Loading...
16A-020 (7) /I4 - odo - 1/ `� Eric Boudreau EricRBoudreauCgomail.com Johanna Kasidi 978-815-0887 414 Fairway Village 413-461-5477 Leeds. MA 01053 Revisions To Planned Work ���(.Sed 7-4‘-/Z Notes — Bob Dasso of Boulanger Plumbing will be pulling the plumbing permit. — Pioneer Heating & Cooling will be installing a mini-split HVAC system. Existing baseboard will be removed from the 3 rooms that will contain the head units: Living/Dining, Master Bedroom, Second Bedroom(the other spaces/rooms will continue to have their own heaters). First Floor Kitchen — The "L" shape will be changed to a "galley" configuration, with the sink and dishwasher relocated to the new island. — The above change necessitates relocation of the existing circuits for dishwasher and garbage disposal — A pony wall will be constructed along the back of the island to accommodate plumbing and wiring, and to provide a solid structure for attaching the base cabinets. Second Floor Master Bathroom — Toilet will be located —12" further down the existing wall to accommodate a larger vanity — Jacuzzi tub will be replaced with a free-standing soaking tub, requiring the elevation of the sunken portion of the floor to be level with the remaining floor. — Electric baseboard will be replaced with radiant heat(by the tile installer), using the former Jacuzzi cicuit for power. Description of work to residential condominium (townhouse) Notes — Complex is all electric, no fuel — Owners will perform most demolition, removal, some wiring and installation/construction — Plumber will obtain relevent permits First Floor Kitchen — Replace cabinets, sink, floor — Locations of appliances will remain the same — Remove soffit above cabinets (empty except for sink lights) — Remove 2x3 non-bearing partial partition walls between kitchen and dining area — Relocate affected light switches — Add lights over island and counters Living/Dining — Remove metal fireplace unit and interior metal flue — Remove fireplace box framing and drywall — Wall is sheetrocked on interior back side — Metal flue continues upward in an exterior wooden chimney box — Remove existing AC/Heat pump — will be replaced by a mini-split(installation permitted separately) — close exterior and interior openings in wall, insulate — Remove 2 of 3 electric baseboard heaters Bathroom — Replace vanity, sink and toilet — Replace drop ceiling with solid ceilng (after Master Bath work is done) Second Floor Master Bathroom — Replace shower unit, toilet, vanity and sink, flooring — Remove Jacuzzi tub, may replace with drop-in soaking tub Master Bedroom — Remove existing AC/Heat pump — Remove 2 of 3 electric baseboard heaters 3throom 233105G Jay Village i — �, ti 1 1 1262 1 rr 0 1- 17'53241R '' 3D512 '51324R\ ( Y (ma c W Q 0 0c46- G}-GI ' 113 IT"- 9/ to to f s� �`ax?da 'l N t J 42, 53 C'r -_ . Q < fi5B31;, — y PrnY i� +: L - �) !� a t/ iOf 1 1N362024 i1 1^1304014 1"1302214 1 1N3S4014 * '� ` - I ;ti 3D1530 t 317B36 - ps a -- �_ _ - {t D1312hwasher (basis 51530 j 3DB3b 1 '\ ' Thr-- „r i fh . 5� r IT S � b�� . / 1