Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
44-109
solar=ee Single Phase Inverters for North America s o I a r SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-US/ SE760OA-US/SE10000A-US/SE1140OA-US SE3000A-US SE38GOA-US SESOOOA-US SE6000A-US SE7600A-US SE10000A-US I SE1140OA-US _OUTPUT 9980 @ 208V olarEdge Singe Phase Inverters • Nominal AC Power Output 3000 3800 5000 6000 7600 10000 @240V 11400 VA ... .. ...... ._ .. .......... ..... ...... . ..... . . ... .. ..... . . . For North America 5400 @208V 10800 @208V Max.AC Power Output 3300 4150 6000 8350 12000 VA 5450 @240V 10950 @240V AC Output Voltage Min.-Nom.-Max.' SE3000A-US/SE380OA-US/SE5000A-US/SE6000A-US/ 183-208-229 Vac _ . ................................ . ................ ..... .. ... ............. ........ ....... . .. ...... AC Output Voltage Min.-Nom.-Max.' � � � V SE760OA-US/SE10000A-US/SE1140OA-US 211 240-264va�..................... .... . . ... ... ............... ................. ................ ..._.... ......I........... ...... . AC Frequency Min.-Nom.-Max.* 59.3-60-60.5(with HI country setting 57-60.60.5) Hz ..... ............. . ... . .. .... ... - - 24 @ 208V 48 @ 208V Max.Continuous Output Current 12.5 16 21 @ 240V 25 32 42 @ 240V 47 S A .. .. .. .. .. .. .._. . .. .. .. ...,. . . . ..... . .. .... . ..... ..............._. .. ... ... 1 '`° ... .. .. ...... .............. A .... ..... . .. ......... Utility Monitoring,Islanding Protection,Country Configurable Yes srtes. .;L� Thresholds —. -- _--- ---- ---_---- _--- _._ -,-- ---- q W INPUT 8 �getg -m r Recommended Max.DC Power— i— 0 �� � m— W8R - (STC) 3750 4750 6250 750 9500 12400 14250 W .... .. _.. ......... ... .. ........ ... .. . .. ...... .. ... ..... .. .. Transformer less,Ungrounded Yes is Max Input Volta e 500 Vdc Nom.DC Input Voltage _ 325 @ 208V/350 @ 240V _ Vdc 16 Max.Input Current`*' 9 5 13 18 23 34 5 Adc 5 @ 208V 33 @ 208V 15 5 @ 240V 30 5 @ 240V i . ... ... .... . ........ . . _. .. .. ....... .... i Max.Input Short Circuit Current 30 45 Adc ...... ...... .V ......... .. .. ... .. ...... ..... ..... .. .. . ._ .. ....._ ... _ .... ..... Reverse-Polarity Protection Yes ..... ...... ...... ...... ... ... . .... ... ..,.... ....... .. ... ....,.. ............... .... ..... ' .. .... Ground-Fault Isolation Detection 600kn Sensitivity ..... ... .. .._. ..... .. ...... ..... .. _ ... ...... _. ... . .... .. `*• Maximum Inverter Efficiency 97 7 98 2 98.3 98 3 98 98 98 _...... .. ... ... .. .._ ...._ .. 97 _.. _. ..... @208V ..._ .__... { CEC Weighted Efficiency 97.5 98 .5 @ 211V 97.5. 97.5 97 97.5 .... .... .. ....... .97.5 @ 240V.. ..... .. ...... .. ... .... ........ ..... ..... ......... .. ....... ...... .. .. I . Nighttime Power Consumption <2.5 .._—J-- <4 - W i ADDITIONAL FEATURES Supported Communication Interfaces RS485,RS232,Ethernet,ZigBee(optional) ....... ..... __... ...... .. ......._ ._._.... . ..... ... .. ._. Revenue Grade Data,ANSI C12.1 Optional STANDARD COMPLIANCE Safety UL1741,UL1699B,UL1998 CSA 2272 Grid Connection Standards IEEE1547 Emissions FCC part15 class B �- INSTALLATION SPECIFICATIONS AC output conduit size/AWG range 3/4 minimum/24-6 AWG �T 3/4 minimum/8 3 AWG ' + DC input conduit size/#of strings/ AWG range 3/4"minimum/1 2 stnngs/24-6 AWG 3/4"minimum/1-2 strings/14-6 AWG . ..._.. . ..... ..... ............ . .. ....... . ...... . . . ' Dimensions with AC/DC Safety 30.5 x 12.5 x 7/ 30.5 x 12.5 x 7.5/ 30.5 x 12.5 x 10.5/775 x 315 x 260 in/ Switch(HxWxD) 775 x 315 x.172 775 x 315 x 191 mm -.. - - Weight with AC/DC Safety Switch 51.2/23.2 54.7/24.7 88.4/40.1 lb/kg Cooling Natural Convection Fans(user replaceable) Noise <25 <50 dBA The best choice for SolarEd a enabled systems -- --- - - - - - - - g y Mm-Max OperatlngTemperature Integrated arc fault protection(Type 1)for NEC 2011690.11 compliance Range 13 to+140/-25 to+60(CAN version****-40 to+60) F/°c — Superior efficiency(98%) Protection Rating NEMA sR :,For other reg onal settings please contact 5olarEdge support — Small,lightweight and easy to install on provided bracket "Limaedto125%forlocations where the yearly average high temperature is above77'F/25'C and to 135%for locations where it is below7TF/25'C. For detailed information,refer to htto://www.solaredee.us/files/odfs/inverter do oversizing euide.pdf Built-in module level monitoring A higher current source maybe used;the inverter will limit its input current to the values stated. "CAN P/NS are eligible for the Ontario FIT and micronT(microFIT exc.SE11400A-US-CAN). — Internet connection through Ethernet or Wireless — Outdoor and indoor installation — Fixed voltage inverter,DC/AC conversion only — Pre-assembled AC/DC Safety Switch for faster installation — Optional—revenue grade data,ANSI C12.1 )sur sP�c • USA-GERMANY-ITALY-FRANCE-JAPAN-CHINA-AUSTRALIA-THE NETHERLANDS-ISRAEL www.solaredge.us 71 i � SolarEd a Power Optimizer solar=@@ solar=@e 9 p Module Add-On for North America P300 / P350 / P400 SolarEdge Power Optimizer P3oo Module Add-On For North America (for 72- P4oD 60-cell PV I (for 72-cell PV (for 96-cell PV i modules) ( modules) modules) INPUT P300 / P350 / P400 Rated Input DC Poweri'i I 300 j 350 400 ( W Absolute Maximum Input Voltage(Voc at lowest temperature) 48 60 80 Vdc MPPT Operating Range 8 48 ) 8-60 8-80 Vdc . Maximum Short Circuit Current(Isc) 10 Adc Maximum DC Input Curren[ 12.5 I Adc Maximum Efficiency 99.5 j % 1 Weighted Efficiency. ... 8.8 " Overvolta a Cate _ % OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING INVERTER) Maximum Output Current 15 Adc >. Maximum Output Voltage -. _ __.._. .__.-. - _. ._.fi0.. .__.-. _._... _.Vdc a. — - ;= OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM INVERTER OR INVERTER OFF) Safety Output Voltage per Power Optimizer 1 - 7-Vdc STANDARD COMPLIANCE EMC FCC Part15 Class B,IEC61000 6 2,1EC61000 6 3 Safety IEC62109 1(class II safety),UL1741 -" - RoHS I Yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 1 Vdc Dimensions(W x L x H) _ 141x 212 x40.5/5.55x83421.59 in Weight(including cables) 950/2.1 gr/lb Input Connector ( MC4/Amphenol/Tyco Output Wire Type/Connector _ Double Insulated,Amphenol Output Wire Length 1 0.95/30 12/3.9 m/ft Operating Temperature Range _. _ _ _ 40 +85/-40 +185 'C/'F Protection Rating IP65/NEMA4 Relative Humidity _.. .. 0-100 __ .. %._. a Raced srC1or-m e.Mmm�& ,o sx Ro.11 0—d. PV SYSTEM DESIGN USING A SOLAREDGE THREE PHASE THREE PHASE INVERTER SINGLE PHASE 208V 480V PV power optimization at the module-level Minimum String Length(Power Optimizers) 8 10 18 -� _ i Up to 25%more energy Maximum String Length(Power Optimizers) 25 25 50 Maximum Power per String 5250 6000 12750 ! W - Superior efficiency(99.5%) -- Parallel Strings of Different Lengths or Orientations yes ! Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading -- ��� �� � --- ��-- �-- - � - - -- - Flexible system design for maximum space utilization - Fast installation with a single bolt - Next generation maintenance with module-level monitoring - Module-level voltage shutdown for installer and firefighter safety USA - GERMANY - ITALY - FRANCE - JAPAN - CHINA - ISRAEL - AUSTRALIA www.solaredge.us 0 A` �t�►' ee5,a� ® S� CS6P-235/240/245/250/255PX �r CanadianSolar Electrical Data Black-framed STC CS6P-235P CS6P-240P CS6P-245P CS6P-250PXCS6P-255PX Temperature Characteristics Nominal Maximum Power(Pmax) 235W 240W 245W 25OW 255W NewEdge Optimum Operating Voltage(Vmp) 29.8V 29.9V 30.OV 30.1V 30.2V Pmax -0.43%/°C Optimum Operating Current(Imp) 7.90A 8.03A 8.17A 8.30A 8.43A Temperature Coefficient Voc -0.34%/°C Open Circuit Voltage(Voc) 36.9V 37.OV 37.1V 37.2V 37AV Ise 0.065%/°C Short Circuit Current(Ise) 8.46A 8.59A 8.74A 8.87A 9.00A Normal Operating Cell Temperature 45±2°C • Module Efficiency 14.61% 14.92% 15.23% 15.54% 15.85% Operating Temperature _40°C—+85°C Performance at Low Irradiance Maximum System Voltage 1000V IEC /600V UL Industry leading performance at low irradiation Maximum Series Fuse Rating 15A environment,+95.5%module efficiency from an Application Classification ClassA irradiance of 1000w/m'to 200w/m' Next Generation Solar Module Under Standard Test Conditions(STC)ofirradianceof1000W1m',spectru AM15b ndcelltemperatureof25'C Engineering Drawings Power Tolerance AM 1.5,25"C NewEdge,the next generation module designed for multiple g g g NOCT CS6P-235P CS6P-240PX CS6P-245P CS6P-250PXCS6P-255PX types of mounting systems,offers customers the added Nominal Maximum Power(Pmax) 170W 174W 178W 181W 185W value of minimal system costs,aesthetic seamless Optimum Operating Voltage(Vmp) 27.2V 27.3V 27AV 27.5V 27.5V appearance,auto groundingand theft resistance. Optimum Operating Current(Imp) 6.27A 6.38A 6.49A 6.60A 6.71A .. Open Circuit Voltage(Voc) 33.9V 34.OV 34.1V 34.2V 34AV The black-framed CS6P-PX is a robust 60 cell solar module Short circuit current(Ise) 6.86A 6.96A 7.08A 7.19A 7.29A incorporating the groundbreaking Zep compatible frame. Under Normal operating Call Temperature,Irradiance of 800 W/m',spectrum AM 1.5,ambient temperature 20'C, The specially designed frame allows for rail-free fast wind speed 1 m/s installation with the industry's most reliable grounding Mechanical Data system.The module uses high efficiency poly-crystalline Cell Type _ Poly-crystalline 156 x 156mm,2 or 3 Busbars Key Features silicon cells laminated with a white back sheet and framed Cell Arrangement 60(6 x 10) with black anodized aluminum.The black-framed CS6P-PX Dimensions 1638 x 982 x 40mm(64.5 x 38.7 x 1.57in) • Quick and easy to install - dramatically is the perfect choice for customers who are looking for a high Weight 20.5kg(45.2165) reduces installation time quality aesthetic module with lowest system cost. Front Cover 3.2mm Tempered glass Frame Material Anodized aluminium alloy • Lower system costs - can cut rooftop �-BOx Best Quality IP65,3 diodes _ _-- ---_-- — installation costs in half Cable 4mm'(IEC)/l2AWG(UL),1000mm • 235 quality control points in module production • Aesthetic seamless appearance - low profile Connectors MC4 or MC4 Comparable EL screening to eliminate product defects - � Standard Packaging(Modules per Pallet) 24pcs -- with auto leveling and alignment Current binning to improve system performance Module Pieces per container(40 f1.Container) 672pcs(40'HQ) • Accredited Salt mist resistant • Built-in hyper-bonded grounding system - if it's I-V Curves (CS6P-255PX) mounted,it's grounded Best Warranty Insurance i • Theft resistant hardware • 25 years worldwide coverage • 100%warranty term coverage Section A-A • Ultra-low parts count - 3 parts for the mounting • Providing third party bankruptcy rights 35.0 and grounding system • Non-cancellable • Industry first comprehensive warranty insurance by • Immediate coverage AM Best rated leading insurance companies in the Insured by 3 world top insurance companies world -- Comprehensive Certificates —• Industry leading plus only power tolerance:0-+5W • IEC 61215,IEC 61730, IEC61701 ED2,UL1703, 115 • Backward compatibility with all standard rooftop and CEC Listed,CE and MCS 926 ground mounting systems • IS09001:2008:Quality Management System • ISO/TS16949:2009:The automotive quality 'Speccations included in this datasheet are subject to change without prior notice. • Backed By Our New 10/25 Linear Power Warranty management system Plus our added 25 year insurance coverage • IS014001:2004:Standards for Environmental About Canadian Solar management system Canadian Solar Inc. is one of the world's largest solar Canadian Solar was founded in Canada in 2001 and was 197% Added • QC080000 HSPM:The Certification for companies. As a leading vertically-integrated successfully listed on NASDAQ Exchange (symbol: CSIQ) in Value manufacturer of ingots,wafers,cells,solar modules and November 2006. Canadian Solar has module manufacturing 90% From Warranty Hazardous Substances Regulations solar systems, Canadian Solar delivers solar power capacity of 2.05GW and cell manufacturing capacity of 1.3GW. • OHSAS 18001:2007 International standards for products of uncompromising quality to worldwide so% occupational health and safety customers. Canadian Solar's world class team of 0% s 10 1s 2a 2s REACH Compliance professionals works closely with our customers to provide them with solutions for all their solar needs. Headquarters • 10 year product warranty on materials and workmanship a C SGS rrcwxe.