Loading...
107 Septic Install Checklist 2014 Commonwealth of Massachusetts /Q7 G`jeS�/ j City/Town of /6// Septic System Installation Checklist B. Application Checklist front.) c) Distribution Box(310 CMR 15.232) App% N/A Problem 27% All outlet pipes at same elevation Check by adding water E ❑ Number of outlets Pe Pell Number of laterals Inlet tee min. 1'over outlet Visual and w/tape {7 ❑ D box set on level base Visual J ❑ ❑ try- of D box 36'max depth Visual and wttape ❑ ❑ D box is water-tight Add water er---- ❑ ❑ D box has a minimum of 2'thick wall and " ❑ El 12'inside dimension ddd��� / d) Pump Chamber(310 CMR 15.231) Approved N//A/ Problem Tank is set level Visual and w/level ❑ ❑ Proper volume is provided Check plan and tank ❑ G/ ❑ ❑ Float elevations set per plan Measure w/tape ❑ ❑ ❑ Min.2'delivery line to D box Visual ❑ ❑ ❑ Number of pumps: ❑ ❑ p Specified pump provided or designers ❑ ❑ ❑ approval for equal pump Correct pump sequence ❑ ❑ ❑ ❑ ❑ ❑ Covers set to grade Electrical permit provided ❑ ❑ ❑ 6'of stone beneath chamber Visual ❑ ❑ ❑ Chamber is water-tight Test ❑ ❑ ❑ Min. 9'cover provided Visual ❑ ❑ ❑ Correct loading provided per plan Visual on tank ❑ ❑ ❑ Notes: Sepik System V sbM on Checklist 11-09.doc•d 6 �N A-L, // 1,54) Neme•Pepe 3 of Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist(cont) a) Leaching Facility(310 CMR 15.240) Approved NIA Problem No frozen material used including back fill Visual V ❑ ❑ No clay, tailings or stones larger than 6 for ViV ❑ ❑ cover material Soil at bottom/sides of excavation matches Ere ❑ 0 info on deep holes All impervious layers removed Visual UK ❑ ❑ No remaining NB horizons Visual ��// C Groundwater conditions match plan and Visual/check plan �r�j ❑ ❑ deep holes Vented if under impervious cover per plan ry/ ❑ ❑ (15.241) '6' Vent is protected from precipitation 132 ❑ ❑ and animal entry d Cover of a minimum of 9•over leach area gi ❑ ❑ Pipe slope equal to 0.005 Check w/transit V ❑ ❑ Leach area per design(15241) ,.j.,,��// ❑ ❑ Excavation is level and at required depth Visual/check plan I� ❑ p Removal of 5 ft material and replacement VisuaUdleck plan [�' ❑ ❑ (if in fill) Bads fill material is acceptable Visual [F ❑ ❑ Final contours correct per plan Check with plan ❑ ❑ Surface/subsurface drainage away from ❑ ❑ teach area Find grade and side slopes are stable ❑ ❑ Distribution lines are capped, vented, or ❑ ❑ connected together Impermeable barrier(15.255(2)) ❑ ❑ , ❑ Retaining wall inspected by PE ❑ lfl// ❑ Retaining wall is water-proofed ❑ ❑ ❑ Retaining walUbarier is at cored ❑ ❑ ❑ dept /height Septic System kaYbion Checklist 11-09.doc•date Form Name•Pepe♦of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B. Application Checklist(cont) 2. Construction Inspection a) Building Sewer(310 CMR 15222) All waste pipes tied into building sewer Schedule 40 PVC 4'or cast iron Minimum slope of 0.01-0.02 Pipe laid in continuous straight line Pipe laid on compact,firm base Cleanouts precede all changes in alignment/grade Cleanout provided every 100 ft. Bartell material clean b) Septic Tank(310 CMR 15.223) Tank is set level with 6'stone under (15228) Tank is required siralloading per plan Inlet and outlet we at proper location (15.227) Tank is water tight(15226) Outlet tees extend r above flow line Approved filter device placed at outlet Gas baffle installed at outlet tee Inlet and outlet tees on center Iine Tank is baddibed with acceptable material Notes: Basement check Verify by reading pipe Visual Visual Visual Verify by visual/tape Verify by visual/tape Visual Check with level Verify with plan Verify with plan Test Verify by visuavtape DEP list Visual Visual Visual Approved ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ayproveq, N/A Problem ({{/ ❑ ❑ • ❑ ❑ ❑ ❑ TiVHs. ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ N/A Problem Septic System IMtaMbon Checklist 11-09 doc•dote Form Name•Pogo 2 of 6 Commonwealth of Massachusetts City/Town of Septic System Installation Checklist B.Application Checklist(cont.) f) Leaching trenches(310 CMR 15.251) / proved N/A Problem Number of trenches: !f $7 Depth of trenches: / //�-- ❑ ❑ With of trenches: Ufa f/C/(J/ Y ❑ ❑ Trench sparing per plan y / ❑ ❑ ❑ Stone is double-washed[3/4'to 1W] (15.247) ❑ ❑ ❑ g) Leaching fields (310 CMR 15.242) Length of field: /fl/ /dC5�1 A/ [��j..//� ❑ ❑ Width of field: rie' 4 _/ /2l IU' ❑ ❑ Min. of 2 distribution lines �/� /J />i`/V ❑ ❑ Separation distance conforms to plan ❑ ❑ ❑ Stone is double-washed[3/4'to 1W)(15 247) ❑ ❑ ❑ h) Loathing Pits(310 CMR 16253) Number of pits: ❑ 7IY. ❑ Depth of pits: ❑ ❑ ❑ Stone is double-washed[3/4'to 1w](15.247) ❑ ❑ ❑ Each pit has min. 1 20'access cover ❑ ❑ ❑ Piping network and configuration of ❑ ❑ ❑ pft&Thnben per Wan i) TigM Tank(310 CMR 15.260) Tank is set level with 6'stone under Visual and with level ❑ gill ❑ Tank is proper size per Wan Visual with Wan ❑ ❑ ❑ • Pumping contract has been provided ❑ ❑ ❑ Covers to grade Visual ❑ ❑ ❑ AN alarm set at 3/5 tank capacity Check floats by raising ❑ ❑ ❑ AN Marro test on separate draft Set off alarm ❑ ❑ ❑ Sepik Swim InosM on Choke*11d0.doc•date Form flame•Peee 5 of 6 Commonwealth of Massachusetts Cfty/Town of Septic System Installation Checklist B.Application Checklist(cont) j) Certificate of Compliance(310 CMR 15.021) As Built Plan Submitted Signed by Installer Signed by Designer Certificate of Compliance Issued Notes: Deb Date Deb Date Sep*System Mete Steen Cheadle I1-09 doe•date Fam Nom•Page 6 of e