Loading...
23A-114 (10) . : 1 'ST MP-2004-0150 COMMONWEALTH OF MASSACHUSETTS CITY OF NORTHAMPTON GIS 4: 9021 Map: 1" "Y -. .. Block: ZONING PERMIT :Lot: 001 Permit :ZONING PERMITAPPLI1 APPLICATION PERMIT Category. 1Zoning Permit permit# 'iVJP-zoos_oiso PERMISSION IS HEREBY GRANTED TO: Project# JS-2004-1616 -- -- - -- - Est. Cost. $0.00 l Contractor: License: Fee: $15.00 'Homeowner as Contractor if ofFiztures:j Owner: ZAWADSKI JAMES F Applicant: NORTHAMPTON CO-OPERATIVE BANK AT: 8 MAIN ST ISSUED ON: 24-Aug-2004 AMENDED ON: EXPIRES ON: TO PERFORM THE FOLLOWING WORK: ZPA-BANK&OFFICE BLDG(5058) THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: Zoning Permit Application RE,C-2004-004117 05.May-04 3919 $15.00 212 Main Street,Phone:(413)587-1240,Far(413)587-1212 GeoTMS®2004 Des Lauriers Municipal Solutions,Inc. File#MP-2004-0150 APPLICANT/CONTACT PERSON NORTHAMPTON CO-OPERATIVE BANK ADDRESS/PHONE 67 KING ST 0 584-4474() PROPERTY LOCATION 8 MAIN ST MAP 23A PARCEL 114 001 ZONE GB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FO ILLED OUT (ZONING Building Permit Filled out Fee Paid Typeof Construction: ZPA-BANK&OFFICE BLDG(5058) New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE F99LLO WING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFQRMATION PRESENTED: ��✓✓///Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER: § Intermediate Project: Site Plan AND/OR Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § • Finding Special Permit Variance* / / / Received&Recorded at Registry of Deeds Proof Enclosed 1,,,40"Other Permits Required: VVV Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street e,mmission .......„....„&itc 19 ` Lao Signature of Building 0 icial Da • Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact the Office of Planning&Development for more information. Etheredge St Steuer, P.C. ATTORNEYS AT LAW 64 GOTHIC STREET NORTHAMPTON. MASSACHOSEI IS 01060 EDWARD a ED EREDGE 1413) 584-1600 FAX (413) 585-8406 SHELLEY SSEUER' 'Aldo AUmincd in Nem York and Ciltlomu August 16, 2004 Anthony Patillo, Building Commissioner City of Northampton 210 Main Street _ 6 i J 2 rD Northampton, MA 01060 J V W LS �I Re: Northampton Cooperative Bank p AUG 1 7 2004 IJ Florence Property • DEN Of BUILD,.3 INsPECTONS Dear Tony: NORMHe4PfCN,MA 01060 I enclose a copy of the Planning Board Decision for the above-referenced property which was recorded on August 16, 2004 in the Hampshire Registry of Deeds. I enclose a copy of the recording receipt with the book and page. If you have any questions, give me a call. Very truly yours, 'ward D. EDE/kap Enc. cc: Bill Stapleton, President Official Receipt for Ra:nrding fn: xuot �i L, '? 33 XingtrgttgmtY Rett of Deeds s rr'"yaxa� M "'B asM w R ' Rorthaepton, Massachusetts 01060 ET7tEREp1E t STEDER Recording Fees Daomit .^ Receding Description Number RRec ook/Page Noun OFC15 W024055 no 166 , N IHAIIPTOX COOP BMX 156 $75.00 Collected Aeouns $75.00 Type gaunt 5312 $75.00 $75.00 •/ a. e, >'."L� o Change Due —__-$.00 Thank Yon MARIAIOIE D7MOHOE - Register of Deeds By: Marilyn H Runge08/16/2004Date 0095841 12:32P Planning Board - Decision • City of Northampton Hearing No.: P0I-2004-0080 Date: June 10,2004 APPUCAtN TYPE: SUBMISSION DATE: PB Major Site Plan 5,/12004 Applicants Name: Owners Name: Surveyor's Name: NAME: NAME: COMPANY NAME Northampton Cooperative bank Z4WADSK/JAMES F ADDRESS: ADDRESS: ADDRESS: 67 King Street 8 MAIN ST TOWN: STATE ZIP CODE TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE NORTHAMPTON MA 01060 FLORENCE MA 01062 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE NO FAX NO.: EMAIL ADORES& EMAIL ADDRESS: EMAI ADDRESS: • Site Information: STREET NO.: SrE ZONING: 8 MAIN ST GB TOWN: SECTION OF BYLAW: FLORENCE MA 01062 Section 11:Site Plan Approval MAP. BI Erie LOT: MAP DATE ACTON TAJ(EN: 214 114 001 Approved With Conditions Boat Paye: 1844 108 NATURE OF PROPOSED WORK Demolish existing gas station and construct two office buildings,including one bank with an acc•wry drive-up window for a total o/ 5,058 square feet Project also Includes Map ID 23A-121. HARDSHIP CONOMON OF APPROVAL: 1.Prior to requesting a building permit,the applicant mustobtain sign off from the Office of Planning 8 Development indicating the following conditions have been met a. Landscaping plans shall be resubmitted showing 2 additional street frees along Main Street b. A sidewalk connection from