Loading...
151 Municipal Water Application NORTHAMPTON WATER DEPARTMENT 237 PROSPECT STREET NORTHAMPTON, MA 01060 586-6950 Ext. 300 Subject: Municipal Water Availability Location: 151 Mapleridge Rd. (Lot 815) Inquiry Made By: Henry Whitlock Date of Inquiry: 6-4-92 Municipal Water Main in Front of Location: YES ✓ Size/Material/Age of Water Main: 8" DI pipe / Approx. 1989 NO Approximate Street Pressure: 36 PSI Size of Service Connection: 1" copper Comments: Little or no water pressure can be expected at peak demand times at this proposed house location without a booster system because of the elevation. A corresponding "water entrance fee" shall be paid prior to making any connection to the municipal water system. Arrangements of such installation shall be made with the Northampton Water Department with a minimum of 5 working days notification. All work shall conform to Northampton Water Department specifications. �� harles Borowski Superintendent of Water Enclosure: Letter to Frank Sienkiewicz from Sam Brindis, dated June 14 , 1991. cc: Samuel B. Brindis, Peter McNulty, Jr. George Andrikidis, Frank Sienkiewicz, IV\Water4\CityH2O Director, DPW , Assistant Director, DPW Assistant City Engineer Building Inspector