Loading...
19-012 (16) ----------------------------------------------* Official Receipt for Recording in: Hampshire County Registry of Deeds 33 King St. Northampton, Massachusetts 01060 Issued To: ATTY EDWARD ETHEREDGE Recording Fees *---------------------------------------------- Document Recording Description Number Book/Page Amount *---------------------------------------------- AFF 00007719 9452 310 $75.00 MICROCAL LLC $75.00 Collected Amounts *---------------------------------------------- Payment Type Amount ---------------------------------------------- Check 9975 $75.00 $75.00 Total Received $75.00 Less Total Recordings: $75.00 Change Due $.00 Thank You MARIANNE DONOHUE - Register of Deeds By: Linda N Receipt§ Date Time 0188804 04/14/2008 02:14p COMMONWEALTH OF MASSACHUSETTS HAMPSHIRE, SS. On this 1Y Aday of April 2008, before me, the undersigned notary public, personally appeared Richard K. Brown, proved to me through satisfactory evidence of identification, which was my personal knowledge, to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he signed it voluntarily for its stated purpose. Notary Public My Commission Expires: OFFICIAL SEAL DONALD J.G0 LIC KI NOTARY PUBLIC COMMOEALIH MAS5AT15 My Comm•Expires Nov.29,2013 2 A YA i�l%.-ZA *�Air Affected Premises 22 Industrial Drive East HAWSHM Northampton, MA 01060 RB01g'TRY0FD S.k pa�0 Date u L�g 'T" a 1 For Registry Use Only Now comes Richard K. Brown, President and CEO of MicroCal, LLC, with a principal place of business at 22 Industrial Drive East in Northampton, Massachusetts and upon oath, deposes and states as follows: 1. I am the President and CEO of MicroCal, LLC and am an individual authorized to execute, acknowledge, deliver and record any recordable instrument on behalf of MicroCal, LLC, the owner of real property known and numbered as 22 Industrial Drive East, Northampton, Massachusetts, more particularly described in a deed recorded in the Hampshire Registry of Deeds in Book 5850, Page 280. 2. I hereby certify that the 2nd floor of the building at 22 Industrial Drive East, Northampton, Massachusetts will be used and accessed only by employees of MicroCal,LLC. 3. I further certify that the 2nd floor is not public space and will not be used or accessed by the public for any purposes at any time. SIGNED UNDER THE PAINS AND PENALTIES OF PERJURY THIS I-P DAY OF APRIL, 2008. Richard K. Brown Etheredge & Steuer,, RC. ATTORNEYS AT LAW 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 EDWARD D. ETHEREDCE (413) 584-1600 FAX (413) 585-8406 SHELLEY STEUER' 'Also Admitted in New York and California April 14, 2008 VIA FACSIMILE AND REGULAR MAIL Anthony Patillo, Building Commissioner City of Northampton 210 Main Street Northampton, MA 01060 Re: MicroCal, LLC 22 Industrial Drive East Dear Tony: I enclose a copy of the Affidavit which was recorded this day in the Hampshire Registry of Deeds in Book 9452 Page 310, and a copy of the recording receipt for the above referenced. If you have any questions, give me a call. Very truly yours, Edward D. Ethere ge EDE/dmo Enc. cc: Microcal, LLC STEIGER ENGINEERING INC. 9 Moody Road Suite# 15 Tel.(860)698-9626 Fax(860)698-9810 May 20,2008 Northampton Building Department a 212 Main Street Northampton,MAO 1060 Attn: Anthony Patillo. j 1 RE: Building Addition Project for Microcal L.L.C. -- Site Visit May 20,2008 ~- General Contractor: Hampshire Construction Co.Inc. Permit number BP-2008-0833 Administration: The Engineer visited the site to inspect the concrete floor slab and related concrete accessories. This will be the final inspection and report attesting that the foundation system is complete and thereby concludes this Engineers area of responsibility. Field Observations: The Engineer noted a layer of poly vapor barrier separating the 4' slab from the grade. A layer of 6x6 welded wire mesh was in place and was being lifted off the grade as the concrete floor was being poured,thus insuring that the mesh was situated within the concrete slab. The hairpin at column line E-4 was correctly placed and the area excavated to allow ample concrete coverage. in bar hairpins projecting Vapor barrier and 6x6 Other hairpins were observed and noted to be in into the new slab. Note the welded wire mesh area around the hairpin is installed beneath the new place during previous inspections. Expansion joint excavated to allow for ample 4"concrete slab material was placed at the top of the wall as shown concrete coverage on the drawings. Additional rebar was drilled into the face of the existing wall where the new doorway to the existing building is to be located. George Bucala,the project manager, informed the Engineer that the design strength of the concrete for the floor slab used was 4000 psi. In addition,a curing membrane will be laid on top of the new slab to provide a controlled hydration period and to protect the slab from the elements. The Engineer was also informed that control joints will be sawcut into the slab when the concrete has hardened enough to do so. Miscellaneous: The foundation system and floor slab will be finished upon the completion of the concrete slab. The foundation was successfully constructed according to the plans and specifications meeting the requirements of the Massachusetts State Building Code as well as the requirements of the American Concrete Institute Code Requirements for Structural Concrete.This will be the final report for this foundation system. End of report t 6 Philip Steiger,P.E. Steiger Engineering,Inc. 0. cc.Hampshire Construction Co.,Inc f�► STEIGER ENGINEERING INC. I � 9 Moody Road Unit#15, Enfield,CT 06082 Tel. (860)698-9626 Fax(860)698-9810 rvs. May 22, 2008 City of Northampton M M 2008 Building Department rS 212 Main Streetti Northampton, MA 01060 t_ Permit# BP 2008-0833 02133 RE: 116.2 Certification Microcal Building Addition, 22 Industrial Drive,Northampton, MA In accordance with the Massachusetts State Building Code, 1, Philip Steiger being a Professional Engineering, certify that the Building Addition for Microcal located at 22 Industrial Drive has been completed under my supervision and to the best of my knowledge such conditions do conform to the provisions of the Massachusetts State Building Code. 7 )t Philip C. Steiger, P. SUBSCRIBED AND SWORN TO BEFORE ME THIS �:('V ,DAY OF A A.D. 2008 Notary Public My Commission Expires MY COMMISSION EXPAES MAR.31,2011 Of 3 William V. DeFlavio,P.E. July 30, 2008 City of Northampton, Building Department Upon this supplemental inspection, the Engineer noted that all exit and emergency lighting on the first floor of the building was installed. The Engineer checked the operation of the emergency lights and found that two heads on separate fixtures failed to light. The project manager was informed and the Engineer was assured that the lights will be operational prior to the buildings occupancy. It was noted that fire detectors and pull boxes were also in place. The Engineer is satisfied that the new addition was built according to the plans as submitted to the building department and is adequately prepared for the Owners use to allow construction to continue in the existing building. End of report Respectfully submitted, t'o William V. DeFlavio, P.E. �.K F A/ Aye WILLIAM V. jza 0,FLAV10 ,A No.9081 �O ti `e�� �.0 t � 2 William V. DeFlavio, P.E. July 30, 2008 City of Northampton, Building Department The sprinkler system is complete. The Engineered verified the number and location of the sprinkler heads including those on the second floor. The fire department connection is complete and it was noted that the flow sensor was installed. Supply and return vents for the HVAC system was completely installed with some variation in their locations; most notably in the shipping and receiving area where the supply and return was separated considerably more than shown on the plan to prevent a short circuit in air flow. The 110v electrical outlets and some switches were installed. The 2x4 troffer lights were in place but some locations were altered from the plan. Emergency lighting was installed in the Assembly and Quality Control areas of the building while junction boxes were noted in locations where exit and emergency/exit lights are to be installed; specifically at the top of the exit doors and the top of the door into the existing office. The Engineer noted boxes and wiring for fire detectors in Shipping and Receiving, Assembly, Stock Room, Cubical area and two in the Quality Control area. Junction boxes for the pull box alarms were installed in both stairways in the new building. The existing wall was removed to open the Shipping and Receiving area to the existing building as shown on the plan. Demolition in the existing building has begun. Views in the Quality Control and Cubical area respectively Miscellaneous The Engineer was informed that the Owner is seeking a temporary occupancy permit to allow the use of the new space while the existing building is being renovated as shown on the plans. The Engineer performed a supplemental inspection on July 30 to insure the installation of life safety devices prior to such occupancy. CONSULTING&DESIGN WORK 508-799-6554 REG.PROFESSIONAL ENGR.#9081 Sa.Y William V. DeFlavio 13 CAMERON STREET WORCESTER,MASSACHUSETTS 01604 July 30, 2008 Mr. Anthony Patilio, Building Commissioner Northampton Building Department 212 Main Street Northampton,MAO 1060 RE: Building Permit# BP-2008-0833 Office Addition Project Microcal L.L.C. 22 Industrial Drive Northampton, Massachusetts 01060 Dear Building Commissioner Patillo, In accordance with Section 116 of the Massachusetts State Building Code (6t'Edition), I, William V. DeFlavio, as the Professional Engineer of Record, submit the following report: Date of inspection: July 25, 2008 The Engineer visited the site to record the progression of the building's construction including interior finishes and the installation of life safety devices. Progress/Inspection Wall and floor finishes were being applied at the time of the visit. The tiles on the lavatory floors were installed while the VCT flooring was underway in the Stock Room. Some ceiling tiles were in place. All of the hollow metal door frames are installed and painted with wood doors in place in the Stock Room, new offices, the new 3' wide opening into the existing building and the sprinkler room. The Engineer verified that the hollow metal door assemblies installed in the stairway walls were 1 1/2 hour fire rated. rr 3 William V. DeFlavio, P.E. July 24, 2008 City of Northampton, Building Department (a) (b) (C) (a)New drops for a vent system in the Assembly area.