Loading...
44-086 (5) 1157 FLORENCE RD BP-2016-1351 GIS 4: — COMM01 WEALTH OF MASSACHUSETTS Map:Blo k:44-086 ITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Category: SOLAR PANELS BUILDING PERMIT Pert-nit# BP-2016-1351 Project# JS-2016-002317 Est. Cost: $11000.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: REAL GOODS SOLAR INC— 101487 Lot Size(sq. ft.): 61855.20 Owner: CLOPTON SUSAN M&JOHN P LEVIN zoning: Applicant. REAL GOODS SOLAR INC AT. 1157 FLORENCE RD Applicant Address: Phone: Insurance: 106 rt 32 suite 10 (860) 535-3370 Workers Compensation NORTH FRANKLINCT06254 ISSUED ON.5118120160:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 2.08 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy §ignature: FeeType: Date Paid: Amount. Building, 5/18/2016 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2016-1351 APPLICANT/CONTACT PERSON REAL GOODS SOLAR INC ADDRESS/PHONE 106 rt 32 suite 10 NORTH FRANKLIN06254(860)535-3370 Q PROPERTY LOCATION 1157 FLORENCE RD MAP 44 PARCEL 086 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid `J Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED 8 KW SOLAR ARRAY New Construction Non Structural interior renovations El X Addition to Existing- Accessory Structure Building Plans Included: Owner/Statement or License 101487 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: pproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds .Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management olitio Delay Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. Department use only City of Northampton Status of Permit: Building Department Curb Cut/Driveway Parmit LC � 212 Main Street Sewer/ ept AvRoom 100 WaterfNeN Ava#*I yNorthampton, MA 01060 Two�of Structure6ph ne 13-587-1240 Fax 413-587-1272 Ptottsite Pis Other Specify CTIo' 1�0 C NSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: Map Lot Unit 1157 Florence Road Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: John& Susan Clopton-Levine 1157 Florence Road, Florence,MA 01062 Name(Print) Current Mailing Address: 413-575-5052 see signed contract attached Telephone Signature 2.2 Authorized Agent: Alteris Renewables dba0 �v`y 1 .�iv f� lb, Alf'rHrkJ, Name(Print) 1 Current Mailing Address: - 5 t C i _'t Fid ' 860 -q/5: ? Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 2,000 (a) Building Permit Fee 2. Electrical 9,000 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3 +4+5) 1 1,000 1 Check Number This Section Far Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date �.i .: +� ,.,w�i.' ..,, �. Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L:-,-R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO U DONT KNOW � YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO � DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading, excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. i i SECTION 5-DESCRIPTION OF PROPOSED WORK check all ap,r licable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors C] Accessory Bldg. ❑ Demolition ❑ New Signs [C]] Decks [[] Siding[C]] Other[CA solar Brief Description of Proposed This is an addition to an existing array. Work: 1-tallation of a 208k W roof mounted solar airay using 8 Silfab SLA 260P modules,8 Enphase Mh 15-60-2LL-S22 micro inverters&all associated electrical work. Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet 6a. if New house and or addition to existing housing.1 complete the following: a. Use of building : One Family X Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes X No. Is construction within 100 yr. floodplain Yes X No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? X Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT John&Susan Clopton-Levine I, , as Owner of the subject property hereby authorize Alteris Renewables dba RGS Energy to act on my behalf, in all matters relative to work authorized by this building permit application. see signed