Loading...
18C-101 (5) 31 GLEASON RD BP-2016-1253 GIs#: COMMONWEALTH OF MASSACHUSETTS MapBlock: 18C- 101 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2016-1253 Project# JS-2016-002155 Est. Cost: $5100.00 Fee: $65.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: STEVEN ZUCCHINO 021356 Lot Size(sq. ft.): 7143.84 Owner: VAZQUEZ JUAN M&JUDY K Zoning: URB(100)/ Applicant: STEVEN ZUCCHINO AT. 31 GLEASON RD Applicant Address: Phone: Insurance: 70 Gleason Road (413) 584-3878 NORTHAM PTONMA01 060 ISSUED ON:4/29/2016 0:00:00 TO PERFORM THE FOLLOWING WORK:REPLACE FRONT STEPS W/PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 4/29/2016 0:00:00 $65.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner o _ File#BP-2016-1253 APPLICANT/CONTACT PERSON STEVEN ZUCCHINO 1 � w ADDRESS/PHONE 70 Gleason Road NORTHAMPTON01060(413)584-3878 PROPERTY LOCATION 31 GLEASON RD MAP 18C PARCEL 101 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid o2 3 Building Permit Filled out Fee Paid Typeof Construction: REPLACE FRONT STEPS W/PORCH New Construction Non Structural interior renovations Addition to Existing Accessory Structure BuildinIZ Plans Included: Owner/Statement or License 021356 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: IV" Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR_ Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health _Well Water Potability Board of Health Permit from Conservation Commission _Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay Sig ure of Building fficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning& Development for more information. ' s 'Department use onl "'`t" "a ►-- of Northampton Status ofL?ermrt �_' "'� r Bui ing Department ctrta Cut/priueway'Perrntt lnr, .y 2 2 Main Street Sewer/septicAvaifaF�itrty �NTf Room 100 Water/ Ve1CAva�lablhty ort mpton, MA 01060 11 DET7 F phone 413-5 7-1240 Fax 413-587-1272 P[of/Site PCans _.._ _' OtfierSpec�fy '- 3 11 r APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office /, f Map: Lot' Unit Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: ify"`t ry NG jLCr-q ( ,2�°ye Z 31 Oeois°`� ///JJ►► `o4d Name(Print) Current Mailing Address: gnature . 2.2 Authorized Agent: t"by-1 all'0 ^7 n 94,,i fia­f kVJilhr11A A Name(Pri Current Mailing Address: Sys_ ;151 Signat a Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building (a) Building Permit Fee jo 2. Electrical (b)Estimated Total Cost of �ff Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) _ �� Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: _ Building Commissioner/Inspector'of Buildings Date ^ . Section 4. ZONING AR Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning 11iis column to be filled in by Building Department Lot Size Setbacks Front Rear Building Height Bldg.Square Footage F 71 , Open Space Footage % (Lot area minus bldg&paved FX- #of Parking Spaces (volume&Location) A. Has aSpecial Perm /Variance/Rnding ever been issuedkn/on the site? NO �~��� DON7KNOYY YES IF YES, dateissued:/ � IF YES: Was the permit recorded at the Registry of Deeds? NO �~�� / DON7KN0YY 0 YES C) IF YES: enter Book Page and/or Document# | L______-_`__� �� �� B. Does the site contain a brook, body ofwater or wetlands? NO �&/ DONT KNOW �~� YES �~� IF YES, has permit been or need to be obtained from the Conservation Commission? Needs tobeobtained /~� Obtained �~� Date ! ' \_� �~/ ' ' i �� C. Do any signs exist on the property? YES v�� NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,gradingexcavation,urfilling)over 1acre orisitpart ofacommon plan �hu(nvi||disbdbover1acva? YES > NO K�A ' ^�, `~� |FYES,then oNorthampton Storm Water Management Permit from the DPW iorequired. ^ '' SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [ ] Siding [0] Other[0] Brief D cription of Prop sed �J // ,.��fJ - Work:J<ea..s•.. c2�C i 1?,.1 C_a'K c<<{�. (11.4 ('[tpi 1'1 1 e t lk+_ 1W A I/VI A f c Alteration of existing bedroom Yes_ No Adding new bedroom Yes _No Attached Narrative X Renovating unfinished basement Yes No Plans Attached Roll -Sheet �( 6a. If Mew house and:or addition to existing hou�inq, compiete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new const r ction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction 1. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR,BUILDING PERMIT IO`,h <Nc �uYi� �Cy Z�VQ Z. as Owner of the subject prope y !, hereby authorizePIJ�'h to act on my behalf, in II matters relative to work authorized by this building permit application. f Si ature of ner Date 2ucc III" as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. 'Signed under the pains and penalties of perjury. .0vEc_C ;wC) Print Na kk� L0111t. l'l )-Jl Signa re of Owner A e t Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ Name of License Holder: J 2LIKr) CS"- 090T, - License Number to ,L, 31/;JI 7 Address L Expiration Date Signa ure Telephone 9 Registered Home'ImpFovemerit Contractor Not Applicable £ 00 Company Name Registration Number 5ei Address Expiration Oate Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c..152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11. -.Home Owne11-Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildinLy permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,von may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. The Commonwealth of Massachusetts Department of Industrial Accidents J. Office of Investigations 600 Washington Street Boston, MA 02111 4 ,.• www.naass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone #: //3- 1�7S- ),)[ST Are you an employer? Check thg appropriate box: Type of project (required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. E] New construction 2.1X I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8. ❑ Demolition working for me in any capacity. employees and have workers' 9. E] Building addition [No workers' comp. insurance comp. insurance. required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lie. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certifyptider the pains andpenalties ofperjury that the information provided above is true and correct. Si ature: Date: 02 14ic Phone#: Official use only. Do not write in this area, to be completed by city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton �,{ ,• k y, S S.. s/C. Massachusetts .✓`t Y DEPARTMENT OF BUXLDING INSPECTIONS 212 Main Street • Municipal Building y Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioners HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection _ The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location t City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: The debris will be transported by: _ SffV-,, 2vcc- 41 ►'b The debris will be received by- ae k Building permit number: Name of Permit Applicant j610A,, Z(Icc_ Date Signature of Permit Applicant 4/24/2016 Steven Zucchino 70 Gleason Road Northampton, MA 01060 413-575-2258 Const. Supervisor Lic.#21356 HIC# 100199 steve.zucci@comcast.net Juan and Judy Vazquez 31 Gleason Road Northampton, MA 01060 586-6707 Proposed project- Remove and dispose of existing concrete steps from the front of the house. Build 15'x 5'4" new open porch where concrete steps had existed as per attached plans. Build 4'x4' landing to tie new porch to existing walkway as per attached plans. Build 1' wide plant shelf around the new porch perimeter on the north and west side at an elevation equal to the new landings height as per attached plans. New construction to be made entirely of southern yellow pine pressure treated lumber. Remove all construction related debris. Provide for all permitting and related inspections. No painting, staining, clear coating or landscaping is included. Permitting and plans- 150.00 Debris removal- 100.00 Materials- 1000.00 Labor- 3850.00 Total cost- $5100.00 Payment schedule- In advance of permitting- $1500.00 Upon completion- $3600.00 Juan Vazq , Ju y Va46e Ste)(e)Zucchino dX5 IX /-is 0 9i Id d A s 9xY 5 d,of/ 1 � b4W /M -1akf+r (f. 1t1Zu� 9 sl CC old 91 /�a�a Lv 3"►3"'S �I'�' .t'�a7i Id Sly- 11,01 xy11,01 ' Wtll 1,d dX5 01 x /h `, it q `w���y� xt� �a1 W�'7 5 d V A4S 11 t U 7 .A V „fl 140 ,1d des tix�, tk— 0 ,t1 vo Ld dX5 9k9 T14 a J . \ _. ._.. U l6 95 E-- IL -----� I G flails �►aysc ' a y i I ' 3� L_ 5 13 7 ' I � � Ne i i I i I t