Loading...
42-050 City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal .Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction /,activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. r 1 Address of the work: S97 4,6 kk+ oy G�o�yu The debris will be transported by: Q¢vt 'Vck(ey i The debris will be received by: 0,,4.-c Wy44(-f t 44 i Building permit number: Name of Permit Applicant 04¢ v,z 1 1 i, 1 Date Signature of Permit Applicant City of Northampton Massachusetts DEPARTIWNT OF BUILDING INSPECTIONS ?*, 212 Main Street • Municipal Building .• '� P ff Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas)the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, C S L==�� L--��nderstand the above. (Home owner/resident's sign ture request' g exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date I tl r11 r Address of work location .yj 7 wtf �*'► /�o�e-✓�c �4 pCdG2 I The Commonwealth of Massachusetts Department of Industrial Accidents Office o Investigations .._ s. . _,. ff i f g x 600 Washington Street " r Boston, MA 02111 ' www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone #: Are you an employer? Check the appropriate box: Type of project(required): 4. I am a general contractor and I 1.❑ I am a employer with 6. ❑New construction employees (full and/or part-time).* have hired the sub-contractors listed on the attached sheet. 7. ❑Remodeling 2.❑ I am a sole proprietor or partner- ship and have no employees These sub-contractors have g• �Demolition working or me in an capacity. employees and have workers' g Y P tY• 9. ❑Building addition [No workers' comp. insurance comp. insurance.# required.] 5. 7 We area corporation and its 10.7 Electrical repairs or additions 3. I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right c. 152,, exemption per have n no 12.❑ Roof repairs insurance required.] t §1(4), and we have employees. [No workers' 13.❑ Other comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Iimatld ereb y c ' under the pains andpenalties ofperjury that the information provided above is ttrue and correct. ure• ---'' Date• !l J�(�� Phone# V1 3- c`a Of use only. Do not write in this area, to be completed by city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable £ Name of License Holder: License Number Address Expiration Date Signature Telephone 9.Registered:Homeamprovement Contractor �,._._ _ _:. Not Applicable £ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.162,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11 Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellinss of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the buildint permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of orthampton Ordinances,Stat and Local Zoning Laws and State of Massachusetts General Laws Annotated. omeowner Signature, i I I SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors Acc ssory Bldg. ❑ Demolition ❑ New Signs [0] Decks (M Siding [O] Other[0] Brief Description of Proposed /r�Id„ Work: Ci /C tP�Ay T 'mo f �"'�^�c Alteration of existing bedroom Yes V No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet saT If`New`house`and or!.addi.#ion.to ex�sting.housing, complete fhe foliowinct: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN .OWNERS AGENT OR CONTRACTOR APPLIES"FOR BUILDING PERMIT as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date 'f"'A as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Pri Signature of Owner/Agent Date e Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning•• This column to be filled in by Building Department Lot Size I f Frontage 1 —— -----� k Setbacks Front Side L:' I R:= L:! R:i I Rear �^ t Building Height Bldg. Square Footage Open Space Footage 3 % Y--- (Lot area minus bldg&paved ? �----- parking) 1 #of Parking Spaces Fill: f I (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DONT KNOW Q YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW Q YES Q IF YES: enter Book Pagel -- and/or Document#� B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Q , Date Issued: C. Do any signs exist on the property? YES Q NO 0 IF YES, describe size,'type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO Q IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, excavation, or filling)over 9 acre or is it part of a common plan that will disturb over 1 acre? YES O NO Q IF YES, then a Northampton Storm Water Management Permit from the DPW is required. i t a €3epartmerit use Drily k C ty of Northampton Status ofPerinit "ti4�Lr-1 3 �.5 01. Foil 2. V 5 201 B ilding Department CtfrbCut/DrntelayPermI# �s r 91rc ! i it 5.�7 er 12 Main Street SewerlS_O_P=M uai.. IN �� Room 100 1MaterfU+fel�Aiiail-5- i i `'� E i n I c pTio-n.e c � , Y Ir r t r>r1�o ampton, MA 01060 87-1240 N4.3. !E ! Fax 413-587-1272 P1ot/Slte Plans' "{ �'`�,'r ' t Tµ r Other 5pecif}�` ! 1 yi 3! IN 5 APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This secfiorr to be complefetl by office n' .1 Property Address: r r - - - / �A S�'l y/edtwt "'J =rMap Lot Umt,. -_Zone w �-� !s �'���Ouerlay D�strrct ✓ ��r_ r, a�,-i4+i, L, y cv =_Elm St.District r, C8 Dlstnct` r „ SECTION 2. PROPERTY OWNERSHIP/AUTHORIZED AGENT: 2.1 Owner of Record: Name(Print) Current Mailing Address: �1-- Telephone ignature 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3 -ESTIMATED CONSTRUCTION COSTS. . Item Estimated Cost(Dollars)to be w Official Use Only l completed by ermit applicant 1. Building fj q/ 3�d (a) Building Permit Fee J� 2. Electrical O< t b Estimated Total Cost of . Construcfion`from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) Check Number This Section For Official Use'Only Date Building Permit Number: Issued: Signature: Building Cam missioner/Inspector'of Buildings: ,. Date 597 WESTHAMPTON RD BP-2016-0632 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block:42-050 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ROOF BUILDING PERMIT Permit# BP-2016-0632 Project# JS-2016-001052 Est. Cost: $2300.00 Fee: $40.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Groin: Homeowner as Contractor Lot Size(sg.ft.): 14984.64 Owner: SMITH DANIEL J&HEATHER A zoning: Applicant: SMITH DANIEL J & HEATHER A AT. 597 WESTHAMPTON RD Applicant Address: Phone: Insurance: 597 WESTHAMPTON RD (413) 218-1940 Q FLORENCEMA01062 ISSUED ON.11 1512015 0:00:00 TO PERFORM THE FOLLOWING WORK.-STRIP & SHINGLE ROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Deaartment Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 11/5/2015 0:00:00 $40.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner