508) 259-2387 WC HOPKI NTO NMA01748 ISSUED ON:6/2/2017 0:00:00 TO PERFORM THE FOLLOWING WORK:ROOF MOUNTED SOLAR INSTALLTION -40 - 11 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 6/2/2017 0:00:00 S60.00 212 Main Street,Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1403 APPLICANT/CONTACT PERSON ASTRUM SOLAR ADDRESS/PHONE 15 AVENUE E HOPKINTON (508)259-2387 PROPERTY LOCATION 395 PARK HILL RD MAP 43 PARCEL 178 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typed Construction; ROOF M NT OLAR INSTALLTION-40- II KW New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 109668 3 sets of Plans r Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: ✓Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demr 'f•. delay -/ gio Signature of Build ng ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40k Contact Office of Planning& Development for more information. • JUIN - I lfy t\ The Commonwealth of Massachusetts L _ I 3y I 1 Board of Building Regulations and Standards _ Massachusetts State Building Code, 780 CMR 24LITY' ., (i _ , USE �.s-717 Building Permit Application To Construct,Repair, Renovate Or Demolish a Revised Mar2011 One-or Two-Family Dwelling Q � 7-/c/0.5 Thiss Section For Official Use Only Building Permit Number: SL_ ' yDate Applied: _ Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: 1.2.4ssessp yslap& Parcel Numbers(� Park Hill Road, Northampton, MA 01062 ss„,++ .,er b I.I a Is this an accepted street?yes _ no Map Numhe Parcel umber 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use I.ot Area(sq ft) Frontage(fl) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: Outside Flood Zone? Municipal On site disposal system ❑ Cheek if SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner of Record: william Haber Northampton, MA 01062 Name(Print) --- City.State,ZIP - - 395 Park Hill Road (508) 386-8564 michaelwhalen@directenergysolar.com No.and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. 0 Number of Units __ Other V/ Specify:soma INSTALLATION eRoof mounted solar installation consisting pf(40) T1pan 27els and(40J Enphase miaoinverters Brief Description of Proposed Work ,. EIC-STC=n o'2w SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only I.Building $ 38,500.00 I. Building Permit Fee: $ _Indicate how fee is determined: 0 Standard City/Town Application Fee 2.Electrical S 2500.00 0 Total Project Cost'(Item 6)x multiplier x__ 3. Plumbing S 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5.Mechanical (Fire $ - -- - _ . Suppression) Total All Fees:All *UV Check No.%W leCheck Amount: Cash Amount: 6. Total Project Cost: $41 000.00 0 Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-109668 01/03/2020 Henry Bratcher License Number Expiration Datc Name of CSL l folder U 55 Bacon Street List CSL Type(see below) -- No.and Street Type Description Natick, MA 01760 D Unrestricted(Buildings up to 35.000 cu.ft) Restricted I&2 Family Duelling City/Town.State,ZIP M Masonry RC Roofing Covering WS Window and Siding SFSolid Fuel Burning Appliances (508) 386-8564 mlchael_whalen@directenergysolar_com I - Insulation Telephone dHu Imn Email address D Demolition SASph, S� aW/115lYeciernerg oda LIQ Bratcher 161228 1/19/2019 _ - IIIC Registration Number Expiration Date �f0cioMerwmed cUrvCe Registrant Name michael whalen@directenergysolar.com totelmsbra MD 21046 (508) 386-8564 Email address City/Town, State,ZIP Telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.I..c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ell No SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize ASTRUM SOLAR t Direct Energy Solan Henry Balmer to act on my behalf, in all matters relative to work authorized by this building permit application. Print 0.'mss Name(Electronic Signature) Date SECTION 76:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Ife"r_y r cher _Sl d5117 ra, r Print Or Authorized Agents ame(Plc onic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.ma Information on the Construction Supervisor License can be found at www.mass.gov/dos 2. When substantial work is planned,provide the information below: Total floor area(sq. R) (including garage,finished basemenUattics,decks or porch) Gross living area(sq. ft.) Habitable room count _— Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths _ Type of heating system Number of decks/porches _ Type of cooling system Enclosed _ Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" JJ,�� 1{� .