`G FEwT +1 519 837 1 25 year linear power output warranty C s ` r r r o inquire.ca@canadiansolar.coni www.canadiansolar.com www.canadiansolar.coin EN-Rev 10.17 Copyright E.2012 C.n,u n Solar Inc. SolarCity SleekMountT"" - Comp SolarCity SleekMountTM - Comp The SolarCity SleekMount hardware solution •Utilizes Zep Solar hardware and UL 1703 listed Installation Instructions is optimized to achieve superior strength and Zep Compatible TM modules ; aesthetics while minimizing roof disruption and Drill Pilot Hole of Proper Diameter for labor.The elimination of visible rail ends and °Interlock and grounding devices in system UL Fastener Size Per NDS Section 1.1.3.2 mounting clamps, combined with the addition listed to UL 2703 of array trim and a lower profile all contribute •Interlock and Ground Zep ETL listed to UL 1703 Seal pilot hole with roofing sealant to a more visually appealing system.SleekMount as"Grounding and Bonding System" ` `fir Insert Comp Mount flashing under upper utilizes Zep Compatible TM modules with •Ground Zep UL and ETL listed to UL 467 as layer of shingle strengthened frames that attach directly to grounding device Zep Solar standoffs, effectively eliminating the Place Comp Mount centered need for rail and reducing the number of •Painted galvanized waterproof flashing upon flashing standoffs required. In addition, composition .Anodized components for corrosion resistance fir; Install lag pursuant to NDS Section 11.1.3 shingles are not required to be cut for this with sealing washer. system, allowing for minimal roof disturbance. °Applicable for vent spanning functions t Secure Leveling Foot to the Comp Mount using machine Screw Place module Components 5/16"Machine Screw Leveling Foot Lag Screw Comp Mount Comp Mount Flashing r a°WOO, SolarCity January 2013 � `W SolarCit ® y Janua � � LISTED y January 2013 °MPP Label Location: Label Location: Label Location: WARNING:PHOTOVOLTAIC POWER SOURCE WARNING P' WARNING Per Code: Per Code: Per Code: NEC 690.31.G.3 ELECTRIC SHOCK HAZARD ,. ELECTRIC SHOCK HAZARD 690.35(F) DO NOT TOUCH TERMINALS THE DC CONDUCTORS OF THIS Label Location: TERMINALS ON BOTH LINE AND PHOTOVOLTAIC SYSTEM ARE • BE USED WHEN LOAD SIDES MAY BE ENERGIZED UNGROUNDED AND PHOTOVOLTAIC DC IN THE OE 690.14.C.2••- PN POSITIO N MAY BE ENERGIZED UNGROUNDED • NE DISCONNECT - Location:Label Label Location: WARNING Code: MAXIMUM POWER--A D (INV) Per INVERTER OUTPUT POINT CURRENT(Imp} MAXIMUM POWER- Code: CONNECTION 690.64.B.7 NEC• POINT VOLTAGE(Vmp}-v ', DO NOT RELOCATE THIS OVERCURRENT MAXIMUM SYSTEM V DEVICE VOLTAGE{Voc) SHORT-CIRCUIT A CURRENT{Iscj Label • • PHOTOVOLTAIC POINT OF (POI) Label Location: INTERCONNECTION ._ Code WARNING WARNING:ELECTRIC SHOCK . Per HAZARD.DO NOT TOUCH Code: TERMINALS.TERMINALS ON NEC ELECTRICAL SHOCK HAZARD BOTH THE LINE AND LOAD SIDE DO NOT TOUGH TERMINALS MAY BE ENERGIZED IN THE OPEN TERMINALS ON BOTH LINE AND POSITION.FOR SERVICE LOAD SIDES MAYBE ENERGIZED DE-ENERGIZE BOTH SOURCE IN THE OPEN POSITION AND MAIN BREAKER. DC VOLTAGE IS PV POWER SOURCE ALWAYS PRESENT WHEN .............AC A SOLAR MODULES ARE OPERATING CURRENT - EXPOSED TO SUNLIGHT MAXIMUM AC OPERATING VOLTAGE V Label • • WARNING CUTION 'Label Location: Per Code: A ELECTRIC SHOCK HAZARD 690.5(C) Code: IF A GROUND FAULT IS INDICATED PHOTOVOLTAIC SYSTEM NORMALLY GROUNDED CIRCUIT IS BACKFED 690.64.B.4 CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED Label • • Label • - • CA (POI)O _ PHOTOVOLTAIC AC (POI) DUAL POWER SOURCE Code: DISCONNECT Per Code: PHOTOVOLT C SYSTEM 690.64.13.4 (C): Cond NEC ,.0 :. Conduit(D): Distribution Panel (DC): DC Disconnect (IC): Interior Run Label Integrated DC Disconnect MAXIMUM AC A Load OPERATING CURRENT Per Code: MAXIMUM AC V NEC ,•0.54 (POI): Point of • • OPERATING VOLTAGE - . c k F.1 I Z I II 1 C •irn• mun•i•■•i• 11 111111114 V-131111 SIN MISSION I:� r r . r • i I III am IIIIIIIIIIIJIN r . . I uuunc. a mncni.m�iuunmrnnnimi• GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BOND (N) #8 GEC TO (N) GROUND ROD Panel Number:Crouse-Hinds LC120DS Inv 1: DC Ungrounded INV`1 -(I SOLAREDGE 1SE5000A-USDODSNR )� A -(38)CANADIAN SOLAR__# CS6P-255PX GEN #168572 AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:032684367 Inv 2: DC Ungrounded Inverter, 5000W, 240V, 97.596; w m e Isco and ZB,RGM,AFCI PV Module; 255 234.3W PTC, Black Frame, MC4, ZEP Enabled ELEC 1136 MR Underground Service Entrance Tie-In: Supply Side Connection INV 2 -(1)SOLAREDGE Id SE3600A-USODOSNg2.LAgE� B Inverter, 38 W, 24OV, 97.576 w//uUnlfed Disco and ZB,RGM,AFCI Voc: 37.4 Vpmax: 30.2 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER E 100A MAIN SERVICE PANEL E 10OA/2P MAIN CIRCUIT BREAKER SolarCity (E) WIRING CUTLER-HAMMER BRYANT Inverter 1 Disconnect CUTLER-HAMMER (N) 125A Load Center 5 ❑A 1 10OA/2P 10 Disconnect 9 7 SOLAREDGE Dc+ B 50A D SE5000A-USOOOSNR2 Dc- MP 1: 1x11 C 30A/2P _______ Ecc AL1 2;-- ------------ - - -------------------- B L2 N DG I 4 2 (E) LOADS GND _ ____ GND _ EGG DC+ pC+ I i-------------- - GEC ---TN DG pc- MP 1: 1x11 GND __ EGC ------------ _ _ EGC ---- --------- -F----- -------------------- I I I WE:GC/GEC I I (1)Conduit Kit; 3/4' EMT I __� Inverter 2 I I _, I I a SOLAREDGE I SE380OA-USOOOSNR2 20A/2P _ GEC___1 I L2 zaav T I TO 120/240V i N 6 SINGLE PHASE EEC DC+ DC- UTILITY SERVICE I L_ _-__-_____---_-- - GEC ---�� pc- Dc- MP 2: 1x16 ---�- -------------------t~� GND __ EGC- ------------- ------------- ---- - EGC I I PHOTO VOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN Voc* = MAX VOC AT MIN TEMP POI (1)Ground Rod; 5/8* x 8', Copper B (I)CUTLER-HAMMER /DG222NRB A (i)SdarC y 4 STRING JUNCTION BOX -(2)ILSCO!IPC 4/0-� Disconnect; 60A, 24OVoc,Fusible, NEMA 3R AC 2x2 STR GS, UNFUSED, GROUNDED DC Insulattion Piercing Connector; Main 4/0-4, Tap 6-14 -(1)CUTLER- AMMER DG1OONB `, Ground leutrM 60-100A, General Duty(DG) P V (38)SOLAREDGE 300-2NA4AZS D (1)BRYANT I BR816LI25RP -(I)CUTLER-HAMMER /DS16FK Power$ox Optimizer, 300W, H4, DC to DC, ZEP Load Center, 125A, 120/24OV, NEMA 3R Class R Fuse Kit -(1)CUTLER-HAMM /BR230 ERRAZ SHAWMUT f TR50R PV BACKFEED OCP n d (1)AM 16, Solid Bare Copper Breaker, 3OA/22P, 2 Spaces -(2)FFuse; 50A, 25OV, Class RKS - (1 ER /BR220 -(1)Ground Rod; 5/8' x 8', Copper Breaker; 20A/2P, 2 Spaces C (I)CUTLER-HAMMER 0 DG222UR8 N ARRAY GROUND PER 690.47 D NOTE: PER EXCEPTION N0. 2, ADDITIONAL SUPPLY SIDE CONNECTION. DISCONNECTING MEANS SHALL BE SUITABLE Disconnect; 60A,/24OVoc,Non-Fusible, NEMA 3R ( ) ( ) SC AS SERVICE EQUIPMENT AND SHALL BE RATED PER NEC. -(1)GrLou�nd�NeuM Kit;D60 100A, General Duty(DG) ELECTRODE MAY NOT BE REQUIRED DEPENDING ON LOCATION OF (E) ELECTRODE � 1)AWG/8, THWN-2, Black � 1 AWG#10, THWN-2, Black (1�AWG /10, THWN-2, Black Voc* =500 VDC Isc =15 ADC - (2)AWG#10, PV WIRE, Black Voc* =500 VDC Isc =15 ADC O Is1-(1)AWG#8, THWN-2, Red O 13r(1)AWG#10, THWN-2, Red ® (1)AWG /10, THWN-2, Red Vmp =350 VDC Imp=7.91 ADC O (1)AM 16, Solid Bore Copper EGC Vmp =350 VDC Imp=7.91 ADC (1)AWG/8, THWN-2, White NEUTRAL Vmp =240 VAC Imp=36.66AAC (1)AWG/10, THWN-2, White NEUTRAL Vmp =240 VAC Imp=20.83AAC 0 AWG{1Q 111WN-2..Green, EGC. . . . . . 70)AWG/B,,1HWN-2,,Green . EGC/GEC.-(1)Condult.Kit;,3/4',EMT. . . . . . . . . . . . . . -(1)AWG 08,.THWN-2,Green . . EGC/GEC.-(1)Conduit.Kit;.3/4'.EMT, (1 AM 110, TNWN-2, Black Voc* =500 VDC Isc =15 ADC (2)AWG /10, PV WIRE Black Voc* =500 VDC Isc =15 ADC (I)AM#6, THWN-2, Black �(1)AW6 110, THWN-2, Black O (1)AWG 110, THWN-2, Red Vmp =350 VDC IMP=7.91 ADC O (1)AWG}6, Solid Bare Copper EGC Vmp =350 VDC Imp=7.91 ADC ®I . (1)AWG/6, THWN-2, Red ®IsI-(1)AWG/10, THWN-2, Red . . . . (1)AWG(10, THWN-2,.Green EGC. . . . . . . . . . . . . I L 1)AM = - ILL . . p p- ( ) /1 p p- (1)AWG/ (2)AM/10, PV HARE, Black Voc =500 VDC Isc =15 ADC ( ) /6, THWN-2, White NEUTRAL Vm 240 VAC Imp 36.66AAC (I)AM 0, THWN-2, White NEUTRAL Vm =240 VAC IMP-15.83AAC 1 AWG 10, THWN-2, Black Voc* =500 VDC Isc =15 ADC . . . . . . .70)M!q#6,,Slid Bare.Copper. GEC. . . .-0)Conduit,Kit;.3/4',EMT. . . . . . . . . . . . . . . . .-(1)AWG/8,.TI IWN-2,.Green . . EGC/GEC.-(1)Conduit.Kit;.3/47.EMT. . . . . . . . © � (1)AWG 110, THNM-2, Red Vmp =350 VDC IMP=11.51 ADC O�(1)AWG X16, Solid Bare Copper EGC Vmp =350 VDC IMP=11.51 ADC (1)AWG X10, TI IWN-2,.Green. . EGC. . . .-(1)Conduit Kit; 3/4'.EMT. . . . . . . . I J . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CONFIDENTIAL- THE INFORMATION HEREIN JOB NUMBER: PREMISE OWNER: DESMPTION: DESKOI: JB-010328 00 `\`!r SolarCit . CONTAINED SHALL NOT BE USED FOR THE MIZULA, WILLIAM MIZULA RESIDENCE SOngitO Sharma BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: .W� NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 11 PARK HILL RD 9.69 KW PV ARRAY A. PART TO OTHERS OUTSIDE THE RECIPIENTS ,� Y ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES FLORENCE, MA 01062 THE SALE AND USE OF THE RESPECTIVE (38) CANADIAN SOLAR # CS6P-255PX 24 St.Martin Drive, Building 2,Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME rp REV DATE: T: (650)638-1028 FIA.A(650)638-1029 PERMISSION Of SOLARCITY INC. Multiple Inverters 4135840836 THREE LINE DIAGRAM V 5 0 10/30/2014 (888)-SOL-CITY(765-2489) www.Warcity.com UPLIFT CALCULATIONS SEE SEPARATE PACKET FOR STRUCTURAL CALCULATIONS. CONFIDENTIAL— THE INFORMATION HEREIN r BER: PREMISE OWNER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE JB-010328 00 MIZULA, WILLIAM MIZULA RESIDENCE Songito Sharma SolarCity. BENEFIT OF ANYONE EXCEPT SOLARCITY INC., G SYSTEM: �,1` NOR SHALL IT BE DISCLOSED IN WHOLE OR IN p Mount Type c 11 PARK HILL RD 9.69 KW PV ARRAY PART IZ OTHERS OUTSIDE THE RECIPIENT'S : FLORENCE MA 01062 ORGANIZATION, EXCEPT IN CONNECTION WITH � THE SALE AND USE OF THE RESPECTIVE CANADIAN SOLAR # CS6P-255PX 24 St. Martin Drs , Building 2,unit tt SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: SHEET: REV: DATE T. (650)638-1028 F:A(617 638-1029 PERMISSION OF SOLARCITY INC. le Inverters 4135840836 UPLIFT CALCULATIONS PV 4 a 10/30/2014 (8B8)—SOL—aTY(7r�s-2469) .mn.salaralty.aom Of ER, S1 /.`' n rT4 F w n. 2x6 (E) 2x6 � (E) �� Sri;L.r.°.�=1••,. � r'k s S1 r —8" 11'_8„ 4" STAMPED SIGNED —8" 13'-7" (E) LBW (E) LBW FOR STRUCTURAL ONLY (E) LBW (E) LBW A SIDE VIEW OF MP1 NTS SIDE VIEW OF MP2 NTS B MP1 X-SPACING X-CANTILEVER Y-SPACING Y-CANTILEVER NOTES LANDSCAPE 64" 24" STAGGERED MP2 X-SPACING X-CANTILEVER Y-SPACING Y-CANTILEVER NOTES PORTRAIT 6411 20" LANDSCAPE 64" 24" STAGGERED RAFTER 2X8 @ 16" OC ROOF AZI 175 PITCH 20 STORIES: 1 PORTRAIT 64" 2011 ARRAY AZI 175 PITCH 20 RAFTER 2X8 @ 16" OC ARRAY AZI 250 PITCH 20 STORIES: 1 C.J. 2X8 @16" OC Comp Shingle C.J. 2x8 @16" OC Comp Shingle PV MODULE PV MODULE 5/16" BOLT WITH LOCK F777WTALLATION ORDER 5/16" BOLT WITH LOCK INSTALLATION ORDER & FENDER WASHERS & FENDER WASHERS LOCATE RAFTER, MARK HOLE LOCATE RAFTER, MARK HOLE ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT ZEP ARRAY SKIRT (6) HOLE. ZEP ARRAY SKIRT (6) HOLE. (4) (2) SEAL PILOT HOLE WITH (4) (2) POLYURETHANE PILOT HOLE EANTH ZEP COMP MOUNT C POLYURETHANE SEALANT. ZEP COMP MOUNT C ZEP FLASHING C (3) (3) INSERT FLASHING. ZEP FLASHING C (3) (3) INSERT FLASHING. (E) COMP. SHINGLE (E) COMP. SHINGLE (1) (1) (4) (4) PLACE MOUNT. PLACE MOUNT. (E) ROOF DECKING (2) (E) ROOF DECKING u (2) INSTALL LAG BOLT WITH INSTALL LAG BOLT WITH 5/16" DIA STAINLESS (5) (5) 5/16" DIA STAINLESS (5) (5) SEALING WASHER. SEALING WASHER, STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT WITH STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT WITH WITH SEALING WASHER (6) BOLT & WASHERS. WITH SEALING WASHER (6) BOLT & WASHERS. (2-1/2' EMBED, MIN) (2-1/2' EMBED, MIN) (E) RAFTER 1 STANDOFF (E) RAFTER (l� STANDOFF Si Scale: 1 1/2"= 1' Scale: 1 1/2"= V J B-010328 0 0 PREMISE OWR: DESCRIPTION: DESIGN: CONFIDENTIAL— THE INFORMATION HEREIN M NUMBER: San Ito Sharma \,I,`�O'���I� CONTAINED SHALL NOT BE USED FOR THE MIZULA, WILLIAM MIZULA RESIDENCE 9' ; " BENEFIT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: �.,� r NOR SHALL IT BE DISCLOSED IN WHOLE OR IN Comp Mount Type C 11 PARK HILL RD 9.69 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES FLORENCE MA 01062 ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE (38) CANADIAN SOLAR # CS6P-255PX 2a sc. Mach Drive,Building 2, u"IC 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN �� PAGE NAME SHEET: REY DATE T: (650)638-1028'F. (650)636-1029 PERMISSION OF SOLARCITY INC. Multiple Inverters 4135840836 STRUCTURAL VIEWS PV 3 a 10/30/2014 (888)—SCI.-CITY(765-2469) wwwsoIacltyx PITCH: 20 ARRAY PITCH:20 MP1 AZIMUTH: 175 ARRAY AZIMUTH: 175 MATERIAL: Comp Shingle STORY: 1 Story PITCH: 20 ARRAY PITCH:20 AN MP2 AZIMUTH:250 ARRAY AZIMUTH: 250 _T r, t n ra , i MATERIAL: Comp Shingle STORY: 1 Story �r ,, ) � J jTAI '"L.. IC311'AMPEL) SIGNED FOR STRUCTURAL ONLY 0 Digitally signed by Andrew White Date:2014.11.10 19:13:01 -05'00' El L� 30 LEGEND N (E) UTILITY METER & WARNING LABEL INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS © DC DISCONNECT & WARNING LABELS AC AC DISCONNECT & WARNING LABELS MIDI O DC JUNCTION/COMBINER BOX & LABELS AC _ 0 DISTRIBUTION PANEL & LABELS © - D -LOAD--GE#TER & WARNING LABELS <A O DEDICATED PV SYSTEM METER _ STA1VD0F1"=AMbNS'_. a.___ CONDUIT RUN ON EXTERIOR Front Of House CONDUIT RUN ON INTERIOR (E)DRIVEWAY — GATE/FENCE 0 HEAT PRODUCING VENTS ARE RED r, INTERIOR EQUIPMENT IS DASHED 11 Park Hill Rd L-'J SITE PLAN N Scale: 3/32" = 1' w E 01' 10' 21' hp Elm S CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: PREMISE OWNER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE J B-010328 0 0 \�!