Loading...
43-099 (4) 11 WHITTIER ST BP-2017-1139 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block:43 -099 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit BP-2017-1139 Project# JS-2017-001931 Est.Cost:$31000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: SOLARCITY CORP 110253 Lot Size(sq.f): 83199.60 Owner: MYINT SOE zoning: Applicant: SOLARCITY CORP AT: 11 WHITTIER ST Applicant Address: Phone: Insurance: 604 SILVER ST (978) 215-23691) Workers Compensation AGAWAMMA01001 ISSUED ON:4/11/2017 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL GRID TIED SOLAR, 24 PANELS 7.2 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 4/11/2017 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1139 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 604 SILVER ST AGAWAM (978)215-23690 PROPERTY LOCATION 11 WHITTIER ST MAP 43 PARCEL 099 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid 47 /I� Building Permit Filled out 7� 1 Fee Paid Tyoeof Construction: INSTALL GRID TIED SOLAR 24 PANELS 7.2 KW New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 110253 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: pproved_Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received& Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability _ Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit/from Elm Street Commission Permit DPW Storm Water Management D-5.ditity r Signa - of Building 0 ¢ial Date - Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning& Development for more information. . City of Northampton Statue D1P.epp ` {,` Building Department Curbt fwtvtayp.41 4:t, ^ 4' 212 Main Street sewtedsep#c , Room 100 Y+1eRenVdetl A x � i i `: Northampton, MA 01060 ''phone 413-587-1240 Fax 413-587-1272 PIrd/$i1a "„ c" Otherspett[y 2.P2 PLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 11 Whittier St Map Lot Unit Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Soe Myint 11 Whittier St,Northampton,MA 01062 Name(Print) Current Mailing Address: (201)914-0077 5,E fv1ixw; Telephone Signature 2.2 Authorized Agent: SolarCity Corp/James DiPadua 604 Silver St Agawam MA 01001 Nam (Pri ) r Current Mailing Address'. 1. __ ,\ w 978-847-7170 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 9,000 (a)Building Permit Fee 2 Electrical 22,000 (b)Estimated tTotal Cost of Construction from(6) 3 Plumbing Building Permit Fee 4 Mechanical(HVAC) 5 Fire Protection pp 6. Total=(1 +2+3+4+5) 31,000 Check Number 776,511 This Section For Official Use Only Building Permit Number Date Issued: Signature: Building Commissioner/Inspector of Buildings Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage Open Space Footage (Lot area mimes bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. Demolition New Signs I ] Decks ( ] Siding[ ] Other El Brief Description of Proposed Work' install solar electric panels to roof ofexistine home,to be interconnected with home's electrical system. Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet ea. If New house and or addition to existing housing, complete the following: a Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? -.a d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Soe Myint as Owner of the subject property hereby authorize SOLARCITY to act on my behalf, in all matters relative to work authorized by this building permit application. Sc,e N\y 1nIT 4/10/17 Signature of Owner Date IIIIIIIIC I, SOLARCITY CORP/Dan Rubin as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. SOLARCITY CORP/Dan Rubin Print Name 4/10/17 Signature of Owner/Age Date SECTION 8-CONSTRUCTION SERVICES 8.t Licensed Construction Supervisor: Not Applicable ❑ Name ptLicense Holder SOLARCITY/Dan Kelley 110253 License Number 604 SILVER ST AGAWAM MA 01001 12/01/19 Address Expiration Date 774-364-3145 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ SOLARCITY CORP/Dan Rubin 168572 Company Name Registration Number 604 SILVER STAGAM MA 01001 03/08/2017 Address Expiration Date Telephone 978-847-7170 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes 0 No ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(I) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be.a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner'shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature r � 1p omit :soca,Pgae3 =PO 9 gar ahag 1169aay'e a l dsul laalilaola 10013 MxaSA°t lusaeasdir(OWES'L 9110a/U.Plant! low°PAs)Lap{pla 'Malan/ daausrlyemaad manic cera midge mean qts dq Jalaldawo9 al baa sppa/mho lou Off sesta aaaPJA110 11 - 0V _h M6laa_>, ' 'z_' •y� v+a00pusm!YaaapffMadmMempist W plima(adf aaluswipa.mtaanpir}a •taldigane gee UOprwyau allan on emanaate via alms seo!leepsaup P oa4wp tel al popmauo/aq Leal haunts topic Moo,w 94*gm tU •mayor.op wide*prams Pl&Ju wig r Pin Nano M OM dOiS flu maD Walla sgeaaad Irmo sa am%$o•uamuorpaue an4-no mgma pppps'tS of da ttlp Jo aaNlraaa Puulpa Joeaypmdrnt9yal Pal mat'a'i0pita VLL aa!sm5aapanpaunb 1 m*noun magas aaWled •(slap aeeupinapas aapaau 4011 tel Swamp)need wle:lnp ASyod aapausdaoa.ualtimk o Lena s gamy 7.9010 :di7/36646Fno LS 2» 1 1 11 t1 r I1 "'IPPV 66S 906 tr tits waHivt.� LLOn./6 Anaaepagdra LO-S1.0Z81.00m:dI'91•nfjSm nolyy Auedwo`,J eauetnsur uespeu d tpunZ-umtyt AtaAa°)emnnet +Prphsm65nsOISM . wIf*otan •HeLa(inAtioleaanull isguasmdnai.raasiuuto sw' apno 1legetaoad%Y.Yt+a�lli PMu 'boas R+poi aum•Oolz `419eelakmm.tap'akiegow4 a<ananaumin 'aattaaa 9'4 q8.910nxmN gab McMtulanaaaWnaowwaa1a41P=NM IAA laagraam I*MWVU I 4nanmmai ImpMPagwwaa apaaaimpul nAmaa aaoaawrsrala millet**WlWata ismiaraa.taaaenamlgga919..P Mtaa9aaaaama14, 'nMaa9MalWauwpwnbam.gtVO4 aa9 tmMa isana%maaanrmm a9rtiau Mn4aiW+aRr�1�[i[Y. fla.ryMm=mime am AdPeloS 141POLZfriAIDIVICeld ah!]YoaLo!daa tare am ern%Phi'L51 'a 4CPanahol gaminq aqu ia0S Et El 'MN and mpdatA10l9Su *um.ux!maaora masAn suop!ppa mayedn etgomt Uri airy paPmamangsrmo 3flOM faIIupp»amuse s tat -E imeipPge madoa ieolmxaDOI ae peg uopuadnattuaraao 0.5 mama;'dem1711/0211 4 aap!pp *Wrap 'd Ampex DM UMI a%( Q Ass g mm larva u9pppaaa[a 1 ante stapsswtri-qprasou sc4aedan ou tnaq pm dpt SolpPaaall 0 'L , cpaesamn ao panY •aaguwaaaggidmdaps n as t[Jt mpsnaataaa sou '9 tmuelplm.gns nary ram a.Aa9 ['faaaP-4nd"Nue❑y)PWCOld a :tpa+!o[otj Papudlo ad{L t Fag loon=romaa nal O '6 000'SI. NIA siondtuor us IC'1 :Loe ns.Llde.Wde x97'pat baadgdaa n net kw 69trZ-S9L-888 :gava4a ZObbB VO oayeyd ues... 151' y!J AeM Mamma!3 SSO£ :aswPPy .. _...—....