�/i- vl//Y///U////'P(7/// Of 7yr.J.iac�/cie//i '-4�Y '� Office of Consumer Affairs and Business Regulation 10 Park Plaza• Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Type: Supplement Card Registration: 168228 Astrum Solar Inc. Expiration: 01/19/2019 7101 Riverwood Dr. Columbia, MD 21046 Update Address and rstum card. Mark reason for change. n Alar.__ no.__..._, n c_._,_—ginrn...t PP.w AAAA . •_ ._. _._ .. _._AA .. i2, r,..,,,,_.,,,,..,/L. — 14.,,,,Gre,//. Office of Consumer Maks&Business apuletbn HOME IMPROVEMENT CONTRACTOR Registration valid for Individual use only a TYPE:Supplement Card before the expreHM found on eels. mm w u : ^ Reefatreaen ESSnS Office of Consumer Affairs ark Bualnase Regulation 108228 01/19/2019 M 10 Park ass-Sults 5170 Boston,MA 02111 AMmm Solar Inc. D/B/A Dkecl Energy Solar HENRY BRATCHERrca 1900 West Park Drive,suite 280 L �^ JJ4 Westborough,MA 01581 Undersecretary Not valid without signature Construction Supervisor Massachusetts Department of Public Safety Restricted to: - ® Board of Building Regulations and Standards Unrestricted-Buildings of any use group which contain License: CS-109888 less than 35,000 cubic feet(991 cubic meters)of Construction Supervisor enclosed space. 1f HENRY BRACHTER ee BACON STREET NATICK MA current017100'' � Failure to possess a current edition of the Massachusetts (�-rn l/�__ Expiration State Building Code Is cause for revocation of role license. Commissioner 01/03/2020 DPS Licensing information visit:WWW.MASS.Gov/DPS -1 e A✓n CERTIFICATE OF LIABILITY INSURANCE Page 1 of 1 DATE 05/24/ THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Willis of Tens, Inc. IN.WE die 26 Century Blvd. ( Nil Fin 877-945-7378 FAX NOT 888-467-2378 P.O. Box 305191 annnsca. eertifieates@wi11is.com Nashville, TN 37230-5191 "' - WSURER(SWFSORDIN000VERAGE RPUCS INSURER A.ACE American Insurance Cwpany 22667-302 INSURED - -- Direct tangy and its majority orad'' INSURER 9. Zurich American Insurance Company 116535-305 subaidi ' and affiliate. including INSURER C: Astra Solar, Inc.dbabirect Energy Solar, Inc. 'i INSURER 7101 River-wood Drive - : Columbia, Sm 21046 INSURER E: I INSURER F. I COVERAGES CERTIFICATE NUMBER 25488392 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I N—SIR Mn a R SOUS-JEFF WnEP imem nERP .-- TYPE OFIN6VMXCE POIICYNUYeER Lylll A ' X COMMERCIALGENERAL LIAEInY x8LG27341226 1/1/2017 1/1/2018 EACH OCCURRENCE 114 1 OQO,000 I CLAMS-MADE X OCCUR PXEAIISTiS([a Axixo'e) If 100,000 X I SIR: $100,000 I MED EXP(Any one person) f 5,000 PERSONAL&ADVNJURY s 1,000,000 GEHL AGGREGATE LIMIT APPLIES PER. GENERAL AGGREGATE I 1,000,000 ' POLICY X,Eo- LOC '� PRODUCTS-COMP/OP AGO s 1,000,000 , . OTHER. B AUTOslOalLE LIABILITY BAP5953966-03 1/1/2017 1/1/2018 itrixd,OI)SINGLE°MIT Is 1,000,000 _ X11 Ann AUTO BWXYIWURY(P.rPWSOO) '5 IOWNED i SCHEDULED AUTOS ONLY i AUTOS ' BODILY IWVRY(Pxaltl]eY) S I HIRED INONLANED PPOPERDAMAGE AUTOSONLY YZ AUTOS ONLY ',.... (PT' er EmI) IS 1S UMBRELLA WB I OCCUR EACH OCCURRENCE EXCESS We I CLAMS-WOE li I AGGREGATE S DED RETENTIONS '., 5 B WORMERS COMPENSATION IWC5953969-03 1/1/2017 1/1/2018 Ix 41-',,HT.l I oTH- . AND EMPLOYERS'LIABILITY 1'EB.I B ANY PROPRIETOR NXCLUOEP.XECUTIVE NX NM NC5953973-03 1/1/2017 ,1/1/2018 E.L.EACH ACCIDENT s 1,000,000 CFFICERAIEMSER EXCLUDED? IYsdmar,blWl EL.DISEARF.EA EMPLOYEE $ 1,000,000 I IDIESCRRIIPTIONLOOIFF.O�PERATIONS Cebu El.DISEASE•POLICY LIMIT 5 1,000,000 • DESCRIPTION OFOPERATONS/LOCATORS I VEHICLES(ACORD IDI.Addltlxul Ren,YcScSMVY,may es meshed Xnser.sp•Mb,gulse° Pe: Operations; Eat. Project / Contract End Date: 12/30/2017. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED R PRESENTATn2 City of Northampton 212 Main Street 4100 Northampton, MA 01060 )) Co11:5079798 Tpl:2101797 Cert:25488392 ®1988k2015ACORD CORPORATION.All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts a-=.7==71-.