September 8, 2016
Re: NOTICE OF AUDIT FINDINGS AND
NOTICE OF NONCOMPLIANCE
Northampton
118 Conz Street
RTN 1-15737
NON-WE-16-3A043
Dear Mr Auth:
On September 1,2016,the Massachusetts Department of Environmental Protection(MassDEP,the
Department) conducted an audit inspection at the location identified above. In particular,the audit
inspection focused on the operation,maintenance,and monitoring of the sub-slab depressurization
system being implemented at this site under Remedy Operation Status. The audit also included a
review of the inspection and monitoring(1&M)reports on-file at the Department,the most recent
of which was received on August 26,2016. This Notice informs you of the results of the
Department's audit inspection.
VIOLATIONS IDENTIFIED
The Department has determined that response actions were not performed in compliance with the
requirements of the Massachusetts Contingency Plan(MCP). The enclosed Notice of Audit
Findings and Notice of Noncompliance list the violation(s) and those action(s)that axe required
to achieve compliance. A copy of the applicable field inspection form is also enclosed.
Specifically,the Notice of Audit Findings and Notice of Noncompliance contains: (1)the
requirement violated,(2)the date and place that the Department asserts the requirement was
violated,(3)either the specific actions which must be taken in order to return to compliance or
direction to submit a written proposal describing how and when you plan to return to compliance
and(4)the deadline for taking such actions or submitting such a proposal.
This information Is available in alternate format.Call Michelle Waters-Ekanem,Diversity Director,at 617-292-5751.TTY#MassReleY Se rvic 1-B00-439-2370
MassDEP Webslte_www.mass9ovideo
Printed on Recycled Paper
NORTHAMPTON,RTN 1-15737
2 NOTICE OF AUDIT FINDINGS
AND NOTICE OF NONCOMPLIANCE
LICENSED SITE PROFESSIONAL(LSP)
A copy of this Notice has been sent to Dan Felten, the current LSP-of-Record for the disposal site.
However,you,not your LSP,are responsible for responding to this Notice of Noncompliance and
correcting the violations identified therein.
LIMITATIONS
The audit inspection did not include a compliance review of all response actions undertaken at
this site to date. This audit was focused primarily on evaluating compliance with the MCP's
maintenance requirements for operation,monitoring, and response
as detailed in the most recent I&M report and as observed on September 1,2016. being conducted,
The Department's findings were based on the certainty of the information reviewed during the
audit. These findings do not: (1)apply to actions or other aspects of the site that were not
reviewed in the audit,(2)preclude future audits of past,current,or future actions at the site,(3)in
any way constitute a release from any liability,obligation, action or penalty under M.G.L.c.21E,
310 CMR 40.0000,or any other law,regulation,or requirement,or(4)limit the Department's
authority to take or arrange,or to require any Responsible Party or Potentially Responsible Party to
perform, any response action authorized by M.G.L. c.21E which the Department deems necessary
to protect health,safety,public welfare,or the environment.
If you have any questions regarding this Notice,please contact John Ziegler at 413-755-2228.
Please reference Release Tracking Number 1-15737 and Enforcement Tracking Number NON-
WE-16-3A043 in any future correspondence to the Department regarding the site.
Sincerely,
Eva V. Tor
Deputy Regional Director
Bureau of Waste Site Cleanup
Certified Mail#7016 1970 0000 4853 3062,Return Receipt Requested
Enc.: Notice of Audit Findings and Notice of Noncompliance
Field inspection form
e-cc: Northampton: Chief Municipal Officer,Board of Health
Dan Felten,LSP-of-Record,ECS
Bill Simmons, Sr.Project Manager,ECS
Denise Andler,DEP WERO
Data Entry: ROS/SNAUDI; AUDCOM/NAFNON; FLDRUN 09/01/16
NOTICE OF AUDIT FINDINGS AND
NOTICE OF NONCOMPLIANCE
NON-WE-16-3A043
RTN 1-15737
THIS IS AN IMPORTANT LEGAL NOTICE.
FAILURE TO RESPOND COULD RESULT IN SERIOUS LEGAL CONSEQUENCES.
NAME OF ENTITY IN NONCOMPLIANCE:
Gretna Green Development Corp.
LOCATION WHERE NONCOMPLIANCE OCCURRED OR WAS OBSERVED:
118 Conz Street,Northampton
DATE(S)WHEN NONCOMPLIANCE OCCURRED OR WAS OBSERVED:
April 25,2014—current date (ongoing) —Date range that remote monitoring technology is
required to be operational for an Active Exposure Mitigation Measure being implemented
under Remedy Operation Status(ROS).
