Loading...
38B-277 (5) �i f Ord KO ��»►- g' I I � ? GTfGC�nner.l� set j44 sc 3/-1 y 1 1 K AVe S+ree-t vie-it/ -I k'R Ko �ecf?scr A-44 I -Ate 6K � � 1 ( krewS per S} d�'0.[, S n`I 1 y�r c� r'ov m i-M CX K�Av of I A r C , o�f/ � 1 i ► ' k/.� ��) f�f4Ny�,�' �� ��,1• ��IQ'f N I 9 � ! � I I I �`G Jl a erl5s.�� nn" 'L I I 1 I OT 'Sgrui-Y�. well 40 6 'tilc�P— CArP,rk (� 3"K r la.'' w►��� �c�P; ��f� zot 1 rmTe +op W(�I pl�fts PYG n�1 h P ILc PI ♦ f Ave El Ll F -- w 1ww�, �f Pa- C: +. 1 ,1� -1-,+3 6 "1 -- 11 - 1 Zoning Board of Appeals -Decision City of Northampton Hearing No.: ZBA-2015-0013 Date: July 9, 2015 1,Carolyn Misch,as agent to the Zoning Board of Appeals,certify that this is a true and accurate decision made by the Zoning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on the date above. 1 certi Dcthat a copy of this decision`hpsl�been mailed to the Owner and Applicant. NOTICE OF APPEAL An appeal from the decision of the Zoning Board maybe made by any person aggrieved and pursuant to MGL Chapt 40A,Section 17 as amended, within(20)days[30 days for a residential Finding]after the date of the filing of this decision with the City Clerk. The date of Filing is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of Northampton. i ppyy [ ��II -iC✓ �ViJ _ - i - - i July 31, 2015 I, Wendy Mazza, City Clerk of the City of Northampton, hereby certify that the above Decision of the Northampton Zoning Board of Appeals was filed in the Office of the City Clerk on July 10, 2015, that twenty days have elapsed since such filing and that no appeals have been filed on this matter. Attest: IJJOA� 9444CL .0 City Clerk City of Northampton GeoTMS®2015 Des Lauriers Municipal Solutions,Inc. , , REGISTER AMST: AAUTSHiRE, MARY LBERD Zoning Board of Appeals - Decision City of Northampton Bearing No.: ZBA-2015-0013 Date: July 9, 2015 APPLICATION TYPE: SUBMISSION DATE: Special Permit 6/11/2015 Applicant's Name: Owner's Name: Illllli111111111111 IiI ili!iii111 Ni1111111 1 11 111 1 1111 1 1 11 i 1 1 1 i H 11111111111 NAME: NAME: 2015 00015153 STEVEN ZUCCHINO Werth,Barry Bk: 12024Pg: 147 Page: 1 of 2 ADDRESS: ADDRESS: Recorded: 07/31/2015 03:04 PM 70 Gleason Road 27 Revell Ave TOWN: STATE: ZIP CODE: TOWN: F77 TIP CODE: NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: 413 584-3878 EMAIL ADDRESS: EMAIL ADDRESS: Steve.Zucci @comcast.net Site Information: Surveyor's Name: STREET NO.: SITE ZONING: COMPANY NAME: 27 REVELL AVE URB(100)1 TOWN: ACTION TAKEN: ADDRESS: NORTHAMPTON MA 01060 Grant MAP: BLOCK I LOT: MAP DATE: SECTION OF BYLAW: 38B 277 001 Chpt.350-9.3:Pre-existing Nonconforming TOWN: STATE: ZIP CODE: Book Page: Structures or Uses May be Changed, 2985 340 Extended or Altered. PHONE NO.: FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK Expand an existing carport bringing it closer to the side lot line HARDSHIP: CONDITION OF APPROVAL: FINDINGS: The Zoning Board granted the special permit for the extension further into the side setback than the existing side of the attached carport extends based on the information submitted with the application. The Board made a finding that the change,which includes new zoning violations(further encroachments into the setback,etc.), will not be substantially more detrimental to the neighborhood than the existing nonconforming single-or two-family structure. The carport will come 4.25'from the side lot line. The existing carport•is 5'from the side lot line. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 61912015 71412015 711612015 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 612712015 811512015 71912015 712312015 713012015 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 612512015 7/9/2015 7/9/2015 7/1012015 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 7/2/2015 5:30 PM 10/7/2015 11/11/2015 MEMBERS PRESENT: VOTE: Malcolm B.E.Smith votes to Grant David Bloomberg votes to Grant Sara Northrup votes to Grant MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Malcolm B.E. Smith Sara Northrup 3 Approved MINUTES OF MEETING: Available online at www.northamptonma.gov GeoTMS@ 2015 Des Lauriers Municipal Solutions,Inc. Zoning Board of Appeals - Decision City of Northampton Hearing No.: ZBA-2015-0013 Date: July 9, 2015 1, Carolyn Misch,as agent to the Zoning Board of Appeals,certify that this is a true and accurate decision made by the Zoning Board and certify that a copy of this and all plans have been filed with the Board and the City Clerk on the date above. I certify that a copy of this decision has been mailed to the Owner and Applicant. NOTICE OF APPEAL An appeal from the decision of the Zoning Board may be made by any person aggrieved and pursuant to MGL Chapt 40A, Section 17 as amended,within(20)days[30 days for a residential Finding]after the date of the tiling of this decision with the City Clerk. The date of filing