31A-196 (4) e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Windows and the Thermal Bypass Checklist. Duct blast testing when practicable.
f. All band joist insulation must be enclosed within an air tight cavity, which you must create.
38. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air
flow (convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99%of the moisture in a structure.This is evident every time one
exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving
through the insulation.780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing
requirements.
39. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
40. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:Thrul-oks
are engineered for post attachment supporting a railing. Lateral attachment is required for each deck
per section 502.2.2.3.
41. Smoke and CO detectors as required. 780 CMR R314 and R315.
a. Smokes in each bedroom,within 10'of a bedroom door, and at the bottom of a stair leading to
a finished floor above.
b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the
mechanical room) Except if there are no fossil burning fuels or attached garage.
c. Heat detector in attached garage, and other large unfinished unconditioned spaces.
42. Closets beneath stair which have doors must be drywalled with%". 780 CMR R302.7
43. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of
ceiling joist to bottom of rafters an attic access of minimum RO of 22" x 30" is required to be located in
an accessible place. It must be insulated equal to surrounding,gasketed, and secured in place.
44. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30" to combustibles.
Relevant items must be submitted to the building department for approvals before inspections and or
Certificates of Occupancy can be issued.
Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday
through Friday, 8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email
address is: cmillerOD-northamotonma.gov
Tha u for r cooperation on th matters.
Chuck it r
City of Northampton
Assistant Commissioner and Zoning Enforcement
0 NMI III
c. Two doors remote as possible at the normal level of travel,opening measured from the face of
the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR
R311.2
d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7 V from
the top of the threshold and only in-swinging doors. 780 CMR R311.3
23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9",
maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle.
Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails
must be continuous and returned to the wall if not to newel post.780 CMR R311.7.
24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than
30" above floor or grade within 36",4" sphere rule.780 CMR R312.1.
25. Floor joist systems that are not equal to 1%" nominal dimension must be covered with %" drywall or
5/8" wood structural panel or equivalent with some exceptions. 780 CMR R501.3
26. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge,
In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes
in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole.
Notches are different.
27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition
requires a 16 GA 1%" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR
R602.6.1
28. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen,
and require 3' clearance from windows. 780 CMR M1502.3
29. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780
CMR M1502.4.3
30. Dryer duct maximum equivalent length is 25' less 5' per 900 elbow or per manufacturer's specs.780
CMR M1502.4.4.1, no screwed connections.
31. Dryer ducts when concealed must have a permanent label or tag within 6' of the duct connection 780
CMR M1502.4.5
32. Markup air is required for any exhaust hood over 400 CFM. 780 CMR M1503.4
33. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work
maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC
402.4.3
34. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and
bottom (floor) plates,soffits, and every 10'within enclosed cavities.780 CMR R302.
35. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316.
36. Dwelling/Garage fire separation.An attached garage (within 3' of main structure) is required to have%"
drywall on the garage side of the separation wall and if there is a finished space above the garage all
walls must have%" drywall and the ceiling 5/8" drywall.780 CMR R302.6
37. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. A signed copy of the Thermal Bypass Checklist.
d. Energy information including mechanical equipment posted on the electric panel.
6. Foundation anchor bolts must be %2" and be embedded a minimum of 7" into the concrete. 10" bolts!
780 CMR R403.1.6
7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions.
8. Emergency escape is required out of every basement whether habitable or not, each bedroom and walk-
in attics.780 CMR R310.1
9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust
only systems), or treating the space with supply and return.See 780 CMR R408
10. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common
are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is
required with a load path to the foundation.
11. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd 780 CMR
R802.3.1
12. Ridge boards must be the full depth of the cut.780 CMR R802.3.
13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and
number of jack studs required.
14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls
with bearing partitions,joints staggered 2' minimum. 780 CMR R602.3.2
a. Exception: A single plate may be used or plates may be excluded over lintels provided the
plates/lintels are adequately connected by a 3" x 6" plate .036 galvanized steel nailed to each
segment with 6-8d nails.
15. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I-joist and or Floor Truss
c. Roof truss
16. All I-Joist need to be protected from fire with%drywall or 5/8 wood structural panel. (R501.3)
17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall
method being used. 780 CMR 602.10.
a. Garage corners and large corner window/door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3"
respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full
headed with the temper and shank sizing meeting the strict code requirement.
18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep
perforate the sheathing weakening it and contribute to building damage in high wind events.
19. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a
shower head is used, 6'8" for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended
20. Hazardous glazing locations,within 24" of a door, or within 60" of a stair, or across from hot tubs,spas,
bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4
21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule. Order restrictors. 780 CMR R612.2
22. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310
b. Windows within 44 of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft
at 1"floor. Minimum clear opening 20"x24" or 24"x20".780 CMR R310.1.1
City of Northampton
Massachusetts
x
- DEPARTMENT OF BUILDING INSPECTIONS
a
212 Main Street • Municipal Building
Northampton, MA 01060W�xi �
INSPECTOR
Marissa & David Whitehill April 1,2015
60 Washington Avenue
Northampton, MA 01060
Subject Location:60 Washington Avenue, Northampton, MA
Map Block: 31A-196
Mr.Whitehill,
Your building permit application and plans dated 3-23-15 have been approved as drawn and per this memo.
All work must meet all applicable codes whether noted or not included within this memo.
Please follow up on the following items:
These items will need to be accomplished as the project moves forward and before rough inspections;
1. Smoke, Heat and CO detectors throughout the structure to current building codes.
2. An emergency escape window is required within every bedroom.
3. There are two window required to be tempered noted on the plan.
4. All ridge boards must fill the complete rafter cut.
5. Valleys require appropriate bearing.
6. Rafter extensions need to have two times the cantilever section attached to the rafter.
7. Note It may be a challenge to get a concrete contractor to fill a 10" wall through a 4" opening.Only
R-5 is required at the slab edge with radiant heating so you have a bit of leeway.
8. The bracket structure which supports the roof above the slider on the South elevation cannot be
verified by prescriptive, I would be willing to accept a bracket at a 45%angle securely fastened to
the supporting structure or you could stamp that detail.
9. If permeable insulation is used air sealing and an air sealing inspection is required at the exterior and
interior skins.Typically the sheathing and drywall.
Note:The 2012 IECC with MA amendments is the non-stretch energy code and the new Stretch Code
expected to be completed in 2015.
As of August 4th 2011 the 81h Edition MA code is the 2009 IRC with MA amendments.
in the following are some generic requirements which seem to be problematic.
This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes.
Read only international codes are available on line at http://publicecodes.cyberregs.com/icodl one
must also consider the MA amendments to these codes which can be found at www.mass.gov/dpsZbbrs .
The current relevant building codes are:
2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments.
1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I
soils (table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if
high water table or severe soils waterproofing 780 CMR R406.2.
5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR
R406.2 of amendments.
2012 IECC Energy
Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 20.00
Floor 10.00
Ceiling / Roof 49.00
Ductwork (unconditioned spaces):
Glass&Door Rating U-Factor SHGC
Window 0.28
Door 0.29
Cooling Heating &
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? comments/Assumptions
& Req.ID
404.1.1 Fuel gas lighting systems have ❑Complies
(FI23]3 no continuous pilot light. ❑Does Not
❑Not Observable
❑Not Applicable
401.3 Compliance certificate posted. ❑Complies Requirement will be met.
[FI7]2 ❑Does Not
❑Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
systems have been provided. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 9 of 9
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID —
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel ❑ Steel []Not Observable
402.2.6
❑
[FI1]1 Not Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met.
303.2 manufacturer's instructions. ❑Does Not
[F12]1 Blown insulation marked every ❑Not Observable Location on plans/spec:
300 ft z. SP1
❑Not Applicable
402.2.3 Vented attics with air permeable ❑Complies Requirement will be met.
(FI22]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that ❑Not Observable Location on plans/spec:
extends over insulation.
❑ A3
Not Applicable
402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met.
[F13]1 insulation >_R-value of the ❑Does Not
adjacent assembly. ❑Not Observable Location on plans/spec:
❑Not Applicable (EXISTING)
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies Requirement will be met.
