Page 2 of Revised NOI-Northampton.pdfwpaform3.doc • rev. 5/28/2014 Page 2 of 8
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 3 – Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Provided by MassDEP:
MassDEP File Number
Document Transaction Number
Northampton
City/Town
A. General Information (continued)
6. General Project Description:
This maintenance project consists of reestablishing the roadway drainage at culverts and outlets near
North King Street, and the Exit 21 ramps off I 91 in Northampton. This includes removing sediment & debris near culverts, cleaning a section of a stone lined channel, and selective invasive vegetation
removal.
7a. Project Type Checklist:
1. Single Family Home 2. Residential Subdivision
3. Limited Project Driveway Crossing 4. Commercial/Industrial
5. Dock/Pier 6. Utilities
7. Coastal Engineering Structure 8. Agriculture (e.g., cranberries, forestry)
9. Transportation 10. Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)?
1. Yes No If yes, describe which limited project applies to this project:
10.53 (f) Maintenance and improvement of existing public roadways . . . (k) The routine
maintenance and repair of road drainage structures. . .
8. Property recorded at the Registry of Deeds for:
Hampshire
a. County
b. Certificate # (if registered land)
10524
c. Book
44
d. Page Number
B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. Buffer Zone Only – Check if the project is located only in the Buffer Zone of a Bordering
Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.
For all projects affecting other Resource Areas, please attach a narrative explaining how the resource area was
delineated.
Resource Area Size of Proposed Alteration Proposed Replacement (if any)
a. Bank 360
1. linear feet
2. linear feet
b. Bordering Vegetated Wetland
1. square feet
2. square feet
c. Land Under
Waterbodies and Waterways
660
1. square feet
2. square feet
25
3. cubic yards dredged