Loading...
112 Application DW /Certificate of Compliance„•0740/6-i �D od FEE COMMONWEALTH OF 1 ASS HUSETTS Board of Health, / 10 4(G.,firiv , A1A. APPLICATION FOR g DISPOSAL SYST I CONSTRUCTION PERMIT pplication for a Permit to Construct( ) RepairUpgrade( ) Abandon( ) - ❑Complete System Individual Compo ents / SePi”c 4.)X Location �4a ,ej-41-/B4_,--./ Owner's Name Ejt S5/' e,� 1 Map/Parcel# Address ..s�,..iiCp Lot# Telephone# Installer's Name Designer's Name J Address Address a ‘57%( /1/////0/0/11eAli/ Telephone# Telephone# qpe of Building Lot Size sq.ft. welling-No.of Bedrooms Garbage grinder( ) ther-Type of Building No.of persons Showers ( ),Cafeteria ( ) ther Fixtures esign Flow (min.required) gpd Calculated design flow Design flow provided gpd an: Date Number of sheets Revision Date itle escription of Soil(s) til Evaluator Form No. Name of Soil Evaluator Date of Evaluatio ES F PAIRS OR ALTERATIONS 41,// 1 / / /'J he undersigned agrees to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and irther agrees to not to place the system in operation until a Certificate of Compliance has been issued by the Board of Health. gned1:/e Date 6� ispections c).. /6-// FEE /1 / COMMONWEALTH OF/ MASSACIIL SETTS Board of Health, Ai/rlb I'1/TU/Li, MA. CERTIFICATE OF COMPLIANCE escription of Work: Individual Component(s) ❑Complete System / 1/e : 74 he undetsi ed he by certif that the Sewage Disposal System; Constructed ( ),Repaired' Upgraydd ( ),Abandoned( } r. 7 > /l l P� / r / %1/22 �i,,, ,_ / ,,/,- /�Gr�t,I is been installed in a cord. c, with the provisions9f 310 CMR 15.00 (Title 5) and the approved desigiu pla s/as-built plans relating to tplication No. _ 1 - , dated -,,,K)/,,b, . Approved Design Flow (gpd)— 4,e /-7)/ (,c2,-./.. /..4� istaller G/' �� e ) ! ' esigner: -- Inspector: _� Date: /O 2 / _ he issuance of this permit shall not be construed as a guarantee that the system will function as designed. a. FEE COMMONWEALTH OF MASSACHUSETTS r;1 F 1 o P Board of Health, MA. DISPOSAL SYSTEM CONSTRUCTION PERMIT ermission is hereby granted to; Construct( ) Repair( ) Upgrade( ) Abandon( ) an individual sewage disposal system as described in the application for isposal System Construction Permit No. , dated . rovided: Construction shall be completed within three years of the date of this permit. All local conditions must be met. n 1255 Rev.5/96 A.M.Sulkin Co.Chadeta,'MA Date Board of Health