Revisions To Planned Work ���(.Sed 7-4‘-/Z
Notes
— Bob Dasso of Boulanger Plumbing will be pulling the plumbing permit.
— Pioneer Heating & Cooling will be installing a mini-split HVAC system. Existing baseboard will be
removed from the 3 rooms that will contain the head units: Living/Dining, Master Bedroom, Second
Bedroom(the other spaces/rooms will continue to have their own heaters).
First Floor
Kitchen
— The "L" shape will be changed to a "galley" configuration, with the sink and dishwasher relocated to the
new island.
— The above change necessitates relocation of the existing circuits for dishwasher and garbage disposal
— A pony wall will be constructed along the back of the island to accommodate plumbing and wiring, and
to provide a solid structure for attaching the base cabinets.
Second Floor
Master Bathroom
— Toilet will be located —12" further down the existing wall to accommodate a larger vanity
— Jacuzzi tub will be replaced with a free-standing soaking tub, requiring the elevation of the sunken
portion of the floor to be level with the remaining floor.
— Electric baseboard will be replaced with radiant heat(by the tile installer), using the former Jacuzzi
cicuit for power.
Description of work to residential condominium (townhouse)
Notes
— Complex is all electric, no fuel
— Owners will perform most demolition, removal, some wiring and installation/construction
— Plumber will obtain relevent permits
First Floor
Kitchen
— Replace cabinets, sink, floor
— Locations of appliances will remain the same
— Remove soffit above cabinets (empty except for sink lights)
— Remove 2x3 non-bearing partial partition walls between kitchen and dining area
— Relocate affected light switches
— Add lights over island and counters
Living/Dining
— Remove metal fireplace unit and interior metal flue
— Remove fireplace box framing and drywall
— Wall is sheetrocked on interior back side
— Metal flue continues upward in an exterior wooden chimney box
— Remove existing AC/Heat pump
— will be replaced by a mini-split(installation permitted separately)
— close exterior and interior openings in wall, insulate
— Remove 2 of 3 electric baseboard heaters
Bathroom
— Replace vanity, sink and toilet
— Replace drop ceiling with solid ceilng (after Master Bath work is done)
Second Floor
Master Bathroom
— Replace shower unit, toilet, vanity and sink, flooring
— Remove Jacuzzi tub, may replace with drop-in soaking tub
Master Bedroom
— Remove existing AC/Heat pump
— Remove 2 of 3 electric baseboard heaters
3throom 233105G
Jay Village i — �, ti
1
1
1262
1
rr
0 1-
17'53241R '' 3D512 '51324R\
( Y (ma c W Q 0 0c46-
G}-GI
' 113
IT"-
9/ to
to
f s�
�`ax?da 'l
N t J
42, 53
C'r
-_ . Q <
fi5B31;, — y PrnY
i�
+:
L - �) !� a
t/ iOf 1
1N362024 i1 1^1304014 1"1302214 1 1N3S4014 * '�
` - I ;ti 3D1530 t 317B36 -
ps
a -- �_ _ - {t
D1312hwasher (basis 51530 j 3DB3b 1 '\
' Thr--
„r i fh .
5� r IT
S � b�� . /
1