is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of Northampton. GeoTMS®2015 Des Lauriers Municipal Solutions,Inc. Zoning Board of Appeals -Decision City of Northampton Hearing No.: ZBA-2015-0013 Date: July 9, 2015 APPLICATION TYPE: SUBMISSION DATE: Special Permit 611112015 Applicant's Name: Owner's Name: NAME: NAME: STEVEN ZUCCHINO Werth,Barry ADDRESS: ADDRESS: 70 Gleason Road 27 Revell Ave TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: 413 584-3878 EMAIL ADDRESS: EMAIL ADDRESS: Steve.Zucci @comcast.net Site Information: Surveyor's Name: STREET NO.: SITE ZONING: COMPANY NAME: 27 REVELL AVE URB(100)1 TOWN: ACTION TAKEN: ADDRESS: NORTHAMPTON MA 01060 Grant MAP. BLOCK: LOT: MAP DATE: SECTION OF BYLAW: 38B 277 001 Chpt.350-9.3:Pre-existing Nonconforming TOWN: STATE: ZIP CODE: Book: Pege: Structures or Uses May be Changed, 2985 340 Extended or Altered. PHONE No.: FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK: Expand an existing carport,bringing it closer to the side lot line HARDSHIP: CONDITION OF APPROVAL: FINDINGS: The Zoning Board granted the special permit for the extension further into the side setback than the existing side of the attached carport extends based on the information submitted with the application. The Board made a finding that the change, which includes new zoning violations(further encroachments into the setback,etc.),will not be substantially more detrimental to the neighborhood than the existing nonconforming single-or two-family structure. The carport will come 4.25'from the side lot line. The existing carport is 5'from the side lot line. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 61912015 71412015 711612015 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 6/27/2015 811512015 7/9/2015 712312015 713012015 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 612512015 1 71912015 171912015 7/10/2015 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 71212015 5:30 PM 1 10/7/2015 11/11/2015 MEMBERS PRESENT: VOTE: Malcolm B.E.Smith votes to Grant David Bloomberg votes to Grant Sara Northrup votes to Grant MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Malcolm B.E.Smith Sara Northrup 3 Approved MINUTES OF MEETING: Available online at www.northamptonma.gov GeoTMS@ 2015 Des Lauriers Municipal Solutions,Inc. Page 2 of 2 Finish details- 1 x 8 shiplap boards, with a mill raked finish,will be applied to the bottom of the rafters,the roof panel wells and the new wall above the front garage wall and the new carport ceiling. Pine boards of varying size will be used for boxing out the beam, soffits and ledger. PVC trim boards will be used for the fascia and rake boards. Items not included- No painting, staining, sealing or clear coating is included. No electrical work is included. No roofing work not directly related to the carport project is included. Disposal of non-project related debris is not included. Cost of project- General construction materials $4552.00 Kalwall roof panels 3600.00 Framing plan, plot plan and permit 500.00 Project related debris removal 200.00 Labor 14,000.00 Total cost of project $22,852.00 Payment schedule- Signed agreement- $1852.00 Start of project- 7000.00 Footings and piers complete- 5000.00 Rough framing complete- 5000.00 Project complete- 4000.0 $22, .00 1.. Steven Zucchino Owner of record Page 1 of 2 5/25/2015 Steven Zucchino 70 Gleason Road Northampton, MA 01060 413-575-2258 Const. Supervisor Lic.#21356 H I C#100199 steve.zucci @comcast.net Barry Werth Kathy Goos 27 Revell Avenue Northampton, MA 01060 Scope of project- Build 22'x 13.5' car port on the NW side of the house over the existing asphalt driveway. The carport is to be attached to the NW exterior wall of the existing house and supported by the corner of the existing garage and three 8"x 8'tall round fiberglass columns.The new carport roof will have three 4'x 9' Kalwall roof panels evenly spaced 30" apart.The roof of the carport will tie into the existing garage roof. Project specifications- Remove tree roots from driveway area to allow for new pavement. Roof- 2 x 8 KD spf rafters 16"on center. 3/2 x 8 KD spf laminated rafters to frame roof panel openings. 2 x 8 KD ledger attached tight to existing wall sheathing with 2 ledger lock screws into each existing wall stud at 16"centers. Rafters to be attached to a ledger using metal joist hangers with 1%"joist hanger screws. Rafters to be attached to carrying beam using 12" metal straps. 5/8"5 ply CDX plywood roof sheathing nailed to the rafters every 12" on center along the length of the rafters and 6" on center along the length of the ledger. Snow and ice shield will be applied to the entire roof deck. Finish roof to be asphalt shingles with metal roofing the width of the roof panels and extending from the bottom of the roof panels to the edge of the roof. Kalwall roof panels will be installed on a 2" curb,counter flashed to asphalt roof. Roof support- 12"round concrete piers with#4 rebar supported on a 24" round footing 4' below grade. 