} . MIZULA, WILLIAM MIZULA RESIDENCE Sangita Sharma SolarCity. BENEFIT OF ANYONE EXCEPT SOLARCITY INC.. MOUNTING SYSTEM: NOR SHALL IT BE DISCLOSED IN WHOLE OR IN 11 PARK HILL R D A'A PART TO OTHERS OUTSIDE THE RECIPIENTS Comp Mount Type C 9.69 KW PV ARRAY ►�� ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES FLORENCE, MA 01062 THE SALE AND USE OF THE RESPECTIVE (38) CANADIAN SOLAR # CS6P-255PX 24 St. Martin Drive,Building 2,Unit 11 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME SHEET: REV: DATE: Marlborough,MA 01752 PERMISSION OF SOLARCITY INC. 41 35840836 PV 2 a 10/30/2014 L (850)838-1028 8 (seo>sae-1028 Multiple Inverters SITE PLAN (ees>—Sa—CITY(765-2486) rr.n..edarcity.cam ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID-INTERTIED VIA A AC ALTERNATING CURRENT UL-LISTED POWER-CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONC CONCRETE 3. A NATIONALLY-RECOGNIZED TESTING DC DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN EGC() EXISTING .NT GROUNDING CONDUCTOR COMPLIANCE E WHERE ALL TERMINALS OF THE DISCONNECTING CITY OF NORTHAMPTON EMT FSB FR A ELECTRICAL E SET-BACK METALLIC TUBING MEANS SIGN WILL BE PROVIDED WARNINGOOFNTH POSITION, BUILDING DEPARTMENT GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY These plans have been reviewed HDG CURRENT DPED GALVANIZED 6. SYSTEM GROUND SHALL And approved. Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(B). Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR Date kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY Signature NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL-LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING POI POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER VICINITY MAP INDEX Voc VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT PVl COVER SHEET PV2 SITE PLAN go PV3 STRUCTURAL VIEWS PV4 UPLIFT CALCULATIONS LICENSE GENERAL NOTES Cu heetREttalNed IAGRAM t 66 GEN #168572 1. ALL WORK TO BE DONE TO THE 8TH EDITION ELEC 1136 MR OF THE MA STATE BUILDING CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2014 NATIONAL ELECTRIC CODE INCLUDING MASSACHUSETTS AMENDMENTS. MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Northampton REV BY DATE COMMENTS REV A NAME DATE COMMENTS UTILITY: National Grid USA (Massachusetts Electric) ` IVA J B-010328 0 0 PREMISE OYMER: DESCRIPTION: DESIGN: CONTAINEDAL A THE INFORMATION HEREIN JOB NUMBER: \�,1`SOI���' `y CONTAINED SHALL NOT BE USED FOR THE MIZULA, WILLIAM MIZULA RESIDENCE Sangita Sharma .._ +; BENEnT OF ANYONE EXCEPT SOLARCITY INC., MOUNTING SYSTEM: w, NOR SHALL IT BE DISCLOSED IN MOLE OR IN Comp Mount Type C 11 PARK HILL RD 9.69 KW PV ARRAY PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES: FLORENCE MA 01062 ORGANIZATION, EXCEPT IN CONNECTION WITH 24 St. Martin Drive,Building 2,Unit 11 THE SALE AND USE OF THE RESPECTIVE (38) CANADIAN SOLAR # CS6P-255PX SHEET: REV DATE: Marlborough,MA D1752 SOLARCITY EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME: L• (650)63B-1028 R (650)63B-1029 PERMISSION OF SOLARCITY INC. INVERTER: 41 35840836 PV 1 a 10/30/2014 (888)—SOL—CITY(765-2489) www.Warcity.com Multiple Inverters COVER SHEET CALCULATION OF DESIGN WIND LOADS - MP1 & MP2 Mounting Plane Information Roofing Material Comp Roof PV System Type SolarCity SleekMountTm Spanning Vents No Standoff Attachment Hardware om l?MgUnt lyptC Roof Slope 200 Rafter Spacing 16"O.C. Framing Type Direction Y-Y Rafters Purlin Spacing X-X Purlins Only NA Tile Reveal Tile Roofs Only NA Tile Attachment System Tile Roofs Only NA Standing Seam Spacing SM Seam Only NA Wind Design Criteria Wind Design Code ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 9090moh Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 15 ft Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure KZ 0.85 Table 6-3 Topographic Factor Krt 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 qh = 0.00256(Kz)(Kzt)(Kd)(V^2)(I) Velocity Pressure qh 15.0 sf Equation 6-15 Wind Pressure Ext. Pressure Coefficient U GC -0.88 Fig.6-11B/C/D-14A/B Ext. Pressure Coefficient Down GC 0.45 Fig.6-11B/C/D-14A/B Design Wind Pressure p p = qh(GC ) Equation 6-22 Wind Pressure U -13.1 psf Wind Pressure Down 10.0 Psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction Max Allowable Standoff Spacing Landscape 64" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W-PV 3 psf Net Wind Uplift at Standoff T-actual -196 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 39.2% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 48" 64" Max Allowable Cantilever Portrait 20" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 21 sf PV Assembly Dead Load W-PV 3 psf Net Wind Uplift at Standoff T-actual -245 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 49.1% WoodWorks® Sizer SOFTWARE FOR WOOD DESIGN MP2.wwb WoodWorks®Sizer 10.1 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 48 Fv' = 155 fv/Fv' = 0.31 Bending(+) fb = 1250 Fb' = 1389 fb/Fb' = 0.90 Bending(-) fb = 72 Fb' = 658 fb/Fb' = 0.11 Live Defl'n 0.54 = L/324 0.98 = L/180 0.55 Total Defl'n 0.80 = L/221 1.47 = L/120 0.54 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.200 1.00 1.15 1.00 1.00 - 4 Fb' - 875 1.15 1.00 1.00 0.474 1.200 1.00 1.15 1.00 1.00 - 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 4 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 4 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 385, V design = 346 lbs Bending(+) : LC #4 = D+S (pattern: sS) , M = 1369 lbs-ft Bending(-) : LC #2 = D+S, M = 79 lbs-ft Deflection: LC #4 = (live) LC #4 = (total) D=dead L=construction S=snow W=wind I=impact Lr=roof constr. Lc=concentrated All LC's are listed in the Analysis output Load Patterns: s=S 12, X=L+S or L+Lr, _=no pattern load in this span Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 67e06 lb-in2 "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.00 (Dead Load Deflection) + Live Load Deflection. Bearing: Allowable bearing at an angle F'theta calculated for each support as per NDS 3 .10.3 Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Continuous or Cantilevered Beams: NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 5. SLOPED BEAMS: level bearing is required for all sloped beams. 6. The critical deflection value has been determined using maximum back-span deflection. Cantilever deflections do not govern design. COMPANY PROJECT WoodWorks(D U Nov. 10, 2014 10:32 MP2.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End DL Dead Full Area No 10.50 (16.0) * psf PV LOAD Dead Partial Area No 1.17 13 .58 3.00 (16.0) * psf SNOW LOAD Snow Full Area Yes 30.80 (16.0) * psf *Tributary Width (in) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 17'-0.7„ 0' 1'-8" 15'-3" Unfactored- Dead 161 128 Snow 351 288 Factored: Total 512 416 Bearing: F'theta 474 474 Capacity Joist 2753 2486 Supports 2789 _ Anal/Des Joist 0.19 0.17 Support 0.18 - Load comb #2 #4 Length 3 .50 3.50 Min req'd 0.64** 0.59 Cb 1.11 1.00 Cb min 1.58 1.00 Cb support 1.25 _ Fcp sup 425 _ ""Minimum bearing length governed by the required width of the supporting member. Bearing for wall supports is perpendicular-to-grain bearing on top plate. No stud design included. MP2 Lumber-soft, S-P-F, No.1/No.2, 2x8 (1-1/2"x7-1/4") Supports: 1 -Lumber Stud Wall, S-P-F Stud; 2- Hanger; Roof joist spaced at 16.0"c/c; Total length: 17'-0.7'; Pitch: 5/12; Lateral support: top=full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); WoodWorks® Sizer SOFTWARE FOR WOOD DESIGN MP1 BEAM2.wwb WoodWorks®Sizer 10.1 Page 2 MP1 BEAM Lumber-soft, S-P-F, No.1/No.2, 4-1/2"x9-1/4" Supports: All-Lumber Stud Wall, S-P-F Stud Roof joist spaced at 16"c/c; Total length: 9'-6.2"; Lateral support: top=full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); WARNING:this CUSTOM SIZE is not in the database. Refer to online help. Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 41 Fv' = 155 fv/Fv' = 0.26 Bending(+) fb = 520 Fb' = 1006 fb/Fb' = 0.52 Live Defl'n 0.07 = <L/999 0.45 = L/240 0.15 Total Defl'n 0.10 = <L/999 0.60 = L/180 0.16 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.000 1.00 1.00 1.00 1.00 - 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 1134, V design = 1127 lbs Bending(+) : LC #2 = D+S, M = 2782 lbs-ft Deflection: LC #2 = D+S (live) LC #2 = D+S (total) D=dead L=construction S=snow W=wind I=impact Lr=roof constr. Lc=concentrated All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 416e06 lb-in2 "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.00 (Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code(IBC 2012), the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY PROJECT Woodworks® tiOy IWARI iOR WOOD DI U(".N Nov. 10, 2014 19:03 MP1 BEAM2.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End RAFTER DL 1 Dead Point 0.00 109 lbs RAFTER DL 2 Dead Point 1.33 109 lbs RAFTER DL 3 Dead Point 2.67 109 lbs RAFTER DL 4 Dead Point 4.00 109 lbs RAFTER DL 5 Dead Point 5.33 109 lbs RAFTER DL 6 Dead Point 6.67 109 lbs RAFTER DL 7 Dead Point 8.00 109 lbs RAFTER DL 8 Dead Point 9.33 109 lbs RAFTER SL 1 Snow Point 0.00 249 lbs RAFTER SL 2 Snow Point 1.33 249 lbs RAFTER SL 3 Snow Point 2.67 249 lbs RAFTER SL 4 Snow Point 4.00 249 lbs RAFTER SL 5 Snow Point 5.33 249 lbs RAFTER SL 6 Snow Point 6.67 249 lbs RAFTER SL 7 Snow Point 8.00 249 lbs RAFTER SL 8 Snow Point 9.33 249 lbs Self-weight Dead Full UDL 8.4 Iplf Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 9'-6.2" 0' Unfactored: Dead 481 467 Snow 1011 981 Factored: Total 1492 1448 Bearing: Capacity Joist 6694 6694 Supports 7251 7251 Anal/Des Joist 0.22 0.22 Support 0.21 0.20 Load comb #2 #2 Length 3.50 3 .50 Min req'd 0.78 0.76 Cb 1.00 1.00 Cb min 1.00 1.00 Cb support 1.08 1.08 Fcp sup 425 425 Bearing for wall supports is perpendicular-to-grain bearing on top plate. No stud design included. a► , F] WOodWorkS® Slzer SOFTWARE FOR WOOD DESIGN MP1.wwb WoodWorks®Sizer 10.1 Page 2 Analysis vs. Allowable Stress (psi) and Deflection (in) using NDS 2012 : Criterion Analysis Value Design Value Analysis/Design Shear fv = 40 Fv' = 155 fv/Fv' = 0.26 Bending(+) fb = 915 Fb' = 1389 fb/Fb' = 0.66 Bending(-) fb = 71 Fb' = 747 fb/Fb' = 0.10 Live Defl'n 0.29 = L/516 0.84 = L/180 0.35 Total Defl'n 1 0.43 = L/352 1.26 = L/120 0.34 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' 135 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'+ 875 1.15 1.00 1.00 1.000 1.200 1.00 1.15 1.00 1.00 - 4 Fb' - 875 1.15 1.00 1.00 0.538 1.200 1.00 1.15 1.00 1.00 - 2 Fcp' 425 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.4 million 1.00 1.00 - - - - 1.00 1.00 - 4 Emin' 0.51 million 1.00 1.00 - - - - 1.00 1.00 - 4 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V = 329, V design = 294 lbs Bending(+) : LC #4 = D+S (pattern: sS) , M = 1002 lbs-ft Bending(-) : LC #2 = D+S, M = 78 lbs-ft Deflection: LC #4 = (live) LC #4 = (total) D=dead L=construction S=snow W=wind I=impact Lr=roof constr. Lc=concentrated All LC's are listed in the Analysis output Load Patterns: s=S/2, X=L+S or L+Lr, _=no pattern load in this span Load combinations: ASCE 7-10 / IBC 2012 CALCULATIONS: Deflection: EI = 67e06 lb-in2 "Live" deflection = Deflection from all non-dead loads (live, wind, snow...) Total Deflection = 1.00 (Dead Load Deflection) + Live Load Deflection. Bearing: Allowable bearing at an angle F'theta calculated for each support as per NDS 3 .10.3 Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code(IBC 2012),the National Design Specification (NDS 2012), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Continuous or Cantilevered Beams: NDS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 5. SLOPED BEAMS: level bearing is required for all sloped beams. 6. The critical deflection value has been determined using maximum back-span deflection. Cantilever deflections do not govern design. COMPANY PROJECT WoodWorkso Nov. 10, 2014 10:33 MP1.wwb Design Check Calculation Sheet WoodWorks Sizer 10.1 Loads: Load Type Distribution Pat- Location [ft] Magnitude Unit tern Start End Start End DL Dead Full Area No 10.50 (16.0) * psf PV LOAD Dead Partial Area No 2.33 11.67 3.00 (16.0) * psf SNOW LOAD Snow Full Area Yes 30.80 (16.0) * psf *Tributary Width (in) Maximum Reactions (lbs), Bearing Capacities (lbs) and Bearing Lengths (in) : 14'-11.9" 77:� 0' 1'-8" 13'-4" Unfactored: Dead 137 109 Snow 312 249 Factored: Total 449 358 Bearing: F'theta 474 474 Capacity Joist 2753 2486 Supports 2789 - Anal/Des Joist 0.16 0.14 Support 0.16 - Load comb #2 #4 Length 3 .50 3.50 Min req'd 0.56** 0.50 Cb 1.11 1.00 Cb min 1.66 1.00 Cb support 1.25 - Fcp sup 425 _ "Minimum bearing length governed by the required width of the supporting member. Bearing for wall supports is perpendicular-to-grain bearing on top plate. No stud design included. MIDI Lumber-soft, S-P-F, No.1/No.2, 2x8 (1-1/2"x7-1/4") Supports: 1 - Lumber Stud Wall, S-P-F Stud; 2-Hanger; Roof joist spaced at 16.0"c/c; Total length: 14'-11.9'; Pitch: 5/12; Lateral support: top=full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); LOAD ITEMIZATION - MP1 &MP2 PV System Load PV Module Weight(psf) 2.5 psf Hardware Assembly Weight s 0.5 psf PV System Weight s 3.0 Psf Roof Dead Load Material Load Roof Category Description MP1&MP2 Roofing Type Comp Roof (2 Layers) 5.0 psf Re-Roof to 1 Layer of Comp? No Underlayment Roofing Paper 0.5 psf Plywood Sheathing Yes 1.5 psf Board Sheathing None Rafter Size and Spacing 2 x 8 @ 16 in.O.C. 2.3 psf Vaulted Ceiling No Miscellaneous Miscellaneous Items 1.2 psf Total Roof Dead Load 10.5 psf MP1&M1122 10.5 sf Reduced Roof LL Non-PV Areas Value ASCE 7-05 Roof Live Load L. 20.0 psf Table 4-1 Member Tributary Area At < 200 sf Roof Slope 5/12 Tributary Area Reduction Rl 1 Section 4.9 Sloped Roof Reduction Rz 0.975 Section 4.9 Reduced Roof Lave Load Lr Lr= Lo(R1)(Rz) I Equation 4-2 Reduced Roof Live Load Lr 19.5 psf MP1&MP2 19.5 sf Reduced Ground Roof Live Snow Loads Code Ground Snow Load p9 40.0 psf ASCE Table 7-1 Snow Load Reductions