Loading...
02-003 (2) Boa7roffuridingeVe&gulat/ons n an �rs a t On e Ashburton Place - Room 1301 Boston. Massachusetts 02108 Home Improvement Contractor Registration Registration: 101536 Type: -Private Corporation Expiration: 6/26/2010 Tr# 269991 WRIGHT BUILDERS, INC. Jonathan Wright 48 BATES STREET Northampton, MA 01060 Update Address and return card.Mark reason for change. - Address Renewal Employment Lost Card DPS-CA1 ca 50M-07/07-PC8490 W R I G H TZ. CAUILDERS I N C O R P O R A T E D 48 BATES STREET NORTHAMPTON, MASSACHUSETTS 01060 Charles & Kelly Derose 677 North Farms Road Northampton, MA 01060 RE: Roof repair project Dear Kelly & Charles: Thank you for your confidence in Wright Builders and for the opportunity to work together and be of assistance. Our quote is based on the scope of work outlined below. The Scope of the Project: The scope of the work is as outlined below: 10111111111111- -_ moor Remove existing J. P. Stevens roofing on east side of house and replace with .060 mil Single Ply EPDM (ethylene propylene diene monomer) black rubber roof. Provide 2" urethane insulation under new roof, mechanically fastened to existing deck(See note on insulation below). Flashing, Drip Edge,Ventilated Ridge Cap per manufacture specifications. Remove and replace existing gutter and down spouts on East side only.New gutter to be 6" seamless aluminum and 1 downspouts to be 3"x 4" corrugated aluminum. The installation of the new roof is to include "snow blocks"to minimize ice and snow falling on deck below. Electric work to include the installation of a gutter and downspouts deicing cable(new gutter only). 1 Remove and replace existing roofing on west side of the house with Architectural asphalt shingles similar to shingles on the garage. Flashing, Drip Edge, Caps per manufacture specifications. Existing snow slide to be removed and reinstalled. Existing gutter to remain. Prior to the roofing replacement,blow-in cellulose insulation is to be installed at cathedral ceiling and open roof area(over deck). This will be achieved by boring holes, from above, 1 through wood sheathing. Holes will receive a temporary waterproof patch. Also, cellulose insulation is to be installed on top of existing, sub standard,insulation at existing attic area (ceiling). Work to include improving insulation over existing cover at pull down stair along with the mounding of cellulose over existing HVAC duct work Costs: Costs for the project are as shown on the attached estimate summary and Wright Builders, Inc. makes substantial efforts to secure and hold pricing on all aspects of the work. Volatile items such as,but not limited to, wire, copper piping, plastic products, oil based products and lumber are beyond the control of Wright Builders, Inc. and the customer agrees to pay for incremental cost changes that exceed those unit costs contained within the quoted package, by change order, should such conditions arise. TELEPHONE 413-386-8287 _2_ FAX 413-587-9276 A. ELECTRONIC .MAIL: irfoowright-builders.com s •. SECTION 8-CONSTRUCTION SERVICES 81 Licensed Construction Supervisor: Q p ly J Not Applicable ❑ Name of License Holder: �(v�•" Tl ✓i' U / m , ��'� License Num er k7v,-& Ad ik �/I(�//D A�dfes ,� s Expiration Date Signatu Telephone 9'Reaistered'Home Improvement Gontiractor: ;, Not Applicable ❑ its j� Company Name I Regist tion umbel /Ind- Addre s Qom' Expiration Date J Telephone �u��' SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c 152,§25C(6))'. Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes.......115C No...... ❑ 1 .. - Home Qwner'. Exnption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. ` As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. . Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ` SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) e , New House ❑ Addition ❑ Replacen n]Windows Alteration(s) ❑ Roofing Or Doors F1 Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks.[p Siding[0] Other[o] Brief Description of Proposed Q 6 0� �1/ N� CA-Ti b 0 V' " U �n ( '� Work: j`' �"h'- '�w" �J Alteration of existing bedroom Yes->;�—No Adding new bedroom Yes N Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa Ifi Newheusn `o adcfitlnn toXiSfllq hous�r>1a com.iMte theotlQing: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensi e. Number of stories? f. Method of heating? Fire ces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetl s? