Loading...
MCP Response Actions 2003 Fuss&O'Neill Inc. cer,roms March 27, 2003 Mayor Mary Clare Higgins City Hall 210 Main Street Northampton, Massachusetts 01060 Mr. Peter McErlain Department of Health 210 Main Street Northampton, Massachusetts 01060 78 Interstate Drive,West Springfield,MA 01089 TEL 413 452-0445 FAX mc 845-0497 INTERNET.AWW.fussandoneilcom OI er omccs Manchester,Connecticut Providence,Rhode Island _ Trumbull.Connecticut Columbia,South Carolina GreenvIIe, North Carolina RE: MCP Response Actions Massachusetts Highway Department, Facility#20 Mount Tom Road, Northampton, Massachusetts RTN: 1-11151 Dear Mayor Higgins and Mr. McErlain: In accordance with the Public Involvement requirements outlined under 310 CMR 40.1403(3) of the Massachusetts Contingency Plan (MCP), this letter serves as notification of Phase IV remedial actions completed at the above referenced site. A Phase IV As-Built Construction Report (including a Final Inspection Report) has been prepared by Fuss & O'Neill, Inc. under the supervision of a Licensed Site Professional (LSP) in accordance with the requirements of 310 CMR 40.0875 and 40.0876 of the MCP. The Phase IV As-Built Construction Report has been filed with the Massachusetts Department of Environmental Protection (MADEP) Westem Regional office in Springfield, Massachusetts. Appointments to review the MADEP site files can be made by calling the Western Regional office at(413)784-1100. If you have any questions regarding this notification, please contact either of the undersigned at(413)452-0445. Sincerely, Slil/- e vAtek)-4 i71412, (1446)/a Addie Rose Holland Iierbert E. Woike, LSP Hydrogeologist Project Manager c: Douglas J. Spink, MassHighway Department Richard Green, Massachusetts DEP F fP2000120007851Al2ARH03186.doc Corres.(MA) Fuss&O'Neill Inc. ConsnRing Engineers July 3, 2003 Mayor Mary Clare Higgins City Hall 210 Main Street Northampton, Massachusetts 01060 JMr. Peter McErlain Department of Health 210 Main Street Northampton, Massachusetts 01060 78 Interstate Drive,West Springfield,MA 01089 TEL 413 452-0445 FAX 413 846-0497 INTERNET:VAVWJussandonelll.com Omer Otos'' Manchester,Connecticut Providence,Rhode Island Trumbull,Connecticut Columbia,South Carolina Greenville,North Carolina RE: MCP Response Actions Massachusetts Highway Department, Facility#20 Mount Tom Road,Northampton,Massachusetts RTN: 1-11151 Dear Mayor Higgins and Mr. McErlain: In accordance with the Public Involvement requirements outlined under 310 CMR 40.1403(3) of the Massachusetts Contingency Plan (MCP), this letter serves as notification of Phase IV remedial actions completed at the above referenced site. A Phase IV As-Built Construction Report (including a Final Inspection Report) has been prepared by Fuss & O'Neill, Inc. under the supervision of a Licensed Site Professional (LSP) in accordance with the requirements of 310 CMR 40.0875 and 40.0876 of the MCP. The Phase IV As-Built Construction Report has been filed with the Massachusetts Department of Environmental Protection (MADEP) Western Regional office in Springfield, Massachusetts. Appointments to review the MADEP site files can be made by calling the Western Regional office at(413) 784-1100. If you have any questions regarding this notification, please contact either of the undersigned at(413)452-0445. Sincerely, Addie Rose Holland Hydrogeologist fl Herbert E. Woike, LSP Project Manager c: Douglas J. Spink, MassHighway Department Richard Green, Massachusetts DEP F:\P200012000785\A 12\ARH03 18b.doc Cones.(MA)