Allowed? Yes Effective Roof Slope 200 I Horiz. Distance from Eve to Ridge W 14.2 ft Snow Importance Factor IS 1.0 Table 1.5-2 Snow Exposure Factor Ce Partially EOxposed Table 7-2 Snow Thermal Factor Ct Structures kept just above freezing Table 7-3 1.1 Minimum Flat Roof Snow Load(w/ pf-min 30.8 psf 7.3.4&7.10 Rain-on-Snow Surcharge) Flat Roof Snow Load pr pf= 0.7(Ce) (CL)(I) pg; pf? pf-min Eq: 7�3-1 30.8 psf 77% ASCE Design Sloped R Snow Load Over Surroundin Roof Surface Condition of Surrounding CS-=f All Other Surfaces Figure 7-2 Roof 1.0 Design Roof Snow Load Over Ps-root= (Cs-roof)Pr ASCE Eq: 7.4-1 Surrounding Roof PS-rO°f 30.8 Psf 77% ASCE Design Sloped Roof Snow Load Over PV Modules Surface Condition of PV Modules CS_PV Unobstructed Slippery Surfaces Figure 7-2 1.0 Design Snow Load Over PV PS-P,= (Cs_ )Pf ASCE Eq:7.4-1 Modules Ps°O 30.8 Psf 77% 10.20.2014 SleekMountT'" PV System Version#39.5 SolarCity, Structural Design Software PROJECT INFORMATION &TABLE OF CONTENTS Project Name: Mizula Residence AHJ: Northampton Job Number: 010328 Building Code: MA Res. Code, 8th Edition Customer Name: Mizula,William Based On: IRC 2009/IBC 2009 Address: 11 Park Hill Rd ASCE Code: ASCE 7-05 City/State: Northampton, MA Risk Category: II Zip Code 01062 Upgrades Req'd? No Latitude/Longitude: 42.300518 -72.674082 Stamp Req'd? Yes SC Office: Hartford PV Designer: Sangita Sharma Calculations: Brad Taylor EOR: Andrew White P.E. Certification Letter 1 Project Information, Table Of Contents, &Vicinity Map 2 Structure Analysis (Loading Summary and Member Check) 3 Hardware Design (PV System Assembly) 4 Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category(SDQ = B < D 1.12-MILE VICINITY MAP of Massachusetts EOEA, U.S. Geological Survey, USDA'Parm Service Agenc- 66 11 Park Hill Rd, Northampton, MA 01062 Latitude:42.300518, Longitude: -72.674082,Exposure Category:C Version#39.5 r :Solar�it { y -t bl 3055 Clearview Way, San Mateo, CA 94402 (888)-SOL-CITY (765-2489) 1 www solarcity com /C)'' A"gf1R D. October 20 2014 -' rr,l r �. �r�,t 44 Project/Job# 010328 RE: CERTIFICATION LETTER N r Project: Mizula Residence MAl 11 Park Hill Rd Northampton, MA 01062 To Whom It May Concern, A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on site observations and the design criteria listed below: Design Criteria: -Applicable Codes = MA Res. Code,8th Edition,ASCE 7-05,and 2005 NDS - Risk Category = II -Wind Speed =90 mph, Exposure Category C -Ground Snow Load =40 psf - MPI&MP2: Roof DL = 10.5 psf, Roof LL/SL= 30.8 psf(Non-PV Areas), Roof LL/SL= 30.8 psf(PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.22424 < 0.4g and Seismic Design Category(SDC) = B < D On the above referenced project,the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead load, PV assembly load,and live/snow loads indicated in the design criteria above. I certify that the structural roof framing and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the MA Res. Code,8th Edition. Please contact me with any questions or concerns regarding this project. Sincerely, Andrew White, P.E. Digitally signed by Andrew White Structural Engineer Date: 2014.11 .10 19:09:13 -05100' Main: 888.765.2489,x2377 email: awhite @solarcity.com 3055 Gielarview bNay ',;M Mateo.(;A4,1 10° T(650)63S 1028 (888)SOt C;I I Y F(650)638 1029 solar ity.cum DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 San Mateo,CA 94402 Attention: Warranty Claims Telephone: 650-638-1028 Facsimile: 650-638-1029 Email: contracts @solarcity.com TO YOU: At the billing address in the Power Purchase Agreement or any subsequent billing address you give us. 8. ASSIGNMENT AND TRANSFER OF THIS LIMITED WARRANTY SolarCity may assign its rights or obligations under this Limited Warranty to a third party without your consent,provided that any assignment of SolarCity's obligations under this Limited Warranty shall be to a party professionally and financially qualified to perform such obligation. This Limited Warranty protects only the person who hosts the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer the Power Purchase Agreement.This Limited Warranty contains the parties'entire agreement regarding the limited warranty of the System. 4 Aa A Solar Power Purchase Agreerr,ent version. 1.9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 5. FORCE MAJEURE If SolarCity is unable to perform all or some of its obligations under this Limited Warranty because of a Force Majeure Event,SolarCity will be excused from whatever performance is affected by the Force Majeure Event,provided that: (a) SolarCity,as soon as is reasonably practical,gives you notice describing the Force Majeure Event; (b) SolarCity's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e., when a Force Majeure Event is over,we will make repairs);and (c) No SolarCity obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result of such Force Majeure Event. "Force Majeure Event"means any event,condition or circumstance beyond the control of and not caused by SolarCity's fault or negligence. It shall include,without limitation,failure or interruption of the production,delivery or acceptance of power due to:an act of god;war(declared or undeclared);sabotage;riot;insurrection;civil unrest or disturbance;military or guerilla action;terrorism;economic sanction or embargo;civil strike, work stoppage,slow-down,or lock-out;explosion;fire;earthquake;abnormal weather condition or actions of the elements;hurricane;flood; lightning;wind;drought;the binding order of any governmental authority(provided that such order has been resisted in good faith by all reasonable legal means);the failure to act on the part of any governmental authority(provided that such action has been timely requested and diligently pursued);unavailability of power from the utility grid,equipment,supplies or products(but not to the extent that any such availability of any of the foregoing results from SolarCity's failure to have exercised reasonable diligence);power or voltage sLF9,0 c aused by someone other than SolarCity including a grid supply voltage outside of the standard range specified by your utility;and failure of equipment not utilized by SolarCity or under its control. F 6. LIMITATIONS ON LIABILITY (a) No Consequential Damages YOU MAY ONLY RECOVER DIRECT DAMAGES INCLUDING THQPEAMOUNTS DUE,PURSUANT TO SECTIONS 2(c)AND 6(C) UNDER THIS LIMITED WARRANTY,AND IN NO EVENT SHALL SOLARCITY OR ITS AGENTS OR SUBCONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL,INDIRECT, NITNE,Er(NCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE. SOME STATES DO NOT ALLOW TH . ' MW TtON OF INCIDENTAL OR CONSEQUENTIAL DAMAGES,SO THE ABOVE LIMITATIGIN MAY NO (b) Limitation of Duration of lmp[ied,fflaRanfles a 4 � . ANY IMPLIED WARRANTIES, N * }N TV CL�I 'ING THE IMPLI b 1M} ANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING, NDER STATE LAWpSHALL 1N NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARRANTY PERIOD IN THIS LIMITED ANTY. SOME S DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS,SO THE ABOVE LI .. :, N MAY NOT Y TO YOU. (c) Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary,SolarCity's total liability arising out of relating to this Limited Warranty shall in no event: (i) For System Replacement: exceed the greater of(a)the sum of the Monthly Payments over the Term of the Power Purchase Agreement and(b)the original cost of the System;and (ii) For damages to your Home,Belongings and Property: exceed two million dollars($2,000,000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Power Purchase Agreement to the addresses listed below: TO SOLARCITY: SolarCity Corporation 3055 Clearview Way solzr Power P:rcS-se Aoveement version_ /.9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 (ii) destruction or damage to the System or its ability to safely produce power not caused by SolarCity or its approved service providers while servicing the System(e.g.,if a tree falls on the System we will replace the System per the Power Purchase Agreement,but we will not repay you for power it did not produce); (iii) your failure to perform,or breach of,your obligations under the Power Purchase Agreement(e.g.,you modify or alter the System); (iv) your breach of this Limited Warranty,including your being unavailable to provide access or assistance to us in diagnosing or repairing a problem; (v) any Force Majeure Event(as defined below); (vi) shading from foliage that is new growth or is not kept trimmed to its appearance on the date the System was installed; (vii) any system failure or lost production not caused by a System defect(e.g.,the System is not producing power because it has been removed to make roof repairs or you have required us to locate the inverter in a non-shaded area);and (viii) theft of the System(e.g.,if the System is stolen we will replace the System per the Power Purchase Agreement,but we will not repay you for the power it did not produce). This Limited Warranty gives you specific rights,and you may also have other rights which vary tram state to state.This Limited Warranty does not warrant any specific electrical performance of the System other than that described of 1ve, A: Snow or ice may accumulate on rooftops and on solar panels during snowstorms.Accumulated�snow or ice may slide or fall,resulting in property damage or bodily harm.If and when conditions safely allow you to remove occUFnulated snow or ice,you should do so to reduce the likelihood of excess snow sliding or falling. THE LIMITED WARRANTIES DESCRIBED IN SECTIONS 2(a)and(c)A? OVE Af THE ONLY EXPRESS WARRANTIES MADE BY SOLARCITY WITH RESPECT TO THE SYSTEM. SOLAFRCITY HEfF ISCLk�i1$;' D ANY BENEtCIARY OF THIS LIMITED WARRANTY HEREBY WAIVES,ANY WARRANTY WITH RESPB ANY COST S�NGS FROM USING THE SYSTEM. 3. SOLARCITY'S STANDARDS r For the purpose of this Limited Warranty the standards for ompef#ormance wll�be(i)norrrial professional standards of performance within the solar photovoltaic power generation industry in the relevant markets lld(ii)Prude nt{EIgctrical Practices. `Prudent Electrical Practices"means those practices,as changed from time to time thatyare engaged In oraproved by ignificant portion of the solar power electrical generation industry operating in the United States to operate rlquipment IaG� t1dr+>Xlthsonable safety,dependability,efficiency and economy. 4. SYSTEM REPAIR,RELOCATION EMOVAL f (a) Repair. You agree that if(i) stem needs an rs that are not the responsibility of SolarCity under this Limited Warranty,(ii)the ;+ system needs to be removed sl lied to f remodeling of your Home or(iii)the system is being relocated to another home you own pursuant to the Power Purch �r11?@ t; c{"will have SolarCity,or another similarly qualified service provider,at your expense, perform such repairs,removal and neinstalationiwr relocation. (b) Removal/Moving. SolarCity will remove and replace the System from your roof while roof repairs are being made for a payment of$499. You will need to provide storage space for the System during such time.Where permitted under the PPA,SolarCity will work with you to move the System to your new home as follows:(i)SolarCity will conduct an audit of your existing Home and new home to determine if a move is commercially feasible. This audit will cost$499. If SolarCity determines that a move is commercially feasible,it will then move the System for an additional payment of$499. (c) Return.If at the end of the Term you want to return the System to SolarCity under Section 17 of the PPA then SolarCity will remove the System at no cost to you. SolarCity will remove the posts,waterproof the post area and return the roof as close as is reasonably possible to its original condition before the System was installed(e.g.ordinary wear and tear and color variances due to manufacturing changes are excepted). SolarCity will warrant the waterproofing for one(1)year after it removes the System. You agree to reasonably cooperate with SolarCity in removing the System including providing necessary space,access and storage,and we will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. Solar Power Purchase Agreement version 7.4.1 DocuSign Envelope ID:B4DBA355-SAFE-40FC-A18B-F5BC318092E9 (ii) SolarGuard® During the Power Purchase Agreement Term,we will provide you at no additional cost our SolarGuard Monitoring Service ("SolarGuard"). SolarGuard is a proprietary monitoring system designed and installed by SolarCity that captures and displays historical power generation data over an Internet connection and consists of hardware located on site and software hosted by SolarCity. If the System is not operating within normal ranges,SolarGuard will alert us and we will remedy any material issues. (iii) PowerGuide' If you have upgraded your PPA to include the PowerGuide Monitoring Service("PowerGuide"),SolarCity will provide it to you for the first ten(10)years of the Term. PowerGuide is a SolarGuard improvement that captures and displays historical power consumption data. Not all home power systems are compatible with PowerGuide. If you ordered PowerGuide and your Home is not compatible with PowerGuide,then SolarCity will adjust your PPA payments to reflect its removal. (d) Maintenance and Operation (i) General When the System is