8" round fiber glass columns,7' on center, will support a 6x6 laminated beam to which the bottom of the rafters will attach with metal straps. A%" steel cable will be attached to a eye bolt imbedded in the 12" concrete pier and to an eye bolt through the 6 x 6 beam to create a positive attachment of the roof structure to the concrete piers. �. Rod I Ave. Pb+ P1�n ss ' -------31 H{ y I •/ , i i 7.1• i-i'�'-'� H� { K ■3D.f 1 S bo• City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit in accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit-all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: The debris will be transported by: The debris will be received by: V%/IeNj Occvdl h Building permit number: Name of Permit Applicant �j�`pc,�,� -ZUJ, n.o aoij -� Date Osignature of Permit Applicant 1/11(.61LLhJLrVli Massachusetts 4 �,��"i�'•' �:� +fit DEPARTMENT OF BUILDING INSPECTIONS ., , 212 Main Street • Municipal Building ,Northampton MA 01060 J�TJ'p". Jtil�b v„mss. INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner”as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location t�K'rt� Aire, Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): Address: City/State/Zip: Phone M Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. EJ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.A 1 am a sole proprietor or partner- listed on the attached sheet. 7. []Remodeling ship and have no employees' These sub-contractors have g, E]Demolition working for me in any capacity. employees and have workers' [No workers' comp.insurance comp. insurance.x 9 E]Building addition required.] 5. M We are a corporation and its 10.[] Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13% Other (_j,� comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractor;must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. lam an employer that isproviding workers'compensation:insurance for my employees. Below is thepolicy andjob site information. Insurance Company Name: Policy#or Self-ins. Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as-civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cX* nderthepains and penalties ofperjury that the information provided above is true and correct. Signature: �— Date: S f S Phone# S77 5 5� Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: rr Not Applicable E .-- i Name of License Holder: ::0#JQAoX fl License Number :7 ApA i Address hA Expirat&Dafe Sign Telephone 7,7,7, 7, Not Applicable E Company Name Registration Number sci 011 e— Yll 1A0 Address ExpirbtiorYDate Telephone SECTION 10-WORKERS!COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.-152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes. E No...... E Home.Oil..WA . , P 0: is The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CIAR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during'and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under thj�veral. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Codg,Qity'of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. now SECTIONS-DESCRIPTION OF PROPOSED WORK(check all applicable) New House [] Addition [] Replacement Windows Alteration(s) ED Roofing Or Doors 13 Accessory Bldg. ❑ Demolition ❑ New Signs [❑J Decks [❑ Siding[❑] Other Brief Description of Proposed //' Work: L�i1S�Y4c-{ Ids•?$ Z Cct-��T ctTTrc �� S�;Sf; h Alteration of existing bedroom Yes No Adding new bedroom Yes _ r' No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll (Sheet sa If.:New,house:an i.or-add1. Ionao exisflncLhousina t:omLlet�the fflllowlnc;F a. Use of building:One Family�_ Two Family Other b. Number of rooms in each family unit: NA Number of Bathrooms c. Is there a garage attached? 5 , d. Proposed Square footagegqof new construction. Z Dimensions •7 S e. Number of stories? 1 f. Method of.heating? )VA Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction JV014 C%VKV i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr, floodplain Yes No j. Depth of basement or cellar floor below finished grade A k. Will building conform to the Building and Zoning regulations? _ ( Yes No. 1. Septic Tank City Sewer _ Private well City water Supply _ SECTION 7a-OWNER AUTHORIZATION-TO.BE COMPLETED WHEN OWNERS ENT OR CONTRACTOR APPLIES-FOR.BUILDING PERMIT I b(u as Owner of the subject property he y author, � �tee�a Z9111 CC act on m e If,in all matters relative to work authorized by this building permit applic tion. / .