=- Department of Industrial Accidents I9 1 ! Office of Investigations . = _ e= 1 Congress Street, Suite 100 • '"lifr. Boston,MA 02114-2017 %.4-rts, www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Busineas/o gani� oMna;viaua0: Astrum Solar DBA Direct Energy Solar Address: 198 Norman Street City/State/Zip:West Springfield, MA 01089 _ Phone #: (508) 386-8564 Are you an employer? Check the appropriate box: Type of project(required): 1.❑� I am a employer with 15 4. ❑ I am a general contractor and 1 employees (full and/or part-time)." have hired the sub-contractors 6. El New construction listed on the attached sheet. 7. 5 Remodeling 2.El I am a sole proprietor or partner- ship and have no employees These sub-contractors have g, 5 Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.* 9. ❑ Building addition required.] 5. 5 We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.5 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] c. 152, §1(4),and we have no Solar employees. [No workers' 130 Other comp. insurance required.] 'Any applicant that checks box k must also fill out the section below showing their workers'compensation policy information. Homeowners who submit this affidavit indicating they are doing all work and then hire outside contactors must submit a new affidavit indicating such. :Contactors that check this box must attached an additional sheet showing the name of the subcontractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Co. Policy#or Self-ins. Lic. #:WC595397302 Expiration Date:9/15/2017 Job Site Address: 395 Park Hill Road City/State/Zip: Northampton, MA 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pa' and penalties of perjury that the information provided above is true and correct. Signature: OV Date: S 11C II7 Phone#: Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License # Issuing Authority(circle one): I.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6.Other Contact Person: Phone#: A s c. an Bay, CA 961 0 PO Box 413 Carnelian Bay,CA 96140 A • 916.541.8586 structures www.AOstructures.com May 22,2017 To: Direct Energy Solar-MA Subject: Certification Letter Haber Residence 395 Park Hill Rd. Florence, MA.01062 To Whom It May Concern, A jobsite observation of the condition of the existing framing system was performed by an audit team of Direct Energy Solar-MA as a request from AO Structures,Inc..All attached structural calculations are based on these observations and the design criteria listed below and only deemed valid if provided information is true and accurate. On the above referenced project,the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof.The structural review,including the plans and calculations only apply to the section of the roof that is directly supporting the solar PV system and its supporting elements.The observed roof framing is described below.If field conditions differ,contractor to notify engineer prior to starting construction. The roof structure of(Roof 7)consists of composition shingle on roof plywood that is supported by 2x8 rafters @ 16"o.c.paired with 2x8 ceiling joists @ 16"o.c..The rafters have a max projected horizontal span of 13'-0 ,with a slope of 27 degrees.The rafters are connected at the ridge to a ridge board and are supported at the eave by a load bearing wall. The roof structure of(Roof 8)consists of composition shingle on roof plywood that is supported by pre-manufactured trusses that are spaced at @ 24"o.c..The top chords,sloped at 27 degrees,are 2x4 sections,the bottom chords are 2x6 sections and the web members are 2x4 sections.The truss members are connected by steel gusset plates.The max unsupported projected horizontal top chord span is approximately 6'-0". The existing roof framing system of all roofs are judged to be adequate to withstand the loading imposed by the installation of the solar panels. No reinforcement is necessary. The existing roof framing system of(Roof 8)is judged to be adequate to withstand the loading imposed by the installation of the The spacing of the solar standoffs should be kept at 48"o.c.with a staggered pattern to ensure proper distribution of loads. Design Criteria: • Applicable Codes=Massachusetts Residential Code,8th Edition,ASCE 7-05,and NDS-12 • Roof Dead Load=9 psf(Roof 7) -- 7 psf(Roof 8) • Roof Live Load=20 psf • Wind Speed=95 mph,Exposure C g� • Ground Snow Load=50 psf - Roof Snow