(b)Additional sprinkler heads and the completion of the fire department connection will complete the sprinkler system.(c)Quality Control End of report Respectfully submitted, 4V �l OdYh �• 1�� -�c9►/�swL"i William V. DeFlavio,P.E. ov�k OF Myss� 9 WILLIAM g V. `+ peFLAVIO Ui 2 William V. DeFlavio, P.E. July 24, 2008 City of Northampton, Building Department Ductwork for the HVAC system was installed according to plans obtained from McCormick Allum with some exception(see"Variations from submitted plans"). Most of the supply and return vents are installed. The Engineer noted drops for a vent system coinciding with the cubical layout in the northwest portion of the new building. Rough plumbing for the fixtures shown on the plans was complete including supply and waste/vent pipes for the two sinks in the new addition and the two new lavatories in the existing building. The copper vent in the plumbing wall was in place but was not yet projected through the roof. Stubs for hot and cold water supplies were installed in the west wall of the Quality Control area of the new building. In addition, a humidifier was installed and plumbed in the"Assembly" area. The sprinkler system in the new building is about 95% complete. Most of the sprinkler heads were noted and verified as to number and location shown on a plan provided by IIFP Corporation with some exception(see"Variations from submitted plans"). In locations where heads were not yet installed, unions indicating such heads were observed. The sprinkler service entrance in connected to the interior sprinkler piping system. The fire department connection in not yet complete. Panelboard boxes for two subpanels are installed in the Quality Control area of the new addition. Boxes for switches, outlets and emergency lighting were also installed. Variations from submitted plans Two new offices were added along the east wall of the new addition. This effected a change in the locations of some HVAC and sprinkler components. A new computer room was added in the existing building where a closet had originally been shown. The two new lavatories were moved west to accommodate the new room. It was noted that half walls were added in Quality Control. Miscellaneous The Engineer was unable to view the second floor as the concrete steps were freshly poured at time of the visit. The new addition is nearly complete and ready for occupancy. The Engineer will perform a final inspection and report upon notification that life safety components are installed and operational. /9 -/� CONSULTI' G&DESIGN WORK 508-799 6553 REG.PROASSIONAL ENGR.#9081 William V. DeFlavio 13 CAMERON STREET WORCESTER,MASSACHUSETTS 01604 It ' i � July 24, 2008 DEC 1 1 2008 ! ' Mr. Anthony Patillo,Building Commissioner Northampton Building Department 212 Main Street Northampton, MAO 1060 RE: Building Permit# BP-2008-0833 Office Addition Project Microcal L.L.C. 22 Industrial Drive Northampton, Massachusetts 01060 Dear Building Commissioner Patillo, In accordance with Section 116 of the Massachusetts State Building Code (6h Edition), I, William V. DeFlavio, as the Professional Engineer of Record, submit the following report: Date of inspection: July 14, 2008 The Engineer visited the site to record the progression of the building's construction including interior finishes and mechanical systems. Progress/Inspection Gypsum wallboard is installed and primed in the new addition as well as the renovations in the north portion of the exiting building. It was noted that the two new bathrooms in the existing building complied with ADA requirements as to size and fixture locations and was constructed according to the plans submitted for permitting. Ceiling runners in the new building are installed but the tiles are not installed due to continued work above the ceiling line. CMhJ of Yurt4amptlan ex f �tatguatrij�tzrtl�s ,„�' y �, D1,PA1?7'11L'NT OP BUILDING INSPEC,7'7O,hS Y J a 212 Main �-ireet • Municipal Building Northampton, MA 01060 Robert Bartlett �g Hampshire Construction Company, Inc. P. O. Box 327 North Hatfield, MA 01066 August 27, 2008 Re:MicroCal ^ , 22 Industrial Drive East Iry 2 9 �,OS _f Dear Robert, Here-is the Temporary Certificate of Occ�pa-ricy for 22 Industrial Drive East. Please let us know as the project progresses so we can inspect the areas completed and change the conditions of use. The fee for a±Temporary Certificate of Occupancy is $25.00. Please send a check, payable to the City of Northampton, to the building department. Thank you. Feel free to call if you have any questions. Our telephone number is 587-1240 and our office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting that we close at 12:00 noon on Wednesdays. My email address is: Ihasbrouck(a)-city.northamr)ton.ma.us. Louis Hasbrouck 6 V__4j City of Northampton Local Inspector and Zoning Enforcement Ihasbrouck @city.northampton.ma.us �. Letter of n gawps emowai m $7,16. Transmittal 327 West Street Post Office Box 0327 North Hatfield,Massachusetts 01066-0327 DATE: 10-Dec-08 ADDRESS CORRESPONDENCE TO: TO: Name Bob Bartlett Mr. Louis Hasbrouck,Local Inspector City of Northampton 212 Main Street Northampton, Massachusetts 01060 PHONE 413-247-5024 FAX# 413-247-3305 e-mail info(c)hampshireconstruction.com We are Sending You Attached These documents are transmitted: for you files Remarks: MICROCAL, LLC. ,22 Industrial Drive, East, Northampton, Massachusetts ITEM QTY DESCRIPTION 1 one William V. DeFlavio,PE, 14JuIy2008 Inspection Report 2 one William V.DeFlavio,PE,25July2008 Inspection Report 10-Dec-08 Signed Date File:Transmittal Letter-BidgDept-1 0DwW.)ds Printed:12110/2008 ,� '� �' , ,ARttssttrYrusrfts �,, •,� "3 DEPARTMEN T OF BUILDING INSPECTIONS 212 Main Street • Municipal Building We� Northampton, MA 01060 \,SPPCTOR Robert Bartlett Hampshire Construction Company, Inc. P. O. Box 327 North Hatfield, MA 01066 August 27, 2008 Re:MicroCal 22 Industrial Drive East Dear Robert, Here-is the Temporary Certificate of Occupancy for 22 Industrial Drive East. Please let us know as the project progresses so we can inspect the areas completed and change the conditions of use. The fee for a Temporary Certificate of Occupancy is $25.00. Please send a check, payable to the City of Northampton, to the building department. Thank you. Feel free to call if you have any questions. Our telephone number is 587-1240 and our office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting that we close at 12:00 noon on Wednesdays. My email address is: Ihasbrouck(a)city northampton.ma.us. Louis Hasbrouck City of Northampton Local Inspector and Zoning Enforcement Ihasbrouck(a city north ampton.ma.us The Commonwealth of Massachusetts l � ` City of Northampton { Temporary Certificate of Occupancy In accordance with 780 CMR,Section 120.3 (The Sixth Edition of the Massachusetts State Building Code) this Temporanj Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified. Identify Narne of Building of Space Within Certificate No. Issued to Microcal, Inc. BP-2008-0833 Identify property address including street nnmher, name, city or town and county Certificate Located at Expiration 22 Industrial Drive East September 30, 2008 Northampton, Hampshire County, Massachusetts Use Group Classification(s) Factory F-1 This Temporary Certificate of Occupancy is hereby issued by the undersigned to certify that the premise,structure or portion thereof as herein specified has been inspected for general fire and life safety features. This certificate shall allow for the temporary use as herein described and in conformance with any and all conditions as identified below. It shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate,failure to comply with conditions or,tampering with the contents of the certificate is strictly prohibited. Conditions of Partial (first floor, new area). 30 day Temporary Certificate of Occupancy, pending completion of 2nd floor, existing Temporary Use renovations and completion of special permit conditions Name of Municipal Louis Hasbrouck Date of Building Official P / / Ins ection 08 Ol 08 Signature of Municipal Date of Building Official e/rte"`-"'° <fT° '�at�o-+�'�"� Issuance 09/01/08 Dec 14 07 03: 4Gp 4 Exhibi t 13 CITY OF NORTHAMMON MASSACHUSETTS ... ... .. ......... Upon We recommendation of the Planning� ,oard ........ ... ........I.........................--............ ------ ................. -------- ................................................. Oralereal, d.1 WHEHREAS, Microcal, LLC is txjxindill"'-�' their operations in the Northampton bid-List.1jal Park, creating positive economic lic-Velopment benefits and industrial park infill; and WHEREAS, The Planning WA and EmputmEnt of Public Woks have requested a dranllgt with the cily I-LIlilling existing drainage rights and responsibilities and ✓lici-ocal, LLC responsihic,. for operations and maintenance of their facilities; and ��,TIERFAS, Microcal, LLC has aff-retd to provide this easement; NOW, THEREFORE BE IT RESOLVED The Mayor is authorized to accept said di-�iw,<��gecascn-jent. In City Council, December 6,2007 bodes suspended,passed Nvu readings and enrolled. Attest Clerk of Council Approved: Mary Mare Higgins,Mayor Amue coy, A tte'4 Clerk of Council Dec 14 07 03: 46p P. 3 Mimocal Expansion August 7,2007 i`lorthampton,Massachusetts STORMWATER MANAGEMENT SYSTEM E ft b 1T A OPERATION AND MAINTENANCE PLAN STOIZAIWATER MANAGEMENT SYSTEM OWNER: MicroCal, LLC 22 Industrial Drive Fast Northampton, MA 01060 PARTIES RESPONSIBLE FOR OPERATION& MAINTENANCE: The property contains easements along the east, north and west sides for conveyance of stonnwater(i.e.: swales and/or open ditches) from the Industrial Park across the site to other downstream drainage components. The City shall be responsible for maintaining the stonnwater conveyance system that crosses the site, and shall be allowed to have access to the easement areas from the site. Other drainage components on the site and any that fall within the easements shall be maintained by MicroCal. MicroCal shall also be responsible for repair or replacement of pavement, walls, walks, plantings and vegetation within utility easements if these features are disturbed or removed due to maintenance of the conveyance system performed by the City. Any off-site stormwater system components shall not be the responsibility of MicroCal. MAINTENANCE MATIZU FOR STORMWATER SYSTEM: Maintenance Defect When Required Expected Results General Trash&Debris Any trash& debris exceeding No Trash and debris leu,ft./1,000 sq.ft. (= 1 office garbage can) In general, no visual evidence of debris Svvoeping of Pavement Sediment At least twice/year in the spring No visible layer of & fall or more frequently when sand or sediment on excessive sand or sediment paved surfaces _ accumulates Existing Grass Swale Sediment, Debris, Remove debris manually at least Maintain designed I (outside of utility, & Detritus once/year, mow no shr)rtcr than Swale shape and deptil, easements) _ 3" no buildup of detrihis Rain Garden l3asii� Sediment, Debris,— Remove debris nlanually at least Maintain designed & Detritus once/year, cut basin bollom basin shape and deptli, vegetation ;n late Tall no buildup of detritus RZ url ( ,11-dea Outlet Sediment& Debris Inspect 4 times year c�,. clear Maintain clear, fl-cc- grate and clogged holes, rcmovice flowing structure Stull]) accumulation at lual)L I foodud Catch Basin Oil & Sediment Inspect 4 times/eai tenlove Control pollutants and llcep Sump sump accumulation at least sediment Stc�rn,,vater freatnient n c r Sediment& Dbris i Inspect 4 timesiyear; remove Maintain designed �'lrnl�hcr� Hill) acclnritilation at Icast specifications as per UnCC ';'eflr j IlianufaclIn-el J 1C.COIT1nlUlld�ltll)llti ' HAMPSHIRE PMISTRYOFDEEDS Book a3 4q page /`_ EASEMENT AGREEMENT Date !z'/y d Time i.L�7 -v Agreement made this 14°i day of December 2007 by and between MICROCAL, LLC of 22 Industrial Drive East, Northampton, Hampshire County, Massachusetts, 01060 and the City of Northampton acting by and through its Board of Public Works of 125 Locust Street,Northampton, Hampshire County, Massachusetts 01060 (the"City"). WHEREAS Condition #1 of a Site Plan Decision recorded in the Hampshire Registry of Deeds in Book 9291, Page 7 of the Northampton Planning Board requires Microcal, LLC to grant the City an easement for the drainage easement shown on the Site Plan and prepare and file a maintenance plan for the property owned by Microcal, LLC by deed dated December 14 1999 and recorded in the Hampshire Registry of Deeds in Book 5850, Page 280 and affected by the Site Plan Decision; now THEREFORE Microcal, LLC hereby grants to the City of Northampton an easement over the property of Microcal, LLC in Book 5850, Page 280 as shown on the Site Plan and agrees to maintenance plan as set forth on the Stormwater Management System Operation and Maintenance Plan attached as Exhibit A and incorporated herein. Said easement accepted by City of Northampton as shown in Exhibit B. Executed as a sealed instrument this 14t1' day of December 2007. Microcal, LLC IN By Witness Richard K. Brown, President and CEO COMMONWEALTH OF MASSACHUSETTS HAMPSHIRE, SS. December P1 , 2007 On this 14i1i day of December 2007, before me, the undersigned Notary Public,personally appeared Richard K. Brown, as President and CEO and proved to me through satisfactorily evidence of identification, which was ,Q i yjf At L t c£w e E to be the person whose name is signed on the preceding or attached document, and acknowledged to me that lie signed it voluntarily for its stated purpose. Notary Public My Commission Expires: OFFICIAL SEAL ,,,; , ��.<a l �.s�reLraT DONALD J.GOSCENSKI NOTARY PUBLIC COMMONWEALTH 9 MASSACHUSETTS My Comm.Expires Nov.29,2013 ----------------------------------------------* Official Receipt for Recording in: Hampshire County Registry of Deeds 33 King St. Northampton, Massachusetts 01060 Issued To: ATTY ED ETHEREDGE 1 Recording Fees ----------------------------'-----------------* Document Recording Description Number Book/Page Amount *----------------------------------------------* EASE 00030854 9349 103 $75.00 MICROCAL LLC $75.00 Collected Amounts *----------------------------------------------* Payment Type Amount *----------------------------------------------* Check 9630 $75.00 $75.00 Total Received $75.00 Less Total Recordings: $75.00 Change Due $.00 Thank You MARIANNE DONOHUE - Register of Deeds By: Debbie L Receipt# Date Time 0183732 12/14/2007 03:07p Etheredge & Steuer, P.C. ATTORNEYS AT LAW 64 GOTHIC STREET NORTHAMPTON, MASSACHUSETTS 01060 EDWARD D.ETHEREDCE (413) 584-1600 FAX (413) 585-8406 SHELLEY STEUER' `Also Admitted in New York and California i December 14, 2007 Anthony Patillo, Building Commissioner City of Northampton 210 Main Street Northampton, MA 01060 Re: Microcal, LLC Dear Tony: I enclose a date and time stamped copy of the Easement, together with a copy of the recording receipt. The decision is recorded in the Hampshire Registry of Deeds in Book 9349, Page 103. Very truly yours, Edward D. Etheredge EDE/dmo Enc. cc: Ed Wytrych Conservation Commission Planning -decision City of Northampton Heating No.:PLN-2007-0048 Date:June.25, 2007 Noma B. ,The requested use will have no effect on the convenience and safety of vehicular and pedestrian movement on adjacent streets. The expansion is to allow better work Now and space for R&D and manufacturing needs. New trips generated by the anticipated gain in employees will be mitigated by an offer to spend$5000 to construct a sidewalk extension along Bates Avenue sidewalk to Bradford Street for a distance of approximately 365 feet(not including existing.drives and bikepath)and 4'wide asphalt sidewalk. Bike racks and showers on site enable employees to bike to wont. Additionally, the company will institute a policy that provides financial incentives for ride sharing with other employees In the park anoVar within the company. C. The requested use will have a positive effect on the relationship of structures and open spaces to the natural landscape, existing buildings and other community assets In the area. infill in the Industrial park to maximize land area is a goal of the plan and there is enough open space on this site to remain between buildings. The rear of the site abuts 1-91 and will not have an impact.The Conservation Commission has approved the plan with mitigation for wetlands and butler Impacts. D. The requested use will not overload the City's resources including the effect on the City s water supply and distribution system, sanitaryand storm sewage collection and treatment systems,fire protection,streets and schools.AM stormwater systems will comply with DEP standards. Roof drainage 071 be directed to a planted rain garden.Site drainage will flow around the perimeter of the site In a public system. The applicant will rebuild and redirect the public stormdrain system in accordance with DPW guidelines. E, The requested use meets all the standard Site Plan requirements and no additional special requirements set forth in the Zoning Ordinance are applicable. F.-The Planning Board finds that the application compiled with the following technical performance standards: 1. The curb cuts are minimized as no changes are required. COULD NOT DEROGATE BECAUSE. FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE DECISION DRAFT BY: APPEAL DATE: 51312007 511712007 612812007 REFERRALS IN DATE: NEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY:, APPEAL DEADLINE 5101 2007 4/2912007 61412007 612812007 7/15/2007 FIRST ADVERTISING DATE; HEARING DATE; VOTING DATE: DECISION DATE: 510/2007 524/2007 604/2007 6125/2007 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 517/2007 9:10 PM 5/31/2007 1 812212007 MEMBERS PRESENT: VOTE: Stephen Gilson votes to George Russell votes to Ineligible to Vote JenniferDieringer votes to Grant Paul Voss votes to Grant D Francis Johnson votes to Grant JUN 2 8 2007 George Kohout votes to Grant Keith Wilson votes to Grant Kenneth Jodrie votes to Ineligible to Vote David Wilensky votes to ineligible to Vote MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Keith Wilson George Kohout 5-3 Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning&Development. 1,Carolyn 411sch,as agent to the Planning Board, certify that this Is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been fried with the Board and the City Clerk on June 25,2007, 1 certify that a copy of this decision has been malled to the Owner and Applicant. Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt.40A,Section 17 as amended within twenty(20)days after the date of the filing of Lhe notice of the decision with the City Clark. The date'is listed above. Such appeal may be made to the Hampshire Superior Court with a cerdfled copy of the appeal sent to the City Clerk of the City of Northampton. GeoTMS0 2007 Des Lauriers Municipal Solutions,inc. .VPlanning M Declslon City.of Northampton. Hearing No.: PLN-2007-0048 Date:June 25,2007 APPLICATION TYPE: SUBMISSION DATE PB intermediate Site Plan 2/23/2007 Applicant's Name: Owner's Name: Surveyor's Name: NAME: NAME: COMPANY-NAME: . M/CROCAL LLC• MICROCAL LLC ADDRESS: ADDRESS: ADDRESS: 22 INDUSTRIAL DR.East 22 INDUSTRIAL DR.East TOWN: STATE: ZIP CODE TOWN: STATE 21P CODE TOWN: STATE: ZIP CODE- NORTHAMPTON MA 1 01060 NORTHAMPTON MA 01060 PHOh1E NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: (413)586-17200 (413)$86-7720 0 EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS: Site Information: STREET NO.: SITE ZONING: 221NDUSTRIAL DR Gi TOWN: SECTION OF BYLAW: " NORTHAMPTON MA 01060 Chpt 350-11:Site Plan Approval MAP: SLOCt(: I LOT: 141P DATE. ACTION TAKEN: 19 012 1 OOi Approved With Conditions Book: Page: " 2750 070 NATURE OF PROPOSr;p WORK: Addition&additional parking HARDSHIP: CONDITION OF APPROVAL: 1.Prior to issuance of a BUILDING PERMIT,the following items must be completed. a. The applicant must record easement and maintenance plans,with language approved by Department of Public Works,for the drainage easement area indicating that the applicant will be responsible for replacing all materials including landscaping and parking infrastructure if damaged from work performed by Department of Public Works within the easement area. b.An operations and maintenance plan for the stormwater system must be recorded. 2.Perforated concrete,as demonstrated in the hearing,shall line the relocated Swale in coordination with Department of Public Works. 3.An annual report(December of each year)on the use of the ride share program shall be submitted to Office of Planning and Development. 4.As offered by the applicant,the ride share incentive program shall be open to any employee who opts to come to work without a personal vehicle.This could include sharing rides with coworkers, other employees in the Industrial Park,riding the bus,walking,biking,etc. 5. Prior to issuance of a certificate of occupancy,the applicant shall construct the sidewalk as proposed along Bates Street in consultation with Department of Public Works. FINDINGS: The Planning Board approved the Site Plan for the expansion based upon the following items submitted with the application: 1. "Mice ocal Expansion Site Plan%prepared by The Berkshire Design Group,inc. Dated March 27, 2007,revised June 11,2007. Pages L1- L2. 2. "IL►icrocal"interior layouts and exterior elevations;prepared by Hampshire Construction,Co.Inc,dated 12126106. Sheets PR1 and PR2. 3. "Stormwater Management System Operation and Maintenance Plan%Dated June 1,2007. 4. Memo titled: "P•ide Sharing Program" from Edward Wytrych Chief Financial Officer of Microcal,dated June 5, 2007. Upon review of the application and materials,the Planning Board determined that the following site plan approval criteria had been met: A. The requested use protects adjoining premises against seriously detrimental uses. Continued use and expansion for this high tech manufacturing company is consistent with the uses in the industrial park and the use meets the overall goal for job expansion in Northampton and the park. i GeOTMSIP 2007 Des Laurlers Municipal Solutions.Inc. ILIMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Nurnbmr: WPA Form 5 — Order of Conditions 246-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ---------------------------------------------------------------------------------- To: Conservation Commission Please be advised that the Order of Conditions for the Project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date -_-- If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number -- — —-- ----- – —. --- -- - — -- Signature of Applicant ---- :vnn(�nn�rinr rvw "t/1!nn Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the,public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. Section G, Recording Information is available on the following page, wpaform5.dor• rev.3/1/05 Massachusetts Department of Environmental Protection IL 3 Bureau of Resource Protection - Wetlands DEP File Number: WPA Fora 5 -- Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special � condition pursuant to General Conditions #4, from the date of issuance. �_ . Date of Issuance Please indicate the number of members who will sign this form: This Order must be signed by a majority of the Conservation Commission. 2 -Number of signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. r-{ j Signatures Not ry Acknowledgement Commonwealth of Massachusetts County of -- On this Day of Month Year Before me, the undersigned Notary Public, ' personally appeared Na e of Document Signer proved to me through satisfactory evidence of identification, which waslwere escription of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of Conservation Commission I I!///, City/Town Val. YOB 'n = , :5 * .tier at re of Wt. lic ,. C, ,A py Printed Name Not y Publi -- Place notary seal and/or any stamp above e'dick -- My Commission Expires(Date) This Order is issued to the applicant as follows: P hi- a i 110)ef ❑ by hand delivery on by certified mail, return receipt requested, on Date Date wpatorm5-(Inc rev 3/vw5 Massachusetts Department of Environmental Protection ` Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 Order of Conditions 246-603 Massachusetts Wetlands Protection Act M.G.L. c. 131; §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ❑ No 2. The Northampton hereby finds (check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically:. a.Municipal Ordinance or Bylaw b. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Northampton Wetlands Ordinance _ J _ Chapter 337 of the a.Municipal Ordinance or Bylaw Code of Ordinances The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. s you need more c. The special conditions relating to municipal ordinance or law are as follows: space for p g p y additional See"Attachment A" conditions, select box to attach a text _ document ❑ r wpafum`dor• rw 'W I10r, i } 1 33, As offered by the applicant for additional wetland mitigation, the applicant provides fifteen thousand dollars ($15,000) to the Conservation Fund of the City of Northampton Conservation Commission for wetland replication, enhancement or preservation. 34. Applicant either creates the replication area shown on the plan, creates an area of equal size replication area within the same watershed (to be approved by the Northampton Conservation Commission) or provides the City of Northampton with an additional fifteen thousand dollars ($15,000) toward a wetland replication project within the watershed. 27• Soils exposed for periods greater than two months shall be stabilized with erosion control blankets and netting, a covering of straw mulch, or a temporary cover of rye or other grass to prevent erosion and sedimentation. Drainage ditches shall be stabilized and seeded with a native perennial grass mixture. Any stabilization materials such as jute netting shall be firmly anchored to prevent them from being washed from slopes by rain or flooding. Preference should be given to biodegradable materials. 28. All disturbed areas shall be graded, loaned and seeded, or stabilized with erosion control blankets or netting, and a covering of straw mulch prior to November 30, of each year. No disturbed areas or stockpiled materials will be left unprotected or without erosion control after this date. 29. No disposal of soils or other materials shall be allowed within: a 100-year floodplain; 40 feet of the 100-year floodplain elevation; any wetland; or any area within 100-feet of a wetland, unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances - Chapter 24 30. Ongoing conditions that shall not expire with the issuance of a Certificate of Compliance are as follows: N/A 31. Upon completion of the work covered by this Order, the applicant shall submit an as-built plan, signed and stamped by a registered professional engineer or land surveyor, together with a written request for a Certificate of Compliance. The plan and written request shall specify any ways that the completed project differs from the plans referenced in the Order. The as-built plan shall include, at a minimum, and as applicable to the project: elevations of all pipe inverts and outlets, pipe sizes, materials, and slopes; all other drainage structures; limits of clearing, grading, and fill; all structures, pavement, and contours within 100 feet of wetland boundaries; all alterations within the wetland resource areas; and all dates of fieldwork. 32. The owner of the property described in this Order must advise any potential buyer of the property that any construction or alteration to said property, including brush cutting or clearance, may require approval by the Northampton Conservation Commission. Any instrument conveying any or all of the owners' interest in said property or any portion thereof, shall contain language similar to the following: "This property is subject to the Northampton Wetlands Protection Ordinance and/or Wetlands Protection Act. Any construction or maintenance work performed on this property requires an Order of Conditions, and/or a Determination of Applicability from the Northampton Conservation Commission. , "ATTACI3MENT A" 19. Prior to the initiation of any work, the applicant/owner shall submit a letter of understanding to the Commission stating that he/she has received, read, understands and shall comply with these Orders. The applicant, and, his or her contractor, foreman and/or construction inanager shall sign the letter of understanding. 20• Prior to the initiation of any ��ork, the applicant shall submit to the Commission a sequencing plan for construction, vrd erosion and sedimentation control installation. 21. Prior to the start of any site work, excavation or construction, a pre-construction conference shall be held on the site, between the contractor conducting the work, the site/project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Order are understood by all parties. Prior to the pre-construction meeting,.all erosion control devices must be installed. 22. All required permits must be obtained from the Army Corp of Engineers (Section 404, Water Quality Certification), Planning Board, Zoning Board, Department of Public Works, or Building Inspector prior to the start of any project. 