Loading...
Plan sheet 1 of 2.pdfEXISTING HEADWALL INV. = 142.6 EXISTING HEADWALL INV. = 139.5 EXISTING HEADWALL INV. = 140.3 EXISTING HEADWALLS INV. = 138.3 INV. = 138.1 A EXISTING 4' CONCRETE WATERWAY EXISTING STONE LINED DRAINAGE DITCH EXISTING HEADWALL INV. = 138.9 42" RCP 54" R C P 54" R C P 54" R C P EXISTING STONE LINED CHANNEL - PROP. CLEANING AND RESTORATION BEGINS EXISTING STONE LINED CHANNEL - PROP. CLEANING AND RESTORATION ENDS A B B PROP. LIMIT OF WORK (TYP.) PROP. LOGGING MATS FOR ACCESS PROP. SHRUB/VINE/PLANT REMOVAL AREA BEGINS PROP. INVASIVE SHRUB/VINE/PLANT REMOVAL AREA ENDS RETAIN TREE AND SHRUBS BASED ON CONDITION DURING CONSTRUCTION FLOW FLO W L = 116 FT W = 2 0 F T APPROX. LENG T H O F D I T C H = 1 2 8 F T EXISTING HEADWALL EXISTING HEADWALL AND PIPE FLOW EXISTING HEADWALL 10.00'10.00' SEED SIDE SLOPES WITH EROSION CONTROL AND RESTORATION SEED MIX INVASIVE PLANT REMOVAL TYPICAL SECTION B-B ȭ EXISTING CONCRETE WATERWAY OR UNLINED STONE DRAINAGE DITCH NOTES: 1) BRUSH SHALL BE CLEARED TEN (10) FEET FROM THE CENTERLINE OF THE EXISTING CONCRETE WATERWAY OR UNLINED DRAINAGE CHANNEL. 2)BRUSH SHALL BE CUT FLUSH WITH EXISTING GROUND LEVEL TO MINIMIZE SOIL DISTURBANCE.LINE CHANNEL BOTTOM AND SLOPES WITH GEOTEXTILE FABRIC NOTES: 1) THE CONTRACTOR WILL BE RESPONSIBLE FOR CONTROL OF WATER DURING WORK. THE WATER SHALL BE INTERCEPTED UPSTREAMOF THE WORK AREA AND BE PUMPED BACK INTO THE DITCH AT A LOCATION DOWNSTREAM FROM THE WORK. THE EXCAVATION AND WATER CONTROL SHALL BE DONE IN THE DRY AND IN A MANNER TO AVOID EROSION AND SILTATION. DITCH SHAPING TYPICAL SECTION A-A DEPTH VARIES 0' TO 1' (MAX) 1:1 1: 1 2.00' ROUND TOP TO BLENDROUND TOP TO BLEND WORK AREA CHANNEL FLOW SAND BAG DAM OR APPROVED DAM MATERIAL EXISTING HEADWALL PROP. HOSE FOR WATER CONTROL PROP. PUMP FOR WATER CONTROL WATER CONTROL TYPICAL NORTHAMPTON CONSTRUCTION PLAN DI T C H C L E A N I N G _ H D 1 ( C O N S T R U C T I O N P L A N S ) . D W G 20 - J u l - 2 0 1 5 3: 4 6 P M Pl o t t e d o n 0 SCALE: 1" = 40' 40 160100 FED. AID PROJ. NO.SHEET NO. TOTAL SHEETS 2 STATE MA PROJECT FILE NO. - -------- 1 N. KING STREET & EXIT 21 DRAINAGE STRUCTURE MAINTENANCE