Load=35 psf '6! Please contact me with any further questions or concerns regarding this project —11 "3/4. No.52174 4.9 Sincerely, Qt1�r'r37EW" aONAL Andrew Oesterreicher,P.E. Project Engineer Haber Residence, Florence, MA 1 A s Inc an cC 96140 790 Carnelian Circle Carnelian Bay,CA 96140 A • 916.541.8586 www.AOstru ctu res.co m structures Gravity Loading RoolSnow Load Caloolaaoaa pg=Ground Snow Load= 50 psf p,=0.7 Ce Cr I pg (ASCE]-Eq 7-1) C,=Exposure Factor= 1 (ASCE]-Table 7-2) C1=Thermal Factor= 1 (ASCE7-Table 7-3) I=Importance Factor= 1 =Flat Roof Snow Load= 35.0 psf p,=C,pr (ASCE]-Eq 7-2) Cs=Slope Factor= 1 p,=Sloped Roof Snow Load= 35.0 psf PV Daad Load=3.7psf(Per Direct energy$olarMA) RoofLtveLoad a 20 pet Note, Roof live load is removed in area's covered by PV array. Rooffkad:Load Moor 7) .. Composition Shingle 4.00 Roof Plywood 2.00 2x8 Rafters @ 16''o c. 2 27 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.73 Total Roof DL(Roof 7) 9.0 psf DL Adjusted to 27 Degree Slope 10.1 psf Roof Dead Load Roof 8): Composition Shingle 4.00 Roof Plywood 2.00 2x4 Top Chords @ 24"o.c. 0.73 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.27 Total Roof DL(Roof 8) 7.0 psf DL Adjusted to 27 Degree Slope 7.86 Haber Residence, Florence, MA 2 BC96 A 790 Carnelian Circle Carnelianan Bay,ay,CAA 9611 400 • 916.541.8586 structures www.AOstructures.com Wind Calculations Per ASCE 7-05 Components and Cladding Input Variables Wind Speed 95 mph Exposure Category C Roof Shape Gable/Hip Roof Slope 27 degrees Mean Roof Height 20 ft Effective Wind Area 19.3 ft Design Wind PressureCalculations Wind Pressure P=qh•G*Cn qh=0.00256'Kz•Kzt•Kd'V^2'I (Eq_6-15) Kz(Exposure Coefficient)= 0.9 (Table 6-3) Kzt(topographic factor)= 1 (Fig.6-4) Kd(Wind Directionality Factor)= 0.85 (Table 6-4) V(Design Wind Speed)= 95 mph Importance Factor= 1 (Table 64) qh= 17.67 Standoff Uplift Calculations Zone 1 Zone 2 Zone 3 Positive GCp= -0.86 -1.51 -2.37 042 (Fig.6-11) Uplift Pressure= -15,24 psf -26.69 psf -41.92 psf 10.0 psf (Minimum) X Standoff Spacing= 4.00 4.00 2.67 Y Standoff Spacing= 2.67 2.67 2.67 Tributary Area= 10.68 10.68 7.12 Footing Uplift= -163 lb -285 lb -298 lb . . Standoff Uplift Check Maximum Design Uplift= -298 lb Standoff Uplift Capacity = 425 lb 425 lb capacity>298 lb demand Therefore,OK Fastener Capacity Check Fastener= 1 -5/16"dia Lag Number of Fasteners= 1 Embedment Depth= 2.25 Pullout Capacity Per Inch= 250 lb Fastener Capacity= 563 lb w/F.S.of1.5= 3761b 376 lb capacity>2981b demand Therefore,OK Haber Residence, Florence, MA 3 B ycC9 A 790 Carnelian Circle . • Carnelianan Baa y,CAA 961406140 916.541.8586 structures www.AOstructure.com Framing Check (Roof 7) PASS w=65 plf Dead Load 10.1 psf PV Load 3.7 psf Snow Load 35.0 psf 2x8 Rafters @ 16'o.c. 0 o Governing Load Combo=DL+SL Member Span=13'-0" Total Load 48.8 psf Member Properties Member Size S(n"3) I(in"4) Lumber Sp/Gr Member Spacing 2x8 13.14 47.63 DF#2 @ 16"o.c. Check Sending Stress. Fb(psi)= ft] x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.2 x 1.15 Allowed Bending Stress= 1428.3 psi Maximum Moment =(wL2)/8 = 1374.56 fN# = 16494.7 in# Actual Bending Stress=(Maximum Moment)/S = 1255.3 psi Allowed>Actual—87.9%Stressed — Therefore,OK Check Deflection Allowed Deflection(Total Load) = L/180 (E=1600000 psi Per NDS) = 0.866 in Deflection Criteria Based on = Simple Span Actual Deflection(Total Load) = (5"w1"4)/(384"E9) = 0.549 in = L/285 > L/180 Therefore OK Allowed Deflection(Live Load) = L/240 0.65 in Actual Deflection(Live Load) = (5"w'L"4)/(384"E9) 0.394 in L1396 > L/240 Therefore OK .Cheok7Gtetlr Member Area= 10.9 in"2 Fv(psi)= 180 psi (NDS Table 4A) Allowed Shear = Fv'A = 1958 lb Max Shear(V)=w`L/2 = 423 lb Allowed>Actual—21.7%Stressed — Therefore,OK Haber Residence, Florence, MA 4 A s Inc. an Bay, COr96140 790 Carnelian Circle � • Carnelian Bay,CA 96140 structures 916.541.8586 www.A0structures.com Framing Check (Roof 8) PASS =93 pif Dead Load 7.9 psf PV Load 3.7 psf Snow Load 35.0 psf 2x4 Top Chords @ 24"o.c. O Governing Load Combo=DL+SL Member Span= -0" Total Load 46.6 psf Member Properties Member Size S(in'3) I(inA4) Lumber Sp/Gr Member Spacing 2x4 3.06 5.36 DF#2 @24'o.c. Check Bending Stress Fb(psi)= Pb