MCP Response Actions 2003 Fuss&O'Neill Inc. cer,roms
March 27, 2003
Mayor Mary Clare Higgins
City Hall
210 Main Street
Northampton, Massachusetts 01060
Mr. Peter McErlain
Department of Health
210 Main Street
Northampton, Massachusetts 01060
78 Interstate Drive,West Springfield,MA 01089
TEL 413 452-0445 FAX mc 845-0497
INTERNET.AWW.fussandoneilcom
OI er omccs
Manchester,Connecticut
Providence,Rhode Island
_ Trumbull.Connecticut
Columbia,South Carolina
GreenvIIe, North Carolina
RE: MCP Response Actions
Massachusetts Highway Department, Facility#20
Mount Tom Road, Northampton, Massachusetts
RTN: 1-11151
Dear Mayor Higgins and Mr. McErlain:
In accordance with the Public Involvement requirements outlined under 310 CMR
40.1403(3) of the Massachusetts Contingency Plan (MCP), this letter serves as
notification of Phase IV remedial actions completed at the above referenced site.
A Phase IV As-Built Construction Report (including a Final Inspection Report) has
been prepared by Fuss & O'Neill, Inc. under the supervision of a Licensed Site
Professional (LSP) in accordance with the requirements of 310 CMR 40.0875 and
40.0876 of the MCP. The Phase IV As-Built Construction Report has been filed with
the Massachusetts Department of Environmental Protection (MADEP) Westem
Regional office in Springfield, Massachusetts. Appointments to review the MADEP
site files can be made by calling the Western Regional office at(413)784-1100.
If you have any questions regarding this notification, please contact either of the
undersigned at(413)452-0445.
Sincerely, Slil/- e
vAtek)-4 i71412, (1446)/a
Addie Rose Holland Iierbert E. Woike, LSP
Hydrogeologist Project Manager
c: Douglas J. Spink, MassHighway Department
Richard Green, Massachusetts DEP
F fP2000120007851Al2ARH03186.doc
Corres.(MA)
Fuss&O'Neill Inc. ConsnRing Engineers
July 3, 2003
Mayor Mary Clare Higgins
City Hall
210 Main Street
Northampton, Massachusetts 01060
JMr. Peter McErlain
Department of Health
210 Main Street
Northampton, Massachusetts 01060
78 Interstate Drive,West Springfield,MA 01089
TEL 413 452-0445 FAX 413 846-0497
INTERNET:VAVWJussandonelll.com
Omer Otos''
Manchester,Connecticut
Providence,Rhode Island
Trumbull,Connecticut
Columbia,South Carolina
Greenville,North Carolina
RE: MCP Response Actions
Massachusetts Highway Department, Facility#20
Mount Tom Road,Northampton,Massachusetts
RTN: 1-11151
Dear Mayor Higgins and Mr. McErlain:
In accordance with the Public Involvement requirements outlined under 310 CMR
40.1403(3) of the Massachusetts Contingency Plan (MCP), this letter serves as
notification of Phase IV remedial actions completed at the above referenced site.
A Phase IV As-Built Construction Report (including a Final Inspection Report) has
been prepared by Fuss & O'Neill, Inc. under the supervision of a Licensed Site
Professional (LSP) in accordance with the requirements of 310 CMR 40.0875 and
40.0876 of the MCP. The Phase IV As-Built Construction Report has been filed with
the Massachusetts Department of Environmental Protection (MADEP) Western
Regional office in Springfield, Massachusetts. Appointments to review the MADEP
site files can be made by calling the Western Regional office at(413) 784-1100.
If you have any questions regarding this notification, please contact either of the
undersigned at(413)452-0445.
Sincerely,
Addie Rose Holland
Hydrogeologist
fl
Herbert E. Woike, LSP
Project Manager
c: Douglas J. Spink, MassHighway Department
Richard Green, Massachusetts DEP
F:\P200012000785\A 12\ARH03 18b.doc
Cones.(MA)