[F117]1 ach in Climate Zones 1-2, and ❑Does Not
<=3 ach in Climate Zones 3-8. ❑Not Observable Location on plans/spec:
-
❑Not Applicable SP1
403.2.2 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
Mv handler @ 25 Pa. For rough-in
tests,verification may need to ❑Not Applicable
occur during Framing Inspection.
403.2.2.1 Air handler leakage designated ❑Complies
(F124]1 by manufacturer at <=2%of ❑Does Not
design air flow.
❑Not Observable
[:]Not Applicable
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed on forced air furnaces. ❑Does Not
_ ❑Not Observable
❑Not Applicable
403.1.2 Heat pump thermostat installed []Complies
[F[10]2 on heat pumps. ❑Does Not
❑Not Observable
[]Not Applicable
403.4.1 Circulating service hot water ❑Complies
[Flll]2 systems have automatic or []Does Not
accessible manual controls.
❑Not Observable
❑Not Applicable
403.5.1 All mechanical ventilation system ❑Complies
[FI25]2 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy
and air flow limits. ❑Not Observable
❑Not Applicable
404.1 75%of lamps in permanent ❑Complies
[F16]1 fixtures or 75%of permanent ❑Does Not
fixtures have high efficacy lamps. ❑Not Observable
Does not apply to low-voltage
❑
lighting. Not Applicable
1 High Impact(Tier 1)� 2 Medium Impact(Tier 2) L3 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 8 of 9
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Re .ID _ _
303.1 All installed insulation is labeled ❑Complies Requirement will be met.
[IN13]2 or the installed R-values ❑Does Not
provided.
❑Not Observable
❑Not Applicable
402.1.1, Floor insulation R-value. R- R- ❑Complies see the Envelope assemblies
402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values.
[IN1]1 ❑ Steel ❑ Steel ❑Not Observable
❑Not Applicable
303.2, Floor insulation installed per ❑Complies Requirement will be met.
402.2.7 manufacturer's instructions, and []Does Not
[IN2]1 in substantial contact with the []Not Observable Location on plans/spec:
underside of the subfloor. SP1
❑Not Applicable
402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood []Does Not table for values.
402.2.6 wall insulation on the wall [:] Mass ❑ Mass ❑Not Observable
[IN3]1 exterior,the exterior insulation
requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation is installed per ❑Complies Requirement will be met.
[IN4]1 manufacturer's instructions. ❑Does Not
Not Observable Location on plans/spec:
[:]Not
- SP1
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 7 of 9
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 6 of 9
Section Plans Verified Field Verified
# Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions
& Req.ID -- --- -- --- - __-
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies see the Envelope Assemblies
4023.1, average). ❑Does Not table for values.
402.3.3,
❑
402.3.6, Not Observable
402.5 ❑Not Applicable
[FR2]1
303.1.3 U-factors of fenestration products ❑Complies Requirement will be met.
[FR4]1 are determined in accordance ❑Does Not
with the NFRC test procedure or ❑Not Observable Location on plans/spec:
Vi taken from the default table. ❑Not Applicable A4
402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met.
[FR23]1 installed per manufacturer's []Does Not
instructions. ❑Not Observable Location on plans/spec:
A4
❑Not Applicable
402.4.3 Fenestration that is not site built ❑Complies Requirement will be met.
[FR20]1 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
402.4.4 IC-rated recessed lighting fixtures ❑Complies Exception: Requirement is
[FR16]2 sealed at housing/interior finish ❑Does Not not applicable.
and labeled to indicate :52.0 cfm ❑Not Observable
leakage at 75 Pa.