23. A copy of this Order and associated plans shall remain on site during all construction and/or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 24. All revised plans, referenced within this Order of Conditions, shall be approved by the Conservation Commission and incorporated into the permit by reference and shall be followed during the course of constriction. 25. The areas of construction shall remain in a stable condition at the close of each construction day. Erosion control measures shall be inspected at this time, and maintained or reinforced as necessary. All such devices shall be inspected, cleaned or replaced during construction and shall remain in place until such time as stabilization of all areas that may impact resource areas is permanent. These devices shall also be inspected to assure that the maximum control has been provided. Any entrapped silt shall be removed to an area outside the buffer zone and resource areas, and maintained or reinforced as necessary. Erosion controls shall be inspected after every rainfall to assure that maximum control has been provided. 26. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement and shall include materials to repair or replace silt fences, straw bales, erosion control blankets, riprap, filter berms or other devices planned for use during construction. Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands LI WPA Form 5 — Order of Conditions 246;603________ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the.project involves work adjacent.to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards, Special Conditions: If you need more See "Attachment A" space for --- ,�____-------- -- -- ----- additional conditions, select box to attach a text document ❑ — waform5 doc• rev.3(1105 Massachusetts Department of Environmental Protection If L--low Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 — Order of Conditions 2.46-6_03_ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, WA DEP"] "File Number 246-603 wpalorms.doc• rev.3/1/05 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: .WPA Form 5 - Order of Conditions 2_4.6-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 7. El Bordering Land Subject to Flooding a.square feet b. square feet c. square feet d. square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g cubic feet h.cubic feet a. ❑ Isolated Land Subject _ to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ RlVerfr011t area a.total sq.feet b.total sq.feet Sq ft within 100 ft c.square feet d.square feet e. square feet f.square feet Sq ft between 100-200 ft -square s feet h. feet— i.s uare feet 9• q q j.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b,square feet c. cu.yd dredged d.cu.yd dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches a.square feet b.square feet c.c/y nourishmt. �d.c/y nourishmt. 14. ❑ Coastal Dunes a.square feet b.square feet c.c/y nourishmt. d.c/y nourishmt 15. ❑ Coastal Banks a. linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d. square feet 18. ❑ Land Under Salt Ponds — a. square feet b. square feet c,cu.yd dredged d.cu.yd dredged 19. . ❑ Land Containing Shellfish a. square feet b. square feet c. square feet d, square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 21. ❑ Land Subject to Coastal _ Storm Flowage a,square feet b.square feet wpaform5.doc• rev 3/1105 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 5 - Order of Conditions 246-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ❑ Private Water Supply e. ❑ Fisheries t. ® Protection of Wildlife Habitat g. ® Groundwater Supply b. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: n. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and _ _ wetland boundary (if available) a.linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a. linear feet b. linear feet c. linear feet d. linear feet 5. ® Bordering Vegetated 4,916 4,916 _ 7,386 _ 7,386 Wetland a. square feet b. square feet c. square feet d. square feet 6. ❑ Land Under Waterbodies a. square feet b. square feet c. square feet d.square feet and Waterways e cu.yd dredged f,cu.yd dredged wpaform5 doc• rev.3/1105 2 2007 Massachusetts Department of Environmental Protecti Bureau of Resource Protection - Wetlands 7 .t��3 ber: WPA Form 5 — ------------ - '" Order of Conditions 246-603 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: North From: ----ampton ------ ---------- --------------- --- -- - -— --- When filling 1. Conservation Commission out forms on the computer, 2. This issuance is for(check one): a. ❑ Order of Conditions b. ❑ Amended Order of Conditions use only the tab key to 3. To: Applicant: move your cursor- do not Rick _ Brown MicroCal, L_LC use tine return a. First Name b.Last Name c.Company key. 22 Industrial Drive d.Mailing Address Northampton MA 01060 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): a. First Name b.Last Name c.Company d. Mailing Address e.City/Town f.State g.Zip Code 5. Project Location: 22 Industrial Drive Northampton a.Street Address b.City/Town 19 __ _ 12 c.Assessors Map/Plat Number — d.Parcel/Lot Number — Latitude and Longitude, if known (note: 42 20 15 N 72 37 64 W electronic filers will click for GIS locator): e. Latitude f. Longitude 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Hampshire _ a. County b.Certificate(if registered land) 137 19 c.Book d. Page April 9, 2007 June 14, 2007 July 2, 2007 7, Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance a. Final Approved Plans and Other Documents (attach additional plan or document references as needed): MicroCal Expansion Notice of Intent a. Plan Title - — ----------------------� New England Environmental, Inc. /Berkshire Design Group c. Signed and Stamped by June 15, 2007 _ _ _ 1"=20' d.Final Revision Date J e.Scale f.Additional Plan or Document Title g. Date vq'p Ifonn5.d"'.- rev.3/1/05 File#NIP-2007-0079 APPLICANT/CONTACT PERSON MICROCAL LLC ADDRESS/PHONE 22 INDUSTRIAL DR. East (413) 586-7720 Q PROPERTY LOCATION 22 INDUSTRIAL DR MAP 19 PARCEL 012 001 ZONE GI THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FOR ILLED OUT "7,—ee–T aid Building Permit Filled out Fee Paid Typeof Constriction: ZPA-4800 SQ FT ADDITION&27 PARKING SPACES New Construction Non Structural interior renovations Addition to Existing Accessory Stricture Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE F91-,LOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF ATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER: § Intermediate Project: Site Plan AND/OR Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed_�� Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street C ission Permit DPW Storm Water Management Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning&Development for more information. ZONING REVIEW The building project described by these drawings meets or exceeds the requirements of the Zoning By-Laws of the City of Northampton, Massachusetts Project: Proposed 7,200 SF Addition to Existing 12, 400 SF Research & Development and Manufacturing Facility Owner: MicroCal, LLC. Location: 22 Industrial Drive, East Map 19, Parcel 012 Northampton, Massachusetts Zoning: General Industrial GI Required Actual Lot Area 20,000 SF 1019823 SF Lot Depth 140 Ft. 287.62 Ft. Frontage 120 Ft. 97.15 Ft. Front Yard Setback 20 Ft. 235.0 Ft Side Yard Setback 15 Ft. 55.4 Ft. Rear Yard Setback 20 Ft. 105.6 Ft. Lot Coverage 60% 17 % Building Height 40 Ft.. 30 Ft. addition. The system shall be designed with an "economizer cycle" for energy efficiency. Set back thermostats and controls shall maintain the design temperature requirements of 72 degrees occupied heating, 68 degrees unoccupied heating, 78 degrees occupied cooling and 82 degrees unoccupied cooling (780 CMR 13.03) . Exterior heating and cooling design considerations shall be: Winter design temperature -1 degrees F, Summer dry bulb temperature 86 degrees F, Summer wet bulb temperature 73 degrees F (780 CMR 1303, T 1303. 1 & T 1303.2) . Natural gas piping to the unit shall be extended from the existing natural gas meter. Operating and Maintenance manuals, and an as-built plan of the HVAC system shall be provided to the building owner upon completion of the installation, testing and balancing of the system. monitor panel will be relocated to the primary entrance. Electrical power shall be extended from the existing electrical service entrance panel. Domestic water and Sanitary Sewer shall be extended into the Office addition. Heating, Ventilation and Air Conditioning shall be achieved by the installation of exterior roof top mounted gas fired/electric cooled unit ducted into the addition. REQUIRED INSPECTIONS & TESTING: 1 . Soil bearing capacity 2 . Concrete footing reinforcing & formwork. 3. Concrete mix for compliance with design standards. 4 . Concrete wall reinforcing & formwork. 5. Concrete mix for compliance with design Standards. 6. Concrete placement for maintenance of specified curing temperatures and techniques. 