� S Sign of ner Date as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury.1 Print NWD a��s S)grfaOre of Ow r gent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This cohmm to be filled in by - -� Building Department Lot Size I 1 Frontage ' '� - Setbacks Front r U-711 r----� �---1 Side L:L-I-J R:E /° j� LM RE- Rear Building Height Bldg.Square Footage t,=r i t�T'S� % Open Space Footage !1 P I % (Lot area minus bldg&paved � �•Rill parking) ff #of Parking Spaces ® " Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW 0 YES Q IF YES, date issued:�� IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW Q YES Q IF YES: enter Book Page and/or Document# __ I S. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained Q , Date Issued: �� C. Do any signs exist on the property? YES Q NO IF YES, describe size,'type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,gradin avation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO , exc IF YES,then a Northampton Storm Water Management Permit from the DPW is required. City of Northampton Building Department I C l !I j, MY 26 212 Main Street Room 100 �V1la er �I a '`II 1 ie F " . . rthampton, MA 01060 i. r :5 _�.hene -3�587-1240 Fax 413-587-1272 APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: MT61-9—ecFt ontRON ot:��Re ve_ hi%l DPItrit SECTION 2.-PROPERTYOWNERSHIP/AUTHORIZED AGENT: .. 2.1 Owner of Record: t e 4 tJ U-n4 2'7 Pe-ve lIA-ve— , _ Na rint) Current Mailing Address: Signature Telephone 2.2 Authorized Agent: 1 Name A Current Mailing Address: SiglfatZre Telephone SECTION 3.ESWMATED CONSTRUCTION COSTS. . Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building d (a),Building Permit Fee 2. Electrical (b)Estimated Total'Cost of Construction'from E 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) _ 5. Fire Protection 6. Total=(1 +2+3+4+5) 2, .00 Check Number Ld K5 I This Section For Official Use On! Building Permit Number te r: Issued: Signature: Building Commissioner/Inspector of Buiidings: Date File#BP-2015-1173 �°Lb APPLICANT/CONTACT PERSON STEVEN ZUCCHINO S� ADDRESS/PHONE 70 Gleason Road NORTHAWTON01060(413)584-3878 PROPERTY LOCATION 27 REVELL AVE MAP 38B PARCEL 277 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out < �7 Fee Paid Meof Construction: CONSTRUCT 12 X 22 ATT/CARPORT New Construction Non Structural interior renovations Addition to Existing - Accessory Structure - Building Plans Included: Owner/Statement or License 021356 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved VAdditional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit Wit�hj ite Plan ZONING BOARD PERMIT REQUIRED UNDER: §_ 350-1, 3 C Cd Finding Special Permit ✓ Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay Signature of Building Official Date S Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 27 REVELL AVE BP-2015-1173 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38B-277 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2015-1173 Project# JS-2015-002202 Est. Cost: $22852.00 Fee:$56.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: STEVEN ZUCCHINO 021356 Lot Size(sq. ft.): 7187.40 Owner: WERTH BARRY A&KATHY J GOOS Zoning.URB(100) Applicant: STEVEN ZUCCHINO AT: 27 REVELL AVE Applicant Address: Phone: Insurance: 70 Gleason Road (413) 584-3878 NORTHAMPTONMA01060 ISSUED ON:711412015 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 12 X 22 ATT/CARPORT - construction on structure may not start until 7/30/15, sonotubes OK POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Denartment Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 7/14/2015 0:00:00 $56.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2015-1173 APPLICANT/CONTACT PERSON STEVEN ZUCCHINO ADDRESS/PHONE 70 Gleason Road NORTHAMPTON01060(413)584-3878 PROPERTY LOCATION 27 REVELL AVE MAP 38B PARCEL 277 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildiny,Permit Filled out Fee Paid �E Typeof Construction: CONSTRUCT 12 X 22 ATT/CARPORT 0 t5 O New Construction 4_4741 =AZ t,NT t(, —j 13d s Non Structural interior renovations Addition to Existing SOWTLAIVS O Accessory Structure Building Plans Included• Owner/Statement or License 021356 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFOR ION PRESENTED: proved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee t m Elm Street Commission Permit DPW Storm Water Management 7 �6 S Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 27 REVELL AVE BP-2015-1173 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38B -277 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2015-1173 Project# JS-2015-002202 Est. Cost: $22852.00 Fee: $56.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: STEVEN ZUCCHINO 021356 Lot Size(sq. ft.): 7187.40 Owner: WERTH BARRY A&KATHY J GOOS Zoning: URB(100)/ Applicant: STEVEN ZUCCHINO AT. 27 REVELL AVE Applicant Address: Phone: Insurance: 70 Gleason Road (413) 584-3878 NORTHAMPTONMA01060 ISSUED ON:711412015 0:00:00 TO PERFORM THE FOLLOWING WORK.CONSTRUCT 12 X 22 ATT/CARPORT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 7/14/2015 0:00:00 $56.00 212 Main Street, Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner slow