Loading...
10D-001 Chesterfield Rd PlanningSEE DETAIL FOR Fp CLOSURE OF A c � OF WATER GEOMEMBRANE AT CORNER (TYP.) CONCRETE MISSING AT MISSING CONCRETE AREA REMOVE WEATHERED AND AND SPALLED CONCRETE TO CREATE SQUARED EXISTING CRACK SURFACE, CLEAN! SURFACE, INSTALL #40 TIE HOOKS EXISTING �, IN CONCRETE (4" EMBEDMENT) AND SECURE WITH EPDXY OR SPILLWAY NON- SHRINK GROUT, FORM AND PLACE CONCRETE. CHANNEL EXISTING 0 75 " 0 R FILL WITH EARTH AND REGRADE, PLACE STONES TO MATCH EXISTING, LEAVING 6" REVEAL ON CONCRETE DAM FACE S �ee� B PROPOSED TOP OF SLOPE (SEE SECTION B -B) 2' \ EXIST. EDGE OF WATER AT MISSING CONCRETE AREA, REMOVE WEATHERED AND B SPALLED CONCRETE TO CREATE SQUARED SURFACE CLEAN SURFACE, INSTALL #40 TIE HOOKS (4" EMBEDMENT AND EXIST. TOP OF SLOPE SECURE WITH EPDXY OR NON- SHRINK GROUT, FORM AND PLACE CONCRETE. PROPOSED CONCRETE REINFORCEMENT EXIST. TOP OF SLOPE EXISTING TO WEST SPILLWAY WALL (SEE DETAILS) BLOCK CONCRET O( (, -Y( w`O`��j O , �O 0,O 90 G () 0 � EXISTING RIP -RAP TO BE REPLACED TO FORM CHANNEL 0 �o pOp�o 0 A PLAN SCALE: 1 " =5' " BAR SPACED 12" O.C. REMOVE TOP 2 FEET OF 6 4 ORIZONTAL AND VERTICAL / EXISTING SPILLWAY WALL— i i = PROPOSED CONCRETE 1 /2 "x1 /2" REGLET AND REINFORCEMENT JOINT SEALANT M EXISTING SPILLWAY WALL -- REMOVE ALL WEATHERED AND LOOSE CONCRETE, TIE HOOK (TYP.) --� --- -CLEAN SURFACE AND APPLY SEE NOTE 2 BELOW f c ., EPDXY BONDING ADHESIVE 3" �' 1 EXISTING SPILLWAY BOTTOM 18 NOTES: 1. BOTTOM OF NEW CONCRETE WALL SHALL BE SLOPED SUCH THAT THE BOTTOM OF THE WALL IS ONE FOOT BELOW THE SPILLWAY BOTTOM THROUGHOUT THE ENTIRE LENGTH. 2. PLACE THE TIE HOOKS STAGGERED EVERY 1' VERTICALLY AND 3' HORIZONTALLY. 3. SECURE TIE HOOKS AND REBAR INTO EXISTING CONCRETE WITH EITHER EPDXY OR NON- SHRINK GROUT. WEST SPILLWAY WALL REINFORCEMENT- DETAIL SCALE: 1 /4" -1' -0" 2 "x4" PRESSURE TREATED WOOD 2 "x12" PRESSURE TREATED WOOD SECURE TO CONCRETE DAM AT (CUT TO FIT). SECURE TO CONCRETE CORNER WITH WEDGE ANCHORS DAM WITH WEDGE ANCHORS AT AT 15" O.C. = 4' -0" O.C. 2 "x4" PRESSURE TREATED WOOD r SECURED SAME AS UPSTREAM SIDE POLYPROPYLENE >t GEOMEMBRANE WITH . { NOTES: CUSHION GEOTEXTILE�� ' 1. WEDGE ANCHORS SHALL BE 1/2" DIA. S.S. COUNTER SUNK WEDGE ANCHORS (3W MIN_ EMBEDMENT) GEOMEMBRANE CLOSURE AT CORNER OF SPILLWAY- DETAIL SCALE: 1 /4 " =1' -0" EXISTING WEST DETERIORATED CONCRETE SPILLWAY WALL MULTIPLE CRACKS -� IN CONCRETE 0 / RIP -RAP s ir ���� EXISTING SPILLWAY BOTTOM V i BOTTOM OF PROPOSED CONCRETE SPILLWAY ADDITION SECTION A -A SCALE: 1 " =5' REMOVE ALL WEATHERED AND LOOSE - UPSTREAM CONCRETE DAM FACE CONCRETE TO CREATE SQUARED SURFACE AND CLEAN AREA TO BE REPAIRED. SPALLED AREA OF CONCRETE TO BE REPAIRED WITH CONTINUOUS #40 BAR DRY - PACKED CONCRETE. 140 TIE HOOKS SPACED 1' -0" O.C. SECURED WITH EITHER EPDXY OR NON- SHRINK GROUT 3W' MIN. DRY- PACKED CONCRETE REPAIR - DETAIL NOT TO SCALE PROPOSED POLYPROPYLENE 2 "x12" PRESSURE TREATED WOOD (CUT GEOMEMBRANE WITH A TO FIT) TO BE INSTALLED ON THE NONWOVEN CUSHION ENTIRE LENGTH OF EXPOSED DAM WALL GEOTEXTILE BENEATH �. EXISTING GROUND T SURFACE PROPOSED EARTH FILL WITH STONE COVER o" I SEE DETAIL ABOVE FOR DRY- PACKED CONCRETE REPAIR. ANCHOR TRENCH (TYP.) EXISTING CONCRETE DAM BACKFILL TRENCH WITH _ 12 �y PREVIOUSLY EXCAVATED�� TRENCH MATERIAL SECTION B -B T -. '95 DAM REHABILITATION- DETAIL \ _' SCALE: 1/4 " =1' -0" SITE PLAN, SECTION AND DETAILS NOTES: HOWARDS ICE POND DAM REHABILITATION 1. ALL WOOD TO BE USED SHALL BE OFFICE OF PLANNING & DEVELOPMENT NO. 1 SOUTHERN YELLOW PINE. NORTHAMPTON, MASSACHUSETTS TIGHE & BOND INC. CONSULTING ENGINEERS WESTFIELD, MASSACHUSETTS SCALE: AS SHOWN DATE: APM 1999 5/17/99 `0419 \N4 19DAM