7 . Structural Steel Framing: - Bolts and nuts - Identification markings - Welds - Plumb and true 8. Non-Structural Framing 9. Building Envelope MECHANICAL SYSTEM: The HVAC system shall provide heating, cooling and ventilation compliant with 780 CMR 28, 780 CMR 13 and ASHRAE standards. The system shall consist of three (3) exterior roof top mounted gas fired/electric cooling units ducted thru the roof of the addition and ducted throughout the NARRATIVE: The proposed Addition (F-1 use group) addition shall be constructed of a pre-engineered steel building system (Type 2-C) , with interior partitions constructed of steel studs and gypsum wall board. The entire addition shall be have an automatic sprinkler system by extending the existing municipal water main in the street into the Addition and extending the fire protection system into the existing manufacturing building. The setbacks from other buildings is greater than 10, therefore the exterior walls are not fire rated. A common wall between the existing manufacturing building and a earlier addition is a concrete masonry wall and is rated at 2 hours. The Addition will not be fire separated from the existing building by a fire rated wall . CHAPTER 34 NARRATIVE: The construction of the addition will result in a Hazard Index of 3, which is the same HI as the use of the existing manufacturing building. The existing manufacturing buildings have been constructed within the past 15 years therefore it is assumed the construction is in compliance with 780 CMR 6th Edition. FIRE PROTECTION SYSTEMS: The existing building shall be equipped throughout with an automatic sprinkler system. The sprinkler system will originate in the Addition and extend into the existing manufacturing building. Design of the automatic fire sprinkler system will conform to NFPA 13, "Installation of Sprinkler Systems" . The sprinkler system will be monitored by a third party monitoring company. All means of egress exits shall be marked with lighted "exit" signs and lighted with battery back-up emergency lighting, with exterior remote light fixtures. Emergency pull boxes will be located at all means of egress exits. The existing fire alarm FIRE RESISTANCE RATING (T 602) Exterior Walls = Ohr (separation distance > 10' (T 705.2) Non-Load Bearing Int. Part.= 0 hr. Structural Members = 0 hr. Roof Structural = 0 hr. Interior Partitions = 0 hr. SITE PLAN Set Backs Front = 235' -0" Side, Left = 99.8' , Right = 55.4' Rear = 105. 6' Frontage = 97. 1511 Parking = 57 spaces provided 2 AAB Accessible space (521 CMR 23.2 . 1) ARCHITECTURAL ACCESS BOARD: Exit: -A horizontal exit (north side door) , opening at grade level, is provided from the Addition to the parking lot via a concrete sidewalk. A second horizontal exit (south side door) , opening at grade level, from the Addition to the area of refuge on the south side of the building. Toilets: Both the Men' s and Women' s toilet rooms are designed to AAB standards (521 CMR 30. 1 thru 3. 13) . Door Hardware: All door hardware shall be lever type, or push/pull hardware designed to AAB standards (521 CMR 26.1 thru 26. 11 .4) Ramps & Stairs: Not Applicable Railings: Not Applicable ACTUAL BUILDING HEIGHT 30' -0" ROOF SNOW LOAD 35 PSF ( ZONE 3) (1610.1C) ACTUAL ROOF SNOW LOAD 40 PSF ROOF COLLATERAL LOAD 5 PSF (SPRINKLER LOAD) 5 PSF (CEILING LOAD) SECOND FLOOR LOAD 80 PSF (LIVE LOAD) 5 PSF (SPRINKLER LOAD) 5 PSF (CEILING LOAD) WIND LOAD 70 MPH (ZONE 1) (1611 .1A) ACTUAL WIND LOAD 70 MPH, EXPOSURE B SEISMIC LOAD /\ L + 1/2 LL (RF) (GROUP 1) SOIL BEARING 2,500 PSF BUILDING ENVELOPE ROOF SYSTEM Uo = .051 < .07 (REQ) THERMAL CO-EFFICIENT WALL SYSTEM Uo _ .051 < .07 (REQ) (See COMCHEK attached) USE OF BUILDING (existing) Medical Computer Systems Assembly & Research & Development of Medical Equipment USE GROUP (Existing) F-2 (low hazard factory) (T 306.3) HAZZARD INDEX (Existing) HI 3 (T 3403) HAZZARD INDEX (Addition) HI 3 (T 3403) OCCUPANCY LOAD (Addition) 7,200sf / 100sf = 72 (T 1008.1 .2) EGRESS REQUIREMENTS 500 persons or less = 2 means of egress (T 1010.2) EGRESS CAPACITY 72 persons*0. 15 = 10.8" (T 1009.2) use 36" STAIRWAYS 2,400sf / 100 sf = 24 (T 1008.1 .2) 24 persons*0.20 = 4 .8" (T1009.2) Use 36" (1014 .3 Exception 5) EGRESS TRAVEL DIST. (req) 250' (T 1006.5)w/sprinkler 75' (T 1010.3) One Exit EGRESS TRAVEL DIST. 60' (actual) B U I L D I N G C O D E R E V I E W / C O MM E N T A R Y THE BUILDING DESCRIBED BY THESE DRAWINGS MEETS OR EXCEEDS THE REQUIREMENTS OF THE MASSACHUSETTS STATE BUILDING CODE, 780 CODE OF MASSACHUSETTS REGULATIONS, (6 EDITION) PROJECT: ADDITION MicroCal, LLC. 22 Industrial Drive, East Northampton, Massachusetts 01060 413-586-7720 ARCHITECT: Challenger J. Whitham, AIA ARCHITECTS, INC. 64 Gothic Street Northampton, Massachusetts 413-584-7224 GENERAL CONTRACTOR: Hampshire Construction Co. , Inc. Robert T. Bartlett, Jr. CSL 017276 327 West Street Post Office Box 327 North Hatfield, Massachusetts 01066 413-247-5024 413-247-3305 fax PROJECT DESCRIPTION: The project consists of a 7,200 SF Addition to an existing Manufacturing building. The Addition shall be constructed using pre-engineered steel building system with steel clad exterior walls and a partial second floor. The existing building is construction of a pre-engineered steel building system. USE GROUP (Addition) F-1 (Factory) (T306.2) TYPE OF CONSTRUCTION 2 - C (T-602) ALLOWABLE BUILDING AREA UNLIMITED W/SPRINKLER & SET BACK INCREASES. (506.3 & 506.2) � �� ACTUAL BUILDING AREA 500 SF + -'7,200' SSF` 19 700 d SF (Existing ) + ( Addition) ALLOWABLE BUILDING HEIGHT 301 , 2 STORIES ( T-503) SUBCONTRACTOR Project: Northampton,MA Company Name Contact Name Address City State Zip Phone Number Cell Number Notes 1 IFound ation Design Steiger Engineering,Inc. Phil Steiger 9 Moody Road Enfield CT 06082 413-737-1851 !John Hollywood 413-786-1168 1 2 Electrical j Bergeron Electrical Services,Inc. Scott Bergeron I36 Gunn Road Extension Southampton, MA 01073 413-527-2032 413-531-0558 3 !Steel Studs,Gyp Bd,Ceilings i (Yankee Partitions. Inc. Walt Lebiedz 250 Westfield Road Holyoke, IMA 01040 413-532-6411 1 413-285-0472 I I 4 Fire Protection Sprinklers H F P Corporation Jim Lawrence 32 Char Drive Westfield, MA 01085 413-268-4709 1 5 IHVAC j I McCormick-Alium Co.,Inc. Peter Allum 1165 Stafford Street Springfield, MA 1 01101 413-737-1196 6 Plumbina Boulanger's Plumbing&Heating,Inc. (Tony Karella 1373 Main Street Easthampton, !MA 01027 413-527-3240 I f I ! 7 !Windows,Front Glazed Door r Chase Glass&Allied Products,Inc. I John Lanucha 123 Hancock Street Springfield, I MA 01109 j 413-732-1115 8 Metal Building Erection a LLandmark Steel Erectors jJohn Novak 163 Henderson Road New Hartford CT 860-777-5315 9 Concrete Work 1 Valley Masonry&Construction,Inc. Larry Girard 11 Deacon Parker Road Bernardston IMA 101337 i 413-648-9182 j I I 10 Interior Painting I j I II i I 11 Floor Coverina ! 1 Summenin Floors,Inc. 1322 College Street (Amherst !MA 101002 413-253-3946 12 ;Interior Carpentry&Trim � I i Hampshire Construction Co.,Inc. 13 61teWork I j Hatfield Equipment Co.,Inc. 1327 West Street North Hatfield I MA 101066 413-247-5711 I I I Vjjue uJ illVU3iibullu".3 600 Washington Street Boston, MA 02111 °�M S�•'� www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Le;?U Name (Business/Organization/Individual): HAMPSHIRE CONSTRUCTION CO. , INC. Address: 327 West Street City/State/Zip: North Hatfield, MA 01066 Phone #: 413 247-5024 Are you an employer? Check the appropriate ox: Type of project (required): 1.D I am a employer with 14 4 am a general contractor and I 6. ❑New construction employees(full and/or part-time).* have hired the sub-contractors 2.❑ 1 am a sole proprietor or partner- Iisted on the attached sheet. ❑ Remodeling ship and have no employees These sub-contractors have S. ❑ Demolition working or me in an capacity. workers' comp. insurance. g Y P ry• 9 wilding addition [No workers' comp. insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions myself. [No workers' comp. c. 152, §1(4),and we have no 12.❑ Roof repairs insurance required.] t employees. [No workers' comp. insurance required.] 131-1 Other *Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information: t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: General Casualty Policy#or Self-ins. Lic. #: CWC0396222 Expiration Date: 04/29/2008 Job Site Address:= 11Vb1 6T,e14L- ;�el L% E1 6,7 City/State/Zip: A4,1, - o Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby=Zin's and penalties of perjury that the information provided abov/e his true and correct Si afore: Date: V4,C ;2 Phone#: 413 247-5024 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority (circle one): I.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: ol oard of Building Regulations and Standards Construction Supervisor License License: CS 17276 ` Birthdate 10/27/1948 Expiration: 10/27/2009 Tr# 5502 Restriction: 00 ROBERT T BARTLETT JR PO BOX 327 N HATFIELD, MA 01066 Commissioner Mar 20 UH UU: 5 is mam snire T11 Lommonwea_ th of Massachusetts y J ]Department of Public Safety One Ashburton Place , Room 1301 Boston , Massachusetts 02108-1618 Phone ( 617 ) 727-3200 Fax ( 617 ) 727-5732 SECONDARY CONS'T'RUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) �° Project Title: 1C (JCaL LZ.0 Date:2v 'Q/� �OD Project Location: 22 L-- 50 C ,6466 /4,110,e7A-44�ZAN, d&' Scope of Project: —S7 -67 GDD � z4PP AJ 7U� EXi57s�cJla f - 6 In accordance with the sixth edition Massachusetts State Building Code,780 CMR SECTION 116.0: Mass Registration Number 16ez being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural -{-Mechanical lAVAC- [ ) Fire Protection [ j Electrical [ ? Other(specify) for the above named project and that to the best of my knowledge, such plans,computations and specifications meet the applicable provisions of the Ivlassachusetts State Building Code, all acceptable engineering practices and all applicable laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the wort:proceed in accordance with the documents approved for the building, permit. Upon completion of the work, I shall submit a final report as to the satisfactory completion of the above mentioned portion of the work. Signature and Seal of registered professional;.- ROBERTF _ _.� SAL �•'', , �� N0.33161 �tJNAL 6 CONSTRUCTION CONTROL DOCUMENT PROJECT NUMBER: 19 0 S DATE: �A> —V-(.`O PROJECT TITLE: PROJECT LOCATION: \f,'no 1\ I 1J6V e__ !