31A-196 (4) e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity, which you must create. 38. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow (convection) a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving through the insulation.780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 39. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 40. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:Thrul-oks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 41. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom,within 10'of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels or attached garage. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 42. Closets beneath stair which have doors must be drywalled with%". 780 CMR R302.7 43. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22" x 30" is required to be located in an accessible place. It must be insulated equal to surrounding,gasketed, and secured in place. 44. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30" to combustibles. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmillerOD-northamotonma.gov Tha u for r cooperation on th matters. Chuck it r City of Northampton Assistant Commissioner and Zoning Enforcement 0 NMI III c. Two doors remote as possible at the normal level of travel,opening measured from the face of the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7 V from the top of the threshold and only in-swinging doors. 780 CMR R311.3 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle. Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post.780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule.780 CMR R312.1. 25. Floor joist systems that are not equal to 1%" nominal dimension must be covered with %" drywall or 5/8" wood structural panel or equivalent with some exceptions. 780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1%" strap across the area and 6" beyond each side with 8- 10nd nails. 780 CMR R602.6.1 28. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3' clearance from windows. 780 CMR M1502.3 29. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780 CMR M1502.4.3 30. Dryer duct maximum equivalent length is 25' less 5' per 900 elbow or per manufacturer's specs.780 CMR M1502.4.4.1, no screwed connections. 31. Dryer ducts when concealed must have a permanent label or tag within 6' of the duct connection 780 CMR M1502.4.5 32. Markup air is required for any exhaust hood over 400 CFM. 780 CMR M1503.4 33. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 34. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling) and bottom (floor) plates,soffits, and every 10'within enclosed cavities.780 CMR R302. 35. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316. 36. Dwelling/Garage fire separation.An attached garage (within 3' of main structure) is required to have%" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have%" drywall and the ceiling 5/8" drywall.780 CMR R302.6 37. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. 6. Foundation anchor bolts must be %2" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not, each bedroom and walk- in attics.780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust only systems), or treating the space with supply and return.See 780 CMR R408 10. Ceiling joist are intended to prevent spread, once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut.780 CMR R802.3. 13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2' minimum. 780 CMR R602.3.2 a. Exception: A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3" x 6" plate .036 galvanized steel nailed to each segment with 6-8d nails. 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. I-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with%drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a shower head is used, 6'8" for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations,within 24" of a door, or within 60" of a stair, or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule. Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44 of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1"floor. Minimum clear opening 20"x24" or 24"x20".780 CMR R310.1.1 City of Northampton Massachusetts x - DEPARTMENT OF BUILDING INSPECTIONS a 212 Main Street • Municipal Building Northampton, MA 01060W�xi � INSPECTOR Marissa & David Whitehill April 1,2015 60 Washington Avenue Northampton, MA 01060 Subject Location:60 Washington Avenue, Northampton, MA Map Block: 31A-196 Mr.Whitehill, Your building permit application and plans dated 3-23-15 have been approved as drawn and per this memo. All work must meet all applicable codes whether noted or not included within this memo. Please follow up on the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. Smoke, Heat and CO detectors throughout the structure to current building codes. 2. An emergency escape window is required within every bedroom. 