contract attached 5147 I Signature of Owner Dat Alteris Renewables dba RGS Energy as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Kim Hendel Print Nam(y / Signature of Owner/Agent Date I i SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder Gary Beals 101487 License Number 61 Turnpike Road,Ashby, MA 01431 11/7/16 Address Expiration Date 978-855-8568 Signat re Telephone 9.Registered Home Improvement Contractor. Not Applicable ❑ Alteris Renewables dba RGS Energy 162709 Company Name Registration Number 106 Route 32, Suite 10, North Franklin, CT 06254 4/6/17 Address Expiration Date .. f Telephone 860-425-5282 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and Submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... 9) No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.1.5.1. Definition of Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature The Commonweal h of Massachusetts Department of I dustrial Accidents Office of Investigations IV 600 Washington Street Boston,SIA 02111 www.maiss.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/organization/Individual): Alteris Renevyables, Inc. dba RGS Energy Address: 106 Route 32, Suite 10 City/State/Zip: North Franklin, CT 06254 Phone#: (860)425-5282 Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 320 4. ❑ I am a general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. t 7• ❑ Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. workers' comp.insurance. q. [:]Building addition [No workers'comp.insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.❑ Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(#),and we have no 12.0 Roof repairs insurance required.]T employees,,[No workers' 13.❑x Other solar panels comp.insurance required.] *Any applicant that checks box#1 must also 611 out the section below showing their workers'compensation policy information. Homeowners who submit this affidavit indicating they are doing all work andlthen hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Zurich American Insurance Co. Policy#or Self-ins.Lic.#: WC5852405 Expiration Date: 01/01/2016 Job Site Address: 1157 Florence Road City/State/Zip: Northampton,MA 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certifyj4nder OePUT ni s aandpenalties ofperjury that the information provided above is true and correct. Si nature: Date: 5A ( Phone#: (860)425-5282 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: i i I I Property Owner Consent Form Owner: Address: Town: State: /Vt Zip: 0 l D Phone: 1 hereby give permission to RGS Energy and their representatives to pull the required permits for a solar installation on my property. Property Owner Date 1 i i I May 3, 2016 To: Code Enforcement Division From: James A. Marx, Jr. P.E. Re: Engineer Statement for Clopton-Levine Residence. 1157 Florence Rd., Northampton, MA - Expansion of Solar Roof Mount Installation I have verified the adequacy and structural integrity of the existing Roof 1 & 2 (one layer shingles) 2" x 4" wood truss at 24''o.c., having sloped distance 19'-1". pitch 31 deg.:. for mounting of solar panels and their installation will satisfy the structural roof framing design-loading requirements of the Massachusetts building code— 780 CMR Residential Code 8th Ed. For the installation of the solar mounting,the tlnirac Solarmount rails will be anchored to the rafters with L-foot supports at 48" max sp. having Ecofasten Green Fasten with CP- SQ Bracket and flashing located on the center of the rafters that will be securely fastened to the rafters with 5/16"x 3 1/2" SS lag bolts. All attachments are staggered amongst the framing members. The mounting system has been designed for wind speed criteria 90 mph Exp. B and ground snow criteria 40 psf. The Photovoltaic system and the mounting assemblies will comply with the applicable sections of the Residential Code and loading requirements of roof-mounted collectors. Thereby. I endorse the