Loading...
103A Septic Application & Permit 2001 I • . THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS FEE 3 ± tcation for !isposal $gstezu/Qlonstruction Permit Application is hereby made for a Permit to Construct ( )or Repair ( an On-site Sewage Dispo al System at: Location Address or Lot No. Owner's Name,Address and Tel.No. ��_ y 4 I PA S h 2 n Io3A C2cf/N n,c R-iN�,�q�2.t c kt R-t1=.S MA2€s 1 103 CROSS ,pR \ Rp (v.,L:san> Installer's Name,Address,and Tel.No- Designer's Name.Address and Tel-Nn too RP An) Sfl 60D1 IrnOCTll MAGtNti') �Ph (4 q) 52l-S CI 135 So✓'1ltw...(]�r/+-+ 4ZD errlso 10 nn4 yve. QLn ILI FST LPoIdr,1 ANA Wes;AM^c51Z1,,, ntAA 0 vc i'7 Type of Building: Dwelling Other Design Plan Date 02 B BOP No. of Bedrooms £ e QJ1 BQ4"'0's C.arbegeGeind 1t ) Type of Building AQPCm�N No per Persons 6 Showers(L4 Cafeteria Other Fixtures Oe-Aew. 32L GPg Flow I (O r lvAL gallons per day. - Z3 -6 / Title P . - oG e Description of Soil 'Ati):-/ LANw- lW C>,�D fJ�wN 330 GQD Calculated daily flow gallons, Number of sheets Revision Date L Si(-I) — See Liots. C✓o- --o2,a p4) D,SpcDAC p N AL A,CL Nature of Repairs or Alterations(An er when applicable) 0(50.4v). ate � $X151, Para i.M.ar--1 -I;car AC S nAI\ Date last inspected- Agreement: The undersigned agrees to ensure the construction and maintenance of the aforedescribed on-site sewage disposal system in accordance with the provisions of Title 5 of the Environmental Code and not to place the system in operation until a Certificate of Compliance has been issued y t Board o Signed - j l- <s- Application Approved by Date Application Disapproved for the following reasons Date Permit No Date Issued THE COMMONWEALTH OF MASSACHUSETTS NCR-1)3/4 /),17i, MASSACHUSETTS Certificate of Compliance THIIS IS TO CERTIFY, that the On-site Sewage Disposal System installed ( ) or repaired replaced(>on ir�r CI by for C .. , jlt . J`:<- at /GE 9 (-42(Se. (%11(I i has been constructed in accordance with th provisions of Title 5 and the for Disposal System Construction Permit No ' / 3 dated Use of this system is conditioned on compliance with the provisions set forth below: The issuance of this certificate shall not be construed as a guarantee that the system will function as designed. This Certificate expires on DATE Inspector c� c T E COMMONWEALTH OF MASSACHUSETTS No. ! rrf lr , 'M '/ •7 t1MASSACHUSETTS !flippant gs#(em Construction Permit Permission is hereby granted to C to construct( ) or repair(k)ap On site Sewage System located at FEE and as described in the above Application for Disposal System Construction Permit. The applicant recognizes his/her duty to comply with Title 5 and the following local provisions or special conditions. All construction must be completed within three years of the date below. i • - / Approved by DATE FORM 1255 Rev.S. M SULKIN CO.•BOSTON.MA