Loading...
38B-006 (101) BP-2003-0630 GIS#: COMMONWEALTH OF MASSACHUSETTS CITY OF NORTHAMPTON Lot: -001 Permit: Buildlnl7 Category: BUILDING PERMIT Permit# BP-2003-0630 Project# JS-2003-1038 Est.Cost: $0.00 Fee: $200.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor_ Lot Size(sa. ft.): 14461.92 Owner: Smith Collem Zoning: SI Applicant: Smith College AT: WEST ST Applicant Address: Phone: Insurance: 126 WEST ST (413) 585-2424 NORTHAMPTON MAO 1060 ISSUED ON:1/14/0. 0:00:00 TO PERFORM THE FOLLOWING WORK.-BLANKET TENT PERMIT FOR 2003 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy signature: Fee Type: Receipt No: Date Paid: Check No: Amount: Building 1/14/03 0:00:00 �Lj 60, $200.00 212 Main Street,Phone(413) 587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo w � I I I File No. i ZONING PERMIT APPLICATION (§10 . 2) PLEASE TYPE O',P T .AL.£, -INFORMATION 1. Name of Applicant: } U Address: Telephone: L4 ?L 9—k r 2. Owner of Property: Address: Telephone: 3. Status of Applicant: Owner Contract Purchaser Lessee Other(explain): 4. Street Address: Parcel ld: Zoning Map# Parcel# District(s): (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Existing Use of Structure/Property 6. Description of Proposed Use/VVork/Pro}ect/Occupation: (Use additional sheets if necessary): 7. Attached Plans: Sketch Plan Site Plan Engineered/Surveyed Plans Answers to the following 2 questions may be obtained by checking with the Building Dept or Planning Department Files. 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DON'T KNOW YES IF YES,date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Pa9e and/or Document# 9. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained ,date issued: (FORM CONTINUES ON OTHER SIDE) 10. Do any signs exist on the property? YES_ NO IF YES,describe size,type and location: Are there any proposed changes to or additions of signs intended for the property?YES NO IF YES,describe size,type and location: 11. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION. This columm to be E117 is by the Building Department Required Existing Proposed By Zoning Lot size Frontage Setbacks - side L: R: L: R: - rear Building height Bldg Square footage %Open Space: (Lot area minus bldg &paved parking) # of Parking spaces # of Loading Docks Fill: (volume & location) 13 . Certification: I hereby certify that the information contained herein is tr�u"_e(( and accurate to the best of my knowled e. DATE: �1�N l v\W3 APPLICANT's SIGNATURE G NOTE: Issuanoa of)a zoning permit does not relieve an applioant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health. Conservation Commission, Department of Pubfio Works and other appliomble permit granting authorities. FILE # ' s 4 JANUARY/03 SMITH POLLEGE TENT LOCATIONS AND APPROXIMATE SET UP DATES 1. Seelye lawn August, Sept. April, May, June 2. Neilson Library (front) May—November 3. Scott gym (front) April 4. Athletic Field (upper and lower) April thrugh October. 5. Field House (rear) May through September 6. Comstock\Wilder (Quad) May 7. Alumnae House (front and rear) May 8. President's House (rear) April, May, September, October 9. Quadrangle (numerous locations in Quad.) May—August 10.Chapin lawn April, May, June, July, October 11.Hatfield Hall (side) April, May, September, October 12.Indoor track (front entry/side entrys) April, May September, October 13.Crew House (rear) boat house. (front) May 14.Davis lawn April—October 15.Burton lawn April—May 16.Bass Hall (front) April—May 17.Dewey (front) August, September, June 18.Unity House (front) August, September 19.Lamont House (rear) May, June, July 1 I -2- tent locations and approximate set up dates continued 20.King/Scales (rear courtyard) May, June, July, August 21.Tyler lawn (front) May, June 22.C.P.A. courtyard April—October 23. Stables April, May September, October 24.Chapel-August, September 25.J.M.Greene side-August, September H:\alice\memo\tent. loc I January 13, 2003 Anthony Patillo Building Inspector 212 Main St. Northampton, Mass. , 01060 Tim Straw Manager of Building Services Smith College 126 West St. Northampton, Mass. , 01063 Dear Mr. Patillo, I would like to request a blanket permit for this new year to cover the cost of erecting Rental and Smith College tents. Currently we have three (3) 20' x 201 , and a 8 ' x 201 . We also have four (4) canopies (3) 15' x 30' and a 24' x 24' which we set up once a year in our Quadrangle for Commencement. Confirming that the fee is currently two hundred dollars (200. 00) . Please see the attached permit form and the tent locations. I would appreciate it if you would call me when the permits are ready (585-2421) . I will bring a check to your office then. Sincerely, Tim Straw h: \alice\memo\cty.per