Loading...
38B-089 (2) City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: � me The debris will be transported by: ( I _ The debris will be received by: 11,01e e Building permit number: Name oApplicant ,�sv 1//X/z Date Signature of Permit Applicant M - A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 39. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 40. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:Thrul.oks are engineered for post attachment supporting a railing. lateral attachment is required for each deck per section 502.2.2.3. 41. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom, within 10'of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors,at each level,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels or attached garage. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 42. Closets beneath stair which have doors must be drywalled with%:". 780 CMR R302.7 43. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated equal to surrounding,gasketed, and secured in place. 44. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30"to combustibles. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller(aMorthamptonma.gov Thank you f your cooperation o se matters. uck Miller City of Northampton Assistant Commissioner and Zoning Enforcement 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30"or less 780 CMR R311.7.4.3 Exception,4 3/8"on balustrade, 6" in the triangle. Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8"ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule.780 CMR R312.1. 25. Floor joist systems that are not equal to 1%Z" nominal dimension must be covered with %2" drywall or 5/8"wood structural panel or equivalent with some exceptions. 780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes,and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%:" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR R602.6.1 28. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3' clearance from windows. 780 CMR M1502.3 29. Dryer duct transition is limited to 8'of aluminum flex, must be exposed, and the proper UL listing. 780 CMR M1502.4.3 30. Dryer duct maximum equivalent length is 25' less 5' per 900 elbow or per manufacturer's specs. 780 CMR M1502.4.4.1, no screwed connections. 31. Dryer ducts when concealed must have a permanent label or tag within 6' of the duct connection 780 CMR M1502.4.5 32. Markup air is required for any exhaust hood over 400 CFM. 780 CMR M1503.4 33. Fireplaces require all combustion air be provided from the exterior and below the firebox,duct work maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 34. Fire and draft stopping shall be completed before rough inspection.Typical locations,top(ceiling)and bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302. 35. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316. 36. Dwelling/Garage fire separation.An attached garage (within 3'of main structure) is required to have%" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%2" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 37. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity, which you must create. 38. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). F 8. Emergency escape is required out of every basement whether habitable or not, each bedroom and walk- in attics. 780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust only systems), or treating the space with supply and return.See 780 CMR R408 10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1/1ad 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 13. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2' minimum. 780 CMR R602.3.2 a. Exception: A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3"x 6" plate .036 galvanized steel nailed to each segment with 6-8d nails 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. I-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with%:drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used, 6'8"for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations, within 24"of a door,or within 60" of a stair, or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule.Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics,and all sleeping rooms require emergency escape.780 CMR R310 b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sgft at 1St floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36"out and the width of the door minimum 36", maximum step 7%"from the top of the threshold and only in-swinging doors. 780 CMR R311.3 City of Northampton Massachusetts `"• , DEPARTMENT OF BUILDING INSPECTIONS a 212 Main Street • Municipal Buildingb Northampton, MA 01060 INSPECTOR Thayer Street Associates, Inc. April 10, 2015 8A Coates Avenue South Deerfield, MA 01373 Subject Location:49 Lyman Road, Northampton Map Block: 3813-089 Mr. Harrington, Your building permit application and plans dated 4-7-15 have been approved as drawn and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. All windows in hazardous location must be tempered. It appears there is one above the master tub, there may be one or two in the master shower if the glass is within 60"of the standing surface (note:A2/D varies from others), and one behind each of the enclosed screen porch doors. 2. Item 21 below may apply. 3. Smoke, Heat and CO detectors throughout the structure to current building codes. 4. An emergency escape window is required within every bedroom, basement and walk in attics. 5. An air barrier and insulation is required for all open cavities and between the tubs and the exterior wall cavities. 6. If permeable insulation is used air sealing and an air sealing inspection is required at the exterior and interior skins.Typically the sheathing and drywall. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the new Stretch Code expected to be completed in 2015. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http:H publicecodes.cyberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/­­bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement. 780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be%" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 1 Congress Street, Suite 100 if Boston,MA 02114-2017 rvww mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lecibly Name (Business/Organization/Individual): \ r l �� "_..._�. st•1...1 �� "� e... Address: �3 C Ci /State/Zi LaLUUTPAd Ma Phone4:q_ Are you an employer?Check the appropriate box: Type of project(required): 1.®1 am a employer with _ 4. ❑ l am a general contractor and 1 6 FJ New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. 0 Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.{ required.) 