38B-006 (84) wt jam- 6 The Pike Company, Inc. MEETING MINUTES 2 Penn Plaza No. SMO12 Suite 1500 New York,NY 10 121 Phone: (413)585-2440 Fax:(212)269-4568 PROJECT TITLE:Smith College Co-Gen MEETING DATE: September 20, 2007 LOCATION: Smith College Conf. Rm SUBJECT:Subcontractor Status Meeting A h TIST1CtI1Btt�>C�T�I �l�D ' ATT1DEl NAIL ry C A +aTAE . y,:. Bill Orr Abington Group Darren Bentlev Abington Group Don LeavittJr. Abinaton Group • Sean Bent Abington Grout) • Barry Hi ins Collins Electric COLLINS BH • Herm Ha eman Collins Electric COLLINS HH • Karl McElwey MJ Moran Mechanical Contractors MJM KM • Fran Raymond Smith College SC FE • Gary Hartwell Smith Colle e SC GH • David Perkins The Pike Company,Inc. PTKF DP • David M. Crudo The Pike Company,Inc. PTKF DMC • Bill Donald van elm En ineers V7 BD • David Chiovoloni P.E van elm En ineers VZ DC Pete Brouillette van elm En ineers VZ 1!4 a I'A T 1<J .. TAi -00I T'rr, National Grid 00001 A.National Grid(NG)switch will arrive in early September, OLD 05/17/07 SC GH there is a 3 week lead time to dig.NG stated they would invoice the college and the funds must be in place in order to proceed. B.Coordination is needed for when the change over will occur. Plant to run on generator? Abington 00002 A.Mason working on 12"wall,and doorway frames are being OPN PIKE DP worked on. B.Need roof open for HRSG,demo out floor below it. C.Assist in general cleaning to take place on 9-20. D.Installing HRSG support steel,completed by next week. Collins to start after. E. Move steel (HRSG)from tennis court to behind the building. F. Welding frames for doors coming in on Monday.Not on site yet. G. Cleaning process to be established by Boilers 4&5,dust partition where the HRSG is? H. Status of the cat-walks-mark up drawings? *COR to Smith *Burner platform for 4&5 (SI OK) Form 22f � Page 1 of 3 r The Pike Company, Inc. MEETING MINUTES 2 Penn Plaza No. SM012 Suite 1500 New York,NY 10121 Phone: (413)585-2440 Fax:(212)269-4568 .. EM.. ...: .VES(�t WMV RT',­'; MJ Moran-Piping,Misc. 00003 A. Once beam over oil pump is complete,MJM to complete their OPN PIKE DP piping work. B.Breeching is installed,expansion joint is up on the roof. C. Crane will be on-site Monday for IB's use,Kleeburg on-site next week to do mist.work? D.Opacity monitor,check on status from ABLE,MJM to install. E.vZ added 5 test ports to the breeching,cost impact?(OLD) F.Ryback drawings are moving forward,to be out on Monday. G. Solar duct-Start next week,get crane to return,schedule with AGI. H.Hydro schedule needed from MJM,Abington may need to assist with code piping.Al needs to be scheduled with Abington. I. Check with Kleeburg on the re-circ duct work,build new elbow? Collins-Electric 00004 A.Control wiring on Boiler 3 panel to be set 9-20. OPN PIKE DP B.Need fire alarm narrative and sketch. (OLD) C.Need vz/fire dept.to walk through to determine lighting/ strobes,pull stations,heat detectors,etc....System to be restored to original condition?(OLD) D.Permanent feed needs to be made to the oil pump to pass inspection. *COR to Smith E. Should take approx. a month to wire the controls,piping has started,no wiring completed to date. F.Underground wire to be pulled in a week or two. G.Factory test on Russ Electric gear on 10-19. Form 22f SII Page 2 of 3 The Pike Company, Inc. MEETING MINUTES 2 Penn Plaza NO. SM012 Suite 1500 New York,NY 10121 Phone: (413)585-2440 Fax:(212)269-4568 STATtMS `AJtM.,1( General 00005 A.HOUSEKEEPING-GENERAL OLD *General cleaning&sweeping needs to improve to mitigate dust buildup. *Set up dust partitions,look into bird screens to avoid/control the pigeon poulation. (OLD) B. Cat walks-College to decide on design and access. (OLD) C. Smith/Pike to review instrumentation-control issues.Need O&M manuals from ABLE.(OLD) D. Get flashing detail from Morris roofing.Gary to give Pike roofing quote from Morris. (OLD) These minutes are intended to be an accurate representation of the discussions held at the indicated meeting. If you note any discrepancies,please notify sender within 24 hours with comments or changes. Otherwise,parties are to proceed accordingly. Prepared By: The Pike Company, Inc. Signed: David Perkins Dated: 25-Sep-07 Expedition L Form 22f .�I Page 3 of 3