❑Not Applicable
403.2.1 Supply ducts in attics are R- R- ❑Complies
[FR12]1 insulated to >_R-8. All other ducts R- R- ❑Does Not
in unconditioned spaces or
outside the building envelope are ❑Not Observable
insulated to >_R-6. ❑Not Applicable
403.2.2 All joints and seams of air ducts, ❑Complies
[FR13]1 air handlers, and filter boxes are ❑Does Not
sealed. ❑Not Observable
❑Not Applicable
403.2.3 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. []Does Not
❑Not Observable
❑Not Applicable
403.3 HVAC piping conveying fluids R- R- ❑Complies
[FR17]2 above 105 °F or chilled fluids ❑Does Not
below 55 °F are insulated to >_R-
3 ❑Not Observable
❑Not Applicable
403.3.1 Protection of insulation on HVAC ❑Complies
[FR24]1 piping. []Does Not
❑Not Observable
❑Not Applicable _
403.4.2 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
❑Not Observable
❑Not Applicable
403.5 Automatic or gravity dampers are ❑Complies Requirement will be met.
[FR19]2 installed on all outdoor air ❑Does Not
V, intakes and exhausts. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) _ 3 Low Impact(Tier 3)---�
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 5 of 9
Section Plans Verified Field Verified
# Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies
[FO1]1 ❑ Unheated ❑ Unheated ❑Does Not table for values.
❑ Heated ❑ Heated ❑Not Observable
❑Not Applicable
303.2, Slab edge insulation installed per ❑Complies Requirement will be met.
402.2.9 manufacturer's instructions. []Does Not
[FO2]1 ❑Not Observable Location on plans/spec:
SP1
❑Not Applicable
402.1.1 Slab edge insulation ft ft ❑Complies See the Envelope Assemblies
[FO3]1 depth/length. ❑Does Not table for values.
At
❑Not Observable
❑Not Applicable
402.2.10 Unvented crawl space wall R- R ❑Complies See the Envelope Assemblies
[FO7]1 insulation R-value. R- R- ❑Does Not table for values.
❑Not Observable
❑Not Applicable
303.2 Unvented crawl space wall ❑Complies Requirement will be met.
[FOB]' insulation installed per ❑Does Not
manufacturer's instructions. ❑Not Observable Location on plans/spec:
SP1
❑Not Applicable
402.2.10 Unvented crawl space continuous ❑Complies Requirement will be met.
[FO9]1 vapor retarder installed over ❑Does Not
exposed earth,joints overlapped Location on plans/spec:
❑Not Observable
by 6 in. and sealed, extending at SP1
least 6 in. up and attached to the ❑Not Applicable
wall. _
402.2.9 Unvented crawl space wall in. in. ❑Complies See the Envelope assemblies
[FO10]1 insulation depth of burial or ❑Does Not table for values.
distance from top of wall.
❑Not Observable
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies Requirement will be met.
[F011]z to protect exposed exterior ❑Does Not
insulation and extends a Location on plans/spec:
minimum of 6 in. below grade. ❑Not Observable A4
❑Not Applicable
403.8 Snow-and ice-melting system ❑Complies
[FO12]2 controls installed. ❑Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 4 of 9
REScheck Software Version 4.6.0
Inspection Checklist
Energy Code: 2012 IECC
Requirements: 50.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, Construction drawings and ❑Complies Requirement will be met.
103.2 documentation demonstrate ❑Does Not
[PR1]1 energy code compliance for the
building envelope. ❑Not Observable
- ❑Not Applicable
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ❑Not Observable
Systems serving multiple []Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating Heating: ❑Complies
403,6 sized per ACCA Manual S based Btu/hr Btu/hr []Does Not
[PR2]2 on loads calculated per ACCA Cooling: Cooling: ❑Not Observable
Manual J or other methods Btu/hr Btu/hr
approved by the code official. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) F-21 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washi ngton_Ave_Copy_3.rxl Page 3 of 9
Gross Area Cavity Cont. Glazing
Door UA
Perimeter U-Factor
Crawl: Solid Concrete or Masonry 165 0.0 20.0 0.000 0
Wall height: 5,0'
Depth below grade: 4.0'
Insulation depth: 5.0'
Ceiling: Flat Ceiling or Scissor Truss 475 49.0 0.0 0.026 12
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in
REScheck Version 4.6.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 2 of 9
REScheck Software Version 4.6.0
Compliance Certificate
Project 60 Washington Ave Copy 2
Energy Code: 2012 IECC
Location: Northampton, Massachusetts