3. There are two window required to be tempered noted on the plan. 4. All ridge boards must fill the complete rafter cut. 5. Valleys require appropriate bearing. 6. Rafter extensions need to have two times the cantilever section attached to the rafter. 7. Note It may be a challenge to get a concrete contractor to fill a 10" wall through a 4" opening.Only R-5 is required at the slab edge with radiant heating so you have a bit of leeway. 8. The bracket structure which supports the roof above the slider on the South elevation cannot be verified by prescriptive, I would be willing to accept a bracket at a 45%angle securely fastened to the supporting structure or you could stamp that detail. 9. If permeable insulation is used air sealing and an air sealing inspection is required at the exterior and interior skins.Typically the sheathing and drywall. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the new Stretch Code expected to be completed in 2015. As of August 4th 2011 the 81h Edition MA code is the 2009 IRC with MA amendments. in the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cyberregs.com/icodl one must also consider the MA amendments to these codes which can be found at www.mass.gov/dpsZbbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR R406.2 of amendments. 2012 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 20.00 Floor 10.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.28 Door 0.29 Cooling Heating & Heating System: Cooling System: Water Heater: Name: Date: Comments Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? comments/Assumptions & Req.ID 404.1.1 Fuel gas lighting systems have ❑Complies (FI23]3 no continuous pilot light. ❑Does Not ❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies Requirement will be met. [FI7]2 ❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [FI18]3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 9 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID — 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel []Not Observable 402.2.6 ❑ [FI1]1 Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every ❑Not Observable Location on plans/spec: 300 ft z. SP1 ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Requirement will be met. (FI22]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that ❑Not Observable Location on plans/spec: extends over insulation. ❑ A3 Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [F13]1 insulation >_R-value of the ❑Does Not adjacent assembly. ❑Not Observable Location on plans/spec: ❑Not Applicable (EXISTING) 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies Requirement will be met. [F117]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable Location on plans/spec: - ❑Not Applicable SP1 403.2.2 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [F14]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air ❑Not Observable Mv handler @ 25 Pa. For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.2.2.1 Air handler leakage designated ❑Complies (F124]1 by manufacturer at <=2%of ❑Does Not design air flow. ❑Not Observable [:]Not Applicable 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed on forced air furnaces. ❑Does Not _ ❑Not Observable ❑Not Applicable 403.1.2 Heat pump thermostat installed []Complies [F[10]2 on heat pumps. ❑Does Not ❑Not Observable []Not Applicable 403.4.1 Circulating service hot water ❑Complies [Flll]2 systems have automatic or []Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 403.5.1 All mechanical ventilation system ❑Complies [FI25]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits. ❑Not Observable ❑Not Applicable 404.1 75%of lamps in permanent ❑Complies [F16]1 fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. ❑Not Observable Does not apply to low-voltage ❑ lighting. Not Applicable 1 High Impact(Tier 1)� 2 Medium Impact(Tier 2) L3 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 8 of 9 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Re .ID _ _ 303.1 All installed insulation is labeled ❑Complies Requirement will be met. [IN13]2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies see the Envelope assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per ❑Complies Requirement will be met. 402.2.7 manufacturer's instructions, and []Does Not [IN2]1 in substantial contact with the []Not Observable Location on plans/spec: underside of the subfloor. SP1 ❑Not Applicable 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood []Does Not table for values. 402.2.6 wall insulation on the wall [:] Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. ❑Does Not Not Observable Location on plans/spec: [:]Not - SP1 ❑Not Applicable Additional Comments/Assumptions: 111 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 7 of 9 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 6 of 9 Section Plans Verified Field Verified # Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions & Req.ID -- --- -- --- - __- 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies see the Envelope Assemblies 4023.