�QS1 , NC(+hCti111r,JbA'" NAME OF BUILDING: 1 C fZC``a SCOPE OF.PROJECT: 'Enw-\CAG`�IOCI IN ACCORDANCE WITH SECTION 116.0 OF THE MASSACHUSETTS STATE BUILDING CODE,1, MASS. REGISTRATION NO. 3I L1 11 BEING A REGISTERED PROFESSI6NAL ENGINER/ARCHITECT,HEREBY CERTIFY THAT I HAVE PREPARED OR DIRECTLY SUPERVISED THE PREPARATION OF ALL DESIGN PLANS,COMPUTATIONS AND 'IFICATIONS CONCERNING: ENTIRE PROJECT _ ARCHITECTURAL _ STRUCTURAL MECHANICAL _ FIRE PROTECTION _ ELECTRICAL _ OTHER(specify) FOR THE ABOVE NAMED PROJECT AND THAT, TO THE BEST OF MY KNOWLEDGE, SUCH PLANS, COMPUTATIONS AND SPECIFICATIONS MEET THE APPLICABLE PROVISIONS OF THE MASSACHUSETTS STATE BUILDING CODE, ALL ACCEPTABLE ENGINEERING PRACTICES AND ALL APPLICABLE LAWS FOR THE PROPOSED PROJECT. I FURTHER CERTIFY THAT I SHALL PERFORM THE NECESSARY PROFESSIONAL SERVICES AND BE PRESENT ON THE CONSTRUCTION SITE ON A REGULAR AND PERIODIC BASIS TO DETERMINE THAT THE WORK IS PROCEEDING IN ACCORDANCE WITH THE DOCUMENTS APPROVED FOR THE BUILDING PERMIT AND SHALL BE RESPONSIBLE FOR THE FOLLOWING AS SPECIFIED IN SECTION 116_.2.2: 1. Review, for the conformance to the design concept, shop drawings, samples and other submittals which are submitted by the contractor in accordance with the requirements of the construction documents 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. P.`--,UANT TO SECTION 116.I SHALL,UPON COMPLETION OF THE WORK,SUBMIT A FINAL REPORT INDICATING THAT THE WORK I-t 3EEN PREFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND 780CMR I SHALL SUBMIT A FINAL REPORT AS TO THE SATISFACTORY COMPLETION AND READINESS OF THE PROJECT FOR OCCUPANCY. Signature SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF Notary Public MY COMMISSION EXPIRES ON CATHIE G e LLACHER NOTARY PUBLIC W COMMISSION EXPIRES DEC.31,201, The Commonweal ':h of r Massachusetts d bY�,•' Department of Public Safety One Ashburton Place , Room 1301 Boston , Massachusetts 02108-1618 Phone ( 617 ) 727-3200 Fax ( 617 ) 727-5732 CONSTRUCTION CONTROL DOCUMENT �/ Project Title: 6a,, i zC Date: �Zo,4�44 Oz,� 1-17 e-11 Project Location: / )0V67124L 00V&,zlw� t5 Z .o"A Scope of Project: aw-;�f 4- Z 2bo 5 f'.. , 7j 11/J 70 X`01-N� In accordance with SECTION 116.0-116.4.2 of the 6th edition of the Massachusetts State Building Code I, LC/�'�G�A� �J�v Mass. Registration Number Q0BI being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: ..Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other(specify) for the above named project and that to the best of my knowledge,such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved by the building permit and shall be responsible for the following as specified in section 116.22 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for the building permit,and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required'controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general,if the work is being performed in a manner consistent with the construction documents. I shall submit periodically, in a form acceptable to the build�i ,af) c'al,a progress report together with pertinent comments. Upon completion of the work,I shall submitl"o t sail kte ' fficial a final report as to the satisfactory completion and readiness of the project for occupancy?" '` k WILLIAM {� V. w 1�vtt rl'-� P'"" V Gylrl� i rro DeFLAV10 Signature and Seal of registered professional: ,¢ No.9(}3Q l ft o�c�GIST6y�kko ���.�s'OMAL EaG� 04/08/ZUU4 14:35 FAA 4135allZ!1 wivvc • The Fffe AbMVSWW*jw system ffulSt be supWAMW by eit w a threat connoction to the NwOwnpton Public Safely Dispatch or by a UL 16-ted Central station. • Pull Stations shad be double anion type. • Engraved labels (1 wx 1') nurnbermg of smoke deters for identficattcXI purposes ins Udled on smoke detectors on rmin fire alarm syslSM. NumbSAM sequenoe to be de mined by Fire Depedme t. (Chdy if a zone sysWM) • Alarm verification must be active on as amoke de4edion zones. i -nx - is V yf 3 f 1.11t+v t s. .9{umpshire ConstructiOn CO. Inc. 327 west SteV9t P.O. Box 327 North Hatfield, MA 01:066-4327 •page 2 z •d SOEELbZETbi uoxionuisuo0 autysdweH dB0 :60 80 so udE 04f08f1VUS 14:5lf tA3 91.taart<r� r Ak .< Northampton Fire Department Memorandum E C i. ApR 7 M L} i Ten Tows PAM* wr A� �Dfp;- APR D 9 2008 Fes; [ �04 -Of�J;•s'i':G Q%S�C11Uti5 l imam pA 4. 2M M -------------M------ ___ Cc: Brian Duggen H moire Const =tom Co. Inc. 327 West SbVet not Wracal,22 Industrial DrW P.U.sox 327 North Hatfield, MA Qlb6641327 Seery to a review of the plans and natrative submbW tD me fnr.r Vi8W. t concur ur with the issuance of a bukdmg p9m*subject to the fib,condidoRts: Fire alarm and ftte suppression worts pemtits sW be ObWlned for the pmjeot. The CIO inspectim fee needs to be paid pciar approval of any fire alarm andlor sprinkler ptam. The qrWhO map for the buildvq shaN be Changed to neglect 9*oranges with the vad". • 5 lb ABC Fire extinguishers are needed located at exits. This shalt be in cornp with WPA r bbft to mmWilurn Met distance. ApWprvba signage In cMVftnce Mh ADA should be located above • The FO connection for sprirklx system is to be 4' Starz connection with an attached chain, in addition a sign reading*Fire Depadmot Corwmc fiW in 3" wW #attars an a red back wxW is 10 be nVu led above the cpnrtertion. Also an electric beg, which activates upon water Ilow. must be load above this sign. .Page s T +d SOE6G b� T I uo r 4unjjsuo .J i sdwe � a 4 H d BO -EO 6[I 60 -rd� • The Fire Alarm/Sprinkler system must be supervised by either a direct connection to the Northampton Public Safety Dispatch or by a UL listed Central station. • Pull Stations shall be double action type. • Engraved labels (1"x1") numbering all smoke detectors for identification purposes installed on smoke detectors on main fire alarm system. Numbering sequence to be determined by Fire Department. (Only if a zone system) • Alarm verification must be active on all smoke detection zones. •Page 2 } y7 Northampton Fire Department Memorandum APR - 7 2008 To: Tony Patillo ,s From: Duane Nichols 4� J Date: April 4, 2008 CC: Brian Duggan Re: Microcal, 22 Industrial Drive Secondary to a review of the plans and narrative submitted to me for review, I concur with the issuance of a building permit subject to the following conditions: • Fire alarm and fire suppression work permits shall be obtained for the project. The C/O inspection fee needs to be paid prior approval of any fire alarm and/or sprinkler plans. The graphic map for the building shall be changed to reflect the changes with the renovations. • 5 lb ABC Fire extinguishers are needed located at exits. This shall be in compliance with NFPA relative to maximum travel distance. Appropriate signage in compliance with ADA should be located above • The FD connection for sprinkler system is to be 4" Storz connection with an attached chain, in addition a sign reading "Fire Department Connection" in 3" white letters on a red background is to be mounted above the connection. Also an electric bell, which activates upon water flow, must be located above this sign. •Page 1 • The Fire Alarm/Sprinkler system must be supervised by either a direct connection to the Northampton Public Safety Dispatch or by a UL listed Central station. • Pull Stations shall be double action type. • Engraved labels (1"x1") numbering all smoke detectors for identification purposes installed on smoke detectors on main fire alarm system. Numbering sequence to be determined by Fire Department. (Only if a zone system) • Alarm verification must be active on all smoke detection zones. •Page 2 C , Northampton Department Memorandum -- To: Tony Patillo APR - 7 2008 From: Duane Nichols j Date: April 412008 CC: Brian Duggan Re: Microcal, 22 Industrial Drive Secondary to a review of the plans and narrative submitted to me for review, I concur with the issuance of a building permit subject to the following conditions: Fire alarm and fire suppression work permits shall be obtained for the project. The C/O inspection fee needs to be paid prior approval of any fire alarm and/or sprinkler plans. The graphic map for the building shall be changed to reflect the changes with the renovations. • 5 lb ABC Fire extinguishers are needed located at exits. This shall be in compliance with NFPA relative to maximum travel distance. Appropdate signage in compliance with ADA should be located above The FD connection for sprinkler system is to be 4" Storz connection with an attached chain, in addition a sign reading "Fire Department Connection" in 3" white letters on a red background is to be mounted above the connection. Also an electric bell, which activates upon water flow, must be located above this sign. • Page 1 DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street • Municipal Building Northampton, MA 01060 l\�P1-C'TOP Robert Bartlett Hampshire Construction Company, Inc. P. O. Box 327 North Hatfield, MA 01066 September 30, 2008 Re:MicroCal 22 Industrial Drive East Dear Robert, Here is the new Temporary Certificate of Occupancy for 22 Industrial Drive East. Please let us know as the project progresses so we can inspect the areas completed and change the conditions of use. The fee for a Temporary Certificate of Occupancy is $25.00. Please send a check, payable to the City of Northampton, to the building department. Thank you. Feel free to call if you have any questions. Our telephone number is 587-1240 and our office hours are Monday through Friday, 8:30 am to 4:30 pm, excepting that we close at 12:00 noon on Wednesdays. My email address is: Ihasbrouck(cDcity.northampton.ma.us. Louis Hasbrouck 0'�4 City of Northampton Local Inspector and Zoning Enforcement I has brouck(c)city.northampton.ma.us The Commonwealth of Massachusetts f ffa City of Northampton ' TeTEOrary Certificate of Occupancy In accordance with 780 CMR,Section 120.3 (The Sixth Edition of the Massachusetts State Building Code) this Temporary Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified. Issued to Identify Name of Building of Space Within Certificate No. Microcal, Inc. BP-2008-0833 Identify property address including street number, name, city or town and county Certificate Located at Ex iration 22 Industrial Drive East October 31, 2008 Northampton, Hampshire County, Massachusetts Use Group Classification(s) Factory F-1 This Temporary Certificate of Occupancy is hereby issued by the undersigned to certify that the premise,structure or portion thereof as herein specified has been inspected for general fire and life safety features. This certificate shall allow for the temporary use as herein described and in conformance with any and all conditions as identified below. It shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate,failure to comply with conditions or, tampering With the contents of the certificate is strictly prohibited. Conditions of Partial (first floor, new area). 