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or ce loor below finished grade k. Will building c rm to the Building and Zoning regulations? Yes No. I. Se " ank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, �'C as Owner of the subject property '/�f/� �. ✓ hereby authorize V f/11,6 ItT to act on my behalf, in all matters relative to work authorized by this building permit application. 1�kz�o, kl" .i 71311 b g, Signature of Owner Date VIP, f,W eS4-9Z j as Own e utho A en ereby declare that the statements and informati n on the foregoing application are true and accurate,to the best of my ge and belief. Signed under the pains and penalties of perjury. Print Nam r Sign of Owner/ gent Date AU, PEW Vn 9* �b W vi M� tw 1W 1`4- -fb Wc 6� got Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zonin This column to be d in by Building Depa ent LotSize _- ....... ...... _.-..-.... _,..._ - ...-.__ .._.. _...-..._. _m? Frontage n.. a .. Setbacks Front Side L:. R. Rear .. Building Height _._._. Bldg. Square Footage ox Open Space Footage % E (Lot area minus bldg&paved parking) #of Parkin S s A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO , �0 DON'T KNOW YES; IF YES, date issued IF YES: Was the permit recorded at the Registry of Deeds? NO' 0° DON'T KNOW 0. YES 0 IF YES: enter Book Pages and/or Document B. Does the site contain a brook, body of water or wetlands? NO 0, DONT KNOW. YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued: C. Do any signs exist on the property? YES NO JK IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: --- - __------- _ E. Will the construction activity disturb(clearing,gradin exc ation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. 40N ., aw x � ^ {City of Northampton stags of P � Ir - 5 2008 I 'Building Department Curb Ct�rea Perrrt� , ,v v ny 212 Main Street Sewer/Siiaptre Av,5110bil fjr __� Room 100 U1laterJC�IAyallbrll#yam s�No ham pton, MA 01060 Tw87-1240 Fax 413-587-1272 PIt��Se PI � h APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION This section to be completed by office 1.1 Property Address: MaP Lot C� � 1�riit �� Zone 0 verlay 0fstr�ct 0 � -AA Eiin�St.-District - CB District SECTION 2 PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: No� ►�,n��r� Name(Print) Current Mailing Address: �( ��/ K �� Telephone b b Signature 2.2 Authorized Agent: Wp-tom P:'MAekPmN4 AM— Name(Pri Current Mailing Address: Si natur Telephone "At A 01 SECTION 3-ESTIMATED CONSTRUCTION COSTS 1 r ! •� Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building ?�"� (a) Building Permit Fee lN�VL• -�" 2. Electrical (b) Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) '' 0 O D • r' Check Number 7 G This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2009-0132 APPLICANT/CONTACT PERSON Wright Builders ADDRESS/PHONE 48 Bates St NORTHAMPTON (413)586-8287 PROPERTY LOCATION NORTH FARMS RD MAP 02 PARCEL 003 001 ZONE RR THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT $ee Paid Bililding Permit Filled out ee Paid )p Lpu Typeof Construction: Roofing and Insulation New Construction Non Structural interior renovations Addition to Existing Accesso1y Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF ATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay ,�, /4"-LJ o,r d Signature of Building Micial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. RECEIVED AUG f WRIGHT BUILDERS, iNC i NORTH FARMS RD —(f)6 3 BP-2009-0132 Q GIs#: COM NWEALTH OF MASSACHUSETTS MV-Block: 02-003 l �J� � TY OF NORTHAMPTON Lot: -001 PERSONS CONTRA 1NG WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PERMIT Permit# BP-2009-0132 Project# JS-2009-000165 Est. Cost: $24000.00 Fee: $90.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Wright Builders Lot Size(sq. ft.): 189486.00 Owner: DEROSE CHARLES W&LEILA Zonin : RR Applicant: Wright Builders AT. i*,I0 KIFi_�AKi1/i6 RL) G171 Applicant Address: Phone: Insurance: 48 Bates St (413) 586-8287 NORTHAMPTON MAO 1060 ISSUED ON.81512008 0:00:00 TO PERFORM THE FOLLOWING WORK.-Roofing and Insulation POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector tluderground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THFOCITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGUL TION Certificate of Occu an _ signature: FeeType: Date Paid: Amount: Building 8/5/2008 0:00:00 $90.0029841 212 Main Street,Phone(413)587-1240,Fax: (413) 587-1272 Building Commissions-Anthony Patillo