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 ❑Not Applicable [FR2]1 303.1.3 U-factors of fenestration products ❑Complies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable Location on plans/spec: Vi taken from the default table. ❑Not Applicable A4 402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met. [FR23]1 installed per manufacturer's []Does Not instructions. ❑Not Observable Location on plans/spec: A4 ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.4 IC-rated recessed lighting fixtures ❑Complies Exception: Requirement is [FR16]2 sealed at housing/interior finish ❑Does Not not applicable. and labeled to indicate :52.0 cfm ❑Not Observable leakage at 75 Pa. ❑Not Applicable 403.2.1 Supply ducts in attics are R- R- ❑Complies [FR12]1 insulated to >_R-8. All other ducts R- R- ❑Does Not in unconditioned spaces or outside the building envelope are ❑Not Observable insulated to >_R-6. ❑Not Applicable 403.2.2 All joints and seams of air ducts, ❑Complies [FR13]1 air handlers, and filter boxes are ❑Does Not sealed. ❑Not Observable ❑Not Applicable 403.2.3 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. []Does Not ❑Not Observable ❑Not Applicable 403.3 HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105 °F or chilled fluids ❑Does Not below 55 °F are insulated to >_R- 3 ❑Not Observable ❑Not Applicable 403.3.1 Protection of insulation on HVAC ❑Complies [FR24]1 piping. []Does Not ❑Not Observable ❑Not Applicable _ 403.4.2 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 >_R-3. ❑Does Not ❑Not Observable ❑Not Applicable 403.5 Automatic or gravity dampers are ❑Complies Requirement will be met. [FR19]2 installed on all outdoor air ❑Does Not V, intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) _ 3 Low Impact(Tier 3)---� Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 5 of 9 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Slab edge insulation R-value. R- R- ❑Complies See the Envelope Assemblies [FO1]1 ❑ Unheated ❑ Unheated ❑Does Not table for values. ❑ Heated ❑ Heated ❑Not Observable ❑Not Applicable 303.2, Slab edge insulation installed per ❑Complies Requirement will be met. 402.2.9 manufacturer's instructions. []Does Not [FO2]1 ❑Not Observable Location on plans/spec: SP1 ❑Not Applicable 402.1.1 Slab edge insulation ft ft ❑Complies See the Envelope Assemblies [FO3]1 depth/length. ❑Does Not table for values. At ❑Not Observable ❑Not Applicable 402.2.10 Unvented crawl space wall R- R ❑Complies See the Envelope Assemblies [FO7]1 insulation R-value. R- R- ❑Does Not table for values. ❑Not Observable ❑Not Applicable 303.2 Unvented crawl space wall ❑Complies Requirement will be met. [FOB]' insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable Location on plans/spec: SP1 ❑Not Applicable 402.2.10 Unvented crawl space continuous ❑Complies Requirement will be met. [FO9]1 vapor retarder installed over ❑Does Not exposed earth,joints overlapped Location on plans/spec: ❑Not Observable by 6 in. and sealed, extending at SP1 least 6 in. up and attached to the ❑Not Applicable wall. _ 402.2.9 Unvented crawl space wall in. in. ❑Complies See the Envelope assemblies [FO10]1 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies Requirement will be met. [F011]z to protect exposed exterior ❑Does Not insulation and extends a Location on plans/spec: minimum of 6 in. below grade. ❑Not Observable A4 ❑Not Applicable 403.8 Snow-and ice-melting system ❑Complies [FO12]2 controls installed. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 4 of 9 REScheck Software Version 4.6.0 Inspection Checklist Energy Code: 2012 IECC Requirements: 50.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the building envelope. ❑Not Observable - ❑Not Applicable 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable Systems serving multiple []Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating Heating: ❑Complies 403,6 sized per ACCA Manual S based Btu/hr Btu/hr []Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: ❑Not Observable Manual J or other methods Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1) F-21 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washi ngton_Ave_Copy_3.rxl Page 3 of 9 Gross Area Cavity Cont. Glazing Door UA Perimeter U-Factor Crawl: Solid Concrete or Masonry 165 0.0 20.0 0.000 0 Wall height: 5,0' Depth below grade: 4.0' Insulation depth: 5.0' Ceiling: Flat Ceiling or Scissor Truss 475 49.0 0.0 0.026 12 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 2 of 9 REScheck Software Version 4.6.0 Compliance Certificate Project 60 Washington Ave Copy 2 Energy Code: 2012 IECC Location: Northampton, Massachusetts Construction Type: Single-family Project Type: Addition Orientation: Bldg. faces 315 deg. from North Climate Zone: 5 (6404 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 