installed,SolarCity will provide you with a link to its Solar Operation Guide.This Guide provides you with System operation instructions,answers to frequently asked questions,troubleshooting tips and service information. SolarCity will perform all required System maintenance. (ii) SolarGuard V Both the SolarGuard service and its PowerGuide upgrade require a high speed Int nfet 6ne�tQp orate.Therefore,during the Power Purchase Agreement Term,you agree to maintain the aommunicaf een SolarGudiand the System and between SolarGuard and the Internet. You agree to maintain and make a i b e,at yp Ir�cost,a functiarnr g`indoor internet connection with a router,one DHCP enabled Ethernet port with internet access an ndardC pavtier outlet close enough and free of interference to enable an internet-connected gateway provided by Sol arCliytb Mmmunicate wirelessly with the system's inverter(typically this is 80 feet,but may depend on site conditions). This communication G must be a 101100 Mbps Ethernet connection that supports common Internet protocols(TCP/IP and DHCP). If do not havrlgainta'irt a working high speed Internet line we will not be able to monitor the System and provide you wit guarantee or provide a PowerGuide upgrade. Further,if SolarGuard is not operational,SolarCity will b re tt a you'WbV ,sage as set forth in the PPA. Ssew fit... (e) Making a Claim;Transferring tHl '' ;` r x'�"' (i) Claims Process You can make a claii�i A. emailing us at the wlt i address in Se tidl 7 below; B. writing us a letter at "` stn it over5f rrlail with a well-known service;or C. sending us a fax at t 7 below. (ii) Transferable Limited Warranty SolarCity will accept and honor any valid and properly submitted Warranty claim made during any Term by any person who either purchases the System from you or to whom you properly transfer the PPA. (f) Exclusions and Disclaimer The limited warranties and guarantee provided in this Limited Warranty do not apply to any lost power production or any repair,replacement or correction required due to the following: (i) someone other than SolarCity or its approved service providers installed,removed,re-installed or repaired the System; �;clar Power PL:rc has e Agreement version 9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 EXHIBIT 2 PERFORMANCE GUARANTEE AND LIMITED WARRANTY 1. INTRODUCTION This Performance Guarantee and Limited Warranty(this"Limited Warranty")is SolarCity's agreement to provide you warranties on the System you are hosting pursuant to our PPA. The System will be professionally installed by SolarCity at the address you listed in the PPA.We will refer to the installation location as your"Property"or your"Home." This Limited Warranty begins when we start installing the System at your Home. We look forward to helping you produce clean,renewable solar power at your Home. 2. LIMITED WARRANTIES (a) Limited Warranties SolarCity warrants the System as follows: (i) System Warranty During the entire Power Purchase Agreement Term,under normal use and service conditions,the System will be free from defects in workmanship or defects in,or a breakdown of,materials or components(the*System Warranty"); w Q dU (ii) Roof Warranty ., g When we penetrate your roof during a System installation we will mage we caul I' to our roof penetrations. This roof warranty will run the longer of(A)one(1)year followinC ipletlon o h5ystem instttOrf;and(B)the length of any existing installation warranty or new home builder performa and for yowl I`pof(the"Roo(, arranty Period");and (iii) Repair Promise During the entire Power Purchase Agreemen ` 'Solar honor th*.&*tem Warranty and will repair or replace any defective part,material or caTRonent or corr defective manship,�cost or expense to you(including all labor costs), when you submit a valid t sunder thi Warr y f we damage your Home,your belongings or your Property we will repair the damage we you for the se as described in Section 6.SolarCity may use new or reconditioned parts aking repairs or replacenteri 6ikity may also,at no additional cost to you,upgrade or add to any part of the System t re that it perfor ording to the guarantees set forth in this Limited Warranty. Cosmetic repairs that do not involve safety od° mance shall b at SolarCity's discretion. (b) Warranty Length F . (i) The warranties in Sections 2(a a)(iii)above will start when we begin installing the System at your Home and continue through the entire Power Purchase Agreement Term but never less than ten(10)years.Thus,for as long as you host the System from SolarCity under a PPA,you will have a System Warranty and our Repair Promise. (ii) The Roof Warranty Period may be shorter than the System Warranty,as described in Section 2(a)(ii)above. (iii) If you have assumed an existing PPA,or purchased the System during the Term of your PPA,then this Limited Warranty will cover you for the remaining balance of the existing PPA Term. (c) Performance Warranties and Guarantee (i) Performance Guarantee SolarCity guarantees that during the Power Purchase Agreement Term the System will operate within manufacturer's specifications and if it does not that SolarCity will repair or replace any defective part and restore System performance. Solar Power P,=hd se Agreement version "7.A.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 EXHIBIT 1 (CUSTOMER COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Notice of Cancellation Date of Transaction:The date you signed the Power Purchase Agreement. You may CANCEL this transaction,without any penalty or obligation,within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller(SolarCity Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(SolarCity Corporation)at your residence,in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may,if you wish,comply with the instructions of the seller(SolarCity Corporation)regarding the return shipment of the goods at the seller's (SolarCity Corporation's)expense and risk. If you do make the goods available to the seller(SolarCity Corporation)and the seller (SolarCity Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(SolarCity Corporation),or if you agree to return the goods to the seller(SolarCity Corporation)and fail to do so,then you remain liable for performance of all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice,or send a telegram to SolarCity Corporation,3055 Clearview Way,San Mateo,CA 94402 NOT LATItTHAN MIDN(GNT of the date that is THREE BUSINESS DAYS from the date you signed the Power Purchase Agreement. t a° a � , I,William Mizula,HEREBY CANCEL THIS TRANSACTION on Customer's Signature: JJ I.. s L � 4 Customer's Signature: x , i k 4 i ti�1nr Foer P>>rc ha cP A1reemen_ DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 EXHIBIT I (SOLARCITY COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Notice of Cancellation Date of Transaction:The date you signed the Power Purchase Agreement. You may CANCEL this transaction,without any penalty or obligation,within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within TEN BUSINESS DAYS following receipt by the seller(SolarCity Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(SolarCity Corporation)at your residence,in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may,if you wish,comply with the instructions of the seller(SolarCity Corporation)regarding the return shipment of the goods at the seller's (SolarCity Corporation's)expense and risk. If you do make the goods available to the seller(Solik,ity Corporation)and the seller (SolarCity Corporation)does not pick them up within 20 days of the date of your notice of cancellatibh,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller f§olarCity�,Otfioration),or if you agree to return the goods to the seller(SolarCity Corporation)and fail to do so,then you nemain liable#e�,perFtarmance,af all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation;notice,or any other written notice, or send a telegram to SolarCity Corporation,3055 Clearview Way,San Mateo,CA 9440N,OT LATER 7HAN MIDNIGHY of the date that is THREE BUSINESS DAYS from the date you signed the Power Purchase Agreeml�� %i I,William Mizula,HEREBY CANCEL THIS TRANSACTION on [Date]. Customer's Signature: Customer's Signature: �L . lar Pc' PI tease c1 ,i -eme Lt version .9.] DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 22.NOTICE OF RIGHT TO CANCEL. I have read this Power Purchase Agreement and the Exhibits in their YOU MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR TO entirety and I acknowledge that I have received a complete copy of this MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE Power Purchase Agreement. YOU SIGN THIS CONTRACT. SEE EXHIBIT 1,THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN Customer's Name:William Mizula EXPLANATION OF THIS RIGHT. 11FDE9C6905D8E402 Docu5ignea or: 23.ADDITIONAL RIGHTS TO CANCEL. Signature: t{.(,a^ N, L A .. IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL THIS PPA UNDER SECTION 22,YOU MAY ALSO CANCEL Date: 7/3/2014 THIS PPA AT NO COST AT ANY TIME PRIOR TO COMMENCEMENT OF CONSTRUCTION ON YOUR HOME. 24.Pricing The pricing in this PPA is valid for 30 days after 7/3/2014. If you Customer's Name: don't sign this PPA and return it to us on or prior to 30 days after 7/3/2014,SolarCity reserves the right to reject this PPA unless you Signature: agree to our then current pricing. Date: SolarCity, Power Pot6hBse A �eement SOLARCITY APPROVED n'��".r,�����is ..-....^"""".".....,...✓ Sjgnature: tYNDON z;Wf,.U..0 fiG. v (PPA) Power Purchase Agreement ow " i Lt t Date. 7/3/2014 olar Power Pi=tease Agreement version DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 At the end of the Term or the termination of this PPA,if you have The arbitrator shall have the authority to award any legal or not renewed this PPA or exercised your purchase option(if any) equitable remedy or relief that a court could order or grant under and you have not defaulted,then within ninety(90)days you this agreement.The arbitrator,however,is not authorized to agree to call SolarCity at the telephone number listed in Section 7 change or alter the terms of this agreement or to make any award of Exhibit 2 to schedule a convenient time for SolarCity to remove that would extend to any transaction other than yours.All statutes the System from your Home at no cost to you. of limitations that are applicable to any dispute shall apply to any arbitration between us. The arbitrator will issue a decision or 18.Applicable Law;Arbitration. award in writing,briefly stating the essential findings of fact and PLEASE READ THIS SECTION CAREFULLY.ARBITRATION conclusions of law. REPLACES THE RIGHT TO GO TO COURT,INCLUDING THE BECAUSE YOU AND WE HAVE AGREED TO ARBITRATE ALL RIGHT TO A JURY AND THE RIGHT TO PARTICIPATE IN A DISPUTES,NEITHER OF US WILL HAVE THE RIGHT TO CLASS ACTION OR SIMILAR PROCEEDING.IN ARBITRATION, LITIGATE THAT DISPUTE IN COURT,OR TO HAVE A JURY A DISPUTE IS RESOLVED BY AN ARBITRATOR INSTEAD OF A TRIAL ON THAT DISPUTE,OR ENGAGE IN DISCOVERY JUDGE OR JURY. EXCEPT AS PROVIDED FOR IN THE RULES.FURTHER,YOU The laws of the state where your Home is located shall govern this WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A PPA without giving effect to conflict of laws principles.We agree REPRESENTATIVE OR MEMBER OF ANY CLASS PERTAINING that any dispute,claim or disagreement between us(a"Dispute") TO ANY DISPUTE.THE ARBITRATOR'S DECISION WILL BE shall be resolved exclusively by arbitration. FINAL AND BINDING ON THE PARTIES AND MAY BE ENTERED AND ENFORCED IN ANY COURT HAVING JURISDICTION, The arbitration,including the selecting of the arbitrator,will be EXCEPT TO THE EXT15NT IT IS SUBJECT TO REVIEW IN administered by JAMS,under its Streamlined Arbitration Rules(the ACCORDANCE WITINAAPPLICABLE LAW GOVERNING "Rules")by a single neutral arbitrator agreed on by the parties ARBITRATION AWARDS.OTHER RIGHTS THAT YOU OR WE within thirty(30)days of the commencement of the arbitration. WOULD HAVE[IN COURT MAY ALSO NOT BE AVAILABLE IN The arbitration will be governed by the Federal Arbitration Act(Title ARBITRATION. 