560 Septic Installation Checklist 2012 3.21ves74- Pei Commonwealth of Massachusetts Septic System Installation Checklist / City!Town of /4 p? t3 B. Application Checklist (cont) 2. Construction Inspection a) Building Sewer(310 CMR 15.222) All waste pipes tied into building sewer Schedule 40 PVC 4' or cast iron Minimum slope of 0.01-0.02 Pipe laid in continuous straight line Pipe laid on compact. firm base Cleanouts precede all changes in alignment/grade Cleanout provided every 100 ft. Ball material clean b) Septic Tank(310 CMR 15.223) Tank is set level with 6'stone under (15.228) Tank is required size/loading per plan Inlet and outlet are at proper location (15.227) Tank is water tight(15.226) Outlet tees extend 6 above flow line Approved filter device placed at outlet Gas baffle installed at outlet tee Inlet and outlet tees on center line Basement check Verify by reading pipe Visual Visual Visual Verify by visual/tape Verify by visual/tape Visual Check with level Verify with plan Verify with plan Test Verify by visual/tape DEP list Visual Visual Tank is back filled with acceptable material Visual Notes: /4"faVei Approved NIA Problem ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ N/A Problem ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ System Installation ChsokMst 11-09,doc•dale Form Name Page 2 of 6 Commonwealth of Massachusetts City/fown of Septic System Installation Checklist B. Application Checklist(cont.) c) Distribution Box(310 CMR 15.232) All outlet pipes at same elevation Number of outlets Inlet tee min. 1' over outlet D box set on level base Top of D box 36' max depth d) D box is water-tight D box has a minimum of T thick wall and 17 inside dimension Pump Chamber(310 CMR 15.231) Check by adding water Number of laterals Visual and w/tape Visual Visual and w/tape Add water Tank is set level Proper volume is provided Float elevations set per plan Min. 2'delivery line to D box Number of pumps: Specified pump provided or designers approval for equal pump Correct pump sequence Covers set to grade Electrical permit provided 6' of stone beneath chamber Chamber is water-tight Min. 9' cover provided Correct loading provided per plan Notes: System IrnlagaEOn Checklist 11-0e.doc•date Visual and w/level Check plan and tank Measure wttape Visual Visual Test Visual Visual on tank Appro d N/A Problem per plan ❑ ❑ ❑ ❑ ❑ ❑ 5/ ❑ ❑ Approved N/A Problem ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Form Name•Page 3 of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist(cont) e) Leaching Facility(310 CMR 15.240) No frozen material used including back fill Visual No day, tailings or stones larger than 6°for cover material Soil at bottom/sides of excavation matches info on deep holes All impervious layers removed No remaining NB horizons Visual Groundwater conditions match plan and Visual/check plan deep holes Vented if under impervious cover per plan (15241) Vent is protected from precipitation and animal entry Cover of a minimum of 9° over each area Pipe slope equal to 0.035 Leach area per design(15.241) Excavation is level and at required depth Removal of 5 R material and replacement Of in fill) Back fill material is acceptable Final contours correct per plan Surface/subsurface drainage away from leach area Final grade and side slopes are stable Distribution lines are capped, vented, or connected together Impermeable barrier(15.255(2)) Retaining wall inspected by PE Retaining wall is water-proofed Retaining walUbanier is at correct depth/height Visual yetem Installation Checklist 11-09.doc•date Check wltransit Visual/check plan Visuallcheck plan Visual Check with plan Approved N/A Problem ❑ ❑ Cd ❑ ❑ d ❑ ❑ C!d ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ alz ❑ V ❑ ❑ ❑ ❑ V ❑ ❑ ❑ ❑ DC/ ❑ ❑ ❑ ❑ a- ❑ ❑ [/ ❑ ❑ Cg ' ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Form Name•Page 4 of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist(cont) f) Leaching trenches(310 CMR 15.251) ^ � Approved N/A Problem Number of trenches: LY ❑ ❑ Depth of trenches: ❑ ❑ ❑ Width of trenches: ❑ ❑ ❑ renchspacing per plan tier /"G"/ 111 Stone is double-washed(3/4"to 1W] (15.247) ❑ ❑ U g) Leaching fields (310 CMR 15.242) Length of field: ❑ ❑ ❑ Width of field: ❑ ❑ ❑ Min. of 2 distribution lines ❑ ❑ ❑ Separation distance conforms to plan ❑ ❑ ❑ stone is double-washed[3/4'to 11A1 (15.247) ❑ ❑ ❑ h) Leaching Pits(310 CMR 15.253) Number of pits: ❑ ❑ Depth of pits: ❑ ET Stone is double-washed[3/4'to 1 h'](15.247) ❑ ❑ ❑ Each pit has min. 1 20'access cover ❑ ❑ ❑ Piping network and configuration of ❑ ❑ ❑ pits/chambers per plan i) Tight Tank(310 CMR 15.260) ,,,/ Tank is set level with 6'stone under Visual and with level ❑ l� ❑ Tank is proper size per plan Visual with plan ❑ ❑ ❑ Pumping contract has been provided ❑ ❑ ❑ Covers to grade Visual ❑ ❑ ❑ NV alarm set at 3/5 tank capacity Check floats by raising ❑ ❑ ❑ AN alarm test on separate circuit Set off alarm ❑ ❑ ❑ mem Installation Chap at 11-09 doc•date Fam Name•Pape 5 of 6 Commonwealth of Massachusetts j City/Town of Septic System Installation Checklist B. Application Checklist(cont) j) Certificate of Compliance(310 CMR 15.021) As Built Plan Submitted Signed by Installer Signed by Designer Certificate of Compliance Issued Notes: De (14,5;-7 /-(9_ Date Date tyslem Inetetlebon Checklist 11-09.doc•date Form Name•Page 6 of 6