—__.. •dioQ AADmiciS :(paM.wau.oPtptewsnanfW omaµ • Vaal iulAillaltt uagmsuoJaiyasaalpay slagtertio19ap)aat;(Mnptspm putomm8.1!Lopgyyasawning vognvadmOJ?impsM tNYMetssetuwsiat L PoZ-nnIZO YIV'land/ M1pNttb'YasASssat8tlea! sniVInVWMInPul at+aauadaadW _ RpsmpwsapVf rtJnanuawwq�njj • • AC O" CERTIFICATE OF LIABILITY INSURANCE Ormemmorwvn v 0$1B1Ale THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY MU CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERIS), AUTHORIZED • REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT If the certificate I;Oldei Is an ADDITIONAL INSURED,the pclicy(ies)mast be endorsed. If SUBROGATION IS WANED.subject to Ow Mina and conditions of the policy,cmMin pMklee may ragllae au entlasomrent A stalemant On this certificate dote net comer rights to the certltkate holder In lieu of suchendwsesnent(s). cddrbtT "RODE= Rte' IMRMIWSNUN A ISWCE ARMCES , 3I5CAUFWTNIA STREETS:ME 1906 ING.1.4EOL ,FAX CALYQWIAUCFNtF NO 04,m163 EANMAIL SAN FRANCISCOCA 041M --css: MO Tomo ScouNI5.7430.14 INSURER*AnCEORMCMVUOE . AMC Li ' E0 91.ST [iAME.16-t7 IMMER a:?with Mnerallns?Tema con ny NEMS • U8UREa_ NSWEE a:IIA NO 3L54Maria Way esinic:NA NR UnIOYV,G 0101 aLELEERI Amrinn Tu[A Msum Cenpmy 10I42 NSINSRE: . . MUREX F: COVERAGES CERTIFICATE NUMBER: SEAIIMOM°LLT REVISION NUMBER:5 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOIWTMSTANDINO ANY REOINREMLM.TERM OR COWOrtWN OF ANY CONTRACT OR OTHER DOCUMENT Will RESPECT TO WIPO I TIlS CERTIFICATE MAY BE LSEDED OR MAY PERTAIN.THE INSURANCE AFFORDED DT THE POLICIES DESCISEU HEREN IS SUBJECT TO ALL TIE TERMS, EXCLUSIONSANDCONW ONS OFBUCH POLICIES LIMITS SHOWY MAY HAVE DEEMREDUCEDBY PAID CLAIMS. lETR• MEQ ISYMNCE MW�Hn1suaR WYNUHRER mmoorrron•wencDOLMYFT TU� TYI UITOLP � MmITS A - X [COMMERCIAL GENERAL LMmtITe ' GLD MBMM DI IIgA12116 0901Q017 Earn occwRELEE -s %CONN ICIFWSWDEX OCCUR - - OMEMaCiO^ETT�EpM5 I.R0.W0 X'SIR{50.00 '*DEXPIARL Amain :S 50Ek' ' KnL`WL 4 MYINPMYt 1}GILL° , • 1 GEM.AGGE ATELIMITACMIEDPER GENERA.AGGREGATE S 2.000 DEO E PRTCL ICY , Lno .WOTtira,:CdliMAM? 's I.W6.Lre OINAR1001 � _ A AIflo OwtEM YIE UAlamxair.nI CVO 1001LYolI -{Er�Aee4n9 •E AWT 'a LLmc@ ' ' X AAT AUTO NLnJITIMLRrrrn PA+DEI .5 x -ALL OWNED x SDIEDDOLEII :nc ay INp11r IPe.imRnJ!s AUTO x 10°NY/MEO 1 t6trnrc IXWASC s ' X WRb Autos I AUTOS - :IPCIapWIxl 15 —^ L UMBRELLA LIAR ••OCCUR _ .USN OCOURRAMcr I IMAM LIAR auLtus-MACE ,AGGREGATE :S NEO : :NErexnmla I _. 1: 0 mammacomrtxsA1tON . WW1020R-01(A0EI MIMIC 09.01BOIY I x •N`TATmE .tmma •AWEMPLOTERrUANLfY • 'J gEmELm LiEEREaECUmE YVR HIA W=1E0'31I IMM O?MW2016 imNllmlJ ;EEEACNncrADoa S IWIJPO A Ol.EAMenm)LxCtwEm I CWiO1EXI&011CA1 OEIOIMlu .01U1207 EL DISEASE- IALO.t ITOa�CW/In RE) - [EP0.OV[E'i OFSinNTi n IRAflQ eF4x DMEL spy e!LEacISDNILSIR.CA DEEPSE-POLICY LIMIT a 100,000 DEScanott or onNADOLIE/LoCATONSIVFHNLEe IAEORD ltd.AOWIaW Remits schedule,may p'holes?malt?pipe Is regye:k CERTIFICATE HOLDER CANCELLATION SdaCCy CW(aflR SLIMED ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 305SOMMLETWay WE EXPIRATION DATE THEREW, NOTICE VII. BE oemmiiED IN Si MaIw.CA SNR AGCORDANEEWITH THE POLICY PROVISIONS. ' Aim WINED agfESINTA1IVE eNNsegL Mska legume*farvie s ( SbTAMM GALLIUM duaf ETTA al.