solar panel installation and certify this design to be structurally adequate. Sincerely, � t r - James A. Marx, Jr. Professional Engineer ��►��� ;� MA 36365 10 Hiiah Mountain Road Ringwood, NJ 07456 cc: RGS Energy I jM c-T GUIDE enFsn pRODu V_1 Contents GreenVasten �view— Sec. 1 — — Exploded Product Sec.2 lnstruct�ons— Installation Sec.3 Bi11 of Materials— Sec. Cutsheets m Specifications — Sec.S w values—Sec.6 �� fag golf Pull-Out Sec.7 Leakiest MR- Solaro EcoFasten se [f R ENFAST = PRS DI �_ m ,. GF-I x±-ioder Product View 1' -Note:Numbers correspond with B.O.M,Sec.3-1 E N FA S T E N P RO D Q)C T' C-1 U }:3 =- GFI- L 812 fi t i r �.J a y Finish Options BLK= Matte Black BRZ = Medium Bronze MLL = Mill Finish r� f� ;�rac:et Options - CP-SQ T e 3 Compression Plate 2" X 2" Mill Aluminum Speci ficotions PART I —GENERAL 1.3 SUBMITTAL Fasteners(may be supplied by others) to be A Submit manufacturer's written specifications. compatible with chosen roof application and 1 J SUMMARY B. Submit standard product cut sheets. meet specified pull out values as shown in load A. WORK INCLUDES C. Submit installation instructions. test data. 1. GreenFas en sola attachment bracket that D. Submit roduct specific load test data,showing attaches directly to the roof deck p p — Base flashing is.032 gauge aluminum embossed t ultimate and allowable load values. to accept EPDM bushing f 2. Provide appropriate bracket and fasteners P bushing_ for the roof system. 1.4 QUALITY ASSURANCE Bashing is l I B. RELATED SEC I-IONS Installer to be experienced in the installation of 7 Stainless steel bonded washer is 302 stainless 1.Section 07600:Flashing and Sheet Metal specified roofing material and snowguards`or no less and EPDM. 2.Section 07500:Roofing t'nan 5 years in the area of the project. 3.Division (:Administrative and procedural 2.3 FINISH—Mill Finish roquirlents 1.5 DELIVERY/STORAGE/HANDLING A. Bracket is mill finish aluminum Division 7 Thermal and Moisture Protection Inspect material upon delivery.Notify i�aanufacta er within 24 hours of any missing or defective items.Keep B. Base flashing(choose one, 1.2 SYSTEM DESCRIPTION material dry,covered,and off the ground until installed. I.Mill _rnish A. COMPONENTS: I. GreenFasten system consists of aluminum PART 2 - PRODUCTS 2.Black-kynar painted flashing with integral EPDM bushing and one 3.Dark Bronze-kynar painted bonded stainless steel and EPDM washer. ZI MANUFACTURER. ,16 bo e of A.To bFcoFasten Solar PART 3 - EXECUTION f metal compatible with aluminum 289 Harrel St Morrisville,VT.05661 Greene (877) 859-3947 3.1 EXAMINATION B.fasteners should component. 289 be selected for (1877) A compatibility with he roof deck. . Substrate:Inspect structure on which brackets t are to be installed and verify that it will withstand C.f astener strength should exceed or be equal 2.2- MATERIALS any additional loading that it may incurred.Notify to that of the allowable load of the system. AlAttachment Bracket General Contractor of any deficiencies before See test data at www.ecofastensolar.com 6000 Series Aluminum (choose one) nstalling Ecol'asten Solar brackets. �. Sealant(if required by roof manufacturer): io be roof manufacturer approved. F-III B. Verify that roofing material has been installed I. Aluminum attachment bracket 2. L-101-3" correctly prior to installing solar attachment brackets. 3. L-102-3'' B. DESIGN RFQUIREMFNTS: 4. CP-R 3.2 INSTALLATION 5. CP-SQ A. Comply with architectural drawings and I. Bracket spacing to be recommended by Q project engmee: 6. SL-102-6'' project engineer's recommendations for location 7. Z-101 of system,Comply with Manufacturer's written �. Install a minimum of one fastener assembly. installation instructions for installation and layout. It is important to design new structures or 8. Custom y assess existing structures to make sure that thev can withstand retained loads. �z;.5- GREENFASTEN PRODUCT GUIDE -, CSF-1 ?,rnencon Wood C.