x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 1.15 x 1.5 x 1.15 Allowed Bending Stress= 1785.3 psi Maximum Moment = (wLA2)/8 = 419.007 ft# = 5028.08 in# Actual Bending Stress=(Maximum Moment)/S =1641.9 psi Allowed>Actual-92%Stressed -- Therefore,OK Check Deflection Allowed Deflection (Total Load) = L/180 (E=1600000 psi Per N DS) = 04 in Deflection Criteria Based on = Continuous Span Actual Deflection(Total Load) = (w'L4)I(185'E'I) = 0.132 in = L/546 > Lel 80 Therefore OK Allowed Deflection(Live Load) = L/240 0.3 in Actual Deflection(Live Load) _ (w*LA4)/(185*E9) 0.099 in L/728 > L/240 Therefore OK Check Shear Member Area= 5.3 inA2 Fv(psi)= 180 psi (NDS Table 4A) Allowed Shear = Fv'A =945 lb Max Shear(V)=w*L/2 = 279 lb Allowed>Actual—29.6%Stressed — Therefore,OK Haber Residence, Florence, MA 5 Enphase.Microinvsrters Enphase® M250 S i enphr ass111 The Enphase- M250 Microinverter delivers increased energy harvest and reduces design and installation complexity with its all-AC approach. With the M250, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor(GEC) is required for the microinverter.This further simplifies installation, enhances safety, and saves on labor and materials costs. The Enphase M250 integrates seamlessly with the Engage' Cable, the Envoy°Communications Gateway', and Enlighten', Enphase's monitoring and analysis software. PRODUCTIVE SIMPLE RELIABLE -Optimized for higher-power -No GEC needed for microinverter -4th-generation product modules -No DC design or string calculation -More than 1 million hours of testing -Maximizes energy production required and 3 million units shipped -Minimizes impact of shading, - Easy installation with Engage -Industry-leading warranty, up to 25 dust, and debris Cable years [e] enphase' si' ENERGY C US Enphase®M250 Microinverter//DATA INPUT DATA(DC) M250-60-2LL-S22/S23/524 Recommended input power(STC) 210-300 W Maximum input DC voltage 48 V Peak power tracking voltage 27 V-39 V Operating range 16 V-48V Min/Max start voltage 22 V/48 V Max DC short circuit current 15 A Max input current 9.6 A OUTPUT DATA(AC) 0208 VAC 0240 VAC Peak output power 250 W 250 W Rated(continuous)output power 240 W 240 W Nominal output current 1.15 A(A rms at nominal duration) 1.0 A(A ruts at nominal duration) Nominal voltage/range 208 V/183-229 V 240 V/211-264 V Nominal frequency/range 60.0/57-61 Hz 60.0/57-61 Hz Extended frequency range 57-62.5 Hz 57-62.5 Hz Power factor >0.95 >0.95 Maximum units per 20 A branch circuit 24(three phase) 16(single phase) Maximum output fault current 850 mA ruts for 6 cycles 850 mA ruts for 6 cycles EFFICIENCY CEC weighted efficiency,240 VAC 96.5% CEC weighted efficiency,208 VAC 96.0% Peak inverter efficiency 96.5% Static MPPT efficiency(weighted,reference EN50530) 99.4% Night time power consumption 65 mW max MECHANICAL DATA Ambient temperature range -40°C to+65°C Operating temperature range(internal) -40°C to+85°C Dimensions(WxHxD) 171 mm x 173 mm x 30 mm(without mounting bracket) Weight 2.0 kg Cooling Natural convection-No fans Enclosure environmental rating Outdoor-NEMA 6 FEATURES Compatibility Compatible with 60-cell PV modules. Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in NEC 690.35.Equipment ground is provided in the Engage Cable.No additional GEC or ground is required. Monitoring Free lifetime monitoring via Enlighten software Compliance UL1741/WEE1547,FCC Part 15 Class B,CAN/CSA-C22.2 NO.0-M91, 0.4-04,and 107.1-01 •Frequency ranges can be extended beyond nominal If required by the utility To learn more about Enphase Microinverter technology, [p] enphase® visit enphase.com G ENERGY 02013 Enphase Energy.N rights reserved.All trademarks or brands'0 this document are registered by their repectee owner. .. .N,;..- Q.ANTUM t P Lu\ l , SBFR- r ' . 