Construction Type: Single-family
Project Type: Addition
Orientation: Bldg. faces 315 deg. from North
Climate Zone: 5 (6404 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
60 Washington Ave DAVID WHITEHILL MARC Hoechstetter
Northampton, Massachusetts 01060 60 Washington Ave COMMON SENSE DESIGN
Northampton, Massachusetts 45 LUTHER SHAW RD
01060 CUMMINGTON, Massachusetts
3475142567 01026
davidwhitehill @gmail.com 4134417910
MARCHOEC @VERIZON,NET
Compliance: Passes using UA trade-off
Compliance: 8.7%Better Than Code Maximum UA: 229 Your UA: 209
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont. Glazing
Assembly or R-Vallue 11-Vallue or Door UA
Perimeter 11.11-Factor
Wall: Wood Frame, 16in. D.C. 300 21.0 2.0 0.050 12
Orientation: Front
Window: Vinyl Frame:Double Pane with Low-E 56 0.280 16
Orientation: Front
Wall: Wood Frame, 16in. D.C. 624 21.0 0.0 0.057 30
Orientation: Left side
Window: Vinyl Frame:Double Pane with Low-E 27 0.280 8
Orientation: Left side
Window copy 1: Vinyl Frame:Double Pane with Low-E 22 0.290 6
Orientation: Left side
Door: Glass 42 0.290 12
Orientation: Left side
Wall: Wood Frame, 16in. D.C. 541 21.0 0.0 0.057 26
Orientation: Back
Window: Other 78 0.280 22
Orientation: Back
Wall: Wood Frame, 16in. D.C. 120 21.0 0.0 0.057 7
Orientation: Right side
Floor: Slab-On-Grade:Heated 75 20.0 0.636 48
Insulation depth: 6.0'
Floor: All-Wood JoistlTruss Over Uncond. Space 135 10.0 0.0 0.076 10
Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15
Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 1 of 9
List of subcontractors
To Marc J. Hoechstetter, Contractor
For 60 Washington Ave. Northampton, MA
Excavation: Craig Tighe, no employees
Concrete: Harris&Gray,#7PJUB-2E00824-1-15
Construction: William J.Turomsha,#7PJUB0653N47914
Roofing: T. Luce construction,#UB-613085030-14
Insulation: Cellu-Spray,#WHN9115267
Drywall:Turgeon,#provided as received
Electrical: Rob Poissant,#provided as received
Plumbing:George Propane,#EWGCD000035214
Heating: George Propane,same as above
Painting:William Dynok, no employees
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111, S 150A.
Address of the work: 0/10 A-Ve
The debris will be transported by: Al- (VE-
The debris will be received by: N• VII. U���-S��,iG• i E-l.�
Building permit number:
Name of Permit Applicant KA-T&C �Cd��(SV�E7l>ER
3 Z3 Zeds
Date Signature of Permit Applicant
City of Northampton _
Massachusetts
DEPARTMENT OF BUILDING INSPECTIONS ; .
212 Main Street • Municipal Building
Northampton, MA 01060
INSPECTOR
Louis Hasbrouck Chuck Miller
Building Commissioner Assistant Commissioner
HOME OWNER EXEMPTION ACKNOWLEDGEMENT
The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her
construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which
he/she resides or intends to be, a one or two family dwelling, attached or detached structures
accessory to such use and/or farm structures. A person who constructs more than one home in a two-
year period shall not be considered a home owner."
The building department for the City of Northampton wants any person(s)who seek to use the home
owner exemption, to act as their own construction supervisor, to be aware that by doing so you
become responsible for compliance with state building codes and regulations. The inspection
process requires that the building department be called to inspect work at various stages, which include
foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection
(before work is concealed), insulation inspection (if required) and a final building inspection.
The building department requires these inspections before the work is concealed, failure to secure
these inspections can result in failure to obtain a certificate of occupancy until the work can be
inspected.
if the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be
responsible to make sure that the trades hired secure their proper permits in conjunction to the building
permit issued, and that they get their required inspections. Failure of the individual trades to secure
the permits and inspections as required can DELAY the project until such time as the proper permits
and inspections are made
1, understand the above.
(Home owner/resident's signature requesting exemption)
I will call to schedule all required building inspections necessary for the building permit issued to me.
Date
Address of work location
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
600 FVashington Street
Boston MA 02111
www.mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Lellibly
Name (Business/Organization/Individual):
Address:
City/State/Zip: Phone #:
Are you an employer? Check the appropriate box: Type of project(required):
1.❑ I am a employer with 4. K I am a general contractor and I
employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction
2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. F]Remodeling
ship and have no employees These sub-contractors have g. 21 Demolition
working for me in any capacity. employees and have workers'
[No workers' comp, insurance comp. insurance.t 9• Building addition
required.] 5. F� We are:a corporation and its 10.® Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.;<Plumbing repairs or additions
myself.m se ' right of exemption per MGL
y �o workers comp. 12.M Roof repairs
insurance required.] t c. 152, §1(4),and we have no
employees. [No workers' 13.❑ Other
comp. insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name:
Policy#or Self-ins. Lie. #: Expiration Date:
Job Site Address: City/State/Zip:
Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify and r the p ins and penalties of perjury that the information provided above is true and correct.
Sign ature: / ) / UKQ- he'ECHS M-9t .Date: 3 Z3 2-al S
Phone#: �f I 4 y I 75 10
Official use only. Do not write in this area, to be completed by city or town official
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6. Other
Contact Person: Phone#:
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: \ f.� ��/ Not Applicable £
Name of License Holder: L .1 • , `�Eck 1 5 T� C.5- 06 r s 16
License Number
5 CU -Ke-K 5-,Y kw no( . Cutitil1NC-iov/ 19A-otot6
Address Expiration Efate
13— I- 79 to
S gnature Telephone
..
9 Registered Home Improve mentGontractorc Not Applicable £
h-C C- do0 P-.ofsM7 EA' 7390 o
Company Name" Registration Number
¢ 5 f a x� gm -w nA co HmNrry�N-ow,,,' �/,f l 2 15
Address
Expiral n Date
Telephone -7%D
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... £ No...... £
11. :Home Owrier Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellinlzs of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is, or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A_person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the buildine permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature.
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House ❑ Addition ® Replacement Windows Alteration(s) Roofing ®'
Or Doors 0
Accessory Bldg. ❑ Demolition New Signs [O] Decks [[IJ Siding[❑] Other[0]
Brief DescWiop of Proposed
Work:_ (LSUlLn 2— b'DDt Ti, &` $ 'TO Ek S Tew t o -S€
Alteration of existing bedroom X Yes No Adding new bedroom X" Yes No
Attached Narrative Renovating unfinished basement Yes _ <'No
Plans Attached Roll -Sheet
_If New house an'
sa i ow additiio/n to existing housing;`complete tf `e foilowlng':
a. Use of building :One Family /� Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms Z.
a Is there a garage attached? J ! J q q q l p
d. Proposed Square footage of new construction. ` a ` Dimensions G��7f X G Zf �Z' 13 f 7'X V Mgt[
e. Number of stories? 2—
f. Method of heating? /V 6-1— V 5 FE> Fireplaces Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of constructions w �
i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes -No
j. Depth of basement or cellar floor below finished grade
Coll
k. Will building conform to the Building and Zoning regulations? X Yes No.
I. Septic Tank City Sewer X' Private well City water Supply x
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR,BUILDING PERMIT
I, -]P>A\J S VJ+ N—ME 1 as Owner of the subject
property
hereby authorize G � �f i A— CG
t'6—Al
to act on my behalf, in all matters relative to work authorized by this building permit application.
rr/Ti 0-(AJA42-C4� ,Z D
Signature of Own- Date
as GwmerlAuthorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed unAeorthe pai and penalties of perjury.
'! SJ'�
Prin ame
3�
Signature of-GwneilAgent Date
'
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size
Frontage
Setbacks Front [far
Rear I
Building Height -- -4— r
Bldg.Square Footage [10 "0 LLW [17:1- 1
Open Space Footage
(Lot area minus bldg&pav d
#of Parking Spaces
(volume&Location)
A. Has a Special Permit/Yarianoe/Fi riding ever been issued for/on the site?
x-�
_ DONTKNOV �x YES 0NO xo
|F YES, date isaued:
IF YES: Was the permit recorded at the Registry ofDeeds?