9 of the U.S.Code).Either party may initiate the arbitration process by filing the necessary forms with JAMS.To learn more about 19.Waiver. arbitration,you can call any JAMS office or review the materials at Airly' ay.,or failure of a party 0"enforce any of the provisions of www.jamsadr.com.The arbitration shall be held in the location that t�ti; 'PA it, cladlr� but not limited to any remedies listed in this is most convenient to your Home. If a JAMS office does not exist P,A or to requrr8 performance by the other party of any of the within 50(fifty)miles of your Home,then we will use anothec provisions of this��PA,shall not be construed to(i)be a waiver of accredited arbitration provider with offices close to your Home. such provisions or a party's right to enforce that provision;or(ii) If you initiate the arbitration,you will be required to pay the first affectthe validity of this PPA. $125 of any filing fee. We will pay any filing fees in excess af. 125 otices .r. and we will pay all of the arbitration fees and costs. If we in the arbitration,we will pay all of the filing fe I of the notices under this PPA shall be in writing and shall be by arbitration fees and costs. We will eac r own rsonal delivery,facsimile transmission,electronic mail,overnight attorney's fees and costs except that en od to recov courier,or certified or registered mail,return receipt requested. your attorney's fees and costs if you II in the arbltratiortgnd 21.Entire Agreement;Chances. the award you receive from the arbi Is higher than a;"Ry's last written settlement offer. When ining whether ypr This PPA contains the parties'entire agreement regarding the sale award is higher than SolarCity's last rWyttsettlement offer yqur and purchase of power generated by the System. There are no attorney's fees and costs will not be Inal ~�r t;` other agreements regarding this PPA,either written or oral. Any ` change to this PPA must be in writing and signed by both parties. Only Disputes involving you and SolarCity m ssed in the If any portion of this PPA is determined to be unenforceable,the arbitration.Disputes must be brought in the name of an individual remaining provisions shall be enforced in accordance with their person or entity and must proceed on an individual(non-class,non- terms or shall be interpreted or re-written so as to make them representative)basis.The arbitrator will not award relief for or enforceable. against anyone who is not a party.If either of us arbitrates a Dispute,neither of us,nor any other person,may pursue the Dispute in arbitration as a class action,class arbitration,private REST OF PAGE INTENTIONALLY LEFT BLANK attorney general action or other representative action,nor may any such Dispute be pursued on your or our behalf in any litigation in any court.Claims regarding any Dispute and remedies sought as part of a class action,class arbitration,private attorney general or other representative action are subject to arbitration on an individual(non-class,non-representative)basis,and the arbitrator may award relief only on an individual(non-class,non- representative)basis.This means that the arbitration may not address disputes involving other persons with disputes similar to the Disputes between you and SolarCity. so.Lar Power Pcrcaese P_7reement versier. "7.9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 (b) You agree to give SolarCity at least fifteen(15)days but not have agreed not to do,like alter the System)and such failure more than three(3)months prior written notice if you want continues for a period of fourteen(14)days after written notice; someone to assume your PPA obligations. In connection (c) you or your guarantor have provided any false or misleading with this assumption,you,your approved buyer and SolarCity financial or other information to obtain this Power Purchase shall execute a written transfer of this PPA. Agreement; (c) If you sell your Home and can't comply with any of the (d) you assign,transfer,encumber,sublet or sell this PPA or any options in subsection(a)above,you will be in default under part of the System without SolarCity's prior written consent;or this Power Purchase Agreement. Section 12(a)includes a Home sale by your estate or heirs. (e) you or any guarantor makes an assignment for the benefit of (d) EXCEPT AS SET FORTH IN THIS SECTION,YOU WILL creditors,admits in writing its insolvency,files or there is filed NOT ASSIGN,SELL,PLEDGE OR IN ANY OTHER WAY against you or it a voluntary petition in bankruptcy,is TRANSFER YOUR INTEREST IN THE SYSTEM OR THIS adjudicated bankrupt or insolvent or undertakes or PPA WITHOUT OUR PRIOR WRITTEN CONSENT,WHICH experiences any substantially similar activity. SHALL NOT BE UNREASONABLY WITHHELD. 16.Remedies in Case of Default. If this Power Purchase Agreement is in default,we may take any 13.Loss or Damage. one or more of the following actions. If the law requires us to do so,we will give you notice and wait any period of time required (a) Unless you are grossly negligent or you intentionally damage before taking any of these actions. We may: the System,SolarCity will bear all of the risk of loss,damage, (a) terminate this PPS theft,destruction or similar occurrence to any or all of the System. Except as expressly provided in this PPA,no loss, (b) take any reasonatt)e,action to correct your default or to prevent damage,theft or destruction will excuse you from your our loss;any amoun M, ,pay will be added to the amount you obligations under this PPA,including Monthly Payments. owe us and Ali be immediately due; (b) If there is loss,damage,theft,destruction or a similar (c) require you,atyour expetlse`r to return the System or make it occurrence affecting the System,and you are not in default of available to us in a reasonabie,manner; this PPA,you shall continue to timely make all Monthly roceeds b a ro riate court,action,to enforce performance Jd,ap Y pP p p Payments and pay all other amounts due under the PPA and, of this PPA_and to recover,damages for your breach; cooperate with SolarCity,at SolarCity's sole cost and expense, to have the System repaired pursuant to the Limited Warranty gpnneSt n off or take back the System by legal process � I ,but we may not disturb the peace or violate the 14.Limitation of Liability. 0 l (a) No Consequential Damages report sUCltilon-operational status of the System to your utility, SOLARCITY'S LIABILITY TO YOU UN FRS PO informing them that you are no longer net metering; PURCHASE AGREEMENT SHAIJI, ) TO Dlf �9) charge you a reasonable reconnection fee for reconnecting the ACTUAL DAMAGES ONLY. Y 1 "A THAT IN NO S System to your utility or turning your System back on after we EVENT SHALL EITHER PAR TO THE Q,.,-,HER disconnect or turn off the System due to your default; FOR CONSEQUENTIAL,INCI AL,PUNITIVE EXEMPLARY,SPECIAL OR I T DAMAGES. (h) recover from you(i)a payment equal to the purchase price as set forth in this agreement plus(ii)all taxes,late charges, (b)Actual Damages penalties,interest and all or any other sums then accrued or EXCEPT FOR CLAIMS UNDER SEC HER due and owing;or PARTY'S LIABILITY TO THE OTHER WILL CEED AN (i) use any other remedy available to us in this PPA or by law. AMOUNT EQUAL TO THE MAXIMUM AMOUNT THAT COULD BE PAYABLE BY YOU UNDER SECTION 16(H). We may submit to credit reporting agencies(credit DAMAGES TO YOUR HOME,BELONGINGS OR PROPERTY bureaus)negative credit reports that would be reflected on your RESULTING FROM THE INSTALLATION OR OPERATION credit record if you do not pay any amounts due under this PPA as OF THE SYSTEM ARE COVERED IN SECTION 6(C)OF THE required. LIMITED WARRANTY. You agree to repay us for any reasonable amounts we pay to 15.Default. correct or cover your default.You also agree to reimburse us for any costs and expenses we incur relating to the System's return You will default under this Power Purchase Agreement if any resulting from early termination.By choosing any one or more of one of the e following occurs: these remedies,SolarCity does not give up its right to use another (a) you fail to make any payment when it is due and such failure remedy.By deciding not to use any remedy should this Power continues for a period of ten(10)days; Purchase Agreement be in default,SolarCity does not give up our (b) you fail to perform any material obligation that you have right to use that remedy in case of a subsequent default. undertaken in this PPA(which includes doing something you 17.System Removal;Return. Solar Power Purchase Agreement version 7.9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 this PPA is not a contract to sell or lease the System to you. In each of(i),(ii)and(iii)above,the price you will pay for the SolarCity owns the System for all purposes,including any data System will be the System's fair market value("FMV").A third generated from the System. You shall at all times keep the party independent appraiser will be retained to compute the System free and clear of all liens,claims,levies and legal System's FMV. SolarCity's maintenance and repair obligations processes not created by SolarCity,and shall at your expense under the Limited Warranty(Exhibit 2)will continue when you protect and defend SolarCity against the same. purchase the System until what would have been the end of the YOU UNDERSTAND AND AGREE THAT ANY AND ALL TAX original Term. CREDITS,INCENTIVES,RENEWABLE ENERGY CREDITS, 11.Renewal. GREEN TAGS,CARBON OFFSET CREDITS,UTILITY REBATES If you are in compliance with your PPA,you have the option to OR ANY OTHER NON-POWER ATTRIBUTES OF THE SYSTEM renew your PPA for up to ten(10)years in two(2)five(5)year ARE THE PROPERTY OF AND FOR THE BENEFIT OF renewal periods. We will send you renewal forms three(3)months SOLARCITY,USABLE AT ITS SOLE DISCRETION.SOLARCITY prior to the expiration of the Term,which forms shall set forth the SHALL HAVE THE EXCLUSIVE RIGHT TO ENJOY AND USE new Monthly Payments due under the renewal PPA,based on our ALL SUCH BENEFITS,WHETHER SUCH BENEFITS EXIST assessment of the then current fair market value of the System. If NOW OR IN THE FUTURE. YOU AGREE TO REFRAIN FROM you want to renew,complete the renewal forms and return them to ENTERING INTO ANY AGREEMENT WITH YOUR UTILITY us at least one(1)month prior to the end of the PPA. In the event THAT WOULD ENTITLE YOUR UTILITY TO CLAIM ANY SUCH that you do not agree to the new Monthly Payments this PPA shall BENEFITS. YOU AGREE TO REASONABLY COOPERATE expire by its terms on the termination date. If you don't send us WITH SOLARCITY SO THAT IT MAY CLAIM ANY TAX anything in writing after we send you the renewal forms,then this CREDITS,RENEWABLE ENERGY CREDITS,REBATES, PPA shall renew for an additional one(1)year term at ten percent CARBON OFFSET CREDITS OR ANY OTHER BENEFITS FROM (10%)less than the tGUrrent average rate charged by your local THE SYSTEM.THIS MAY INCLUDE TO THE EXTENT utility and shall contin jMnew for one(1)year terms at the same ALLOWABLE BY LAW,ENTERING INTO NET METERING rate as youn flrst renewaIuupti (i)you give us notice at least thirty AGREEMENTS,INTERCONNECTION AGREEMENTS,AND FILING RENEWABLE ENERGY/CARBON OFFSET CREDIT (30)days priii 'eriew� sim that you do not wish to renew;or REGISTRATIONS AND/OR APPLICATIONS FOR REBATES (ii)we send you a ngtjb8 terminating the PPA. FROM THE FEDERAL,STATE OR LOCAL GOVERNMENT OR A 12.Shctig6 ;0`44Home. LOCAL UTILITY AND GIVING THESE TAX CREDITS, If you self our Home you"can: RENEWABLE ENERGY/CARBON CREDITS,REBATES OR ('a)' y y y OTHER BENEFITS TO SOLARCITY. rT c'." (i) Transfoi';,his Power Purchase Agreement and the You understand that solar renewable energy credits(SRECs)an a, rrthl payments associated data cannot be generated without internet. As su, e person buying your Home meets Solar City's credit you agree to maintain and make available,at your cost,a 4`' ��n requirements,then where permitted by the local utility,the ersori u in our Home can sin a transfer agreement functioning indoor Internet connection with the understandlti'g�tiiat , P �? y 9 Y g g Wi Fi hots ottin ,tethering and intermltt Curt feet connec assuming all of your rights and obligations under this p g g Power Purchase Agreement. will not satisfy this obligation. You al operate vvl =Y SolarCity as necessary to provide a: er information require (ii) Move the System to Your New Home to generate SRECs and troublesh nitoring issues. Where permitted by the utility(s),the System can be failure to cooperate with SolarCity spect to Intern moved to your new home pursuant to Section 4 of the requirements will result in your obli compensate ity Limited Warranty.You will need to provide the same rights for all lost SREC revenue and relate bject to ly to SolarCity as provided for in this PPA and provide any charge of no less than$10.00(ten dolls third party consents or releases required by SolarCity in adequate Internet monitoring is implements ore a. connection with the substitute premises. 10.Purchasing the System Prior to the End of the Term. (iii) Prepay this Power Purchase Agreement and Transfer In addition to purchasing the System at the end of the Term,you only the Use of the System have the option to purchase the System prior to the end of the At any time during the Term,you can prepay this Power Term as detailed below. To exercise this option you must be in Purchase Agreement in full by paying SolarCity the good standing under this Power Purchase Agreement and you expected remaining payments(estimated future production need to give us at least one(1)month's,but not more than three during the rest of the Term multiplied by the average kWh (3)months'prior written notice. You can purchase this System: rate during the rest of the Term)at a five percent(5%) discount rate.The person buying your Home will only need (i) on the five(5)year anniversary of the beginning of to sign a transfer agreement to assume your rights and the Term and every annual anniversary after the five non-Monthly Payment obligations under this PPA. The (5)year anniversary;and System stays at your Home,the person buying your Home (ii) at any time after the five(5)year anniversary of the does not make any Monthly Payments and has only to beginning of the Term,when you sell your Home; comply with the non-Monthly Payment portions of this and PPA. (iii) if SolarCity ever ceases its operations. (iv)Purchase the System(see Section 10) _,cla Poae° ic Farchaze Agreemen:. vers !