�o(Incil moo' Bolt Pull-Out Values ' i Lag pull-out (withdrawal) capacities (Ibs) in typical roof lumber (ASD) Lag screw specifications Specific 51/16"sho ft' Gravity per inch thread depth Douglas Fir,Larch .50 266 Douglas Fir.South .46 235 p Engelmann Spruce,lodgepole Pine .46 _— - (MSR 1650 f& higher) Hem.Fir;Redwod (close grain) .43 212 Hem.Fir(North) .46 235 Southern Pine ,55 307 Thread Spruce,Pine.Fir .42 205 Depth Spruce,Pine.Fir 50 266 _ (E of 2 million PSI and higher grades of MSR and MEL) jec.�- t i I I I i, • • • , % • • • 4blb • • • • \ • • •low • �� \\4��\ • fa b SOLAR Silfab Solar Inc. PV Module Data Sheet SLA-P 245/250/255/260/265 i POLYCRYSTALLINE S -p 245/250/255/260/265 PV MODULE I The SILFAB SLA-P 60-cell polycrystalline tt5±0590=' modules are ideal for ground-mount and roof- Z6 top installations where space constraints are not a factor. '* Maximum Efficiency... 60 of the highest f efficiency, best quality polycrystalline cells result in a maximum power rating of 265 Wp. Positive Tolerance... (-0/+5W) module sorting t MOD TIN achieves the maximum electrical performance HOLE of the PV system. '7 `0'2 GROUND CONNECTION HOLE Highest Automation... Strict quality controls .A+0.2 during each step of the world's most automated 450.1 module production facilities. wB.MOUNTINrO Increased Quality... Top quality materials and 100%EL testing guarantee a trustworthy 25-year performance warranty. '. DRAINAGE �l r L 1. ® F-1 I (TU1� ltirt Fraunhofer Module Power(Pmax)r WP 45 250 255 260 265 Maximum power voltage(Vpmax) v 3!1.2 30.4 30.6 30.8 31.0 Maximum power current(Ipmax) A 8.11 8.22 8.33 8.44 8.55 Open circuit voltage(Voc) V 3�1 3 37.9 38.1 38.3 38.5 Short circuit current(Isc) A 81.65 8.76 8.88 9.01 9.12 Module efficiency % 15.0 15.3 15.6 15.9 16.2 Maximum system voltage(UL) VDC 1000 Series fuse rating A 15 Power tolerance Wp -0/+5 Measurement conditions:STC 1000 W/m -AM 1.5-Temperature 25 C•Measurement uncertainty 3 •Sun simulator calibration with modules calibrated by Fraunhofer Institute. Electrical characteristics s may vary by m5'% and power by-01+5W. [emperature Ratings Temperature Coefficient Isc %/K 0.06 Temperature Coefficient Vac %/K -0.34 Temperature Coefficient Pmax %/K -0.40 NOCT(+2'C) C 41 Operating temperature C 40/+85 ComponentsMechanical Properties and Module weight(± 1 kg) kg 19 Dimensions(H x L x D; ± 1 mm} mm 1650 x 990 x 38 Maximum surface load(wind/snow}` N/mz 5400 Hail impact resistance o 25 mm at 83 km/h Celts 60-Si polycrystatline-3 busbar-156 x 156 mm Glass 3.2 mm high transmittance,tempered,antireflective coating Encapsulant PID-resistant EVA Backsheet Muttilayer polyester-based Frame Anodized At Bypass diodes 6 diodes-45V/12A Cables and connectors 1300 mm o 5.7 mm(4 mrl MC4 comparable Module warranty 12 years a 97.5%end of 1`year Guaranteed power z 90%end of 1211 year 82%end of 2511 year Product ULC ORD C1703, UL 1703, IEC 61215,IEC 61730,CEC Listed Product traceability Factory ISO 9001.2008 Also available as... Silfab Smart Module Gtptimized by: T190 i . 80~� �� �� ������ � � �° °�� SoUarMount Techn^caUDa*ashee* Pub 110818-ltd vn.oAugust zo1, So|oMNount Module Connection Hardware................................................................... 1 Bottom UpModule Clip----------_---------------------1 MidClamp.................................................................................................. .............. '2 EndClamp................................................................................................ ....................2 So1arNmmmdBeam Cpnmeot �nF��r�xvmma3 ' '.-'r---^—^'-----~--''--'~'—~-'~~~-~' L-Foot...........................................................................................................................3 Solarh8omnkBeams..........................................................................................................4 SolarMoQnt Module Connection Hardware So\arK4ountBottom UpModule Clip Part No. 302000C Nauh*/ ° Bottom UpClip material: One ofthe following extruded aluminum Bottom Nu (hidden alloys: 0O85'T5. 61O5'T5.0001-TO off Up Clip note*)' ^ Ultimate tensile: 38kni,Yield: 35 kai " Finish: Clear Anodized ~ 'Bottom UpClip weight: -0.031lbs(14g) ~ Allowable and design loads are valid when components are Beam Bolt assembled with So|orK4ountoerieo beams according Loauthorized UN|RACdnoumonto ^ Assemble with one'/4^2OASTM F593bolt,one%''-28ASTM F5S4 serrated flange nut,and one%''flat washer ^ Use anti-seize and tighten to10ft-lbs oftorque |Resistance factors and safety factors are determined according to part 1 section 9 of the 2005 Aluminum Design Manual and third- party test results from an IAS accredited laboratory —'- -- ` �Module edge must befully supported bythe beam � NOTE ONWASHER: Install washer nnbolt head side ofassembly. :DO NOT install washer under serrated flange nut Applied Load Average Allowable Safety Design Resistance Direction Ultimate Load Factor, Load Factor, Tension,Y+ 1566(6967) 686(3052) 2.28 1038(4615) 0,662 Y Transverse,X± 1 1128(5019) 329(1463) 3.43 497(2213) 0.441 0.x Dimensions specified/ninches unless noted � " � �� � � �� �� @ 8��� � ����� �� ° � � " °° ~�� SolarMount Mid Clamp Part No 302101C. 302101D, 302103C 3021040 aumuso aozmoo ° � |Nidulomnpmabe�a|: One ofthe fnUmwingox(mdodaluminum rrated Boltalloys:0UU5'T5. 81O5'T5. 6UO1-T6 Mid C ' — ~ U�imnahetensile: 38koi.Yield: 35ksi ~ Finish: Clear orDark Anodized ~ Mid clamp weight: 0.050 lbs(23g) ~ Allowable and design loads are valid when components are assembled according toauthorized UN|RACdocumemo ` Values represent the allowable and design load capacity ofasingle mid clamp assembly when used with oSo|adNuuntseries beam Vo retain amodule inthe direction indicated Assemble mid clamp with one Unimo%-20T-bNtand one%%2O ASTM F5D4serrated flange nut . ~ Be uneand'ooizeand 8ghtontm1OM'|bsofmoque p ''' ^ Resistance factors and safety factors are determined according on part section Softhe 2OO5Aluminum Design Manual and third- party ten1naouhohnm on IAS accredited laboratory Applied Load Average Allowable Safety Design Resistance ,m^m°~c - - Direction Ultimate Load Factor, Load Factor, Tension,Y+ 2020(8987) 891 (3963) 2.27 1348(5994) 0.667 Transverse,Z± 1 520(2313) 229(1017) 2.27 346(1539) 0.665 Sliding,X± 1194(52 1 1 741 (3295) 1 0.620 1 _ � P.x Dimensions specified ininches unless noted So|arMoUnt End C/arnp Pout No, 30200/c,302002c302002u. suoouc, m200,10 %02004C 302004n3020055u.m20o5o mzuosc'nuuoouo,xoaoo7o, nuoouac,youu000. snz000u mounymmzo/uc 30201/c 302012r ^ End clamp material: One ofthe following extruded aluminum _ alloys:G0O5-T5. S105-T5. SOO1'T0 Olt ^ Ultimate tensile: 38ksi.Yield: 35kei ^ Finish: Clear orDark Anodized End clamp weight:varies based onheight:-O.O58lbs(20g) End Clamp ^ Allowable and design loads are valid when components are ----'__Jerrated�- assembled according toauthorized UN|RACdooumento Flange Nut ^ Values represent the allowable and design load capacity ofasingle ' end clamp assembly when used with mGu|orK4ountseries beam bu retain module inthe direction indicated ^ Assemble with one Unirao%'''2OT-bo|tand one}<'''2OASTM F594 ' serrated flange nut Bea �� ^ Use anti-seize and tighten 0o1Oft-lbs uftorque ^ ooi��anoefudo,aandnofe(yfaotoroaredoherminodoccon|ingtn pa� 1section Bofthe 2OD5Aluminum Design K�auuu|and{hind' � Yparty iootresu|tofmman /ASacovedi�od�abonm�ory ou|oomus\boino�oUnda1|oas� 1�5inhnmei�hrendpfabeom �x Applied Load Average Allowable Safety Design Resistance Direction Ultimate Load Factor, Loads Factor, Tension,Y+ 1321 (5876) 529(2352) 2.50 800(3557) 0.605 `= .~.` =" Dimensions specified minches unless noted Sliding,X± 142(630) 79(349) 1 0.555 . ^ � ��� V0�� �� �� � Q @0Y� U����� SolarMount Beam Connection Hardwarie So/adNountL~Foot PartNo. 