Pine Street to the parking lot sidewalk shall be made. c. Submission of a plan showing a painted crosswalk across Pine Street that connects to the site sidewalk d. The driveway egresses from Main Street shall be designed to ramp up to the sidewalk along Main Street Detail sheets should show that the sidewalk remains at a continuous elevation for at least - 3'of width in the sections that cross the driveways. e. Submission of a plan showing the detail of a speed hump in the exit drive to Pine Street f.Submission of a plan showing a 6'high stockade fence along the east boundary line with the Day Spa to extend as close as possible toward the Main Street properly line without interfering with she distances. 2. The existing arborvitae hedge shall be pruned or replaced within the site distance triangle at the Pine Street egress as recommended by traffic engineer. 3.Reports of storm water maintenance shall be submitted to the Office of Planning if Development no later than May 15 annually indicating inspections and cleanings have been performed in accordance with the Operations 8 Maintenance plan submitted and shown in Attachment A. Inspections must be performed by a qualified person In accordance with submitted plans. The name of the qualified person is to be approved by Department of Public Works prior to issuance of a certificate of ocduPancy. 4. There shall be nit loss of og parking along the Main Street frontage. Mnecessary,the applicant shall recto-foeon-street parking spaces andif space allows Increase thetotal numberof striped spaces. Al necessary striping shall be performed prior to Issuance of a certificate of occupancy. 5. Prior to Issuance of a Certificate of Occupancy,and if Department of Public Works concurs,the applicant shall implement the following striping and pedestrian crassing signs as recommended by its truffle consultant west of Chestnut Street GeoTMS®2004 Des Landers Municipal Solutions,Inc • Planning Board - Decision City of Northampton Hearing No.: PLN-2004-0080 Date: June 10,2004 a.A white stop bar and cross walk shall be striped on Pine Street as Identified in the traffic consultant's letter dated May 24,2004. b.Double yellow centerline markings on Pine Street at the eastbound approach to South Main Street;On South Main Street between Pine Street and Main Street and On Chestnut Street at the approach to Pine Street The Planning Board granted the Site Plan for construction of 5,056 square feet of new office space,with an accessory bank drive-up based on the following information submitted with the application and as amended through conditions herein: 1. 'Northampton Cooperative Bank Florence Branch Office'Plan Sheets LILT,prepared by The Berkshire Design Group,Inc.,dated May 5,2004. 2. 'Northampton Cooperative Bank Florence Branch Office Site Lighting Plan',Sheet 1 of 1,Prepared by Holophane lighting David Rancatore,dated May 5,2004. 3. 'Northampton Cooperative Bank Florence Branch Bank Elevations,Sheets A-1 and A-2,Prepared by Kuhn Riddle Architects,dated May 6,2004. 4. 'Traffic!mapct Study'(within Application materials),Prepared by Fuss S O'Neill,Inc.Consulting Engineers dated May 6,2004,with revised Table 4&5 dated May 24,2004. 5. 'Traffic Comparisons'sheet,Prepared by Fuss&O'Neill,Inc.Consulting Engineers. 6.Letter from Fuss&O'Neill,Inc.Consulting Engineers dated May 24,2004 to Office of Planning&Development Staff regarding accident data and speed control on Pine Street The Planning Board granted the Site Plan after making the following findings: 1. The requested use protects adjoining premises against seriously detrimental uses.Office uses are allowed by right within the GB zoning district The site plan provides a 30'continuous landscaped buffer along all the property boundaries that abut the URB residential district As offered by the applicant a new 6'high fence wig protect abutters from impacts of automobile headlights. Additionally,the increased open space on site allows for increased infiltration over the existing use The plaza along the Main Street frontage will provide visual relief and provide respite area for pedestrians;and 2.The requested use will promote the convenience and safety of vehicular and pedestrian movement within the site and on adjacent streets,minimize traffic impacts on the streets and roads in the area. Sidewalks will connect across the site and through the site to allow pedestrians safe