Loading...
349 Septic Checklist 2016 3119 Cole Commonwealth of Massachusetts t> City/Town of Septic System Installation Checklist B. Application Checklist (cont.) 2 Construction Inspection a) Building Sewer(310 CMR 15 222) All waste pipes tied into buildup sewer Schedule 40 PVC 4' or cast iron Minimum slope of 0 01-0 02 Pipe laid in continuous straight line Pipe Iced on compact. firm base Cleanouts precede all changes in alpnmenl/grade Cleanout provided every 100 ft Ball matenal dean b) Septic Tank(310 CMR 15 223) Tank is SM lent with 6' stone adder (15.22e) Tank is required sizelloading per plan Inlet and outlet ere at proper location (15 227) Tank is at tight(15 226) Test Outlet tees extend 6'above flow line Verify by vlsuautape Approved filter device placed at outlet DEP list Ga baffle walled at outlet tee Visual Inlet and outlet tees on cater line Visual Tank is brldlked with acceptable material Visual Basement check Verify toy reading Visual Visual Visual Verify by visual/tape Verify by visual/tape Visual Pe Check with level Verity with plan Verity with plan Approved WA Problem E E ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Approved N/A Problem C ❑ ❑ �❑ E ❑ ❑ L' ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 5 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ At /..SSL/P ex BrPec eywm InlWtion Ctwc st I 1-08%c•Ow Form Naive•Pop 2 at e Commonwsalth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist front.) c) Datrib ton Box (310 CMR 15232) All outlet pipes at same elevation Check by adding water Number of outlets -er n --- - Number of laterals pe Approved - NA Problem Inlet tee min. 1• over outlet Visual and wttape !y - !❑ ❑ D box set on level base isue/ >,G// ❑ Top of D box 36' max depth S w/tape ❑ Approved NA Problem Tank is set level Visual and wllevel . �\ ❑ Proper volume is provided Check plan and tank ❑ Float elevations set per plan Measure weeps ❑ ❑ 2 delivery line to D box Visual ❑ ❑ Number of pumps. _ -.._. . . .. ❑ ❑ ❑ SpecKred puny Provided or desiPsrs ❑ (J r approvat for equal pump Per pen D box is water-tight D box has a minimum of 2• thick wall and 12-inside dimension 0) Pump Chamber(310 CMR 15.231) Add water r Correct pump sequence ❑ ❑ ❑ Covers get to grade ❑ ❑ ❑ Electrical perms provided ❑ ❑ ❑ ti of stone beneath Chamber Visual ❑ ❑ ❑ Chamber is water-tight Test ❑ ❑ ❑ Ain. 9' cover provided Visual ❑ ❑ ❑ Correct loading provided per plan Visual on tank ❑ '" ❑ Notes' swat svrem raison chednw rt-0e ape• e fam weer•Pay]of e Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist (coot) e) Leaching Facility (310 CMR 15 290' No frozen material used including back fill Visua. No clay, tailings or stones larger than 6'for cover material Soil at bottom/sides of excavation matches info on deep holes All impervious layers removed No remaining NB horizons Groundwater conditions match plan and deep holes Vented d under impervious cover per pi (15.241) Vent is protected from precipitation and animal entry Cover of a minimum of 9•over leach area plan Approved - NIA Problem ❑ r ❑ ❑ ✓ ❑ Pipe slope equal to 0.005 Check wltr t - / ❑ area Leach per dsspn(15241) ap 1/7 ❑ Excavation is level and at required ..cis_ - plan Removal of 5 n maternal are replacemen (if in fill) Bads fill material is acceptable Final contours correct per plan Surface/subsurface drainage away from leach area Final grade and side slopes are stable Dist ibution lines are capped, vented.or connected together Impermeable barrier(15 255(2)) Retaining wall inspected by PE Retaining wall is water-proofed Retaining wWUbanier is at correct depth/height smprm swm c.rermn cheddar 11-00 dot•deb plan Cheat with plan ❑ 0 Form Nome•Par 4 of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist (cont.) f) Leaching trenches(310 CMR 15 251) Number of trenches. Depth of trenches _. Width of trenches Trench spacing per pan Stone is double-washed 1314'to 5.247) g) Leaching fields (310 CAR 15.242j Length of field. Width of field. Min. of 2 distribution lines Separation distance conforms to plan Stone is double-washed 1304' to 1541(15.247) h) Leeching Pits(310 CMR 15.253) Number of pits. -- Depth of pits. Stone is daubs-washed(314'to 1X'1(15 2471 Each pit has mot. 1 20'access cover Pique network and configuration of pits/chambers per plan i) Tight Tank(310 CMR 15.260) Tank Is set lsvei with 6'stone under Tank Is proper sure per plan Pumping contract has Wan provided Covers to grads AN alarm set at 3/5 task capacity AN alarm test on separate arcult Sorg SoWn Yeeleton Chooklof 11-00 doc•dee Approved NIA Problem _, ❑ Visual and*fah level ❑ ❑ ❑ Visual vnth Wan ❑ ❑ ❑ ❑ Visual ❑ ❑ ❑ Crwcr floats by raising ❑ ❑ ❑ Set oft alarm ❑ Ci ❑ Form Soot Pop 5 of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist(cons) it Certificate of Compliance (310 CMR 15 021 As Built Plan Submitted Signed by Installer Signed by Designer Certificate of Compliance Issued Notes Dote Doe A %c L/74 ,/i Septic eyolern uudYMen Choddlot 17-09 doc•dude Form Moor•Pao 6 of 6