384000C. 304000D ^ L-Fomtmaterial: One ofthe following extruded aluminum alloys:OOU5' T5.6105-T5.0061 J0 ^ Ultimate tensile:88ksi.Yield:35ksi ^ Finish:Clear o,Dark Anodized ^ L-Footweight:varies based onheight: -O215lbs(98g) ` Allowable and design loads are valid when components are Bea bled with SolarMountmenmsbeamoacunrdingmevmonzeu Bolt UNIRAC documents L'roo, ^ For the beam toL-pootconnection: ^Assemble with one ASTM F583 W'10hex head screw and one errated ASTM FsS4}6''oermmuflange nut Flangev � ^Use anti-seize and tighten to3Oft-lbs oftorque _// ^ Resistance factors and safety factors are determined according|opart � 1section 8vfthe 2UO5Aluminum Design Manual and third-party test Y results from anIAS accredited laboratory � ~x NOTE: Loads are given for the L'pom«tnbeam connection only;be sure tocheck load limits for standoff,lag screw,n,other ^ attachment method Applied Load Average Safety Design Resistance Direction Ultimate Allowable Load Factor, Load Factor, .o Sliding,Z± 1766(7856) 755(3356) 2.34 1141 (5077) 0.646 Dimensions specified minches unless noted Co pression,Y- 3258('14492) 1325(5893)1 2.461 2004(8913)1 0.615 Traverse,X± 486i(2162) 213(949)1 2.281 323(1436)1 0.664 | da SOLARMoubirr Technical Datasheets �: UNIRAC SolarMount Beams Part No. 310132E, 310132C-B, 310168C, 310168C-B, 310168D 310208C, 3102081;-B, 3102400, 3102400 -6310240D, 410144M, 410168K 410204M 410240M Properties Units SolarMount SolarMount HID Beam Height in 2.5 3.0 Approximate Weight(per linear ft) plf 0.811 1.271 Total Cross Sectional Area int 0,676 1.059 Section Modulus(X-Axis) in' 0.353 0.898 Section Modulus(Y-Axis) in' 0.113 0.221 Moment of Inertia(X-Axis) in 4 0.464 1.450 Moment of Inertia(Y-Axis) in' 0.044 0.267 Radius of Gyration(X-Axis) in 0.289 1.170 Radius of Gyration (Y-Axis) in 0.254 0.502 SLOT FOR T-BOLT OR SLOT FOR T-BOLT OR 1.728--- V4" HEX HEAD SCREW V4"HEX HEAD SCREW 2X SLOT FOR SLOT FOR BOTTOM CLIP2.500 BOTTOM CLIP T 3.000 C: 1,316 SLOT FOR 3/8" 0 HEX BOLT SLOT FOR 1.385 .387— 8., HEX BOLT .750 1.2072 � y y � 1.875 ►X ►x SolarMount Beam SolarMount HID Beam Dimensions specified in inches unless noted FOR CONSTRUCTION Grid-Tied Photovoltaic stem Sheet gist Sy Sheet No. Sheet Title DC Rating: 2.080 kW PV-000 COVER Clopton-Levine, Susan PV-A01 SITE PLAN 106 Route 32,suite 10 1157 Florence Rd. Franklin,cr 06378 city of Northampton Northampton, MA 01062 PV-A02 MODULE LAYOUT (413)68 2225 Fax Building Department PV-A03 DETAILS Plan Review Jurisdiction: City of Northampton 212 Main Sheet PV-A04 MATERIALS GRID-TIED PHOTOVOLTAIC SYSTEM Northampton, MA 01060 PV-E01 ELECTRICAL DIAGRAM 9W DC @STC Scope of Work: PV-E02 SYSTEM CALCS CLOPTON-LEVINE, SUSAN RGS Energy shall install a 2.080 kW Grid-tied Photovoltaic("PV")System PV-G01 SIGNAGE 1157 FLORENCE RD. totaling (8)Silfab SLA 260 P Modules with (8)Enphase Energy General Notes: NORTHAMPTON, MA 01062 M215-60-2LL-S22-IG Micro- Inverter(s). The Modules shall be flush mounted 1. System follows any/all Fire Code Setbacks per Ordinances of the City Project# 10333569 on the asphalt/comp. shingle roof and interconnected via a supply side tap that Of Northampton. is already in place from existing PV System. 2. All projects will comply with the Ordinances of the City of DESIGNER Lucas Murphy Northampton. REVIEWER Ash Bowersock 3. Construction Hours: 7am-8pm Monday-Friday, 9am-8pm Saturday, VERSIONDATE 2016-05-05 Equipment Specifications: No time on Sunday or legal Holidays. Module: (8)Silfab SLA 260 P 4. Product Data Sheets shall be included. REVISIONS Inverter 1: (8) Enphase Energy M215-60-2LL-S22-IG 5. Rooftop penetrations shall be completed and sealed per code by a # By Date Notes Racking: UniRac SolarMount licensed contractor. combined systems atter Attachment Flashing: Eco-Fasten Green-Fasten with 6. All Photovoltaic modules shall be tested and listed by a recognized t LM '/6/2'16 existing solar energy meter CP-SQ-Slotted and Aluminum Flashing laboratory. 