access from the neighborhood in the rear and for pedestrians walking along Main Street Sidewalk connections,as well as on and off-site traffic calming through signage and pedestrian striping will minimize traffic speeds through the site and surrounding the site driveways. Curb cuts have been reduced to minimize vehicle and pedestrian conflicts.Provisions for persons with disabilities have been made;and The project including any concurrent road improvements,will not decrease the level of service(LOS)of all area roads or Intersections affected by the project below the existing conditions because as offered and conditioned herein,the applicant has addressed the incremental impacts of this project 3.The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape,existing buildings and other community assets in the area.The proposed brick buildings and architectural elements fit with the character of Florence Center and provide a transition in scale between the residential district and the GB district and 4.The requested use will not overload,and will mitigate adverse impacts on,the City's resources including the effect on the City's water supply and distribution system,sanitary and storm sewage collection and treatment systems,fire protection,streets and schools. 5. The requested use meets any special regulations set forth in the Zoning Ordinance. The office uses proposed are allowed by right and the accessory drive-up window for the bank is allowed(as determined by the Northampton Building Commissioner)in accordance with section 13: • 'Any use which is accessory to a principal use allowed by right shall be allowed only in connection with such allowed principal use. Cessation of a principal use shall require cessation of any accessory use which is not otherwise allowed as a principal use. The Building Commissioner shall be responsible for determining what uses are principal,and what uses are accessory? 6.Compliance with the following technical performance standards: A. Curb cuts onto streets shall be minimized. Access to businesses shall use common driveways,existing side streets,or loop/service roads shared by adjacent lots when possible. Tte curb cuts have been reduced substantially over the existing u,sa The two cuts on Main Street have been reduced from 50'and 30'10 24'and 15'respectively. This site fronts Main Street and abuts a secondary'by-pass' sheet on the rear. Therefore, the Board determined that it was appropriate to maintain the existing single egress in the rear In order to distribute site generated traffic between Main Street and Pine Street B. Pedestrian,bicycle and vehicular traffic movement on site has been separated,to the extent possible,and sidewalks are provided between businesses within the project C. This project has been designed to reduce stormwater flows off site between pre and post development conditions and improves GeoTMS®2004 Des Lauriers Municipal Solutions,Inc • Planning Board - Decision • City of Northampton Hearing No.: PLN-2004-0080 Date:June 10. 004 existing off-site flow conditions. Catch basins include sumps of a minimum of M,ee(3)feet and and a'stonnceptor has bean Included. COULD NOT DEROGATE BECAUSE RUNG DEADUNE MAILING DATE HEARING CONTINUED DATE DECISION DRAFT BY: APPEAL DALE 5/6/2004 5/20/2004 6110/2004 REFERRALS M DATE HEARING DEADLINE DATE HEARING CLOSE DATE FINAL SIGNING BY: APPEAL DEADLINE 5/13/2004 7/11/2004 527/2004 &10/2004 6/30/2004 FIRST ADVERTISING DATE HEARING DATE VOTING DATE DECISION DATE 5/132004 5/27/2004 527/2004 6/10/2004 SECOND ADVERTISING DATE HEARING TIME VOTING DEADLINE '✓t'9ION BALI,.ME 510/2004 9:00 PM 8254004 645/2004 MEMBERS PRESENT: VOTE William Letendre voles to Grant Francis Johnson votes to Grant Keith Wilson votes to Grant Paul Diemand votes to Grant Kenneth Jodde votes to Grant David Wlensky votes to Grant NOTION MADE BY: SECONDED BY: NTE COUNT: DECISFJK • William Letendre Francis Johnson 6 Approved with Conditions MMVIESOFIAMMQ Available in the Office of Planning&Development. I,Carolyn Misch,as agent to the Planning Board,certify that this is a he and accurate decision made by the Planning Board and certify that a copy of this and ail plans have been filed with the Board and the City perk on June 10,2004 I certify that a copy of this decision has been mailed to the Owner and Applicant EIVE -91 I EJUN 1 0 2004 CITY CLER.YS OFFICE NORTHAMPTON MAS1060 August 16, 2004 