1 270-28s POLYCRYSTALLINE SOLAR MODULE The new high-performance module Q.PLUS BFR-G4.1 is the ideal solution for all applications thanks to its innovative cell technology Q.ANTUM. The world-record cell design was developed to achieve the best performance under real conditions — even with low radiation intensity and on clear, hot summer days. LOW ELECTRICITY GENERATION COSTS Higher yield per surface area and lower BOS costs thanks to higher power classes and an efficiency rate of up to 17.1%. to INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE ill� Long-term yield security with Anti-PID Technology', Hot-Spot-Protect and Traceable Quality Tra.QTM. 1" LIGHT-WEIGHT DUALITY FRAME EUPD RESEARCH GIMES High-tech aluminum alloy frame, certified for high snow w� (5400Pa)and wind loads(4000 Pa)regarding IEC. i MAXIMUM COST REDUCTIONS Up to 10% lower logistics costs due to higher module capacity per box. voE (Phrt_D ) O A RELIABLE INVESTMENT Quality T?v«a a—s Inclusive 12-year product warranty and 25-year _ Pbolgliast W linear performance guarantee'. 10.40032587 '�— ' APT test conditions:Cells at-1500V against grounded,with conductive me- tal foil covered nodule surface,25 t, THE IDEAL SOLUTION FOR: 168h ' See data sheet on rear for further ooftop wings dn resid„ al buildings mmoclralltlounsinal® cuiltlings information.Engineered in Germany Q CELLS ELLS MECHANICAL SPECIFICATION Format 65.7in x 394ln x 1.26in(including frame) :, r _ (1570 mm x 1000mm x 32mm) Weight 41.451b(18.8 kg) °�'+�•°^"'^' + front Corer 013tn(3.2rim)thermally pre-stressed glass with ann+efection tecnology o-.,.a.„ ^^ Back Corer Compos-to tilrn 1 Frame Black anodised aluminum Cell 6 x 1011ANTUM solar cells ra. Junctionhv 3.03in x 3.54,n x 0.62in(77mm x 90mm x 15-8mml, Protection class 1P67,with bypass diodes ,.-rvmm.. •' S. Cable 4 mm2 Solar cable:1+1 z 3937 in(1000 mm),(-1539.37 in(1000mm) ` Connector MC4,11%68 -IF wu.�i %.eros%, 1 -ti '•� ELECTRICAL CHARACTERISTICS POWER CLASS 270 275 280 MINIMUM PERFORMANCE AT STANDARD TESTING CONDITIONS.STC'(POWER TOLERANCE+5 W/-OW) Power at MPP' P . 1W] 2/0 275 280 Shat Circuit Current' Ix/ [Al 9.29 935 9.41 Om Circuit Voltage Voo [V] 38.46 38.72 38.97 F Current at MPP' INA [A] 8.70 8.77 3.84 Voltage at MPP' V.r, [V] 31.04 31.36 3157 Efficiency, ri 1%I 516.2 >l6.6 2-:6.8 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS.NOC' Power at MPP, Pia_ IW] 199.6 2033 207.0 R Shat Circuit Current' lav IA] 7.49 7.5c 7.58 6 Open Circuit Voltlp' Vat IVl 35.89 36.13 3637 S Current at MPP' law W 681 687 693 Voltage at MPP' yip, [V] 29.30 2955 29.87 loop wen',25`C,spectrum AM 150 Veauurementtci arrss sic-56 Noem% '800 when[SOOT.freeborn AM 150 rep cal vamps actual values-nay dill e. ['CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE i.5.' ct % At era 9/ of nominal power eutl',g Inst year. 7'" ."'�•^^^^-'- n.%eac%ma,_o 6sal power nr Per y� a _..�..,ee.e....�, � I I I Atleast 8z.of nominal power after to years. _ Ea At e5^.or nominal power anertireaa_ w�� ip ' All dam m n r w Fuuw z es r cordae wlith the mnty ` terms or the 0 CELS sats oganisa_en of your , , , mfrs country. B n !mummies[Wan Typecol module perfume-me under ice irr- e conditions in CURS soriparirSTC:mmt ons 2257,1000 W(m1 Fe TEMPERATURE COEFFICIENTS Temperature Coefficient M la a i%/x] +0.04 Temperature Coefficient W V. P [%/x] -029 - TemperatureCoeMcientofPnrr y l%/N] -0.40 Normal Operating Cell emperature HOLT 12I 113_54(41+3'C' PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VVp TVI 1000(IECI/1000(UL) Safety Class II Maximum Series Fuse Rating [A DCI 70 Fire Rating C(I EC)i TYPE 1 ULI o Max Load(ULF IlbsM') 75(3600 Pal Permitted module temperature -40'F up to+185'F on continuous duy 1-40'0 up to+85'Cl load Rating(UL), UhsM1 55.6(7666 Pal 2 see Installation manual QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION ha UL 1703 VDE cruelly Tested:CE-complfart: Number of Modules per Pallet 32 IEC 61215(EdJJ.IED 61730(Ed.I applwstion class A - Number 01 Pellets per 53 Container 32 Number M Pallets per 42 Container 26 DUSE ( E G�, LIS Pallet Dimensions 11 eV/xH) 68.7 inx 45.3 in 461in (1745 x 1150 x 1170 mm, - Pallet Weight 1435 lb(651 kg` NOTE instructions must se•ollowed.See(he mstalIeona opus manual ourtetl,cal service department further infamies on aopryr4 csanaeo�an.use = of product orm Hawed a CELLS America Inc. 500 Spectrum Cent%Drive.Suite 1250.Vane_CA 9261S,LISA I TEL-1949 75653 961 EMAIL whuiro@usmseells.com I WEB WARE..ells us Naber Project s E 395 Park Hill RdiS _ 8 w i ri Florence, MA, 01062 0 ,i • 11 kW DC z Photovoltaic Solar Array REVISIONS HomeownerSystem Owner ARI Haber William Haber Northampton 395 Park Hill Rd 212 Main Street#100 