Loading...
38B-006 (90) +_ TH COLLEGE Campus Operations& Facilities 126 West Street Smith College Northampton,Massachusetts 01063 TRANSMITTAL 2 Date: December 20,20070 Project: Smith College Combined Heat and Power Project To: Distribution PLEASE FIND [XI ATTACHED [1 UNDER SEPARATE COVER Item Description 1 Allied Testing Laboratories, Inc. Report#27- Structural Steel Inspection(10/15/07) Report#28 - Structural Steel Inspection(10/9/07) / Report#2011 —Concrete Cylinder Fabrication (11/28/07) Report#2028 - Concrete Cylinder Fabrication (12/4/07) Report#2345 - 1 —Compressive Strength Test(12/5/07) Report#2370 - 1 - Compressive Strength Test(12/11/07) Report#2067 - Concrete Cylinder Fabrication (12/13/07) [XI FOR YOUR RECORDS [XI FOR USE Distribution: Dave Chiovolotu,vanZelm Hey-,vood&Shadford Dave Perkins,The Pike Company Tony Patillo, Building Commissioner,Northampton,MA Steven M.White GNBC 130 Elm Street PO Box 802 Old Saybrook, CT 06475 Original received and copies distributed by: Gary J. Hartwell V 413-585-2441 Project Manager F 413-585-2398 Campus Operations&Facilities E ghartwel2smith.edu Smith College 126 West Street Northampton, MA 01063 ' ALLIED TESTING LABORATORIES, INC. 115 St.GeorgeRoad • Springfield,Massachusetts 01 104 Phone:(413) 736-1846 Fax:(4 13) 736-1838 Report No. 27 of Structural Steel Inspection Date: 10/5/07 Client: Smith College Project: Smith College Co-Generation Project Contractor: Pike Construction Sub Contractor: Abington Group Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant STRUCTURAL STEEL INSPECTION During today's site visit the superintendent stated that the Operations Floor Framing for the HRSG Unit was ready for weld inspection. Inspector found all beam to beam typical welding details as per drawings and all welds visually acceptable. It was noted that there was one beam with missing bolts. The superintendent was notified prior to departing. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 115 St George Road • Springfield,Massachusetts 01104 Phone:(413) 736-1846 Fax:(413) 736-1838 Report No. 28 of Structural Steel Inspection Date: 10/9/07 Client: Smith College Project: Smith College, Co-Generation Project Contractor: Pike Construction Sub Contractor: Abington Group Reported to: Smith College—Attention: Mr. Gary Hartwell,Physical Plant STRUCTURAL STEEL INSPECTION During today's site visit the sub contractor completed the installation of high strength bolts for the Operations Floor Framing for the HRSG Unit. All bolted connections are now acceptable. Also completed was the Operations Floor Decking around the opening for the HRSG Unit. Deck welds and sidelap screws were visually acceptable. Respectfully submitted, ALLIED TESTING LABORATORIES, INC. AaAWI- 1414� By: Richard Bellucci President MEMBER: A.S.TM. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S. ALLIED TESTING LABORATORIES, INC. 11 S St. George Road •Springfield, Massachusetts 01104 Phone (413) 736-1846 Fax (413) 736-1838 CONCRETE FIELD REPORT NO. 2011 DATE: 11/28/2007 Client: Smith College Project: Co-Generation, Northampton, MA Contractor Pike/Abington Construction Producer: Chicopee Concrete Location of Concrete Placement: Footing -Gas Compressor Reported to: Smith College CYLINDER FABRICATION-ASTM C31 DATE CAST: 11/28/2007 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 16:45 14 4500 4.5" Footing-Gas Compressor SLUMP TESTS -ASTM C143 AIR CONTENT TESTS-ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content(%) 16:45 14 4.5" 16:45 14 5.3% AMBIENT TEMPERATURE CONCRETE TEMPERATURE-ASTM C1064 Time Temperature Time Truck No Temperature 16:45 44°F 16:45 14 66*F REINFORCING INSPECTION Reinforcing incorporated in today's concrete placement was found to be satisfactory for size, quantity, cleanliness, properly supported, adequately tied and spaced as required. Weather: Clear Temp.: 40's No. Yds.: 6.5 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. X41&1444� By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S y ALLIED TESTING LABORATORIES, INC. 115 St. George Road -Springfield, Massachusetts 01104 Phone (413) 736-1846 Fax (413) 736-1838 CONCRETE FIELD REPORT NO. 2028 DATE: 12/4/2007 