2 7. Certifications shall include UL1703, IEC61646, IEC61730. 3 8. A continuous ground shall be provided for the Array and for all Photovoltaic Equipment. ° ROOF $peClflCatlOnS;_ _ 9. DC Wiring shall be run in metal conduit or raceways within enclosed ° Roof 1: spaces ir�building - Asphalt/Comp. Shingle 10. Conduit, Wire systems and Raceways shall be located as close as 2"x 4"Wood Truss possible to ridges, hips, and outside walls. @ 24"O.C. 11. Conduit between Sub Arrays and to DC Combiners/Disconnects shall Pitch: 31' 1 Azimuth: 175° use guidelines that minimize the total amount of conduit by taking the shortest path. Array Size: 8 Modules t 12. Space Requirements for electrical equipment shall comply with NEC Article 110. 13. Equipment grounding shall be sized in accordance with Table X Site Specifications: 250.122. S Occupancy: II 14. Connectors that are not readily accessible and that are used in the Design Wind Speed: 90 MPH circuits operating at or over 30V AC or DC shall require a tool for Exposure Category: B opening and are required to be marked"Do not disconnect under m Mean Roof Height: 25 ft load"or"Not for current interrupting", per 690.33(c)& (e). Ground Snow Load: 40 PSF 15. All signage to be placed in accordance with local building code. Q Adj. Roof Snow Load: 30.8 PSF 16. Signs or Directories shall be attached to the electrical equipment or located adjacent to the identified equipment. 17. Signs should be of sufficient durability to withstand the environment. All Work to be in Compliance with: 18. Any plaques shall be metal or plastic with engraved or machine 2014 National Electrical Code(NEC) printed letters, or electro-plating, in a red background with white 2009 International Residential Code(IRC) lettering, a minimum of 3/8"height and all capital letters. M 0 2009 International Building Code(IBC) 2012 International Fire Code (IFC) 2012 Uniform Mechanical Code(UMC) ❑' °>,E Not to Scale 2012 Uniform Plumbing Code (UPC) MA 780 CMR, 8th Edition COVER -including 2/4/11 revisions to Tables R301.2(4)&R301.2(5) ASCE/ANSI 7-05 Minimum Design Loads for Buildings and Other Structures As amended and adopted by City of Northampton PV_000 FOR CONSTRUCTION Equipment Specifications: Roof Specifications: Module: (8)Silfab SLA 260 P Roof 1: Inverter 1: (8) Enphase Energy M215-60-2LL-S22-IG Asphalt/Comp. Shingle Racking: UniRac SolarMount 2"x 4"Wood Truss 106 Route 32,Suite 10 Attachment Flashing: Eco-Fasten Green-Fasten with @ 24"O.C. Franklin,CT 06378 CP-SQ-Slotted and Aluminum Flashing Pitch: 31' Azimuth: 175° (413)683-2225 Fax Array Size: 8 Modules License#0635274 GRID-TIED PHOTOVOLTAIC SYSTEM ,4.9 16WN DC @ STC CLOPTON-LEVINE, SUSAN 1157 FLORENCE RD. NORTHAMPTON, MA 01062 (E)Single Family Dwelling Project# 10333569 1157 FLORENCE RD. DESIGNER. Lucas Murphy Equipment on Exterior Wall: REVIEWER Ash Bowersock (E) Utility Meter VERSION DATE 2016-05-05 (E)Generator w/ATS- P.O.I. via REVISIONS Supply Side Line Tap (E) PV AC Disconnect-Fused # By Date Notes Equipment on Interior Wall: combined systems after -_c (E) Main Service Panel 1 LM 5/5/2016 existing solar energy meter (E)Sub-Panel 2 (E) PV Prod. Meter 3 (E) PV AC Combiner Panel 4 (E) PV Prod. Monitor - (N)PV-Prod. Meter (N) PV AC Combiner Panel (E) Patio `r--A- — (E) Driveway U C O O r X 0 0 (N) PV Array 8 Silfab to (E) PV Array : SLA 260 P Modules LL 28 SolarWorld Fn SW275 Mono Modules Q M O 1"=25' N SITE PLAN (E)Property Line 'N& W3JK' E \/ NOTE: ALL EXTERIOR CONDUIT ON ROOF AND UNDER EAVES P V -A01 FINAL LOCATIONS TO BE DETERMINED DURING INSTALLATION S FOR CONSTRUCTION PV ARRAY 1 -MECHANICAL LOADS Array Area: 141.6 ft2 Total Photovoltaic Dead Load: 3.24 p Array Weight: 459.0 lbs Avg. Dead Load per Anchor:1 28.7 lbs Equipment Specifications: Roof Specifications: Anchor Qty.: 16 Module: (8)Silfab SLA 260 P Roof 1: Inverter 1: (8) Enphase Energy M215-60-2LL-S22-IG Asphalt/Comp. Shingle Racking: UniRac SolarMount 2"x 4"Wood Truss 106 