^ 01988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014N1) The ACORD name and!ego are Tegistared marks of ACORD - � r�lr° rf7,me niuc'uda ' Office of Consumer Affairs and Business Regulation (i } 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registratton: 168572 Type: Supplement Card SOLAR CITY CORPORATION Expiration: 318/2017 DANIEL KELLEY _... .... ___ 24 ST MARTIN STREET BLD 2UNIT 11 - - ----- -- --MARLBOROUGH, MA 01752 _. _.. .. __.... Update Address and return card.Mark reason for change. Address _.. Renewal " Employment r Lost Card '-;Slake of Consumer Affairs Fs Sliminess.Regulation License or registration valid for individul use wily 41916ME IMPROVEMENTCONTRACTOR before the expiration date. If found return to: M:f;. Office of Consumer Affairs and Business Regulation i'.Registration: 168572 Type: 10 Park Pima-Suite 5110 Espirntlon: 31812017 Supplement ca rd Boston,MA 02116 SOLAR CITY CORPORATION DANIEL KELLEY 3055 CLEARVIEW WAY SAN MATEO,CA 94402 Undersecretary Not valid`iwithout signature ® Massachusetts Department of Public Safety Board of Burlding Regulations and Standards License CS-110253 14C-"` :oasvcction Super sir DANIEL KELLEY .4 11 ROLLINGWOOOS ROAD HUBBAROSTON MA 01452 rM L._ irat/on Coinmigg,oner 1210112018 erutuiir'ifffYrti1// r)/ ^'`lrr,;.;rrcAreJelIJ .+ Office of Consumer Affairs and Business Regulation 10 Park Plaza- Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Type: Corporation Registration: 168572 SOLAR CITY CORPORATION Expiration: 03/07/2019 24 St Martin Street Bid 2Unit 11 Marlborough, MA 01752 Update Address and return card. Mark reason for elm ` n Address ❑ Renewal 0 Employment Ci Loci Oflke of Consumer Affairs 8 BusinessinessTOmbn c�4 HOME IMPROVEMENT CONTRACTOR Bedon valid for Individual useonly 1 TYPE:Corporation before the Consumer on date. If frondi return to: Raaistra0on ExolreUon Office of Consume Affairs and Business Regulation 160512 D3107031910 Park Plaza-Suits 490 Boston,MA AAA���77716� SOLAR CITY CORPORATION DANIEL ROBIN / 3055 CleWay (�f"C — San Mateo,o,CA 94402 Undersecretary / of valid without signature SolarCity Effective March 1,2017 RE: Permit Authorization Dear Sir or Madam: This letter is to verify that JAMES DII'ADUA is/are authorized representatives of SolarCity Corporation and are authorized to pull any and all permits, business licenses, and any other project related documents as needed on my behalf. Please don't hesitate to call if you have any questions. Sincerely, Daniel Rubin 404-771-21 16 Responsible Managing Employee, MA Home Improvement Contractor Registration 4168572 Regional Director, Operations. SolarCity Corporation Office of Consumer Affairs and Business Regulation 10 Park Plaza-Suite 5170 Boston,Massachusem 92116 Home improvement Contractor Registration Type: C<Wswn R`AM1iritp* IOWA KELLY K. STRICKLAND SOLAR CITY CORPORATION Epualion AE1S 24 S1 Martin Street Bid 2Umt 11 Notary PuSc Marlborough.MA 01752 COMMONWEALT}V OF MASSACHUSETTS My COmmiS610n Expires On May23.2023 EadSM nam.ee and rewm osv NTT RATA be ev • P TART* Al Acne**C EspIo mrne Il LOP .,.