NO � J DONTKNOY� YES
��
IF YES: enter Book p and/or Document#
D. Does the site contain o brook' 9 bodyofwaternrwet\ands7 NO DONT KNOW 0 YES
IF YES, has permit been or need to be obtained from the Conservation Commission?
Needs to be obtained �~\ Obtained »�� Date
k_/ �_� ' �
C. Du any signs exist on the property? YES �~��/ NO
_
IF YES, describe size, type and location:
�~\ NO
D. Are there any proposed changes to or additions of signs intended for the property? YES ��,
IF YES, describe size' type and location:
E. Will the construction activity disturb(clearing, grading aUon.orfi||ing)over 1 acre oried part ofa common plan
' that will disturb over 1 acre? YES NO W
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
' pepatroent use only
N
o o City of Northampton Status of Permrt i u " j I r
1.L1 ''��
Building Department ;Curti CutfDrfyeway I�erml# s � '
i a 212 Main Street SewerlSepticAVairablllty '
- 2 F
Room 100 !NaterMteilA�ailabihty
0 p z Northampton, MA 01060 TwaS2fs ofstractural"P1ans ' j� " la
UJ LL o phone 413-587-1240 Fax 413-587-1272 Plof/SiteiPians
PA
APP ICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address: This section to be completed by office
/'��e �,'�i1 A t��� N�—�-��j� /��►-� Ma Lot i Ur1it
Zone Overlay Drstrtct '
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record: r
k w4ii-r
0 t <a - o orc+; -r- -� - �. 1�c>�ZT-�f �rr� �-ot�: MPS C�� 06n
Name(Print) Current Mailing Address: E ._ I c J
r,
Telephone
Signature
2.2 Authorized Agent: Co t Af
�nL r-- C&s iETT5 CU rd-C�2 S/� 2�( . X713- oco
Name 7(Print),"//, Current Mailing Address:
X13- 44/ - 7910
Sig toe Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by ermit applicant
1. Building (r�O Uo (a)Building Permit Fee
2. Electrical 13, 0 0o (b)Estimated Total Cost of
Construction`from 6
3. Plumbing 171 C) .._. Building Permit Fee
4. Mechanical(HVAC) Zv0
5. Fire Protection � � �
6. Total=0 +2+3+4+5) z 000 Check Number
This Section For Official Use Only
Date
Building Permit Number: Issued:
Signature: —
Building Commissioner/Inspector of Buildings Date
File#BP-2015-0883
APPLICANT/CONTACT PERSON HOECHSTETTER MARISSA&DAVID WHITEHILL
ADDRESS/PHONE 60 WASHINGTON AVE NORTHAMPTON01060(347)514-2567 ()
PROPERTY LOCATION 60 WASHINGTON AVE
MAP-31A PARCEL 196 001 ZONE URB 1001/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out ,
Fee Paid "'
Typeof Construction: CONSTRUCT 2 ADDITIONS
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included•
Owner/Statement or License ,�CC
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ONd 1
INFORMATION PRESENTED:
1/Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
n ay
Sign re of Building O icia Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
60 WASHINGTON AVE BP-2015-0883
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 3 1 A- 196 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: ADDITION BUILDING PERMIT
Permit# BP-2015-0883
Project# JS-2015-001721
Est. Cost: $228000.00
Fee: $406.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: Homeowner as Contractor
Lot Size(sq. ft.): 4704.48 Owner: HOECHSTETTER MARISSA&DAVID WHITEHILL
Zoning.URB(100)/ Applicant. HOECHSTETTER MARISSA & DAVID WHITEHILL
AT: 60 WASHINGTON AVE
Applicant Address: Phone: Insurance:
60 WASHINGTON AVE (347) 514-2567 ()
NORTHAMPTONMA01060 ISSUED ON:41212015 0:00:00
TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 ADDITIONS
(KITCHEN,BATH,BEDROMS) & REMODEL
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Shmature:
FeeType: Date Paid: Amount:
Building 4/2/2015 0:00:00 $406.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272