5. We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. o workers' corn right of exemption per MGL Y � P� 12-E] Roof repairs insurance required.] t c. 152, §I(4),and we have no l3.❑ Other employees. [No workers' —. camp. insurance required.] 'Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information_ t 1 fomcowncrs who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such. aContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: �C Policy#or Self ins. Lic. #: L,C_A 1�s 1 C., � Expiration Date:- '0&"16 Job Site Address: �C _R6 City/State/Zip:NIX_ Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). C IUCw Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a da against the violator. Be advi d that a copy of this statement may be forwarded to the Office of Investigations of th IA for insuragge coverag erification. I do hereby i under tVZ� d ury that the information provided above is true and correct Si ature: /��_ Date: 113h Phone#: 4�13 - z9h - J4 (A Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable 0 Name of License Holder: C,S O `�'69 License Number i Address Expiration Date Signatu a Telephone .Q) 9.Realetered Home Improvement Contractor: Not Applicable 0 t-f3 t()-3 Company Name Registration Number Address Expiratio Date U��u vc..sb. �S. _ L a 1 Telephoned 13 10!6 A& SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... V No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 10835.1. Definition of Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A uerson who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature 5,DESCi K JON WORK ;n-K zf,a.2-OcRi ' 1 Vdbl 01 h e &-ief D�ess-`Dt--n c ore n{ X�-zt-- Aftax*i,,,��,J Roll Z��-ee� :i,s 'aitt—toe—,"he 7, J13e 2' Fami:v r,Y, 1 a a c F .,,i tD, I C I S e E a g i 1 •:;Z!tr 4S -n. ---------- OwNiF-pi Au-viiGRUZATION-TO&E CYMNEPS,AGENT OA 11'O1vq'1f'RA--T,0R APPLAS FOR S1,1Ur4r41G PZR�i�Lff as Ow,;t,r 3f tre u-'e, rio r., INU tes"c- k� SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement_windows Alteratlon(s) Roofing Or Doors mm Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [M Siding 10] Other[0] BriefAasc_rii lion of Proposed c 157�,'1�((,��SLtipn'C Alteration of existing bedroom V Yes 4 No Adding new bedroom Yes No/ Attached Narrative Renovating unfinished basement Yes ✓ No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? _. d. Proposed Square footage of new construction. Dimensions e. Number of stories? Z �t, f. Method of heating? AJ�0 — S,TCojly\ Fireplaces or Woodstoves a tcl Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction_^ ngk i. Is construction within 100 ft. of wetlands? _Yes ✓ No. Is construction within 100 yr. floodplain Yes 1/No j. Depth of basement or cellar floor below finished grade y S _ k. Will building conform to the Building and Zoning regulations? ✓ Yes No. I. Septic Tank City Sewer_J/ Private well City water Supply l� SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1 , as Owner of the subject property hereby authorize C l to act on my behalf, in all matters relative to work autho by this building per it application. Signature of Owner Date I 06(rw y,. tS-f• I ng jy` as QwmWAuthorized Agent hereby declare that the statement nd information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. e A'ux r r vw Print Name Signature of 9~,r/Agent Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location) A. Has a Special Permit/Variance/Finding ver been issued for/on the site? NO a DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO ® DON'T KNOW Q YES Q IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued: C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES ® NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. __._. ,.......�,.,..»....,.....,.._...........-..,.,...�..._....-r..._.."_"..._._....._..._._.y.._........,. ....�.. ,, ilLF t�Y�iT'r3r`f•��,#^x� ry}f�� DtV Of ��*}} 3��i ^� � M J�>• �" 3:� e.Yµ�:i.+i{'tj�':�'Gl }�.Atli?4E - f 6 .1�t3Z.. .�i� i ;�T t',' SC.G��Y�`��kt; '•.'6�V7`�t1 f`t1T r !P''+0'1hR. tID"1e1. p"no.?^e 4,13-587-1_'4f_6 r'a? *r'e,. :' I - t APIP%IC T€GN TO CONSTRUCT.ALT ER € EPAill,RENOVAI F OF DEMI LISH A ONE OR TWO IFA tLY MPIELL94G i lh!s zac' on to be ccrnpleied:y offices«_ / j'iv'e- ( C" p `3a�..,.,....f.�Fs ,—a,.��n f{x"e:wr➢�.�''L���'$w�%..'<:�E '�f,+,�.�� ..�._. L:t;v,r'i�.Use c"3n1 St Mate'7 4 re il'otec.Jor, r � � -........?'z?." 1 ..+ iF f 7 ".."''soh:e�i;`i�"f'S .u�t`•;����4 �-.r`e�. V/ Department use only .1 r= 31ior1l Northampton Status of Permit: g Department Curb Cut/Driveway Permit Main Street Sewer/Septic Availability ( Io0m 100 Water/Well Availability pton, MA 01060 Two Sets of Structural Plans '--- phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office LS;' Map Lot Unit � �orAh am�or� Zone Overlay District m� Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: 'Paex - Zl PX t n Name(Print) Current Mailing Address: Telephone Signature 2.2 Authorized Aaent: c t %--(' s' O VQ 1 �e �� o Name r' Current Mailing Address: �- y Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 1 I Cho (a)Building Permit Fee 2. Electrical (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) ( � , G)C.) 5. Fire Protection 6. Total=(1 +2+3+4+5) Check Number By This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0948 APPLICANT/CONTACT PERSON THAYER STREET ASSOC INC ADDRESS/PHONE 8A COATES AVE SOUTH DEERFIELD01373 (416)665-4018 PROPERTY LOCATION 49 LYMAN RD MAP 38B PARCEL 089 001 ZONE URB(100) THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: RENOVATE KITCHEN& 1 ST FLR BATH,BEDROOM&2ND FLR BATH New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included• �/Q Owner/Statement or License 045159 `�N'" `.'y 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO TION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay Si re of B dmg Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 49 LYMAN RD BP-2015-0948 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 38B-089 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit# BP-2015-0948 Project# JS-2015-001835 Est. Cost: $150000.00 Fee: $900.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: THAYER STREET ASSOC INC 045159 Lot Size(sq. ft.): 10062.36 Owner: ZIERLEIN PETER&DARA HERMAN ZIERLEIN Zoning URB(100) Applicant. THAYER STREET ASSOC INC AT: 49 LYMAN RD Applicant Address: Phone: Insurance: 8A COATES AVE (416)665-4018 Workers Compensation SOUTH DEERFIELDMA01373ISSUED ON.•411312015 0:00:00 TO PERFORM THE FOLLOWING WORK.-RENOVATE KITCHEN & 1 ST FLR BATH, BEDROOM & 2ND FLR BATH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Shmature: FeeType: Date Paid: Amount: Building 4/13/2015 0:00:00 $900.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner