38B-008 (5) o REPLACE 3 TREADS &CARRIER ANGLES
o NEW FASTENERS FOR TREAD REPLACEMENT
�� �� 1�° G
POWER HOUSE K� L
■ CARPENTR T INSTALL BLOCKING;HEADER VER DOOR- MOUNT FOR RAILING
■ MISC. PAINT/TOUCH-UP ALLOWANCE: $300.00
■ WASTE MANAGMENT AND HAULING
■ STEEL WORK:
o FABRICATE&ERECT 2 ROOF EDGE RAILS 8FT AND 4FT LONG
o POSTS TO BE ANGLED AROUND EXISTING CORNICE CONDITIONS
o ANCHORS INTO BRICK TO BE HILTI EPDXY ANCHORD
o MODIFICATIONS TO EXISTING LADDER NOT INCLUDED
SCOTT GYM
■ FURNISH AND INSTALL CUSTOM 36" PANIC BAR WTT140UT KEY ENTRY
■ STEEL WORK:
o PATCH BOTTOM OF CENTER STRINGER WITH WELDED PLATES
o REINFORCE PLATFORM ALONG FACE OF BUILDING WITH NEW ANGLE
o ADD NEW TUBE FRAME SUPPORT TO FRONT OF PLATFORM
STODDARD HALL
• INSTALL PANIC BAR HARDWARE ALONG EXISTING CHAIN LINK FENCE GATE
• RAISE EXISTING 4"POSTS ON DOUBLE DRIVE AND INSTALL HEADER
• GATE ON LEFT TO HAVE LOCKABLE DROP ROD AND LOCK ON TOP TO MAKE STATIONARY
• GATE ON RIGHT TO HAVE PANIC BAR
• MISC. PAINT/TOUCH-UP ALLOWANCE: $150.00
• WASTE MANAGMENT AND HAULING"
SUBCONTRACTORS
• STEEL. ENGINEERED BUILDING PRODUCTS, INC. (AISC CERTIFIED)QUOTE DATED 06.27.14
• PAINT. SILVER DESIGNS QUOTE DATED 06.30.14
• TECHNO METAL POSTS
• BRODEUR CAMPBELL. QUOTE DATED 06.17.14
TOTAL PRICE• $78,547.00
ALTERNATE# I: NEW STAIRS AT SCOTT GYM ADD $25,550.00 TO BASE PRICE
• DEMOLITION AND DEBRIS REMOVAL OF EXISTING STRUCTURE AND CONCRETE PAD
• MISC. MASONRY REPAIR ALLOWANCE: $500.00
• INSTALL CAULKING AROUND WINDOW AND MAKE WEATHER TIGHT
• INSTALLATION OF (3) FOOTING TUBES AT BASE OF STAIRS—BELOW FROST
• INSTALLATION OF NEW CONCRETE PAD AT BASE OF STRINGERS
• MISC. ASPHALT REPAIR ALLOWANCE: $500.00
• SHOP DRAWINGS, FABRICATION,AND INSTALLATION OF NEW CODE COMPLIANT STAIRS
• EXCAVATION OPERATOR/EQUIPMENT AND HAULING
• • CUT ASPHALT AND PATCH, WHERE REQUIRED
• EXCAVATOR OPERATOR
• MISC. PAINT/TOUCH-UP ALLOWANCE: $200.00
• WASTE MANAGMENT AND HAULING
• EQUIPMENT RENTAL-AUGER FOR BOBCAT E45
• INSTALL (2)NEW 6" BOLLARDS -PRE FAB
• STEEL WORK:
o SHORE PLATFORM &REMOVE 2 COLUMNS TO UPPER PLATFORM
o SHORE 3RD COLUMN ABD REMOVE LOWER SECTION
o REPAIR TREADS, GRATING& PATCH HOLE
o FURNISH ONLY NEW ANCHOR BOLTS
o FURNISH AND ERECT 2 NEW COLUMNS AND 1 COLUMN EXTENSION
o REPLACE 1 TREAD &REPAIR PLATFORM GRATING
o EXTEND PLATFORM RAIL AT UPPER PLATFORM TO WALL OF STRUCTURE $10,250.00
95 WEST
• NO CARPENTRY
• PAINT- SEE SUBCONTRACTOR, PAINT
115 ELM
• NO CARPENTRY
• PAINT- SEE SUBCONTRACTOR, PAINT
CAPEN BOILER