-� .9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 (ii) During the time that SolarCity has access rights you including,if applicable,geotechnical work),(B)the shall ensure that its access rights are preserved and final System design,and(C)real estate due diligence shall not interfere with or permit any third party to to confirm the suitability of the Property for the interfere with such rights or access. You agree that construction,installation and operation of the System; the System is not a fixture,but SolarCity has the right (ii) approval of this Power Purchase Agreement by one of to file any UCC-1 financing statement or fixture filing SolarCity's financing parties; that confirms its interest in the System. (iii) your meeting the applicable credit score; (h) Indemnity (iv) confirmation of rebate,tax credit and renewable To the fullest extent permitted by law,you shall indemnify, energy credit payment availability in the amount used defend,protect,save and hold harmless SolarCity,its to calculate the Monthly Payments set forth in this employees,officers,directors,agents,successors and Power Purchase Agreement; assigns from any and all third party claims,actions,costs, (v) confirmation that SolarCity will obtain all applicable expenses(including reasonable attorneys'fees and benefits referred to in Section 9; expenses),damages,liabilities,penalties,losses, (vi) receipt of all necessary zoning,land use and building obligations,injuries,demands and liens of any kind or permits;and nature arising out of,connected with,relating to or resulting from your negligence or willful misconduct; (vii) completion of any renovations,improvements or provided,that nothing herein shall require you to indemnify changes reasonably required at your Home or on the SolarCity for its own negligence or willful misconduct.The Property(e.g.,removal of a tree or necessary roof provisions of this paragraph shall survive termination or repairs to apable us to safely install the System). expiration of this Power Purchase Agreement. (viii) if your hctYrt governed by a home owner's associatio r 'milar community organization,your (i) Payments reipt of al vals and authorizations for the SUBJECT TO SECTION 4(b)ABOVE,YOU AGREE THAT 4b ayste equred k!,that organization and advising us of THE OBLIGATION TO PAY ALL PAYMENTS AND ALL any requrrementstOf;that organization that will otherwise OTHER AMOUNTS DUE UNDER THIS PPA SHALL BE, impact th&Sysfem,its installation or operation. ABSOLUTE AND UNCONDITIONAL UNDER ALL SolarCity_may terminate this Power Purchase Agreement CIRCUMSTANCES AND SHALL NOT BE SUBJECT TO without liability if,in its seasonable judgment,any of the ANY ABATEMENT,DEFENSE,COUNTERCLAIM, above listed conditions(i)through(vii)will not be satisfied SETOFF,RECOUPMENT OR REDUCTION FOR ANY �;'�4T�Ifor reasons'beyond its reasonable control. Once SolarCity REASON WHATSOEVER,IT BEING THE EXPRESS s %jinstallation,however,it may not terminate this Power INTENT OF THE PARTIES THAT ALL AMOUNTShase Agreement for your failure to satisfy conditions PAYABLE BY YOU HEREUNDER SHALL BE AND ifal (Qibugh(vii)above. CONTINUE TO BE,PAYABLE IN ALL EVENTS INCLUDING BY YOUR HEIRS AND E�$TATE-AND ,;,; ?) Amendments. EXCEPT AS SET FORTH BEt� IFS {7IONS 6, 2 z qt The System's production will be documented in an AND 23,YOU HEREBY WA) RIGHTS YOU MA :re,„, `' amendment to this PPA. You authorize SolarCity to make HAVE TO REJECT OR CA THIS PPA,TO OKE corrections to the utility paperwork to conform to this PPA ACCEPTANCE OF THE S OR TO GRA1 or any amendments to this PPA we both sign. SECURITY INTEREST IN T}fSTEM. yk 7. Warranty. Q) Credit Check YOU UNDERSTAND THAT THE SYSTEM IS WARRANTED You authorize SolarCity,or its desj ltsiri your SOLELY UNDER THE LIMITED WARRANTY ATTACHED AS credit report now and in the future,check your credit and EXHIBIT 2,AND THAT THERE ARE NO OTHER employment history,answer questions otlhers may ask REPRESENTATIONS OR WARRANTIES,EXPRESS OR regarding your credit and share your credit information with IMPLIED,AS TO THE MERCHANTABILITY,FITNESS FOR ANY SolarCity's financing partners.You certify that all PURPOSE,CONDITION,DESIGN,CAPACITY,SUITABILITY OR information you provide to us in connection with checking PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. your credit will be true and understand that this information must be updated upon request if your financial condition 8. Transfer. changes. SolarCity will assign this PPA to one of its financing partners. You 6. Conditions Prior to Installation of the System;Change agree that SolarCity may assign,sell or transfer the System and Orders. this Power Purchase Agreement,or any part of this Power Purchase Agreement or the exhibits,without your consent. This (a) SolarCity's obligation to install the System and sell you the assignment does not change SolarCity's obligation to maintain and power it produces is conditioned on the following items repair your System as set forth in the Warranty. having been completed to its reasonable satisfaction: 9. Ownership of the System;Tax Credits and Rebates. (i) completion of(A)the engineering site audit(a thorough physical inspection of the Property, You agree that the System is SolarCity's personal property under the Uniform Commercial Code. You understand and agree that 3ulax Puw'eL P.irc: :ase Agire-=menr_ version. /.9.1 DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 enabled Ethernet port with internet access and standard product(a SolarLease,or a prepaid PPA,etc.)you will AC power outlet close enough and free of interference to pay a$250 change fee; enable an intemet-connected gateway provided by (ii) Automatic Payment Discount: All prices include a SolarCity to communicate wirelessly with the system's $7.50 monthly discount for using automatic payment. inverter(typically this is 80 feet,but may depend on site You will not receive a$7.50 monthly discount if you do conditions). See section 2(c)of the Limited Warranty for not make automatic Monthly Payments through your details;and checking or savings account; (x i i i) if your home is governed by a home owner's association (iii) Returned Check Fee:$25(or such lower amount as or similar community organization,obtain all approvals required by law)for any check or withdrawal right that is and authorizations for the System required by that returned or refused by your bank;and organization and advise us of any requirements of that organization that will otherwise impact the System,its (iv) Late Payments:accrue interest at the lesser of twelve installation or operation. percent(12%)annually or the maximum allowable by applicable law. (b) System Construction,Repair,Insurance and SolarCity's obligations: (e) Taxes SolarCity agrees to: Your SolarCity electricity rate of$0.1060 per kWh is (i) schedule the installation of the System at a mutually composed of an electricity rate of$0.1060 plus current convenient date and time; taxes of$0.0000.You agree to pay any changes in the (n) construct the System according to written plans you applicable taxes,related to this PPA. Thus,if tax rates review; change,your SolarCity electricity rate will change to reflect (iii) provide you with a web-enabled meter to accurately this rate change.If this PPA contains a purchase option at measure the amount of power the System delivers to the end of the Term,you agree to pay any applicable tax you; on the purchase price for the System. You also agree to pay as invoiced any applicable personal property taxes on (iv) provide you with a home energy evaluation; the System that your local jurisdiction may levy. (v) notify you if the System design has to be materially No Alterations changed so that you can review any such changes; (vi) clean up after ourselves during the construction of the You agree that you will not make any modifications, System; improvements,revisions or additions to the System or take (vii) insure the System against all damage or loss unless any other action that could void the Limited Warranty on (A)that damage or loss is caused by your gross the System without SolarCity's prior written consent. If you negligence;or(B)you intentionally damage the make any modifications,improvements,revisions or System; additions to the System,they will become part of the (viii) repair the System pursuant to the Limited Warranty and System and shall be SolarCity's property. reasonably cooperate with you when scheduling (g) Access to the System repairs; (i) You grant to SolarCity and its employees,agents and (ix) create a priority stream of operation and maintenance contractors the right to reasonably access all of the payments to provide enough cash flow in our financing Property as necessary for the purposes of(A) transactions to pay for the Limited Warranty obligations installing,constructing,operating,owning,repairing, and the repair and maintenance of the System in removing and replacing the System or making any accordance with this PPA even if SolarCity ceases to additions to the System or installing complementary operate;and technologies on or about the location of the System; (x) not put a lien on your Home or Property. (B)enforcing SolarCity's rights as to this Power Purchase Agreement and the System;(C)installing, (c) Home Renovations or Repairs using and maintaining electric lines and inverters and meters,necessary to interconnect the System to your If you want to make any repairs or improvements to the electric system at the Property and/or to the utility's Property that could interfere with the System(such as electric distribution system;or(D)taking any other repairing the roof where the System is located),you may action reasonably necessary in connection with only remove and replace the System pursuant to the installing,constructing,operating,owning,repairing, Limited Warranty. removing and replacing the System.This access right (d) Automatic Payment,Late Charges shall continue for up to ninety(90)days after this Power Purchase Agreement expires to provide In addition to the other amounts you agree to pay in this SolarCity with time to remove the System at the end Power Purchase Agreement,you agree to pay the following: of the Power Purchase Agreement. SolarCity shall provide you with reasonable notice of its need to (i) Product Change Fee: if after you sign this Power access the Property whenever commercially Purchase Agreement,but before we begin installation, reasonable. you decide you would prefer an alternative SolarCity Sofa Power Purchase Agreement version 7.9.1 DocuSign Envelope ID:64DBA355-9AFE-40FC-A18B-F5BC318092E9 1. Introduction. System;or(iv)your System is not reporting production to This Power Purchase Agreement(this"Power Purchase SolarCity(e.g.you have disconnected the SolarGuard system Agreement"or"PPA")is the agreement between you and or the internet connection at your Home goes down on the SolarCity Corporation(together with its successors and assigns, reporting day),then SolarCity will reasonably estimate the "SolarCity"or"we"),covering the sale to you of the power amount of power that would have been delivered to you during produced by the solar panel system(the"System")we will install such System or reporting outages or reduced production at your home. SolarCity agrees to sell to you,and you agree to periods("Estimated Production")and shall consider Estimated buy from SolarCity,all of the power produced by the System. The Production as actual production for purposes of this System will be installed by SolarCity at the address you listed paragraph. In the first year of the Term,Estimated Production above(the"Property"or your"Home.") This Power Purchase will be based on our production projections. After the first Agreement is eight(8)pages long and has up to three(3)Exhibits year of the Term,Estimated Production will be based on depending on the state where you live.SolarCity provides you historical production for that month in the prior year. If we bill with a Limited Warranty(the"Limited Warranty"). The Limited you for Estimated Production because your System is not Warranty is attached as Exhibit 2.If you have any questions reporting production to SolarCity,and we subsequently regarding this Power Purchase Agreement,please ask your determine that we have either overestimated or SolarCity sales consultant. underestimated the actual production,then we will adjust the next bill downward(to refund overbilling)or upward(to make 2. Term. up for lost billing). You will not be charged for Estimated SolarCity agrees to sell you the power generated by the System Production when the System is not producing electricity due to for 20 years(240 months),plus,if the Interconnection Date is not SolarCity's fault,or if it's due to grid failure or power outages on the first day of a calendar month,the number of days left in that caused by someone other than you. partial calendar month. We refer to this period of time as the 5. Power Purchase Agreement Obligations. "Term." The Term begins on the Interconnection Date. The (a) System,Home and Property Maintenance "Interconnection Date"is the date that the System is turned on and generating power. SolarCity will notify you when your System is You agree to: ready to be turned on. (i)' only have the System