151 Municipal Water Application NORTHAMPTON WATER DEPARTMENT
237 PROSPECT STREET
NORTHAMPTON, MA 01060
586-6950 Ext. 300
Subject: Municipal Water Availability
Location: 151 Mapleridge Rd. (Lot 815)
Inquiry Made By: Henry Whitlock
Date of Inquiry: 6-4-92
Municipal Water Main in Front of Location: YES ✓
Size/Material/Age of Water Main: 8" DI pipe / Approx. 1989
NO
Approximate Street Pressure: 36 PSI
Size of Service Connection: 1" copper
Comments: Little or no water pressure can be expected at peak demand
times at this proposed house location without a booster system because of
the elevation.
A corresponding "water entrance fee" shall be paid prior to making
any connection to the municipal water system. Arrangements of such
installation shall be made with the Northampton Water Department
with a minimum of 5 working days notification. All work shall
conform to Northampton Water Department specifications.
��
harles Borowski
Superintendent of Water
Enclosure: Letter to Frank Sienkiewicz from Sam Brindis, dated
June 14 , 1991.
cc: Samuel B. Brindis,
Peter McNulty, Jr.
George Andrikidis,
Frank Sienkiewicz,
IV\Water4\CityH2O
Director, DPW
, Assistant Director, DPW
Assistant City Engineer
Building Inspector