32A-072 (8) 11M13 Cityof Northampton Mail-19 Union Street
19 Union Street
Louis Hasbrouck <Iasbrouck @northamptonma.gov> Thu, Nov 7, 2013 at 2:21 PM
To: brianpmcdermott @gmail.com
Cc: Carolyn Misch <cmisch @northamptonma.gov>, Charles Miller<cmiller @northamptonma.gov>, Kyle Scott
<kscott @northamptonma.gov>
Brian,
I've reviewed your application for a separate dwelling unit at 19 Union Street and I need more information to make
a determination.
You need to provide a site plan that shows the proposed location of the new dwelling (including accurate
distances for proposed setbacks and separation from the existing building), the location of the required parking
spaces (see the ordinance for location requirements), and the open space of the lot. You will need to provide the
total floor areas of all dwelling units to determine the number of required parking places (one for each 1,000 sf
floor area of each unit)Zoning requires 30% open space (lot area minus building coverage, driveway coverage,
parking area coverage, sidewalk coverage and any other impervious areas such as patios, etc).
The existing barn cannot be converted unless it is moved and meets the setbacks required for a dwelling unit in
that district.
Louis Hasbrouck
Building Commissioner
City of Northampton
Town of Williamsburg
(413) 587-1240 office
(413) 587-1272 fax
URC District ADOPTED.pdf
330K
https://mai I.g oog le.com/mai I/ca/u/0/?ui=2&i Ir ec5fl9a57e&\i evw pt&search=sent&th=142340307a3c968a 1/1
THIS PLAT IS COMPILED FROM DEEDS, PLANS AND OTHER SOURCES AND IS NOT
TO BE CONSTRUED AS AN ACCURATE SURVEY AND IS NOT TO BE RECORDED.
BUILDING LOCATION ACCURACY IS NOT GUARANTEED
NOTE:
PROPERTY LINES SHOWN ARE APPROXIMATE, NOTE:
A FULL FIELD SURVEY IS REQUIRED TO SUBJECT TO EASEMENTS AND
ACCURATELY DETERMINE THEIR LOCATION. RIGHTS OF WAYS OF RECORD.
84.65'±(Plan)
85'±(Deed)
Barn
F
O
I
co
o v REFERENCE:
REFERENCE: w o I BOOK 6255, PAGE 26
PLAN BK. 208, PG. 31 - PLAN BK. 20, PG. 21
o
co
ip
co
#17-19
n
0
85.00'±
UNION STREET
TO: FLORENCE SAVINGS BANK &
FIRST AMERICAN TITLE INSURANCE COMPANY
TO THE BEST OF MY INFORMATION, KNOWLEDGE AND BELIEF
I HEREBY REPORT THAT I HAVE EXAMINED THE PREMISES AND BASED ON EXISTING
MONUMENTATION ALL VISIBLE EASEMENTS, ENCROACHMENTS AND BUILDINGS ARE LOCATED ON
THE GROUND AS SHOWN AND THAT THE BUILDINGS ARE ENTIRELY WITHIN THE LOT LINES,
EXCEPT AS NOTED. I FURTHER REPORT THAT THE PROPERTY IS NOT LOCATED WITHIN
A FLOOD PRONE AREA AS SHOWN ON FEDERAL FLOOD INSURANCE MAPS FOR
COMMUNITY #250167
—NOTE—
SURVEYOR: O_) , �. i 2y, THIS PLAT FOR MORTGAGE LOAN PURPOSES ONLY
AND DOES NOT CONSTITUTE A PROPERTY SURVEY
ty\ OF —MORTGAGE LOAN INSPECTION PLAT—
RA s' NORTHAMPTON, MASSACHUSETTS
NDALL N
E. a PREPARED FOR
IZER
X3550303 2 y BRIAN P. McDERMOTT & ZOE PAPPENHEIMER
SCALE: 1"=30' AUGUST 30, 2013
N� SURVE HAROLD L. EATON AND ASSOCIATES, INC.
REGISTERED PROFESSIONAL LAND SURVEYORS
235 RUSSELL STREE"f — HADLEY — MASSACHUSETTS
- Northampton's goal is to increase infill, and our location on Union Street is a
perfect place to do so. We're extremely close to town, and the flat egress from the
barn to the street means the unit could potentially be rented to the target tenants
Northampton has cited: those over 55 years old, as well as younger graduate
students or young professionals.
- Our lot,which is over 9,000 square feet, allows plenty of room for necessary
parking. The arrangement and placement of the two structures will remain exactly
the same as they have been for over 100 years.
- Our neighbors at 25 Union are a three-unit condo property with separate
entrances on a lot about the same size as ours. Down the street at 38 Union,there is
a separate living unit from the main structure. Next door at 15 Union,there are
multiple apartments,and the condos on Graves Ave. (which we can see from our
window) populate one of the densest streets in Northampton. We believe
transforming this underused barn space perfectly fits the character of the
neighborhood.
-There is no zoning change to the number of units. Unlike in the recent past,both
the upstairs and the downstairs of the current living structure will be owner-
occupied.
-We will build using the most environmentally-friendly technology and materials
we can.
We're expecting our first child in May 2014, and so we'd love to get started on the
construction as soon as possible in the hopes of having a guest house for our parents
the first few years of our child's life. We look forward to your comments and
guidance on how to go about accomplishing our goals.
Thank you for your time and consideration,
Brian McDermott
Zoe Pappenheimer
19 Union Street
Northampton, Mass. 01060
413-225-1150
brianpmcdermott @gmail.com
y r
I
u NOV 6 2013 `i
November 4, 2013 _ - - ; rizCtions
Eleclr OEO
n,,•gip,. r.