I, Wendy Mazza, City Clerk of the City of Northampton, hereby certify that the above Decision of the Northampton Planning Board was filed in the Office of the City on June 10, 2004, that a Complaint was filed with the Hampshire Superior Court (Civil Action No. 2004-001-55) and received in the City Clerk's Office on June 29, 2004, that a .Stipulaltion of Dismissal with prejudice (see attached) was filed in the City Clerk's Office -on Augast 16, 2004. , • OL/ Attest f\ k,y�Clerk-Cit of Nor ampton G oTMSS 2004 Des Louden Municipal Solutions,Inc. • ATTACHMENT A • Northampton Cooperative Bank Florence Branch Office Proposed Stormwater Management System Operation & Maintenance Plan May S, 2004 • During Construction The Contractor shall be responsible for inspection and maintenance during construction. At all times, siltation fabric fencing, stakes and hay bales sufficient to construct a sedimentation control barrier a minimum of 50 feet long will be stockpiled on the site in order to repair established barriers which may have been damaged or breached. An inspection of all erosion control and stormwater management systems shall be conducted by the Contractor at least once a week and during all rainstorms until the completion of construction. In case of any noted breach or failure, the Contractor shall immediately make appropriate repairs to any erosion control system and notify the engineer of any problems involving stormwater management systems. A rainstorm shall be defined as all or one of the following: • Any storm in which rain is predicted to last for twelve consecutive hours or more. • Any storm for which a flash flood watch or warning is issued. • Any single storm predicted to have a cumulative rainfall of greater than one-half inch. • Any storm not meeting the previous three thresholds but which would mark a third consecutive day of measurable rainfall. The Contractor shall also inspect the erosion control and stormwater management systems at times of significant increase in surface water runoff due to rapid thawing when the risk of failure of erosion control measures is significant. In such instances as remedial action is necessary, the Contractor shall repair any and all significant deficiencies in erosion control systems within two days. The Owner shall be notified of any significant failure of stormwater management systems and erosion and sediment control measures and shall be notified of any release of pollutants to the City storm drain system. The Contractor shallkemove the sediment from behind the fence of the sedimentation control barrier when the accumulated sediment has reached one-half of the original installed height of the barrier. See site plans for additional erosion control notes during construction. 1 • ' - Northampton Cooperative Bank Florence Branch Office Post-Construction Stormwater Management System Owner& Party Responsible for Operation & Maintenance: Main Office: • Northampton Cooperative Bank 67 King Street Northampton, MA 01060 i Inspection & Maintenance Schedule: 1) Parking Lot/Street Sweeping Parking lot and driveway sweeping shall take place annually. • 2) Hooded Catch Basins and/or Drain Manholes with Sump Oil and water separators should be Inspected at least four times per year and cleaned annually or more often if required. Oil and sediments should be removed and disposed of in accordance with local, state and federal guidelines and regulations. In the case of an oil or bulk pollutant release, the system must be cleaned immediately following the spill and the proper authorities notified. 3) Stormwater Treatment Chamber The Stormwater Treatment Chambers require minimal routine maintenance; however, it is important that the system be properly inspected and cleaned when necessary in order to function at its best. The rate at which the system collects pollutants will depend more heavily on site activities than the size of the unit, e.g. heavy winter sanding will cause the grit chamber to fill more quickly, but regular sweeping will slow accumulation. For more detail of how the chambers should be maintained, consult the Owner's Manual. 