*CMS aaa..e ax .MME IMPROVEMENT tOottitecrts ATAT+Pen DAT Art PST*UT Cu, TYPE t x, normnsat Moot CmweaCARCLm.MS, uWM 1 1.3572 ta0)1131 Z Pen 10 SIM SOLAR PTV CORPORATOR Eoum.na is DANIEL RUBIN 3SSCEmn WayiUj't'r1'"T— SanAlL�.CA04W2 / r I ttw�axee4iy WYtl N51hm t'grain SAC* Cerywatan DBATesla Enewy.CA CSLg 888109.MA WC1606neEL-iiaaaR Ytsfmrx.naWcty Dom to view oUtvcVIAa`ehM o kaanse numbers W stale. DocuSign Envelope ID:DD51C088-8F013-4F3E-A1 CC-123B33456588 SolarCity Purchase Customer Intormation installation Locarnn Dare Soe Myint 11 Whittier Street 4/5/2017 Northampton,MA 01062 11 Whittier Street Northampton,MA 01062 Name on amity air. 2019140077 Soe Myint Here are the terms of your Solar Home Improvement Agreement 7 . 2 kW DC 2Dyr System Size System Warranty The SolarCity Promise •We provide a money-back energy performance guarantee. w •We warrant all of our roofing work. SM- •We warrant and repair the System -__ Initial here •We fix or pay for any damage we may cause to your property. •We provide 24/7 web-enabled monitoring at no additional cost. •The pricing in this Agreement is valid for 30 days after 4/5/2017. _ Your SolarCity Purchase Agreement Details Contrail Price 5316.00 - REC Value(Estimate) -$6,768.00 Rebate Value(Estimate) -$0.00 Amount Due $24,048.00 Est.first year production 7,668 kWh 3055 Clearview Way,San Mateo,CA 94402 1888.765.2489 I solarcity.com 2638857 Solar Dome Improvement Agreement(SolarLoan),version 4.2.2,February 24,2017 Sola rCty Corporation DBA Tesla Energy Contractors License MA HIC 168572/EL 1136Ma Document generated on 4/512017cityC ❑ D2 0 CopYriBSt 2008-2015 SolarCity Corporation,All rights Reserved DocuSign Envelope Ip:DD51C088-8F0B4F3E-A1 CC-123833456588 By signing below,I agree that SolarCity can contact me for telemarketing and informational purposes via call or text using automated technology and/or pre-recorded messages using the phone number(s)I provided that are listed on the first page of this contract.I understand that consent is not a condition of purchase. You may opt-out of this authorization at any time by calling us at: 888-765-2489 or sending us written notice and mailing it to:SolarCity Corporation,Attention:Phone Authorization Opt-Out,3055 Clearview Way,San Mateo,CA 94402. Customer's Name:Soe Myint Solar Home Improvement Agreement r—nocusigned by, Signature: Set Di6 OEt.4' _ SolarCity L—n18FBi9EF6ENFE Date: 4/5/2017 approved Customer's Name: Signature: Signature: Lyndon Rive, CEO Date: Date: 4/5/2017 Solar Home Improvement Agreement Isola Vt2 eSon 4.2.2,rebr ue ry 24,2017 a 2638857 Version#66.3-TBD SolarCity. • April 7,2017 1 n 4ff itt— RE: CERTIFICATION LETTER ./.lx 9' `TC I// IBES H. G Project/Job# 0102679 ,CHILDS m Project Address: Myint Residence O CIVIL 11 Whittier St No.52764 Northampton, MA 01062 -%9 o/sTei't°, ¢ ANJ Northampton S/ONALE SC Office Springfield Design Criteria: -Applicable Codes = MA Res.Code,8th Edition,ASCE 7-05,and 2005 NDS - Risk Category =II -Wind Speed = 90 mph, Exposure Category C, Partially/Fully Enclosed Method -Ground Snow Load =40 psf - MP1: 2x6 @ 16"OC, Roof DL= 7.5 psf, Roof LL/SL= 28 psf(Non-PV), Roof LL/SL= 28 psf(PV) - MP3: 2x6 @ 16"OC, Roof DL= 7.5 psf, Roof LL/SL = 28 psf(Non-PV),Roof LL/SL= 28 psf(PV) Note: Per IBC 1613.1; Seismic check is not required because Ss =0.22424 < 0.4g and Seismic Design Category(SDC) = B < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Solaroty. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation,I certify that the existing structure directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. James H.Childs, P.E. Professional Engineer Digitally signed by James H. Childs, P.E. T: 1388.765.2489x58390 Date: 2017.04.07 19:06:06 -07'00' email:ail: jchildsl@solarcity.com Version#66.3-TBD . SolarCity HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-V Spacing Y-Y Cantilever Configuration Uplift DCR MP1 64" 24" 39" NA Staggered 35.1% MP3 64" 29" 39 NA Staggered 35.1% Portrait Hardware-Portrait Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever V-Y Spacing Y-Y Cantilever Configuration Uplift DCR MPI 98" 1]" _ 65 NA Staggered 93.9% MP3 98 3]" 65 NA Staggered 43.9% StructureMounting Plane Framing Qualification Results Type Spacing Pitch Member Evaluation Results __ MP1 Stick Frame 16"O.C. Zr _ Member Analysis OK _ MP3 Stick Frame 16"O.C. 22° Member Analysis OK Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site.The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC. 1 IrJ t 1. STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK- MN. Member Properties Summary MP1 Horizontal Member Spans Rafter Properties Overhang 0.16 ft Actual W 1.50" Roof System Properties Span 1 10.57 ft Actual Co 5.50" Number of Spans(w/o Overhang)_ 1 Span 2 Nominal Yes Roofing Material Comp Roof Spm 3 1_._. A((M2} 8.25 Re-Roof No S•-n4 Sx(in.A3) 7.56 PtywMM Sheathing ........ Yes... Spm 5 Ix(In*4) 20.80 Board Sheathing None Total Rake Span 11.57 ft TL Defl'n Limit 120 Vaulmcefnug No PV 1 Start 3.50 ft Wood Similes SPE Ceiling Finish 1/2"Gypsum Board PV 1 End 9.75 ft Wood Grade *2 Ratter Slope 22° PV2 Start Fib(Psi 875 Rafter Spacing 16 O.C. PV 2 End Fv(psi) 135 Top la Bracing FutPV 3 Start E(Poi) 1,410,000 Bot 1St Bracing At Supports 1W 3 End E-min(psi) 510,000 Member Loading Summary Roof Pitch 5/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 7.5 psf x 1.08 8.1 psf 8.1 psf PV Dead Load ... PV-DL 3.0 psf x 1.08 3.2 psf Roof Llve load RLL 20.0 psfx OAS 19.0 psf Live/Snow Load LL/W1,2 40.0 psi x 0.7 I x 0.7 28.0 psf 28.0 psf Total Load(Governing LC) Tl. 36.1 psf 39.3 psf Notes: 1. Ps=Cs*Pf;Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2, pf s 0.7(Ce)(CO(1a)po; 4=0.9,Q=1.1,h1.0 Member Analysis Results Summary Governing Analysis Max Moment I ®Location Capacity DCR Result (i-)Bending Stress(psi) 1,140.4 1 5.5 ft 1,504.3 76% Pass ZEP HARDWARE DESIGN CALCULATIONS- MP1 Mounting Plane Information Roofing Material Comp Roof Roof Slope 22° Rafter Spacing 16"O.C. Framing Type/Direction Y-Y Rafters PV System Type SolarCity SleekMouM•" Zep System Type ZS Comp Standoff(Attachment Hardware) Como Mount Tvoe C Spanning Vents No Wind Design Criteria -- Wind Design Code IBC 2009 ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof E Fig.6-11B/C/D-14A/B Mean Roof Height h I 25 ft I Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure K, 0.95 Table 6-3 Topographic Factor Ka 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 i Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh = 0.00256(Kz)(Kat)(Kd)(VA 2)(I) Equation 6-15 16.7 psf I Wind Pressure Ext. Pressure Coefficient(Up) GCp(Up) -0.88 Fig.6-11B/C/D-14A/13 Ext Pressure Coefficient(Down) GCp(Down) 0.45 Fig.6-11B/C/D-14N8 Design Wind Pressure p - p =qh(GCp) _ Equation 6-22 Wind Pressure Up � Prwm -14.6 psf Wind Pressure Down Prdowm 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction Max Allowable Standoff Spacing Landscape 64" 39" Max Allowable Cantilever Landscape I 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -224 lbs Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capadty DCR 35.1% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait I 48" 65" Max Allowable Cantilever Partrat 17" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff Tactual -280 lbs Uplift Capacity of T-allowStandoff 637 lbs Standoff Demand/Capacity l DCR 43.9% STRUCTURE ANALYSIS- LOADING SUMMARY AND MEMBER CHECK- MP3 Member Properties Summary MP3 Horizontal Member Spans Rafter Properties Overhang 0.82 ft Actual W 1.50' Roof System Properties Span 1 11.86 ft Actual D 5.50" Number of Spans(w/o Overhang) 1 Span2 Nominal Yes Roofing Material Comp Roof Span 3 A(Ina 2) 8.25 Re-Roof No Span4 Sx(in.A3) 7.56 Plywood Sheathing Yes Span 5 Ix(InA4) 20.80 Board Sheathing i None Total Rake Span 13.68 ft TL Der Limit 120 Vaulted Ceiling No PV 1 Start 3.42 ft Wood Species SPF Ceiling Finish 1/2"Gypsum Board PV 1 End 9.67 ft Wood Grade #2 Rafter Slope 22° PV 2 Start Pb(Psi) 875 Rafter Spacing 16"O.C. PV 2 End Fv(psi) 135 Top tat Bracing Fut PV 3 Start E(psi) i 1,400,000 Bot Lat Bracing At Supports PV 3 End E-min(psi) 510,000 Member Loading Summary Roof Pitch 5/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 7.5 psf x 1.08 8.1 psf 8.1 psf PV Dead Load PV-DL 3.0 psf x 1.08 3.2 psf Roof Live Load RLL 20.0 psi x 0.95 19.0 psi Live/Snow Load LL/SL24 40.0 psf x 0.7 I x 0.7 28.0 psi 28.0 psi Total Load(Governing LC) TL 36.1 psf 39.3 psi Notes. 1. ps=Cstpf;Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Ce)(C)(Is)pg; Ce=0.9,Q=1.1,I,=1.0 Member Analysis Results Summary Governing Analysis Max Moment 0 Location Capacity DCR Result (+)Bending Stress(psi) 1,423.3 6.8 ft 1,504.3 1 95% Pass ZEP HARDWARE DESIGN CALCULATIONS- MP3 Mounting Plane Information Roofing Material ; Comp Roof Roof Slope 22° Rafter Spacing 16"O.C. Framing Type/Direction V-V Rafters PV System Type SolarCity SleekMount' Zep System Type ZS Comp Standoff(Attachment Hardware) Como Mount Type C Spanning Vents No Wind Design Criteria Wind Design Code IBC 2009 ASCE 7-05 Wind Design Method Par ialf/Fully Enclosed Method Basic Wind Speed V 90 mph Fig.6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof 'Fig.6-118/C/D-14A/B Mean Roof Height h 25 ft I Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure K, 0.95 Table 6-3 Topographic Factor Kx 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh= 0.00256(Ks)(Kit)(Kd)(VA2)(I) 16.7 psf Equation 6-15 • Wind Pressure Ext. Pressure Coefficient(Up) GCp(Up) -0.88 Fig.6-118/C/D-14A/5 Ext.Pressure Coefficient(Down) GCp(Down) 0.45 fig.6.118/C/0-I4Na Design Wind Pressure p p = qh (GCp) Equation 6-22 Wind Pressure Up Pum -14.6 psf Wind Pressure Down Prdd..m 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction i Max Allowable Standoff Spacing Landscape 64" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -224 lbs Uplift Capacity of Standoff T-allow 1 637 lbs Standoff Demand/Capacity OCR 35.1% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantilever Portrait 17" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -280 Is Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capacity DCR 43.9%