DESCRIPTION OF REQUIREMENT(S)NOT COMPLIED WITH:
1. 310 CMR 40.1026(3)(d) - An Active Exposure Pathway Mitigation Measure(AEPMM)
implemented as part of Remedy Operation Status must employ remote monitoring
technology that will alert the owner and operator of the building protected by the
AEPMM and the Department immediately upon failure of the system,including loss of
power, mechanical failure,or other significant disruption of the system effectiveness.
The sub-slab depressurization system(SSDS)has been operating since February 11,2014
under ROS. On April 25,2014,regulations became effective requiring that AEPMM
as rin onitoing technology.
A remote monitoring system for SSDS has not been employed.
ACTION(S)TO BE TAKEN AND DEADLINE(S)FOR TAKING SUCH ACTION(S):
1. Install remote monitoring technology,if not currently installed,that meets the necessary
system requirements outlined at
htt.://www.mass. ov/eea/a_encies/massde./clean./re 1ations/remote-teleme
information.html.
2. Register the remote monitoring system with MassDEP. In order to complete the
registration process you must submit the initial device registration at
NORTHAMPTON,RTN 1-15737
2
NOTICE OF AUDIT FINDINGS
AND NOTICE OF NONCOMPLIANCE
http://www.mass._ov/eea/a.encies/massde.Icleanu.Ire lations/remote-telemh
information.html,conduct a shutdown and restart test with MassDEP,and receive
confirmation from MassDEP that the test was successful and the registration is complete.
3. After completion of the actions specified above, and submit a Post-Audit Completion
Statement in accordance with 310 CMR 40.1170 on the form established by the
Department(B W SC-111)within 90 days of the date of this Notice. For more information
on electronic submittal of forms and reports,please visit MassDEP's website,
://www.mass .ov/eea/a•encies/massde./cleanu Ja..rovals/#2.
htt
If the required actions are not completed by the deadlines specified,an administrative penalty may
be assessed for every day after the date of this Notice that the noncompliance occurs or continues.
The Department reserves its rights to exercise the full extent of its legal authority in order to
obtain full compliance with all applicable requirements, including,but not limited to,criminal
prosecution,civil action including court-imposed civil penalties,or administrative action,
including administrative penalties imposed by the Department.
For the Department of Environmental Protection:
Date:
Eva V.Tor
Deputy Regional Director
Bureau of Waste Site Cleanup
td RTN: 1-15737
RSI AUDIT-PRE-INSPECTION SCREENING CHECKLIST
Action Inspected: ❑Phase V ❑Class C ® ROS
Town: NORTHAMPTON
P/OP: Gretna Green Development Corp.
'Per'.
cupant. NewE g
Same as PRP
Eng
Treatment Access Inc
Site Name:
LSP/Consultant. Dan Felten,ECS
Site Contact/Phone#: Matt McDonough 413-537-9109
Yes/No
ndition
blic Health Concerns S -
).5"NAPL within 15 feet of ground surface
Na
5 mgll total VOCs<15 ft bgs&w/in 30 tt of school/residence No
iM in surfitlal soil in S-1 area(schooilresidencelpark)
No
<500 feet,or site in Zone II or lWPA No
ivate wells located
her potential impacts to nearby receptors
nvironment and Release Characte
thin 500 feet of surface water,ACEC
onfirmed contamination of surface
lultiple sources of contamination
9edia other than soil or grow
(mediation Waste(310 CMR 40.0030)
temediationWaste removed within 120 days
2emediation Waste has been properly managed
Dpeation,Monitoring and Maintenance
Phase V/Class C OMM Requirements(310 CMR 40.0890)
OMM Plan is on-file,with Ph.IV RIP,per 40.0874(3)(d)
cs
and/or wetlands
wale
and/or wetlands
Comments
Groundwater sampling lass performed in 2012 and 2013
indicated groundwater concentrations below current GW-2
standards and ceased in 2013.
Two areas of PCE contamination-beneath existing
building and outside building footprint to the west
ater are affected
Indoor a
VGAC on site is in use
monitoring
OMM Plan identifies the type and frequency of
OMM activities done in accordance with RIP goals&criteria
See last ROS Status Report(826/16)for OMM-Section
5.0
Yes
Yes
OMM Plan updated in response to changes in site conditions
Current 1&M report received on time(due every 6 mos.)