Dear Mr. Hasbrouck,
Per our phone conversation several weeks ago, this is a letter with information
submitted in the hope we can get city approval to relocate one of the three existing
dwelling units in the main house to an existing barn on the property at 17-19 Union
Street(parcel 32A-072) that we purchased this September.
Currently,there are two structures on the property. The property is zoned as a three
family residence. The first structure is the residence itself,divided into three units:
19 Union takes up the full upstairs,while both 17 and 17a are downstairs, divided
by a wall. It sits toward the front of the property,which is a lot approximately 85
feet wide along Union Street and 109 feet deep,extending back toward Graves
Avenue.
The second structure is the barn, which is detached from the house.This two-story
barn is approximately 31ft 6 inches long on the street-facing side and 18 feet 4
inches deep,and requires significant repairs. Its approximately 580 square foot
footprint is in the back right(most southerly) corner of the lot. The back of the barn
faces the back driveway of the Graves Avenue condo rowhouses with a 32-inch
buffer. The buffer is our property.The barn's right wall is also 32 inches away from
our property line. The remaining two sides face in to our existing property.
Our hope is the City of Northampton will allow us to build a residence within the
existing barn's footprint. Our plan is to legally condoize the current property into
three condos: one family (us) living in 19 Union and another (our good friends Brian
Dillon and Jorge Guzman) buying, reconfiguring and living in the entire downstairs
by combining the current apartments of 17a Union and 17 Union into one unit.The
third condo would be relocated to the barn.
Thus the number of units-three- remains the same. We will, of course, file all the
necessary paperwork and pay the necessary fees.
We believe reshuffling the arrangement on our property fits the goals of
Northampton's zoning ordinances,and will be beneficial for an already great
neighborhood. Here's why:
• When we closed on the property on Sept. 6, 2013,the barn (which dates,as far as
we know,to the original construction) had holes in the roof, cracked stucco on the
exterior, and a general aura of disrepair. The barn has electricity and gas utilities,
and we understand it has existed in this state for decades. We believe that high
quality construction can transform this eyesore into an attractive, desirable rental
unit in a way that benefits the property values of all of our neighbors without any
permanent hassle.
10. Do any signs exist on the property? YES NO
IF YES, describe size, type and location:
Are there any proposed changes to or additions of signs intended for the property? YES NOX
IF YES, describe size, type and location:
11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common
plan of development that will disturb over 1 acre? YES NO _ _
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
ZONING
Lot Size
00ttiY1�y�'
Frontage
/JCS
Setbacks Front 3 j L� r IJQ !!2 —rte
Fa- Side L: 5 R: 32, i nck6 R:Mo.rc- A-,j -'t L: R:
riv"^ fix'"
Rear T -�
?,2 i ; ^i^
Building Height ib,,;z �rec 5 . 45
Nb C�tc''n
Building Square Footage V,,jr feJ,a
%Open Space: (lot area
minus building & paved tic
parking
#of Parking Spaces
#of Loading Docks
Fill:
(volume & location)
13. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: ��'� r l� Applicant's Signature
NOTE:Issuance of a zoning permit does not relieve an applicants burden to comply with all zoning
requirements and obtain all required permits from the Board of Health,Conservation Commission,
Historic and Architectural Boards,Department of Public Works and other applicable permit granting
authorities.
W:\Documents\FORMS\original\Buil ding-Inspector\Zoning-Permit-Application-passive.doc 8/4/2004
File No. �7 LAO
ZONING' 'PERMIT APPLICA TION (§10.2)
Please type or print all information and return this form to the Building
Inspector's Office with the $15f tiling fee (check or money order)payable to the
City of Northampton
1. Name of Applicant: ('t a Y� ! p�G`/ek,moN fit"
Address: Sal U Telephone: 9 l S r ��� � �t'SU
2. Owner of Property: f tGW1 w\c Der mo k-�- e5l
Address: 1q( 0,,,of\ Telephone: \3 Z2�— S O
✓
3. Status of Applicant: Owner /� Contract Purchaser Lessee Other (explain)
4. Job Location: t 13 0-I��
Parcel Id: Zoning Map# Parcel# District(s):
In Elm Street District In Central Business.District
(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Existing Use of Structure/Property:
19 oo(cyx , cAncA f(5"+ i7 2 17c� U,ni'Un
6. Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary):
Fle se see
7. Attached Plans: Sketch Plan Site Plan Engineered/Surveyed Plans
8. Has a Special Perm it/Variance/Finding(ever been issued for/on the site?
NO DON'T KNOW � ` YES IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO DON'T KNOW YES
IF YES: enter Book Page and/or Document#
9.Does the site contain a brook, body of water or wetlands? NO �_ DON'T KNOW YES
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained date issued:
[� rFi�rrdi�D,u;ues pl i Other Side)
W:\Documents\FORMS\original\Building-Inspector\Zoning-Permit-Application-passive.doc 904 8/4/2004
In=PeGtions
PWmbin9&
ntcn,MFG�`v
E►ectri�c�t am,
File#MP-2014-0046
APPLICANT/CONTACT PERSON MCDERMOTT BRIAN&ZOE PAPPENHEIMER uc&W /
ADDRESS/PHONE 19 UNION ST 413 225-1150
PROPERTY LOCATION 19 UNION ST
MAP 32A PARCEL 072 001 ZONE URC(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out Of AWr-
Fee Paid
Typeof Construction:_ZPA- SFH IN BARN
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFORMATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: §
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Signature of Building Official Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.