Loading...
29-004 (2) 205 FLORENCE RD BP-2016-1096 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 29-004 CITY OF NORTHAMPTON 1.0t: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:ROOF BUILDING PERMIT Permit# BP-2016-1096 Project# JS-2016-001877 L:st. Cost: $7000.00 Fee: $40.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq.ft.): 8668.44 Owner: DAMON TAMMY SUE Zoning: Applicant: DAMON TAMMY SUE AT. 205 FLORENCE RD Applicant Address: Phone: Insurance: 205 FLORENCE RD FLORENCEMA01062 ISSUED ON:3/15/2016 0:00:00 TO PERFORM THE FOLLOWING WORK.STRIP & SHINGLE ROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Si2nature: FeeType: Date Paid: Amount: Building 3/15/2016 0:00:00 $40.00 212 Main Street, Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner r '�1� ,, .. � L �eE}artrnenfi use�Rly� iFu I i �-7 ity of Northampton Ji iii L I f 5 *� B ilding Department ;:Curb Cut/Drl�eway Perms# 5 _ _ n _ 12 Main Street SewerLSepticAvaiia511rty,'� t 3 T '}� "� ; �I> e��Availabiht L �p L � Room 100 3lVater y �' '. sa ha pton, MA 01060 Twc Se#s of St>ictrgral PF�[ts' t 'L� u o- -1240 Fax 413-587-1272 'PIof/SiCe § rte. "�""' OF OV\ Q(ON� �Otfier SiJQCI� e'-' 1 � ATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE bINFORMA TION; Property Address. '-------`-- - 6)05 'otncc � Zoe auerla Disfr►ct • arr-4 �_. _. SECTION 2.=PROPERTY OWNERSHIP/AUTHORIZED.AGENT:'. 2.1 Owner of Record: 06S FIWIV til rbf,00 00) Name(Print) r Current Mailing Address: y/�SSI 3�c SPT Telephone nature'] 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS. . Item Estimated Cost(Dollars)to be Official Use'Only completed by permit applicant Building 7 �� (a) Building Permit Feb 2. Electrical (b) Estimated Total Cost of -Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) Check Number This Section For Officiaf Use'Onl Date Building Permit Number: Issued: Signature: Building Comm issioner/ln.spector'of Buildings: Date ' Section 4. ZONING AU Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning Tl�is column to be filled in by 'Building Department k'� ' Lot Size / Frontage Setbacks Front Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved. #of Parking Spaces Fill: h— ~ / � ^ ~ A. Has aSpecial Pennit/Variance/Findingever been issued for/onthe site? x�� y~� r�� NO �� DONT KNOW �~� YES \~� IF YES, date issuedJ IF YES: Was the permit recorded atthe Registry ofDeeds? / NO [ � DONT KNOW YES ' �� IF YES: enter Book Pageir Iand/or Document#1 �� �� �� B. Does the�tecontain abrook, body ofwater orwed ��/wetlands? NO DONTKNOYY ��' YES �~� � IF YES, has a permit been or need to be obtained from the Conservation Commission? ° Needs to be obtained �-� Obtained y~� Date Issued: k=� �~/ ' - ~ C. Cmany signs exist on the property? �� ��� YES ��/ NO k=� /FYES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES n NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, excavation, orfi||ing)over 1acre oriaitpart ofacommon plan that acre? YES {^=� NO� �~_v3 ' /FYES, then aNorthampton Storm Water Management Permit from the DPW is required. - | ' / � � � SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House F7Addition ❑ Replacement Windows Alteration(s) F7 Roofing ❑ Or Doors D Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [M Siding [0] Other(0] B • f Descri tioQn of Proposed ork: oun L,._1 M 3� Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a. ff New house and-or=acl iifiomto existing`housiam.';- orn fete ftie folaowlnc;: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of.heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED.WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR.BUILDING PERMIT 1 as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date 1 as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name ignature of Owne gent Date i SECTION 87 CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ Name of License Holder License Number Address Expiration Date Signature Telephone 9 Registered°l=Tomelmprovement Contractor:_ __, uww u__ = Not Applicable £ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor. CMR 780. Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and(or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned•"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws.Annotated. Homeowner Signature II The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street ,r Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Bunters/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone#: Are you an employer? Check the appropriate box: Type of project(required): 1.0 I am a employer with 4. EJ I am a general contractor and I employees (full and/or part-time). * have hired the sub-contractors 6. New construction 2.0 I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have 8. Demolition working for me in any capacity. employees and have workers' 9. Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. F_� We are:a corporation and its 10.0 Electrical repairs or additions 3.;( I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13.0 Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then Dire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as-civil penalties in the form of a STOP WORK.ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do h eby certify under the pains and penalties ofperju that the information provided above is true and correct. ature. Date: Phone#: Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton Massachusetts _ DEPARTIM7NT OF BUZZDING INSPECTIONS ='" "'•= " 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s) who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made understand the above. (Home owner resident's signature requesting exemption) will call to schedule all required building inspections necessary for the building permit issued to me. Date C5`15 �1co Address of work location I City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: b (Gt�I�CP ��� I �� MA Addr �� The debris will be transported by: The debris will be received by: Building permit number: ame of Permit Applican� Date v3 �����' Signature of Permit Applicant