OMM results are adequately documented,per 40.0892
Additional ROS Requirements(310 CMR 40.0893)
Complete ROS submittal was received,per 40.0893(3)
GRA is designed to achieve a Permanent Solution
is properly operated,monitored.and/or maintained
Each source of OHM has been eliminated or controlled
CRA
All Substantial Hazards have been eliminated
CRA modified or ROS terminated when required NA
Remedial to mitigate vaporrinlmsion of chlorinated solvents slocated beneath the on-site building.ng.aThe SSDS consists of Operation xt actontpoints Summary: A sub-slab
(SSD-1 through SSD-11)connected to a blower. Off-gas emissions are treated using two 1,000-pound VGAC units piped in series.
Monitoring of the SSDS consists of monitoring vacuum at 10 monitoring points throughout the building,indoor air sampling.and soil
gas at one of sampling.
wo sampl n9 locationsreadings
i sbelow both residential and commercial/industrial irtthreshold the values. Other contaminants detected
air
that vacuum is being
in indoor air Include carbon tetrachloride,chloroform.and methylene chloride and are believed to be unrelated to the release.Soil
gas results indicate PCE remains beneath the building but contaminant mass has been reduced.
January 2015-shutdown blower#1 and disconnected
extraction legs SSD-12,880-13,and SSD-14
Telemetry is not setup but is a requirement of 40.1026
REMEDIAL SYSTEM INFORMATION SHEET (RSIS)
Name/Location: 118 Conz Street
actor Name: John Ziegler
RTN: 1-15737
Date: 9/1/16
TEM INFORMATION
licate all that apply: D GW Recovery/Treatment D NAPL Recovery 0 Oil-Water Separator 0 Liquid-phase GAC
SSDS D GW Discharge D Remed.Additives D Air/Oxygen Sparge D SVE D CatOx D Vapor-phase GAC
stem operating: S YES D NO System operating as designed and at proposed levels: S YES D NO
M INSTRUMENTATION AND DOCUMENTATION*
rstem Specifics
Applicable
tgbook present, information current
verflow/high water shut-off switch
'assure shut-off switch
ata collection devices(flow meter,etc.)
rocess&Instrumentation Diagram
ystem secured
osting the name&telephone number of
ontact in case of system malfunction
wastewater Treatment Plant Operator
ispections at regular intervals
'recautions taken to prevent damage by
'eezing,heat,vehicles&vandals
'ossible violations of 310 CMR 40.0041 if not present&working for remedial wastewater generation.
PERATION INFORMATION ([month year)to[month year])
No
Present 8,
Working
Yes
Comment If not present,not working,
or not done.
Last Inspection'. 8/31/16
No
No
Yes
NA
NA
No
Remote telemetry not set up
No NA
Yes Yes
No
No
NA
NA
No
NA
3roundwater Treatment ([OHM type])
[OHM]Concentrations(pg/L) Influent:
System
tow rates(gpm)
Design:
Mid-point:
Observed:
1 Effluent:
Average:
NAPL recovered during current period: (xi()gallons Water recovered during current pericd_1xx19allons
_— ——— — —
D charge meets permit limits? D YES D NO ❑ N/A Recent downtime? D YES D NO (If yes,describe below)
Is
Remedial Additives: Are downgradient monitoring wells present and in satisfactory condition: 0 YES 0 NO D N/A
Sparge System Flow Rate:
SVE System Flow Rate:
antis
Gauges observed at inspection
1.
2.
3.
Air(Off-Gas)Treatment
Readig:
Notes:
Mid-Poin
Effluent
From file review(ppmv):
Field P1D reading(ppmv):
Recent downtime? 0 YES 0 NO (If yes,describe below)
Off-gas treatment devices achieving 95%reduction? 0 YES D NO 0 N/A Percent reduction if<95%:
0 Passive
Sub-Slab Depressurization System:S Active Vacuum 58 inches water
Inspection Summary/Highlights: Met with Bill Simmons and Brent Simmons of ECS on site. Reviewed operation of SSDS.
Indicated that telemetry is required as part of ROS. Also,we discussed the following topics: whether effluent treatment is needed
and PID in as essing both influuent andefuentt concentrate ns,progress towarld a Permanent Solution,and favorable trends ineffectiveness bot soil of
gas and indoor air data.