Florence, MA 01062 Northampton,MA 01060 Project Scope: To install 40 Q Ceils 275W Modules and 40 tfea) �y - -f �jEnphase M250 Microinverter Inverter(s) Iel 4 3 /E'�Lt�lt! 1 Asn me S ti Governing Codes; h It. N CU,�1� � 2017 National Electrical Code 4. �'— Co 4 0 I r/7, 7Massachusetts Residential Code, 8th Edition Q LU in bn e Underwriters lab,atonies(UL)Standards � 5� o n ti` a,� '� - OSHA 24 CER 1436.269 City of Northampton i1 �. ASCE 7-05 Building Department r} 11110 a plan Review 212 Main Street ilc Index of Pages: Northampton,MA 01060 .tl r t§'• T5 Title Sheet PV-1.1 Attachment Detail PV-2 Electrical Diagram _ PV-3 Electrical Calculations PV-4 String and Conduit Layout a o PV-5 Equipment Ratings&.Signage E'D _ G g 5 H 2 m n t O GENERAL NOTES PREPARED BY: Job ID-P-00115695.1 TITLE SHEET TS ROOF : 7 8 TYPICAL SECTION PITCH : 2T 27° a m 0 AZIMUTH : 147° 147° ' o 0 0 MODULES : 16 24 d o w C• n Roof Type: Asphalt Shingle Asphalt Shingle w v 1141-4.0V ` Roof a-cEo- � �_00/ w _ 2x8 Rafter 2x4 Truss „dt- r o- Support: Mcao" cme�r o z '�� 00'4'000zn/ 00 Til � REVISIONS SYSTEM DETAILS dcE3 Module Weight- 1658 lbs ` sE`" 71 Racking Weight. 755 lbs �,"s"`A inert , V Micoinverter Weight 176 lbs I ei° r,"J`"� mErsx i"m 0) 01 su System Weight 2589 lbs �m °ao� Cl W VI System Square Footage 719 sq ft System Distributed Load 3.60 psf �1/ „pR' �� Racking Max Attachment Span 48 in �� �,N.'" Lag Screw Thread Depth 2.25 in yoga Point Load Max Spacing 48 in fit"°s` frissi Number of Roof Attachments 85 s"E`"mEa Max Allowable Rail Overhang 16 in epcfi 5J ate° SYSTEM CONDITIONS Building Height(h) 20 ft Note 1: Use 5/16"x4"Hex Head Stainless Steel Lag Screws Building Least Horizontal(H) 30 ft Note 2:See Roof Details Table Year Building built 0 Note 3: Univac Solarmount Racking ry Basic Wind Speed(V) 117 mph tt Snow Load 40 psf o ± o aid u Roof Zone 3 s- Effective Roof Area [sq ft](E) 50 Racking and Structural Notes Job ID-P-00115696-1 0 ATTACHMENT DETAIL PV-1.1 N. Electrical Diagram for Haber- 11 kW DC Photovoltaic Solar Array cc m a W 0 O a AC Dlamnnectwlain 10'of the UUIIty Meter o When the AC utility source is removed from 12L r.i the inverter outputdrcitvla any means. (-- w a ni such as an AC breaker,a<ebconneato Haber, William& Andrea removal of the alarm main ni meter,this equipment pwn ro �service G the rapid 395 Park Hill Rd shutdown function N nper0.12. Florence MA 01062 a E Array bonded with!6 Bare Cu z Solar Module Total ZaO ValhlPhau m Non-Fused *--------- NIL � 40 Modules and inverters Disconnect Switch VC wiring from the solar moduieltyp) Map mountedadjacentto Oc ult li iter Enclosure Ulily Distribution Connection REVISIONS the taty meter circuit Breaker 1060 Whew Mkro inserterad ModelBEemalt. IOBOF mound Mas DC Protection integrated VDC SksNon-Medalr O Productbntr adjacent to the main circuit ,� ,� An MM Inserter mode: Mzsmbleri p NVDC GNY3220 breaker panel Line Side Tap This Array 16 Panelb/InvertM M Power w 40demenC: 210W 0 Envats 60 Amp SO Amp ]Zit RIC Insulated Taps 16 i1v 12514 = 20 a 20Amp N liintACVWtre tad/2M MM Ac Current' lOAmp �� �_ ��•1�a�a� - Clrculttreeker .i • Two Ungroundedconductorsand one s An ma:. = � Metal,II•� Neutral per circuit of inverter(Typ) - ® — mama I _ Il. ma amens 200 C, pp gi p Amp r— ID ) (1)N-TxxwTHWwZ Copper MSbo.i prop s (1)N-TNHN-TNWN-2 Copper Groundc�ow I g I 1'PVC Conduit or u cal I I I'dank: to Metal Conduit CO cu qtr qp wpI a. ; (a)ii-Txxwrxww2 Copper C C Installation of the y conduit 40')wl have Wire Calf 1t2 Q , `Q This Array 12 Panels/Irwmten I 1 FnphaaeA[ComMner I"PVC Conduit or W three,1 dThHN-THWIconsist hasddaamMl-120 FOr Ilse ide Ta al Conductors �� 12 zlxi25% 15 m 20Amp (b)alOTHHwTNWN-I,phaseconductors, Fm xne Side Condurton Circuit Breaker waft drum 2-Nkecicuit beaker: P (3)t10 THHN-111001neutral, op, � plus h)B B Ground 13)S anp,i-olelebcWtNNkeo n . ISI S Amp,i-pole drcuit breaker for Receptacle ip- trod 11 OP Wire Calc#1 200 Arno Buss I Murry Panel Grounding Electrode RIPS eT e'Ar state°" This Any 12 Panels/Inverters 12 x1x12S% = 1S u 20 Amp Circuit Breaker a • O t a UVQ F Ln L7F lob ID-P-00115696-1 ELECTRICAL- LINE DIAGRAM PV-2 Electrical Diagram for Haber-11 kW DC Photovoltaic Solar Array cc m GO ON o n Calculation for PV