2 - . . .., . • if , • 04 155 A ypuE copy ArresT Av iilitna.dic cam wasoNWEALTH OF MASSACHUSETTS TRIAL COURT HAMPSHIRE, ss. SUPERIOR COURT DEPT. CIVIL ACTION NO. 2004-001-5A nmcn ,-- - = JAN SMARG1E x3/4 inn, Plaintiff Ti =co Le? --“au . c-c, V. — =a, , NORTHAMPTON COOPERATIVE COOPERATIVE BANK, WILLIAM LETENDRE, FRANCIS JOHNSON, DAVID WILENSKY, GEORGE KOHOUT, KEITH WILSON, PAUL DIEMAND, KENNETH JODRIE, and NORTHAMPTON PLANNING BOARD Defendants STIPULATION OF DISMISSAL , - - . The parties to the above-entitled action, pursuant to the provisions of Mass. R.Civ.P. 41 (a)(1)00, hereby stipulate that said action be dismissed as-7 to all parties, with prejudice and without interest and/or costs to any party. Respectfully Submitted for Jan Smargie, Plaintiff By His Attorney, Date i:3 - I l -d-i c Mark A. Tanner , Esq. . BBO No. 649532 . , ) MORSE & SACKS 31 Trumbull Road Iü , E_C E___11 W_E t t 1.- . 1 t' 1 INorthampton, MA 01060 Telephone: (413) 584-1287 AUG 16 2004 L:ii'; - I arr cuig OFFICE NORTHAMPTON MA 01660 I • Respectfully Submitted for The Defendants William Letendre, Francis Johnson, David Wilensky, George Kohout, Keith Wilson, Paul Diemand, Kenneth Jodrie, in their capacity as members of the Planning Board of the City of Northampton r By T, _' / om Date P1a4Q`f" et M. Sheppa Esq. City City Solicitor 210 Main Street • Northampton, MA 01060 (413) 585-5889 880 #457820 CERTIFICATE OF SERVICE I, Mark A. Tanner, Attorney for the Plaintiff, do hereby certify that I • - -served the foregoing Stipulation of Dismissal upon the members of the Manning Board of the City of Northampton, Defendants, by mailing a true copy thereof, via first-class mail, to their attorney, Janet M. Sheppard, Esq.;' City Solicitor, 210 Main Street, Northampton, Massachusetts, 01060, on August 43, 2004. Ma A. Tanner, Esq. A orney for the Plaintiff • ORSE & SACKS 31 Trumbull Road Northampton, MA 01060 Telephone: (413) 584-1287 BBO No. 649532 ry 2 MAS-20040305 . _ Commonwealth of Massachusetts 08/132004 shgpardp - HAMPSHIRE SUPERIOR COURT 03:24 PM Case Summary Civil Docket HSCV2444-00155 Smargie v Northampton Cooperative Bank et al File Date 06/29/2004 Status Disposed: by Settlement(dlspsetq Status Date 087132004 Swollen A Civil A-CtRm 2-3rd fl Origin 1 Case Type CO2-Zoning appeal(40A) Lead Case Track F Service 07202004 Answer Ru1e1271920 11262004 Rule 15 11262004 Discovery 04252005 Rule 56 05125/2005 Final PTC 06242005 Disposition 08/23/2005 Jury Trial No Plaintiff Private Counsel 649532 Jan Smargie Mark A Tanner Active 06/29/2004 Morse&Sacks 31 Trumbull Road Northampton, MA 01060 Phone:4133&4-1287 . Fax:413-584-0453 Active 06/29/2004 Notify Defendant Northampton Cooperative Bank Service pending 06292004 Defendant Private Counsel 457820 Wiifiam Letendre,Member Janet M Sheppard Service pending 06/29/2004 76 Masonic Street Northampton,MA 01060 Phone:413.585-5889 Fax:413-586-2937 Active 07(16/2004 Notify Defendant "'See Attorney Information Above*" Francis Johnson,Member Service pending 06/29/2004 • case01 202322 y y y y y y Page 1 of 3 MAS•20040305 • Commonwealth of Massachusetts 08/13/2004 shepardp - HAMPSHIRE SUPERIOR COURT 03:24 PM Case Summary Civil Docket HSCV2004-00155 Smargie v Northampton Cooperative Bank at at Defendant an See Attorney Information Above"* David Wilensky,Member Service pending 08292004 Defendant ***See Attorney Information Above*" George Kohout,Member Service pending 00292004 Defendant *"See Attorney Information Above Keith Wilson,Member Service pending 06/29/2004 Defendant ***See Attorney Information Above*" Paul Diamond,Member Service pending 06/29/2004 Defendant ***See Attorney Information Above*" Kenneth Jodne,Member Service pending 06292004 • Defendant "*See Attorney Information Above'** Northampton Planning Board Service pending 06292008 • case05202322yyyyyy Page of M49-20040305 Commonwealth of Massachusetts 08/13/2004 shepardp HAMPSHIRE SUPERIOR COURT 03:24 PM Case Summary Civil Docket HSCV20O4-00155 Smargie v Northampton Cooperative Bank et al ate Paper Text 9/2004 1.0 Appeal and request for Declaratory Judgment from Northampton MA Zoning Board filed /29/2004 Origin 1,Type CO2,Track F. 0/2004 Tracking:origin/track set and mailed to Attorney Tanner. 7/09/2004 2.0 Affidavit of compliance by Mark A Tanner with proof of service of complaint re:Northampton Planning Board. 7/16/2004 3.0 Airy Janet M Sheppard's notice of appearance for William Letendre, Francis Johnson,David Wilensky,George Kohout,Keith Wilson,Paul Diemand,Kenneth Jodrie in their capacity as members of the Planning Board of the City of Northampton. 8/13/2004 4.0 Stipulation of dismissal with prejudice,without costs. case01 202322 y y yy y y Page3of3