Loading...
Olander Loop Preliminary Approval February 25, 2015 NOTICE OF PRELIMINARY SUBDIVISION APPROVAL To: City Clerk APPROVED with Conditions The Planning Board by 6-0 vote on February 12, 2015 Olander (loop north of Ford Crossing) Subdivision Name or description: By Energy Positive Homes, LLC c/o Transformations Inc. Address: 323 West Main St, Ayer, MA 01432 The Planning Board approved the request for preliminary subdivision with the following conditions: 1. There shall be no building encroachment into detention pond lot. The lot lines may be redrawn so long as the structures don’t encroach into the portion of the land surrounding the pond that is necessary for maintenance access. 2. The chicken coop/woodshop should be moved to the north side of the site. 3. Dust control and maintenance plan shall be provided for construction phasing as part of the definitive plan. 4. Substantial compliance with the previously approved main north-west, east-west bike path connectors shall be shown. 5. The applicant shall address Department of Public Works comments. 6. Driveway intersections shall be offset from street intersections by 50’ 7. House units and coop should be out of drainage area. As agent to the Planning Board I, Carolyn Misch, attest that this is the decision made by the Planning Board at its public hearing February 12, 2015. February 25, 2015 NOTICE OF PRELIMINARY SUBDIVISION APPROVAL To: City Clerk APPROVED with Conditions The Planning Board by 6-0 vote on February 12, 2015 Olander (loop north of Ford Crossing) Subdivision Name or description: By Energy Positive Homes, LLC c/o Transformations Inc. Address: 323 West Main St, Ayer, MA 01432 The Planning Board approved the request for preliminary subdivision with the following conditions: 1. There shall be no building encroachment into detention pond lot. The lot lines may be redrawn so long as the structures don’t encroach into the portion of the land surrounding the pond that is necessary for maintenance access. 2. The chicken coop/woodshop should be moved to the north side of the site. 3. Dust control and maintenance plan shall be provided for construction phasing as part of the definitive plan. 4. Substantial compliance with the previously approved main north-west, east-west bike path connectors shall be shown. 5. The applicant shall address Department of Public Works comments. 6. Driveway intersections shall be offset from street intersections by 50’ 7. House units and coop should be out of drainage area. As agent to the Planning Board I, Carolyn Misch, attest that this is the decision made by the Planning Board at its public hearing February 12, 2015.