60 Washington Ave DAVID WHITEHILL MARC Hoechstetter Northampton, Massachusetts 01060 60 Washington Ave COMMON SENSE DESIGN Northampton, Massachusetts 45 LUTHER SHAW RD 01060 CUMMINGTON, Massachusetts 3475142567 01026 davidwhitehill @gmail.com 4134417910 MARCHOEC @VERIZON,NET Compliance: Passes using UA trade-off Compliance: 8.7%Better Than Code Maximum UA: 229 Your UA: 209 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Glazing Assembly or R-Vallue 11-Vallue or Door UA Perimeter 11.11-Factor Wall: Wood Frame, 16in. D.C. 300 21.0 2.0 0.050 12 Orientation: Front Window: Vinyl Frame:Double Pane with Low-E 56 0.280 16 Orientation: Front Wall: Wood Frame, 16in. D.C. 624 21.0 0.0 0.057 30 Orientation: Left side Window: Vinyl Frame:Double Pane with Low-E 27 0.280 8 Orientation: Left side Window copy 1: Vinyl Frame:Double Pane with Low-E 22 0.290 6 Orientation: Left side Door: Glass 42 0.290 12 Orientation: Left side Wall: Wood Frame, 16in. D.C. 541 21.0 0.0 0.057 26 Orientation: Back Window: Other 78 0.280 22 Orientation: Back Wall: Wood Frame, 16in. D.C. 120 21.0 0.0 0.057 7 Orientation: Right side Floor: Slab-On-Grade:Heated 75 20.0 0.636 48 Insulation depth: 6.0' Floor: All-Wood JoistlTruss Over Uncond. Space 135 10.0 0.0 0.076 10 Project Title: 60 Washington Ave Copy 2 Report date: 03/22/15 Data filename: C:\Users\WHITEHILL\Downloads\60_Washington_Ave_Copy_3.rxl Page 1 of 9 List of subcontractors To Marc J. Hoechstetter, Contractor For 60 Washington Ave. Northampton, MA Excavation: Craig Tighe, no employees Concrete: Harris&Gray,#7PJUB-2E00824-1-15 Construction: William J.Turomsha,#7PJUB0653N47914 Roofing: T. Luce construction,#UB-613085030-14 Insulation: Cellu-Spray,#WHN9115267 Drywall:Turgeon,#provided as received Electrical: Rob Poissant,#provided as received Plumbing:George Propane,#EWGCD000035214 Heating: George Propane,same as above Painting:William Dynok, no employees City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: 0/10 A-Ve The debris will be transported by: Al- (VE- The debris will be received by: N• VII. U���-S��,iG• i E-l.� Building permit number: Name of Permit Applicant KA-T&C �Cd��(SV�E7l>ER 3 Z3 Zeds Date Signature of Permit Applicant City of Northampton _ Massachusetts DEPARTMENT OF BUILDING INSPECTIONS ; . 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. if the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made 1, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 FVashington Street Boston MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Lellibly Name (Business/Organization/Individual): Address: City/State/Zip: Phone #: Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. K I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. F]Remodeling ship and have no employees These sub-contractors have g. 21 Demolition working for me in any capacity. employees and have workers' [No workers' comp, insurance comp. insurance.t 9• Building addition required.] 5. F� We are:a corporation and its 10.® Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.;<Plumbing repairs or additions myself.m se ' right of exemption per MGL y �o workers comp. 12.M Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. tHo meowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins. Lie. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify and r the p ins and penalties of perjury that the information provided above is true and correct. Sign ature: / ) / UKQ- he'ECHS M-9t .Date: 3 Z3 2-al S Phone#: �f I 4 y I 75 10 Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: \ f.� ��/ Not Applicable £ Name of License Holder: L .1 • , `�Eck 1 5 T� C.5- 06 r s 16 License Number 5 CU -Ke-K 5-,Y kw no( . Cutitil1NC-iov/ 19A-otot6 Address Expiration Efate 13— I- 79 to S gnature Telephone .. 9 Registered Home Improve mentGontractorc Not Applicable £ h-C C- do0 P-.ofsM7 EA' 7390 o Company Name" Registration Number ¢ 5 f a x� gm -w nA co HmNrry�N-ow,,,' �/,f l 2 15 Address Expiral n Date Telephone -7%D SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... £ No...... £ 11. :Home Owrier Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellinlzs of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is, or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A_person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildine permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ® Replacement Windows Alteration(s) Roofing ®' Or Doors 0 Accessory Bldg. ❑ Demolition New Signs [O] Decks [[IJ Siding[❑] Other[0] Brief DescWiop of Proposed Work:_ (LSUlLn 2— b'DDt Ti, &` $ 'TO Ek S Tew t o -S€ Alteration of existing bedroom X Yes No Adding new bedroom X" Yes No Attached Narrative Renovating unfinished basement Yes _ <'No Plans Attached Roll -Sheet _If New house an' sa i ow additiio/n to existing housing;`complete tf `e foilowlng': a. Use of building :One Family /� Two Family Other b. Number of rooms in each family unit: Number of Bathrooms Z. a Is there a garage attached? J ! J q q q l p d. Proposed Square footage of new construction. ` a ` Dimensions G��7f X G Zf �Z' 13 f 7'X V Mgt[ e. Number of stories? 