repaired pursuant to the Limited 3. Intentionally Left Blank. Warranty and reasonably cooperate when repairs are 4. Power Purchase Agreement Payments;Amounts. being made; (ii) keep trees,bushes and hedges trimmed so that the (a) Power Price. During the first year of the term,you are System receives as much sunlight as it did when purchasing all of the power the System produces for$0.1060 SolarCity installed it; per kWh. After the first year,the price per kV%h will increase (iii) not modify your Home in a way that shades the by 2.9%per year.There are no installation costs. System; (b) Payments. (iv) be responsible for any conditions at your Home that Your monthly payments will be the product of(A)the price per affect the installation(e.g.,blocking access to the roof, kWh multiplied by(B)the actual kWh output for the calendar or removing a tree that is in the way,prior work you month("Monthly Payments"). Invoices for Monthly Payments have done on your home that was not permitted); will be mailed or emailed no later than ten(10)days after the (v) not remove any markings or identification tags on the end of a calendar month.If you are paying your invoice by System; automatic debit from your checking or savings account(ACH) (vi) permit SolarCity,after we give you reasonable notice, we will debit your bank account on ar about the 1 sl day of the to inspect the System for proper operation as we next month following invoice(e.g.January invoices are sent in reasonably determine necessary; early February and debited on or about March 1).Monthly (vii) use the System primarily for personal,family or Payments will change as your price per kWh changes over the household purposes,but not to heat a swimming pool; Term of this PPA and as System production varies(e.g., summer has higher production).You will have regular access (viii) not do anything,permit or allow to exist any condition to the System's production via your SolarCity online account. or circumstance that would cause the System not to Payments due upon installation,if any,are due immediately operate as intended at the Property; prior to commencement of installation.You will make no (ix) notify SolarCity if you think the System is damaged or Monthly Payments if you are fully prepaying this PPA.In appears unsafe;if the System is stolen;and prior to this case,you will pay only the amounts listed in the key changing your power supplier; terms summary on page one of this PPA. (x) have anyone who has an ownership interest in your (c) Estimated Production. If(i)the System is shut down for more Home sign this Power Purchase Agreement; than seven(7)full twenty-four(24)hour days cumulatively (xi) return any documents we send you for signature(like during the Term because of your actions;or(ii)you take some incentive claim forms)within seven(7)days of action that significantly reduces the output of the System;(iii) receiving them;and you don't trim your bushes or trees to their appearance when (xi i) maintain and make available,at your cost,a functioning you signed this PPA to avoid foliage growth from shading the indoor internet connection with a router,one DHCP Sular Power PurCrase Aq,eement version ';'.9.i DocuSign Envelope ID:B4DBA355-9AFE-40FC-A18B-F5BC318092E9 r JTV Power Pur-J-i se A( reerre t .......... Here are the key terms of your SolarCity Power Purchase Agreement Date: 7/3/2014 4 , Irs T�- IN14 y_ i 1 r Agresrnent"t@rl'I'1 Our Promises to."You We insurer minm� �t Systn iindtidl�c the'tnyerr} n�additional cost tii"you,as"speclfied in the agreement. .' We pro ud we nabled..ii tonit�11n0 et na�itit�17 cyst to yctu�{ 5 p t et in th eprnent. We-warranty your'r f against ea[cs grid re +ra your,roof t tli ehd cif the agreemerit;;fi ied,in the agreement. • Tle ratei1klrItt�,40,usiue ref tom,wilt neveinnirase by more.fH 29'°°% ar. the"priirlg Iii:this E�# A Is"vatil fir"3""0 days;after 71312014;. . We are confident that we del'Ner=,excelient value and custdmer service.AS A ULT, .x E TO CANCEL ANYTIME AT NQ CHARGE PRIOR TO CQNSTRUGTION-CIN YOUR,HOM , Customer's Name & Service Address Exactly as it appears on the utility bill Customer Name and Address Customer Name Installation Location William Mizula 11 Park Hill Rd 11 Park Hill Rd Florence, MA 01062 Florence, MA 01062 Options for System puralfase and transfer: Options at the end of the 20 year term: • If you move,you may transfer this agreelrcent to the purchaser of your 0 SolarCity will remove the System at no cost to you. Home,as specified in the agreement. . You can upgrade to a new System with the latest solar • At certain times,as specified in the agreement,you may purchase the technology under a new contract. System . You may purchase the System from SolarCity for its fair • These options apply during the 20 year term of our agreement and not market value as specified in the agreement. beyond that term. 0 You may renew this agreement for up to ten(10)years in two(2)five(5)year increments. 888.SOL.CITY 83�a.785.24t J L3LAti CITY.(�C t�9 MA HIC 168572lMA Llc.MR-1136 Document Generated on 71312014 fa DATE(MMIDDNYYY) AC4DRV CERTIFICATE OF LIABILITY INSURANCE 08129/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endomemen s. PRODUCER NAME:_ MARSH RISK 8 INSURANCE SERVICES - 345 CALIFORNIA STREET,SUITE 1300 �QJftEW CALIFORNIA LICENSE NO.0437153 E-MAIL SAN FRANCISCO,CA 94104 ADDRESS -- — - ------ -- - INSUREN AFFORDING COVERAGE NAIC a 998301-STND-GAWUE-14-15 INSURER A,Liberty Mutual Fire Insurance Company 16586 INSURED INSURER B Liberty Insurance Corporation �42404 Ph(650)963.5100 ---- SolarCity Corporation INSURER C NIA WA 3055 Clearview Way INSURER D San Mateo.CA 94402 --- -- _.- INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-002440269-02 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TYPE OF INSURANCE - -- AODL$UBit POLICY NUMBER MPkOwUDY EFF MMIDD/YY� OMITS A GENERAL LIABILITY T82-661-066265-014 09/0112014 09/0112015 EACH OCCURRENCE $ 1,0.x_ DAMAGE TO RENTED X� COMMERCIAL GENERAL LIABILITY PREMI$E�Eaoccurrencel___ $ 1�'� -�CLAIMS-MADE I X I OCCUR MED.EXP(Any one person).._ S 10,000 PERSONAL 8 ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER. PRODUCTS-COMP/OP AGG $ 2,000,000 X I POLICY I X PRO- LOC Deductible S 25,000 A AUTOMOBILE LIABILITY AS2-661-066265.044 09101/2014 09101/2015 COMBINED SINGLE LIMIT 1 _ J axidentj_ _...._ $ ---- X ANY AUTO I BODILY INJURY(Per person) S ALL OWNED SCHEDULED BODILY INJURY(Per accident) S X X NON-OWNED PROPEFtTY DAMAGE $ HIRED AUTOS AUTOS {Per accident) __ X Phys.Damar COMPICOLLDED: $ $1,00031,000 UMBRELLA LIAB OCCUR , EACH OCCURRENCE $ EXCESS UAB l_ CLAIMS-MADE AGGREGATE s p RETENTION $ B WORKERS COMPENSATION WA7-660-066265-024 09/0112614 09101(2015 X I WC STATU- TORY oTH- AND EMPLOYERS'LIABILITY I IORY LIMJT& _ ER - 8 ANY PROPRIETOR/PARTNER/EXECUTIVE YIN WC7.661.066265-034(Wq 09/01/2014 09101(2015 E L EACH ACCIDENT $ 1'000'600 B OFFICER/MEMBER EXCLUDED? a N/A WC DEDUCTIBLE:5350,000 1,tXN),000 (Mandatory In NH) E L DISEASE-EA EMPLOYEE $ It yes.describe under _. _. -_ DESCRIPTION OF PERATION below E L DISEASE.POLICY LIMIT $ l.l)(10,600 I I I DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Evidence of Insurance. CERTIFICATE HOLDER CANCELLATION SolarCity Corporation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 3055 Clearvilm Way THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN San Mateo,CA 94402 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE or Marsh Risk&Insurance Services Charnel s Marmolejo iG�--- 0 1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents {' OKIce of Investigations lr I Congress Street,Suite 100 <' Boston,MA 02114-2017 www.massgov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Leeibly Name(Business/Organization/individual): SOLARCITY CORP Address:3055 CLEARVIEW WAY City/State/Zip:SAN MATEO, CA 94402 Phone#:868-765-2489 Are you an employer?Check the appropriate box: Type of project(required): 1.0 1 an a employer with 5000 4. E) 1 am a general contractor and 1 employees(full and/or part-time).* have hired the sub-contractors 6. El New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. [] Demolition working for me in any capacity. employees and have workers' [No workers' comp. insurance comp. insurance.; 9. []Building addition required.] 5. 0 We are a corporation and its I0.❑ Electrical repairs or additions 3.❑ 1 am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.]t c. 152,§1(4),and we have no SOLAR/PV employees. [No workers' 13.©Other comp. insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer t/tat is providing workers'compensation insurance for my employees. Below is rite policy and job site Information. Insurance Company Name:LIBERTY MUTUAL INSURANCE COMPANY Policy ff or Self-ins. Lic. #:WA7-66D-066265-024 _ Expiration Date:09/01/2015 Job Site Address: City/State/Zip:-E 1 )L_ i_ Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. 1 do hereby cent antler the pains raid enaltles ofperjtrry that the i»jorntatiat provided above is true artd correct. n G Z l!2 Zl�l i1 Signature: Phone ft: OJficlat use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: t SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder:SOLARCITY/CRAIG ELLS 107663 License Number 604 SILVER ST AGAWAM MA 01001 8/29/17 Address Expiration Date l t (-(J)"- 978-875-1698 Signature Telephone 9.Registered Home Improvement Contractor: Not Applicable ❑ SOLARCITY/JAMES DIPADUA 168572 Company Name Registration Number 604 S LV,,E R ST AGAWAM MA 01001 3/8/15 Address Expiration Date Telephone 978-215-2380 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the buildine permit As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature � k SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ED Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [M Siding[0] Other[D] Brief Description of Proposed 9 /f /( ' 'J �a p 00�� 5� kx_Work: / b Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a. If New house and or addition to existina housing, complete the followina: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT William Mizula as Owner of the subject property hereby authorize SOLARCITY to act on my behalf, in all matters relative to work authorized by this building permit application. 11/26/2014 Signature of Owner Date I, SOLARCITY/JAMES DIPADUA as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. JAMES DIPADUA Print Na '�)C�'� D PJA4," 11/26/2014 Signature of O ner/Agent Date J Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DON'T KNOW Q YES Q IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO © DON'T KNOW Q YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DON'T KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained 0 , Date Issued: C. Do any signs exist on the property? YES Q NO Q IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO Q IF YES, then a Northampton Storm Water Management Permit from the DPW is required. q Department use only City of Northampton Status of Permit: 3 Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability "�t�4�`t Northampton, MA 01060 Two Sets of Structural Plans of N P phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 11 Park Hill Rd Florence MA 01062 Map Lot Unit Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: William Mizula 11 Park Hill Rd Florence MA 01062 Name(Print) Current Mailing Address: 413-584-0836 Telephone Signature 2.2 Authorized Aaent: SolarCi /James DiPadua 604 Silver St Agawam MA 01001 Name(Pri t) Current Mailing Address: 978-257-6532 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building 7,200 (a)Building Permit Fee 2. Electrical 16,800 (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=0 +2+3+4+5) 24,000 Check Number This Section For Official Use Only Date Building Permit Number: Issued: Signature: Building Commissioner/Inspector of Buildings Date File#BP-2015-0625 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 24 ST MARTIN DR BLDG 2,UNIT 11 MARLBORO (888)765-2489(2358) PROPERTY LOCATION 1 I PARK HILL RD MAP 44 PARCEL 109 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED 38 PANELS 9.69 KW SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Buildin¢Plans Included: Owner/Statement or License 107663 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: _.proved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management la Ae Signature of Building fficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. I I PARK HILL RD BP-2015-0625 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 44- 109 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Cate o : SOLAR PANELS BUILDING PERMIT Permit# BP-2015-0625 Project# JS-2015-001185 Est.Cost:$24000.00 Fee: $144.00 PERMISSION IS HEREBY GRANTED TO Const. Class: Contractor: License: Use Group: SOLARCITY CORP 107663 Lot Size(sq.1): 30448.44 Owner: MIZULA WILLIAM B&JACQUELINE Zoning: Applicant: SOLARCITY CORP AT: 11 PARK HILL RD Applicant Address: Phone: Insurance: 24 ST MARTIN DR BLDG 2,UNIT 11 (888) 765-2489 (2358) Workers Compensation MARLBOROMA01752 ISSUED ON.•11712 01 5 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 38 PANELS 9.69 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Siiinature: FeeType: Date Paid: Amount: Building 1/7/2015 0:00:00 $144.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner