Loading...
25A-139 Bates St_Montessori Traffic Memo_Addendum_2016  ProTerra Design Group, LLC Ph:(413)320‐4918 4 Bay Road, Building A, Suite 200  Hadley, MA 01035 E: info@proterra‐design.com   ADDENDUM A    Traffic Impact Statement for a Proposed Two‐Story Upper Elementary  & Middle School Building, The Montessori School of Northampton    EXECUTIVE SUMMARY  City of Northampton staff requested that traffic impacts be analyzed for trips generated from both the  upper and lower levels of the proposed school building.  The purpose of this Addendum A is to  document our opinion of the anticipated results of traffic impacts for the existing school and proposed  two‐story elementary and middle school building in Northampton, Massachusetts in the event of a full  build‐out of the upper and lower classroom levels.    Traffic conditions evaluated for this Addendum A:   Existing plus new school full build‐out traffic conditions (Full Build‐out 7,400 SF)  Level of service (LOS) analyses were conducted for the turning movements into and out of the existing  parking lot driveway associated with the existing school building along Bates Street.  Site trips generated  by the two‐story school building at full build‐out were added to the roadway network to determine  impacts.  FULL BUILD‐OUT TRIP GENERATION AND DISTRIBUTION  Based on the City of Northampton City Code, Chapter 350 – Zoning, §350‐11.6, peak‐hour trip  generation for schools equals 10 trips per 1,000 square feet of building area.  The full build‐out scenario  assumes that the lower level of the proposed school building will be finished out into classrooms with  additional students.  The proposed school trip generation was divided for entering and exiting trips  before combining traffic volumes with the existing traffic count volumes.  The data summarizing the  expected number of peak‐hour trips is outlined in Table A1.  TABLE A1:  TRIP GENERATION   LAND USE SIZE TRIP GENERATION  RATE  PEAK  TRIPS  ENTERING  PEAK  TRIPS  EXITING PEAK  TRIPS  PROPOSED  SCHOOL  (UPPER LEVEL)  Schools 3,700 SF 10 / 1,000 SF 37 22  (60%)  15  (40%)  PROPOSED  SCHOOL  (LOWER LEVEL)  Schools 3,700 SF 10 / 1,000 SF 37 22           (60%)  15    (40%)  TOTAL 74 44 30  ProTerra Design Group, LLC Ph:(413)320‐4918 4 Bay Road, Building A, Suite 200  Hadley, MA 01035 E: info@proterra‐design.com     The existing plus new school full build‐out (Full Build‐out 7,400 SF) peak‐hour turning movement  volumes are illustrated in Figure A1.  A 60% / 40% split of entering and exiting trips, respectively, was  utilized for analysis.  It was assumed that future trips to and from the existing school parking lot will be  proportionally split along Bates Street similar to existing conditions.  As a worst case analysis, new trips  were analyzed mimicking the existing traffic patterns by performing left or right turns from the school  parking lot.  FULL BUILD‐OUT TURNING MOVEMENT ANALYSIS  Turning movement operational condition analyses for the exiting plus new school full build‐out (Full  Build‐out 7,400 SF) scenario were performed at the intersection of Bates Street and the existing school  parking lot entrance.  Analyses were conducted using Highway Capacity Manual 2000 methodologies for  unsignalized intersections.  For simplicity, the average control delay is equated to a grade or Level of  Service (LOS) based on the threshold of driver accepted delay.  The amount of delay is assigned a letter  grade A through F, LOS A representing little or no delay and LOS F representing very high delay.  Results of the existing plus new school full build‐out (Full Build‐out 7,400 SF) peak hour analyses are  summarized in Table A2.  TABLE A2:  INTERSECTION LEVEL OF SERVICE  (AM PEAK HOUR)  LOCATION FULL BUILD‐OUT         (7,400 SF) EXISTING  EXISTING +  NEW SCHOOL  (3,700 SF)  Bates Street & Existing School Parking Lot  Entrance/Wright Builders, Inc. Entrance  DELAY  (sec/veh) LOS DELAY &  LOS  DELAY &     LOS  WB Left & Right 10.7 B 10.1          B  10.3           B  EB Left & Right 8.9 A 8.7           A  8.8             A  NB Left 7.3 A 7.3           A  7.3             A  SB Left 7.9 A 7.7           A  7.8             A      CONCLUSION & RECOMMENDATIONS  Based on the results of all the capacity analyses and expected traffic patterns, in our opinion, the  proposed two‐story elementary and middle school building at full build‐out will not have adverse  impacts to the surrounding roadway system.  Provided traffic management recommendations are  applied and maintained, the Level of Service will not decrease along Bates Street due to the minimal  ProTerra Design Group, LLC Ph:(413)320‐4918 4 Bay Road, Building A, Suite 200  Hadley, MA 01035 E: info@proterra‐design.com   addition of traffic from the proposed expansion of the Montessori School of Northampton.  Existing  parking, as described within the “Traffic Impact Statement,” will meet the City of Northampton Zoning  Code parking requirements for the full build‐out of the proposed school.  Previous recommendations outlined within the “Traffic Impact Statement” for the proposed upper  elementary and middle school remain valid based on the full build‐out scenario analyses.