2— f. Method of heating? /V 6-1— V 5 FE> Fireplaces Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of constructions w � i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes -No j. Depth of basement or cellar floor below finished grade Coll k. Will building conform to the Building and Zoning regulations? X Yes No. I. Septic Tank City Sewer X' Private well City water Supply x SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR,BUILDING PERMIT I, -]P>A\J S VJ+ N—ME 1 as Owner of the subject property hereby authorize G � �f i A— CG t'6—Al to act on my behalf, in all matters relative to work authorized by this building permit application. rr/Ti 0-(AJA42-C4� ,Z D Signature of Own- Date as GwmerlAuthorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed unAeorthe pai and penalties of perjury. '! SJ'� Prin ame 3� Signature of-GwneilAgent Date ' Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front [far Rear I Building Height -- -4— r Bldg.Square Footage [10 "0 LLW [17:1- 1 Open Space Footage (Lot area minus bldg&pav d #of Parking Spaces (volume&Location) A. Has a Special Permit/Yarianoe/Fi riding ever been issued for/on the site? x-� _ DONTKNOV �x YES 0NO xo |F YES, date isaued: IF YES: Was the permit recorded at the Registry ofDeeds? NO � J DONTKNOY� YES �� IF YES: enter Book p and/or Document# D. Does the site contain o brook' 9 bodyofwaternrwet\ands7 NO DONT KNOW 0 YES IF YES, has permit been or need to be obtained from the Conservation Commission? Needs to be obtained �~\ Obtained »�� Date k_/ �_� ' � C. Du any signs exist on the property? YES �~��/ NO _ IF YES, describe size, type and location: �~\ NO D. Are there any proposed changes to or additions of signs intended for the property? YES ��, IF YES, describe size' type and location: E. Will the construction activity disturb(clearing, grading aUon.orfi||ing)over 1 acre oried part ofa common plan ' that will disturb over 1 acre? YES NO W IF YES,then a Northampton Storm Water Management Permit from the DPW is required. ' pepatroent use only N o o City of Northampton Status of Permrt i u " j I r 1.L1 ''�� Building Department ;Curti CutfDrfyeway I�erml# s � ' i a 212 Main Street SewerlSepticAVairablllty ' - 2 F Room 100 !NaterMteilA�ailabihty 0 p z Northampton, MA 01060 TwaS2fs ofstractural"P1ans ' j� " la UJ LL o phone 413-587-1240 Fax 413-587-1272 Plof/SiteiPians PA APP ICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office /'��e �,'�i1 A t��� N�—�-��j� /��►-� Ma Lot i Ur1it Zone Overlay Drstrtct ' SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: r k w4ii-r 0 t <a - o orc+; -r- -� - �. 1�c>�ZT-�f �rr� �-ot�: MPS C�� 06n Name(Print) Current Mailing Address: E ._ I c J r, Telephone Signature 2.2 Authorized Agent: Co t Af �nL r-- C&s iETT5 CU rd-C�2 S/� 2�( . X713- oco Name 7(Print),"//, Current Mailing Address: X13- 44/ - 7910 Sig toe Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building (r�O Uo (a)Building Permit Fee 2. Electrical 13, 0 0o (b)Estimated Total Cost of Construction`from 6 3. Plumbing 171 C) .._. Building Permit Fee 4. Mechanical(HVAC) Zv0 5. Fire Protection � � � 6. Total=0 +2+3+4+5) z 000 Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: — Building Commissioner/Inspector of Buildings Date File#BP-2015-0883 APPLICANT/CONTACT PERSON HOECHSTETTER MARISSA&DAVID WHITEHILL ADDRESS/PHONE 60 WASHINGTON AVE NORTHAMPTON01060(347)514-2567 () PROPERTY LOCATION 60 WASHINGTON AVE MAP-31A PARCEL 196 001 ZONE URB 1001/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out , Fee Paid "' Typeof Construction: CONSTRUCT 2 ADDITIONS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included• Owner/Statement or License ,�CC 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ONd 1 INFORMATION PRESENTED: 1/Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management n ay Sign re of Building O icia Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 60 WASHINGTON AVE BP-2015-0883 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 3 1 A- 196 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT Permit# BP-2015-0883 Project# JS-2015-001721 Est. Cost: $228000.00 Fee: $406.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq. ft.): 4704.48 Owner: HOECHSTETTER MARISSA&DAVID WHITEHILL Zoning.URB(100)/ Applicant. HOECHSTETTER MARISSA & DAVID WHITEHILL AT: 60 WASHINGTON AVE Applicant Address: Phone: Insurance: 60 WASHINGTON AVE (347) 514-2567 () NORTHAMPTONMA01060 ISSUED ON:41212015 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 ADDITIONS (KITCHEN,BATH,BEDROMS) & REMODEL POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Shmature: FeeType: Date Paid: Amount: Building 4/2/2015 0:00:00 $406.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner