Item Description
1 Allied Testing Laboratories, Inc.
Report#20 - Structural Steel Inspection (7/26/07)
Report# 21 - Structural Steel Inspection(8/16/07)
Report#22 - Structural Steel Inspection (9/4/07)
Report# 23 - Structural Steel Inspection (9/6/07)
Report# 24 - Structural Steel Inspection(9/12/07)
Report# 25 - Structural Steel Inspection(9/13/07)
Report# 26 - Structural Steel Inspection(9/24/07)
[XI FOR YOUR RECORDS [X] FOR USE
Distribution:
Dave Chiovoloni,vanZelm Heywood&Shadford
Dave Perkins, The Pike Company
Tony Patillo,Building Commissioner,Northampton, MA
Steven M. White
GNBC
130 Elm Street
PO Box 802
Old Saybrook, CT 06475
Original received and c '`es distributed by:
Gars-J. Hartwell V 413-585-2441
Project Manager F 413-585-2398
Campus Operations & Facilities E ghartwel ,,smith.edu
Smith College
126 West Street
Northampton, MA 01063
ALLIED TESTING LABORATORIES, INC.
115 St.George Road • Springfield, Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 20 of Structural Steel Inspection Date: 7/26/07
Client: Smith College
Project: Smith College, Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Construction
Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit the erection company welded in place the North Beam for the Operation
Floor framing in Bay 1. All welds were completed by the same qualified welder previously
used on this project. All welds were visually acceptable as per project drawings.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
ALLIED TESTING LABORATORIES, INC.
115 St George Road • Springfield, Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 21 of Structural Steel Inspection Date; 8/16/07
Client: Smith College
Project: Smith College, Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit the superintendent stated there were several new approved field sketches
for welded connections on the Operations Floor Framing in Bay#1. Inspector was given copies
of the field sketches.
A review of the welding of new plates installed between existing columns flange to flange found
the certified welder completing vertical full penetration as per new details.
Other completed welds were also found visually acceptable today. Approximately 60% were
completed at this time.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
j ALLIED TESTING LABORATORIES, INC.
115 St George Road • Springfield,Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 22 of Structural Steel Inspection Date: 9/4/07
Client: Smith College
Project: Smith College Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEUREINFORCING INSPECTION
During today's site visit the superintendent stated that the subcontractor has completed
installation of rebar for a housekeeping pad on the First Floor and continuing structural steel
beam framing for the Operation Floor, Bay#1.
Inspector noted the following:
A) Rebar installed as per Structural Drawings S-9 and S-2. All epoxied anchor rods were
secured and rebar tied with proper spacing and clearance.
B) Structural Steel Beams for Bay #1 were 100%welded in place as per revised field
Sketches SK-8 through SK-12 and E-3. All welds were visually acceptable.
Decking to begin and shear studs to be installed soon after.
Further inspection requested on decking and studs.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
} ALLIED TESTING LABORATORIES, INC.
115 St.George Road • Springfield, Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 23 of Structural Steel Inspection Date: 9/6/07
Client: Smith College
Project: Smith College Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit the sub contractor completed welding in place the decking and shear
studs for the Operations Floor, Bay#1. The puddle welds were acceptable; but six shear studs
were rejected as they did not pass a 3 lb. hammer test. The foreman had a welder replace all six
shear studs and all were found acceptable. Also installed were side lap screws every 3'.
Also noted today was the installation of epoxied rebar into existing slabs. Rebar not completed
at this time.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
ALLIED TESTING LABORATORIES, INC.
115 St.George Road • Springfield, Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 24 of Structural Steel Inspection Date: 9/12/07
Client: Smith College
Project: Smith College Co-Generation Project
Subject: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College—Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit Allied inspector met with the college project manager who stated that
the sub contractor has begun erection of the HRSG Framing and visual inspection should begin
on the welding and bolting. Inspector met with the erection foreman and was shown the details
for the framing.
Also today, inspector noted the welders on this erection were both certified for procedures and
equipment being utilized. Welding inspection will continue on 9/13/07.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
ALLIED TESTING LABORATORIES, INC.
115 St.George Road • Springfield,Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 25 of Structural Steel Inspection Date: 9/13/07
Client: Smith College
Project: Smith College, Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College-Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit the sub contractor began welding the first level of brace framing for the
HRSG.
Allied inspector noted that the welding detail on S-12 shows only a 5/16 fillet weld vertically,
both sides, full length which is typical on all new T-Seats welded to new columns. These were
completed and acceptable. Also welded are the overheads, full length. Two were not acceptable
as a 5/16 fillet. These were repaired and acceptable as a 5/16 fillet weld.
Also inspected and accepted were the typical new beam clips to existing columns 1/4 inch fillets
full vertical with a 1/2 inch top return.
The welders continued working on bottom gusset plates to existing columns which were not
completed by end of day.
Further inspection to follow.
Respectfully submitted,
ALLIED TESTING LABORATORIES, INC.
A41ZA-e-�
By: Richard Bellucci
President
MEMBER: A.S.T.M. / A.C.I. / A.W.S. / A.S.N.T. / M.C.I.B. / I.A.C.R.S.
ALLIED TESTING LABORATORIES, INC.
115 St. George Road • Springfield, Massachusetts 01 104
Phone: (413) 736-1846 Fax: (413) 736-1838
Report No. 26 of Structural Steel Inspection Date: 9/24/07
Client: Smith College
Project: Smith College, Co-Generation Project
Contractor: Pike Construction
Sub Contractor: Abington Group
Reported to: Smith College —Attention: Mr. Gary Hartwell, Physical Plant
STRUCTURAL STEEL INSPECTION
During today's site visit the superintendent stated that the erection of the HRSG Framing and Oil
Container Framing was completed and ready for inspection of high strength bolts and field
welds.
The following Drawings were reviewed: S-3, S-9 and S-12.
Inspection found that all details were followed and high strength bolts were tightened. All the
fillet welds for both framings were visually acceptable.
Respectfully submitted,