Updated Budgets for City March 2017 (1)Remaining Work Remaining Work Remaining Work 22 20 22 12 13 14 Job Name: Job Address: Estimate Date: Current Release Date: Print Date: Updated cost for final road paving, entire roadway area as of 6-15-16 Change Author: Initial Date: Last Revision Date: Cost for remaining Shade Tree Planting Change Author: Initial Date: Last Revision Date: Final As Built Survey Costs and Road Acceptance Work Change Author: Initial Date: Last Revision Date: Emerson Way Subdivision Florence, MA 9/4/2012 3/20/2017 4/6/2017 Steve 6/14/2016 7/25/2016 main road is 3800LF @ 24' = 91,200SF, Fire Road top section only 300LF @ 12' = 3600 sf Total Area- 94,800sf = 10,534 Sq. Yds. Final Paving Coat at1.5" Compressed Tack Coat for 94,800 SF Cost to add 1/2" of compressed asphalt thickness to Phase I areas, 2000lf x 24' x .5" = 889 CU YDS Cost to raise 19 Manhole Cover Castings @ $650. EA Cost to raise18 Drain Inlet Grates @ $750 EA Supervision Sub Total: Profit & Overhead %: Steve 6/14/2016 2/20/2017 Total 176 trees on plan, 67 on first planting ???? Treews planted Summer-Fall 2016 RICH- This number is based on planting 109 NEW trees. Kevin H planted some trees last year so the actual count to finsih will be less than 109 Supervision Sub Total: Profit & Overhead %: 6/14/2016 7/25/2016 Budget from Heritage for As Built Survey Budget from Mark Darnold to prepare final reports Inspection of final paving Supervision Sub Total: Profit & Overhead %: 10534 94800 889 19 18 24 0 #12 Total Item Cost: 109 20 0.15 #13 Total Item Cost: 1 1 1 24 0 #14 Total Item Cost: 9.25 0.1 25 650 750 70 325 70 10000 6000 2500 70 0 97439.5 0 9480 0 22225 0 12350 0 13500 0 0 0 0 1680 156674.5 0 35425 0 0 0 0 0 0 1400 36825 5523.75 0 10000 0 0 6000 0 2500 0 0 1680 20180 0 156674.5 42348.75 20180 convert to tons gallons break out for lf of 2" and for 1.5"