• REMOVE EXISTING LAG FASTENERS AND CONFIRM EMBEDMENT DEPTH
• SELECT HILTI FASTENING SYSTEM INTENDED FOR SOLID BRICK ATTACHMENT
• INSTALL PER MANUFACTURER SPECIFICATIONS
• REMOVE OVERGROWN VEGETATION AT BASE OF STAIRS
• INTALL T SQUARE, HARD PACKED LEVEL LANDING SURFACE AT BASE OF STAIRS USING
GRAVEL
• PAINT- SEE SUBCONTRACTOR PAINT
• WASTE MANAGMENT AND HAULING
CREW HOUSE
• NO CARPENTRY
• REMOVE VEGETATION
• WASTE MANAGMENT AND HAULING
MORROW WILSON CONNECTOR/WILSON GARDNER CONNECTOR
• ENTIRE STRUCTURE WILL BE REPAINTED—SEE SUBCONTRACTOR PAINT
• REMOVE EXISTING WINDOW SCREENS AND RETURN TO COLLEGE- SEE AMMENDMENT
• DETERMINE CORRECT FASTENERS TO BE USED WITH EXISTING TOE CAP SYSTEM
• INSTALL NEW FASTENERS IN MISSING LOCATIONS
• TIGHTEN ALL LOOSE SCREWS
• MISC. PAINT/TOUCH-UP ALLOWANCE: $150.00
• WASTE MANAGMENT AND HAULING
• STEEL WORK:
/ ok (-,-5> s �
41 WEST STREET
• DETACH VERTICAL POSTS FROM CONCRETE FOOTINGS AND JACK STAIRS AS LEVEL AS
POSSIBLE
• INSTALL SHIMS BENEATH POSTS AND RE-FASTEN TO EXISTING POST ANCHORS"
• INSTALL(1)NEW TECHNO METAL POST AND PT POST TO SUPPORT UPPER LANDING
• REMOVE,AND DISPOSE OF, EXISTING STRINGERS AND TREADS
• INSTALL (2)NEW TECHNO METAL POSTS AT BASE OF STAIRS
• CONSTRUCT NEW PT STAIR ASSEBMLY(STRINGERS, RISERS, AND TREADS)-CODE COMPLIANT
• REMOVE, AND DISPOSE OF,EXISTING RAILING AT DECK LOCATION
• REMOVE, AND DISPOSE OF, EXISTING DECK PLANKS ON DECK
• INSTALL NEW, CODE COMPLIANT RAILING ASSEMBLIES USING EXISTING POSTS
• INSTALL NEW 5/4"X 6" PT DECK PLANKS
• ALLOWANCE($1000.00) PER ADDENDUM# 1 -ROT REPAIR
• PAINT- SEE SUBCONTRACTOR
• WASTE MANAGEMENT AND HAULING
• TECHNO METAL POSTS - SUBCONTRACTOR
54 BELMONT O, ` I —5p /S
• SECURE ALL EXISTING LAG ANCHORS ALONG THE LADDER CONNECTING 2ND/3' FLOORS
• CONFIRM ADEQUATE BLOCKING WITHIN EXTERIOR WALL TO ASSURE GOOD CONNECTION
• NEW LAG BOLTS MAY BE REQUIRED IF EXISTING BLOCKING IS ROTTED OR NOT POSSIBLE
• PROVIDE WATER RESISTANT PROTECTION AT EACH REPAIRED CONNECTION
• ALLOWANCE FOR WORK NOTED ABOVE: 8 MAN HOURS
• LABOR. ALLOWANCE- SEE NOTE ABOVE"
• MISC. PAINT/TOUCH-UP ALLOWANCE: $100.00
• STEEL WORK INCLUDES:
o NEW BRACKET ON IST LADDER LEVER ANCHORED TO FOUNDATION
o NEW CLIP ATTACHMENT ON 2ND LEVEL LADDER
62 KENSINGTON f ` M Q / G �c I
• INSTALL STEEL BRACKET AND FASTEN TO EXISTING BUILDING SIMILAR TO OTHER BRACKETS
LOCATED ALONG THE LADDER-STEEL WORK: PENDING
• BRACKET SIZE SHOULD BE 3/8 THICK WITH AN OVERALL DIMENSION OF 11 LONG AND WIDE.