30 day Temporary Certificate of Occupancy, pending completion of 2nd floor, existing Temporary Use renovations and completion of special permit conditions Name of Municipal Louis Hasbrouck Date of Ma Plot: T Buildin Official P/ Inspection 08/01/08 Signature of Municipal � Date of Building Official c Issuance 09/30/08 19-012 Version l.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) —7 Independent Structural Engineering Structural Peer Review Required Yes 0 No SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT as Owner of the subject property hereby authorize ''to act on my behalf, in all matters relative to work authorized by this building permit application Signature of Owner Date as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties_of perjury. _ 4 - Print Name Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Q'7� T.-15A974-7 Name of License Holder: � '�-/•- - �� License Number _. _ _2 ..vim=r 2 ooq Address Expiration Date 44'6,243 - �5n2/-� Signature Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit: Signed Affidavit Attached Yes No 0 Version 1.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 36,000 C.F.OF ENCLOSED SPACE) `9.1 Registered Architect: 1�✓� -1A� Not Applicable 4/Tl y Name(Registrant): t7�7� 4 AJ' , W. Registration Number Address _......__... Expiration Date Signature % Telephone 9.2 Registered Professional Engineer(s): ,_.._......., PIVILLII' Name Area of Responsibility A lb 4 O ,57E 15 EiUF/,ELI CT y!o t;SZ Address Registration Number A00 IF I liza 240 Signature Telephone Expiration Date t 3 Name Area of Responsibility s Address Registration Number Signature Telephone Expiration Date _ Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 4 Name Area of Responsibility Address Registration Number 'Signature Telephone Expiration Date 9.3 General Contractor eQ/� p1 _G�l�J7, s�/Qr'��! '(10,a r _.... ,.M_,_.....__, Not Applicable ❑ Company Name: ' ZOPE, 7 7 74 E77 _.... _ _._ _.. ..... Responsible In Charge of Construction 32� wE�7`�ST�'E�7�,.11lD, �IA7"F�SLG? �l!J� ol..oGoco.` Address 5O24 Signature Telephone Version1.7 Commercial BuildingPermitMay 1�, 0U0 8. NORTHAMPTONIZONIKE7 Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size .�. ._. ., '' L0 ,.� _dw Frontage . •„ Setbacks Front [� Side L: R L.:.1_l.'_�R..,._�. 1 Rear - f Building Height "l ( Bldg. Square Footage /7,�....t Z 0/' lZ. Open Space Footage _� % o (Lot area minus bldg&paved 0,/. � 'zs '/0 parking) #of Parking Spaces Fill: 400 ZY U�) IZ 8c."7 4VVAI (volume&Location) __.._ .__.....- . _ _.,._....-.._., _..._...-_r: A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW 0 YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? _.. ....... _.. Needs to be obtained 0 Obtained , Date Issued: 02 7,0L 2 0L x67 C. Do any signs exist on the property? YES ' NO IF YES, describe size, type and location: Ma))V7ep D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO__J&— IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Version 1.7 Commercial Building Permit May 15,2000 COAJ ST SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE `J do S f 5TOA,�t �1QQ cTta n� Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions-0-Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Enter a brief description here. Of Proposed Work: 'r �" M tF I l,5-Cog-(A ql' SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly 13 A-1 El A-2 11 A-3 Cl 1A A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A ❑ E Educational ❑ 2B ❑ F Factory ❑ F-1 F-2 ❑ 2C H High Hazard ❑ 3A ❑ I Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 36 ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify M Mixed Use ❑ Specify: S Special Use ❑ Specify COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: ..W Existing Hazard Index 780 CMR 34): J Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA OFFICE USE ONLY BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION Floor Area per Floor(sf) st 1st ._ (..�r^'T�a`.�'" _ �• - .... 1 nd ,. I..A. 2nd 2 :Z -0 _ 3rd 3 rd .... ......_ ._. 4m �th `. _ ._..... ..__.....,.,.. ..__........,,.. _. Total (sf) Total Area (sf) � r�G 14 Proposed New Cons (�t./�� • Total Height(ft) Total Height ft 7.Wat FSu ply(M.G.L.c.40,§54) 7.1 Flood Information: 7.3 Sewa Disposal System: Publi Private ❑ Zone Outside Flood Zone Municipa On site disposal system[] Version 1.7 Commercial Building Permit Mav 15,2000 Department use only typf%.Northampton Status'of Permit s, ,T I ur ing Department way Permif 212 Main Street Sewer%SepttGAvarlabEffy z ` 2008 Room 100 WaterNVeil Availability' t i4" i 1 v: .yam E Northampton, MAO 1060 Two Sets of Structural;Plans ,. t p hone 413-587-1249 Fax 413-587-1272 Plot/Site Plans s , Oth'er'Specify a' APPLICATION TO CONSTRUCT,REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 7 f.-..�.r-�`..._._ C. q 2 G- t�., 00-355TrZAL C4 1V ICS •i...AS�,Map 1 Lot Unit too CZT P-4 M PT(::)�J Zone CA Overlay District __ _ _..-_ .___, __.. _.: Elm St District cB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: G2c�Cl .L-..,. ._. �--.�- . .._... 22 I►�1DU�j`C121A !._ DtZi1/�, E,4--.;T. Name(Print) Current Mailing Address: MPT Signature Telephone 2.2 Authorized Agent: DUSTIZI At- P21VE� ._i�-::�4t51_..__..._._� Name(Print) Current Mailing"Address. L►OIZTWAMPTOM , AA-C_UQCP0 R � V ' Telephone SECTION 3 ESTIMATED' ONSTRUCTION COSTS 'C Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 575 db0 (a)Building Permit Fee _2 2. Electrical on (b)Estimated Total Cost of d5 0C)o -` Construction from 6 3. Plumbing j Building Permit Fee r 4. Mechanical(HVAC) 5. Fire Protection _ .Q..00 °O 6. Total=(1 + 3+ +5) 000 Check Number oil Ia This Section For Official Use Only Bui di i i Nub.e Date Issued Signature: Building Commissioner/Inspector of Buildings Date File#BP-2008-0833 APPLICANT/CONTACT PERSON HAMPSHIRE CONSTRUCTION CO INC ADDRESS/PHONE P O BOX 327 NORTH HATFIELD (413)247-5024 **f.r a 7d f PROPERTY LOCATION 22 INDUSTRIAL DR -7f:2— a MAP 19 PARCEL 012 001 ZONE GI f U THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid uildin Permit Filled out ee Paid T_ypeof Construction: CONST UCT 2 STORY 19,700 SF ADDITION New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included• Owner/Statement or License 017276 3 sets of Plans/Plot Plan .vr THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IN�F9'kMATION PRESENTED: __Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Perrnit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 74 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. cLTJ S1"A)Af y l � 22 INDUSTRIAL DR BP-2008-0833 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 19 -012 CITY OF NORTHAMPTON Lot: -001 Permit: Builft Categ_ory :ADDITION BUILDING PERMIT Permit# BP-2008-0833 Project# JS-2007-001183 Est.Cost: $708000.00 Fee: $841.00 PERMISSION IS HEREB Y GRANTED TO: Const.Class:2C Contractor: License: Use Group: F2 HAMPSHIRE CONSTRUCTION CO INC 017276 Lot Size(sa ft.): 101930.40 Owner: MICROCAL LLC Zoning: GI Applicant.• HAMPSHIRE CONSTRUCTION CO INC AT. 22 INDUSTRIAL DR Applicant Address: Phone: Insurance: P O BOX 327 (413) 247-5024 WC NORTH HATFIELDMA01066 ISSUED ON:312812008 0:00:00 To PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 STORY 19,700 SF ADDITION---- -----FOUNDATION ONLY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring Building Inspector Underground: Service: Meter: Footings: Kou b: house# Foundation: Rough: g 1d/c7lo9 4 Driveway Final: (PA-{4 1-6vsx Final: Final: Rough Frame: A/tC �'/7_-QS Gas: Fire llepartment Fireplace/Chinn►ey: Oil: Rough: Q 01 Insulation: 1`4- lT Final: oul p�(v-,N PERvv� Final: Smoke: '-,eQ t N SA, NYC A THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: Feel e: Date Paid: Amount: Building 3/27/2008 0:00:00 $841.00 212 Main Street,Phone(413) 587-1240, Fax:(413) 587-1272 Building Commissioner-Anthony Patillo Tv-w� FoUN�i��to J� �E�ml 6 1-7 006 crolAO A Y 6 ,6/�2/o�S LOLL o ui en S Ffar�intA V l2bu vA 3T At RC oNLLl l-7 lo '56 PA 2q lA o E,RCt, wpu-5 � (-t9N"[� 0-6c l s? FL°°A�-f s-TAIR-S I LDS DM's �GC� C)" - o t- oV' FOR- 1 + coo rz pj6LJ co►as�R c1�Ct �01J 22 INDUSTRIAL DR BP-2008-0833 GIS Y: COMMONWEALTH OF MASSACHUSETTS Map:Block: 19-012 CITY OF NORTHAMPTON Lot: -001_ PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: ADDITION BUILDING PERMIT, Permit# BP-2008-0833 Project# JS-2007-001183 Est. Cost: $708000.00 Fee: $841.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: 2C Contractor: License: Use Grouu: F2 HAMPSHIRE CONSTRUCTION CO INC 017276 Lot Size(sg. ft.): 101930.40 Owner: MICROCAL LLC [�Jy rl���'n rlt• I".IAM?,�''�HIRV "0NC ! PJ I`TION_.(�rl !�'�IC AT: 22 INDUSTRIAL DR --- — - Applicant Address: Phone: Insurance: P O BOX 327 ("413) 247-5024 _ \VC NORTH HATFIELDMA01066 ISSUED ON:411612008 0:00:00 TO PERFORM THE FOLLOWING WORK.-CONSTRUCT 2 STORY 19,700 SF ADDITION POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing, Inspector of Wiring U.P.W. Building Inspector �t;ndcrground:i-(S-O ervice: Meter: Footings; Rough:C J/ _ Rough: House# Foundation: Driveway Final: •`? 1�p Final: e? ,A.- ., j 6EILid o Epc Finai;� J � r/V� J- `� Il r9 eT��t2 Rough Frame: Ff+2t ('T A f'17P,.a JA t- ` Gas: Fire Department Fireplace/Chimney: m ' Qi! m-e- 30 DnM f Insulation; Isru,`D fiNAl.Cca lZ`o9�t1 Rnu,tm.i 'J-03Z//� — _o C r� 1Fl�A'(- K ots-o 3 300*1 Final- 9 Final: PAV-T1 A —T l L'9I�1��3.Og AC) �iTIQ N p�N®t.N� C�vti,'cErla N c� THIS PERMIT MAYBE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OV ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy ( /Signature: FeeType• Date Paid:_ Amount: Building 4/16/2008 0:00:00 $841.005754 212 Main Street,Phone(413) 587-1240,Fax: (413)587-1272 Building('omrunissioner-Anthony Patillo