Route 32,suite 10 Design Values by Roof Zone: Corner Egde Interior Max. UniRac Rail Span: Attachment Flashing: Eco-Fasten Green-Fasten with @ 24" O.C. Franklin,CT 06378 P 60 in. O.C. 60 in. O.C. 60 in. O.C. (413)683-2225 Fax CP-SQ-Slotted and Aluminum Flashing Pitch: 31' Azimuth: 175° License#0635274 Max. UniRac Rail Cantilever: 20 in. O.C. 20 in. O.C. 20 in. O.C. Array Size: 8 Modules Adjusted Anchor Span: 48 in.O.C. 48 in. O.C. 48 in.O.C. GRID-TIED Downforce Point Load: 396.4 lbs 396.4 lbs 396.4 lbs PHOTOVOLTAIC SYSTEM Uplift Point Load: -151.8 lbs 1 -151.8 lbs -124.8 lbs Z MWN DC @ STC Minimum Anchor Strength: 400 lbs CLOPTON-LEVINE, SUSAN Average Safety Factor: 2,98 1157 FLORENCE RD. 9 — 2-7 NORTHAMPTON, MA 01062 91-91, �{`— Project# 10333569 i DESIGNER. Lucas Murphy 10" REVIEWER Ash Bowersock VERSION DATE. 2016-05-05 REVISIONS # By Date Notes (E)PV ArrayI�, 1 LM 5/5/2016 Combined systems after Combined solar energy meter 28 SOIarWOfld 2 SW275 Mono Modules 3 4 o I 16'-3" N _1 _ _ -- 0 N I (E) Roof Obstructions: Roof 1: 0 • Vent Pipe (1) 0 X 2' 0 0 0] 6'-6" Z Z a (N) PV Array 8 Silfab UniRac SolarMount Mounting Notes: SLA 260 P Modules • Integrated Full System Grounding and Bonding to UL 2703 • Total Quantity of Attachments=16 • Roof Zones are defined by dimension, a= 3.0 ft. '"E 3/16"= V-0" • Maximum Allowable Cantilever for UniRac Rail is Y3 the Maximum Rail Span • Racking and Attachment: UniRac SolarMount with Eco-Fasten Green-Fasten with CP-SQ-Slotted and Aluminum Flashing attached with 5/16"x 3-1/2" Lag Bolt, Hex Head, 18-8 SS N MODULE LAYOUT • All Dimensions shown are to module edges, including 1/4 in. Spacing between Modules required when using the Top Clamp Method. • The SolarMount Rails will extend 1-1/2 in. beyond the Module Edge in order to support the End Clamps. • UniRac requires one thermal expansion gap(4 in.)for continuous sections of rail greater than 40' in length W E • Array Installed according to the UniRac SolarMount Design & Engineering Guide PUB14NOV03 PV j_A02 • Attachment Locations, If shown, are approximate. Final adjustment of attachment location may be necessary depending on field conditions.All attachments are staggered amongst the framing members. V s FOR CONSTRUCTION Rail &Anchor Assembly • UniRac Top-Clamp SLP26�P • UniRac SolarMount Rail 106 Route 32,suite 10 �e • UniRac Standard L-Foot Franklin,CT 06378 • Eco-Fasten Green-Fasten (413)683-2225 Fax �aAtICo�P O G. ModuleLicense#0635274 with CP-SQ-Slotted and Psp d ss Aluminum Flashing GRID-TIED 00 �Cv Rooftop . (1)5/16"x 3-1/2" S.S. Lag PHOTOVOLTAIC SYSTEM q`vN Zq' O.G. Bolt with 2-1/2" Minimum 2' Sheathing Embedment 99kW DC @ STC NloodCLOPTON-LEVINE, SUSAN 2' X 1157 FLORENCE RD. NORTHAMPTON, MA 01062 Project# 10333569 DESIGNER. Lucas Murphy 1 Attac ment Profile 2 Attachment Detail REVIEWER: Ash Bowersock VERSION DATE 2016-05-05 REVISIONS 20" Max Roof Framing PV Module Rail Overhang # By Date Notes 1 LM 5I5/2016 Combined systems after existing soar energy meter Roof Anchor Landscape: -4.9 in. �_ Portrait. 12.2 in. & Flashing .�"�, � �T s " . "��� � a Landscape: -29.3 in. Anchors lncateci " -� ;, r,_ ;; Portrait:-411.7 in. on every roof framing member 1.501I in. I 39.0 in. 48" Max An hor SpAing SolarMount Rail - —-j Mounting I Sta ered Attachment Detail T Holes i A X Not to scale T Silfab SLA 260 P 65.0 in. 20"Max 00 Rail Splice Rail Overhang J ' Q !, ' A { WEEBLug � SS Washer Ground Wire &Nut B B ® Unirac Rail SS Bolt ® / M ' ' Distance from Module Corner 0 Minimum Maximum Stagger splice locations Min of 2 su orts Long Side,A 8.1 in. 16.2 in. 99 P PP VARIES within the each row of modules on either side of splice Short Side*, B 1.9 in. 7.8 in. SS Flat Washer SS Bolt as with a max spacing of 60" *Top-Clamps maybe used on the Short DETAILS Sides of the Module Rail S lice Detail ULA roved Mountin Locations 4 5 PP 9 6 Grounding Lug & Rail Not to Scale Not to Scale Not to Scale PV-A03