Breaker PV Circuit Conductors PV Circuit Conductorsa o AC Combiner Panel to PV Array re Calculation for Main PV Breaker&Circuits lMereonneetiorc LST w v ry Minimum#IOAWG Wire Calce2 77 > 5stem Current= 1 x 90 = 40A Minimum#6AWG - Y WIRE WING CALCULATION Wire Calc ril '^ iac Design Amperage= 90 x 125% = 50 A 20112014 EEC Article 310 WIRE 50NG CALCULATION - Main Buss Rating= 200 x 120% = 290 A Full Load Amperage - 16 201112014 AEC Article 310 o E YE Source Voltage -2w Full Load Amperage 40 Existing Main Breaker= 200 A pe ge • Length of Run(Feet) -40m - Max Solar Breaker= 240 - 200 = 40 A `Source Voltage ' 240 -1 Load Duty Noncontinuous - Circuit#1 16 1x125%= 20 A Conductor Type 'TRWN-2 Length of Run (Feet) - 30 REVISIONS Circuit#2 12 1 x 125%= 15 A Conductor Material 'Copper Load Duty ' Continuous Circuit#3 12 lxus%= 1sA Conductor Location -Dry or Wet Conductor Type . ' THWN-2 Conductor Insulation Temperature:90'C Conductor Material ' Copper Rooftop Installation: NEC 310.15(5)(3)(c) Conductor Location ' Dry or Wet • Distance Above Roof 'Above 13 mm to 90 mm[above 12 inch to 3 12 inch] ' Average Outside Temp '90 Deg. F 32.2 Deg. C Conductor Insulation Temperature :90'C Temperature Adder •40 Deg. F 22 Deg. C Ambient Temperature '26-30 'C=78-36 if - - Terminal Temperature Rating .... :60 'C Adjusted Ambient Temperature_. : 130.0 Deg. F 54.2 Deg. C Circuit Type : Single Phase 3 Wire (2 phase conductors& neutral) Terminal Temperature Rating.... :60'C Qty. of Circuit Current-Carrying Conductors : 2 Circuit Type: Single Phase 3 Wire(2 phase conductors&neutral) Conductor Requirement: Qty.of Circuit Current-Carrying Conductors:2 31 .Ad Q� Additional Current-Carrying Conductors 4 Full Load Amps 40.0 U ` Load Duty Multiplier - 1.25 `! 0 Total Qty. Current-Carrying Conductors '6 Ambient Temp. Multiplier . : 1.15 C 0 Conductor Requirement: Full Load Amps ' 16.0 01y. Conductors Multiplier: 1.0 0 Win Electrical Notes Load Duty Multiplier ' 1.0 1)An equipment o be listed and labeled for its application. Ambient Temp. Multiplier. : 1.32 Required Conductor Ampacity: 57.5 2)All conductors shall be copper,rated for 90C and wet environment,unless Qty.Conductors Multiplier: 125 Terminal Requirement: era noted. Full Load Amps ' 40.0 3)Working clearances around al new and existing electrical equipment shall Required Conductor Ampacity:26.4 Load Duty Multiplier ' 1.25 comply with NEC110.26 Terminal Requirement: Full Load Amps ' 16.0 4)All wire terminations shall be appropriately labeled and readily visable. Load Duty Multiplier ' 1.0 Required Terminal Ampacity : 50.0 Selected Conductor: 5)Module groundingclipsto be installed between module frame and Required TerminalAmpacity: 16.0 Conductor Ampacity - 75.0 Selected Conductor module support rail,per grounding clip manufacturers instruction. Conductor Ampacity '40.g Ambient Temp. Derate - 0.87 Ambient Temp.Derate •0.76 Qty. Conductors Derate ... : 1.0 6)Module Support rail to be bonded to continuous copper GEC via WEED lug Qty.Conductors Derate... :0.8 per NEC 690.4(C). Adjusted Ampacity ' 65.25 G 1= Adjusted Ampacity 24.32 0 - d U 7)If used PV power source breaker to be located at bottom of bus per NEC SELECTED CONDUCTOR Ste:10 Awq SELECTED CONDUCTOR SIZE Awg o. 2 a 69os4(B)ub2 x OhmsmlilFt x Length x Amps 2 x 0.491 x 30 x 57.5 2 x Ohm.UMiIFt x Length x Amps 2 x 1.24 x 40x26.4 = 8)AC combiner panels shall be labeled as"Inverter AC Combiner Panel". VD= =1.59 VD= = = 1.18 es or = 100D x Qty Wires per Phase 1000 x 1 1000 x Qty Wires per Phase 1000 x 1 C = Volts At Load Terminals '238.41 Volts At Load Terminals ' 238.82 9)listing agency name and number to be indicated on Inverters and Actual Percent Voltage Drop. :0.66 modules per NEC 110.310) Actual Percent Voltage Drop . : 0.49 lob ID-P-00115696-1 10)PV power source breaker to be suitable for backfeed per NEC 690.64(B)(6). ELECTRICAL PV-3 String and Conduit Layout Reviewed By: Dan Cramer (010)246-9544 5 m O 0 0 w• v 72 VL7, trnE p E ,., b Z REVISIONS co ■ Circuit 1 (10) ❑ Circuit (12) Cwwwwn wCCE7J Circuit) Box �YNY_ „ I . Junction O End Cap — Trunk Cable — Exterior Conduit IK Okcoa .tlrXNa WoftheIIIIIItyM r V rte l i_d ai — O w in tilt G o a o O i d V s � G H Job ID-P-0011569F6-1 ELECTRICAL PV-4