Client: Smith College Project: Co-Generation, Northampton, MA Contractor Pike/Abington Construction Producer: Chicopee Concrete Location of Concrete Placement: Compressor Walls(ALL) Reported to: Smith College CYLINDER FABRICATION -ASTM C31 DATE CAST: 12/4/2007 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 15:00 10 4500 4.5" Compressor Walls (ALL) SLUMP TESTS-ASTM C143 AIR CONTENT TESTS-ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content M) 15:00 10 4.5" 15:00 10 5.2% AMBIENT TEMPERATURE CONCRETE TEMPERATURE-ASTM C1064 Time Temperature Time Truck No Temperature 15:00 20°F 15:00 10 61 OF REINFORCING INSPECTION Reinforcing incorporated in today's concrete placement was found to be satisfactory for size, quantity, cleanliness, properly supported,adequately tied and spaced as required. Weather: Clear Temp.: 30's No. Yds.: 8 Respectfully submitted, ALLIED TE§TING 1,AABORATQFRIES, INC- 01 By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S ALLIED TESTING LABORATORIES, INC. 115 St. George Road •Springfield, Massachusetts 01104 Phone (413) 736-1846 Fax (413) 736-1838 COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS-ASTM C39 REPORT NO: 2345-1 CLIENT: Smith College PROJECT: Co-Generation, Northampton, MA LOCATION OF CONCRETE PLACEMENT: Footing -Gas Compressor REPORTED TO: Smith College Date: 12/5/2007 Concrete Class 4500 Mixture Weights per cubic yard Cement (lbs) Fine Aggregate (lbs) Coarse Aggregate (lbs) Water (gals) Admixture (oz) LABORATORY NO. W-119 Specimen No. A Slump ASTM C143 (in) 4.5" Air Content ASTM C 173 or C231 N5.3% Concrete Temp. ASTM C1064 66°F Date Sampled 11/28/2007 Date Received 11/29/2007 Date Tested 12/5/2007 Age at Test (days) 7 Dimensions (in) 6 x 12 Area (sq in) 28.3 Wgt. of Specimen (lbs) 28.5 Total Load (lbs) 81,180 COMPRESSIVE STRENGTH (psi) 2870 Remarks: Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S ALLIED TESTING LABORATORIES, INC. 11 5 St. George Road -Springfield,Massachusetts 01104 Phone (413) 736-1846 Fax (413) 736-1838 COMPRESSIVE STRENGTH OF CYLINDRICAL CONCRETE SPECIMENS-ASTM C39 REPORT NO: 2370-1 CLIENT: Smith College PROJECT: Co-Generation, Northampton, MA LOCATION OF CONCRETE PLACEMENT: Compressor Walls (ALL) REPORTED TO: Smith College Date: 12/11/2007 Concrete Class 4500 Mixture Weights per cubic yard Cement (lbs) Fine Aggregate (lbs) Coarse Aggregate (lbs) Water (gals) Admixture (oz) LABORATORY NO. W-250 Specimen No. A Slump ASTM C143 (in) 4.5 Air Content ASTM C173 or C231 N 5.2% Concrete Temp. ASTM C1064 61°F Date Sampled 12/4/2007 Date Received 12/5/2007 Date Tested 12/11/2007 Age at Test (days) 7 Dimensions (in) 6 x 12 Area (sq in) 28.3 Wgt. of Specimen (lbs) 28.5 Total Load (lbs) 78,185 COMPRESSIVE STRENGTH (psi) 2770 Remarks: Respectfully submitted, ALLIED TESTING LABORATORIES,INC. By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S ALLIED TESTING LABORATORIES, INC. 115 St. George Road -Springfield, Massachusetts 01104 Phone (413) 736-1846 Fax (413) 736-1838 CONCRETE FIELD REPORT NO. 2067 DATE: 12/13/2007 Client: Smith College Project: Co-Generation, Northampton, MA Contractor H.P. Cummings Producer: Chicopee Concrete Location of Concrete Placement: Ammonia Foundation Reported to: Smith College CYLINDER FABRICATION -ASTM C31 DATE CAST: 12/13/2007 IDENTIFICATION TIME TRUCK CLASS SLUMP EXACT LOCATION A,B,C,D 10:45 12 4500 5.5" Ammonia Foundation SLUMP TESTS -ASTM C143 AIR CONTENT TESTS-ASTM C173 or C231 Time Truck Slump Time Truck No. Air Content(%) 10:45 12 5.5" 10:45 12 5.5% AMBIENT TEMPERATURE CONCRETE TEMPERATURE -ASTM C1064 Time Temperature Time Truck No Temperature 10:45 32°F 10:45 12 69°F REINFORCING INSPECTION Reinforcing incorporated in today's concrete placement was found to be satisfactory for size, quantity, cleanliness, properly supported, adequately tied and spaced as required in accordance with Drawing No. S-10. REMARKS # Five @ 10"on Center typical slope. #5 @ 10"Top and Bottom. Four#5 corner bars @ edge. #5 @ 10'Wall Dowels Weather: Snowy Temp.: 30's No. Yds.: 64 Respectfully submitted, ALLIED TESTING LABORATORIES, INC. By: Richard Bellucci President MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S