EACH LEG FOR THE LAG FASTENER WILL BE 2 3/4 LONG-STEEL WORK: PENDING
• REMOVE BRICK FROM THE BASE OF LADDER SYSTEM AND CLEAR ANY IMMEDIATE DEBRIS
• POUR A 5" THICK CONCRETE PAD APPROXIMATELY 24" X 12" OVER 6" GRAVEL
• CAREFULLY REMOVE ALL EXISTING DECKING AND DISCARD
• INSTALL NEW PRESSURE TREATED DECKING OF SIMILAR SIZE AND SECURE SIMILAR TO
EXISTING. DECK SHAPE IS A TRAPEZIUM WITH A LONG SIDE OF APPROXIMATELY 16'AND THE
SHORT LEG 94" . THE WIDTH IS 39"
• MISC. PAINT/TOUCH-UP ALLOWANCE: $400.00
• WASTE MANAGMENT AND HAULING
69 BELMONT rml �D
• REMOVE(3)EXISTING CONCRETE PIER FOUNDATIONS
• INSTALL(3) CONCRETE FILLED 12"DIAMETER SONO TUBES WITH THE BASE OF THE PIER AT
LEAST 48" BELOW GRADE& THE TOP OF THE PIER TO BE PLACED APPROX. V ABOVE GRADE
• INSTALL NON-SHRINK GROUT BETWEEN TOP OF NEW PIER AND BASE OF COLUMNS, IF
REQUIRED
• POWER WASH PAD AND EXISTIN CONCRETE 0 S TO MOVE DEBRIS. PARGE WITH
MORTAR O /„
s r �
►� BUILDERSNC
6k /�o PROPOSAL
Revised June 27, 2013
CUSTOMER NAME: Smith College, Fire Escape Project
ADDRESS: 16 Fairview Ave.,Northampton, MA
ESTIMATED START DATE: Summer,2014
ESTIMATED PROJECT RUN TIME: 6—8 Weeks
FIRE ESCAPE REPAIR PROJECT
01 -GENERAL CONDITIONS
• SEE EACH INDIVIDUAL PROJECT FOR WASTE MANAGMENT AND HAULING
• TOILET-NOT INCLUDED-ASSUMED THAT FACILITIES ARE PRESENT FOR USE
• BUILDING PERMIT(INCLUDING APPLICATION FEES)
• SITE SET-UP AND BREAK-DOWN
• LOGISTICS, PLANNING, ETC.
• STAGING AND EQUIPMENT
01-A QUALIFICATIONS & CLARIFICATIONS
• THIS PROPOSAL ASSUMES THAT NO LEAD PAINT IS PRESENT AT TIME OF CONTRUCTION.
LEAD ABATEMENT IS NOT INCLUDED.
• STEEL FABRICATION AND ERECTION BY AN AISC FIRM
• SALES TAX IS NOT INCLUDED
• CLEAR ACCESS TO WORK AREA IS ASSUMED
32 BEDFORD TERRACE
• SISTER NEW PRESSURE TREATED STRINGERS ALONGSIDE ALL (3)EXISTING STRINGERS
• SISTER NEW PRESSURE TREATED RIM BOARD ALONGSIDE EXISTING
• INSTALL NEW PRESSURE TREATED 4 X 4 KNEE WALL BRACE FROM REAR CORNER OF
EXISTING LANDING BACK TO EXISTING HOUSE. FASTEN AND FLASH AS REQUIRED
• INSTALL SECOND KNEE BRACE FROM THE MIDDLE STRINGER BACK TO THE EXISTING
STRUCTURE
• REMOVE THE EXISTING 2 X 8 AT THE BASE OF THE LANDING AND INSTALL A PIECE OF 3/4"
PRESSURE TREATED PLYWOOD TO THE UNDERSIDE OF THE LANDING FRAMING
• MISC. PAINT/TOUCH-UP ALLOWANCE: $400.00. NOTE: PAINTING AFFECTED AREAS ONLY
• WASTE MANAGMENT AND HAULING
• NOTE: PRICING DOES NOT INCLUDE ANY ROT REPAIR OR CARPENTRY BEYOND THAT LISTED
ABOVE