Loading...
31A-211 (4) (j CENTER FOR 314 1 U EcoTechnotog we make green make sense- Post-Construction ensePost-Construction Duct Leakage Testing Report Site Intarmation Date of Test Tuesday, August 02, 2016 Client Russ Blanchard Project Address 35 Harrison Ave, Northampton, MA 01060 Test completed by Miira Gates Duct Leakage Test Results Conditioned Area #1 696 sq ft Duct System 1 - Total Leakage Total Duct Leakage 22 CFM25 CFM25/100 sq ft 3.16 Pass or Fail IECC 2009? Pass Notes: Meets requirements of IECC 2009 Post-Construction Duct Leakage Requirements IECC 2009 -Total Leakage Test for Renovations <4 CFM per 100 sq ft of conditioned floor area