Loading...
7 Septic Perc Test 1999 I�) 7l PERCOLATION TEST(S) Time: j Time: Observation Hole #1 Observation Hole #2 Depth of Perc // Depth of Perc Start Pre-soak r' Start Pre-soak 6 U End Pre-soak End Pm-soak Time at 12- Time atl2'l( ID I Time at 9' 6 . Time at 9' C � Time at 6' �� Time at 6" 5 , 7 Time(9'-6') Time(9"-6') I Rate Min/Inch t^ Rate Min./Inch LI 'minimum of 1 percolation test must`be performed in both the primary area AND reserve area. ■ ■ • • Performed by I Performed by Witnessed by Witnessed by Comments: • On-Site Review Deep Hole#: DEEP OBSERVATION HOLE LOG* 'MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Locatlo Mddress or Lot p^ .I, . —j Soil Texture (USDA) Owner Time rq�e^[�^, t I =N^ 1 (F Engineer or Sanitarian Address Weather >)I yfD 2 0 Date / r- 5 - Engineering Firm 7 II I ),..0.xn1 th{ 1 .d,t/ Id ntity on Site Plan - --- _ ( Land We \) Slope% Sulfate tones ---- Vegetation wtI.n.cx -4yA - Landform --- Position on Landscape Distances from: - Open Water Body feet :Dnnkingwater Well feet .t`Pfoperly LItfe;` feet Possible Wet Area feet Drainage Way feet Other feet Deep Hole#: DEEP OBSERVATION HOLE LOG* 'MINIMUM OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Depth from Surface(Inches) Soil Horizon Soil Texture (USDA) Soil Color (Munsell) Soil Mottling Other (Structure,Stones,Boulders,Consistency.%Gravel) � yfD 2 0 r 'a G > Ib ',); ii --)e70 Parent Material(geologic) I Depth to Bedrock I Depth to groundwater. Standing Water in the-Hole• / !»)n)4 Weeping from Pa Face I yi,AI C. Estimated Seasonal tTigh Ground NWater. .,. ( o I Deep Hole#: 9- DEEP OBSERVATION HOLE LOG* 'MINIM )fa OF TWO HOLES REQUIRED AT EVERY PROPOSED DISPOSAL AREA Depth,f(om Surface(Inches); Soil Horzon - - -Soil Texture: _ (USDA) - Soil Color. (Munsell) , Soil Mottling Other (Structure,Stones.Boulders)Consistency,%Gravel) C � ., L_ > L ,.- etFM. - .P"k^FS�4"til,,�_'�%�fi.E. aea?'0'� :S',�..0-�•aj o--,�-1.. ina PERCOLATION TEST(S) Time: Time: Observation Hole #1 Observation Hole #2 Depth of Perc Depth of Perc Start Pre-soak Start Pre-soak - i End Pre-soak End Pre-soak /, Time at 12" Time at 13=I.I iD . l (.7 Time at 9' G -U Time at 9° C( Time at 6' ��5 Time at 6° S Time(9'-6°) Time 9'-6' Rate Min./Inch 'minimum Rate Min./Inch of 1 nermuenn w.......... s_ .._. .... ry area AND reserve area.