38B-008 (5) o REPLACE 3 TREADS &CARRIER ANGLES o NEW FASTENERS FOR TREAD REPLACEMENT �� �� 1�° G POWER HOUSE K� L ■ CARPENTR T INSTALL BLOCKING;HEADER VER DOOR- MOUNT FOR RAILING ■ MISC. PAINT/TOUCH-UP ALLOWANCE: $300.00 ■ WASTE MANAGMENT AND HAULING ■ STEEL WORK: o FABRICATE&ERECT 2 ROOF EDGE RAILS 8FT AND 4FT LONG o POSTS TO BE ANGLED AROUND EXISTING CORNICE CONDITIONS o ANCHORS INTO BRICK TO BE HILTI EPDXY ANCHORD o MODIFICATIONS TO EXISTING LADDER NOT INCLUDED SCOTT GYM ■ FURNISH AND INSTALL CUSTOM 36" PANIC BAR WTT140UT KEY ENTRY ■ STEEL WORK: o PATCH BOTTOM OF CENTER STRINGER WITH WELDED PLATES o REINFORCE PLATFORM ALONG FACE OF BUILDING WITH NEW ANGLE o ADD NEW TUBE FRAME SUPPORT TO FRONT OF PLATFORM STODDARD HALL • INSTALL PANIC BAR HARDWARE ALONG EXISTING CHAIN LINK FENCE GATE • RAISE EXISTING 4"POSTS ON DOUBLE DRIVE AND INSTALL HEADER • GATE ON LEFT TO HAVE LOCKABLE DROP ROD AND LOCK ON TOP TO MAKE STATIONARY • GATE ON RIGHT TO HAVE PANIC BAR • MISC. PAINT/TOUCH-UP ALLOWANCE: $150.00 • WASTE MANAGMENT AND HAULING" SUBCONTRACTORS • STEEL. ENGINEERED BUILDING PRODUCTS, INC. (AISC CERTIFIED)QUOTE DATED 06.27.14 • PAINT. SILVER DESIGNS QUOTE DATED 06.30.14 • TECHNO METAL POSTS • BRODEUR CAMPBELL. QUOTE DATED 06.17.14 TOTAL PRICE• $78,547.00 ALTERNATE# I: NEW STAIRS AT SCOTT GYM ADD $25,550.00 TO BASE PRICE • DEMOLITION AND DEBRIS REMOVAL OF EXISTING STRUCTURE AND CONCRETE PAD • MISC. MASONRY REPAIR ALLOWANCE: $500.00 • INSTALL CAULKING AROUND WINDOW AND MAKE WEATHER TIGHT • INSTALLATION OF (3) FOOTING TUBES AT BASE OF STAIRS—BELOW FROST • INSTALLATION OF NEW CONCRETE PAD AT BASE OF STRINGERS • MISC. ASPHALT REPAIR ALLOWANCE: $500.00 • SHOP DRAWINGS, FABRICATION,AND INSTALLATION OF NEW CODE COMPLIANT STAIRS • EXCAVATION OPERATOR/EQUIPMENT AND HAULING • • CUT ASPHALT AND PATCH, WHERE REQUIRED • EXCAVATOR OPERATOR • MISC. PAINT/TOUCH-UP ALLOWANCE: $200.00 • WASTE MANAGMENT AND HAULING • EQUIPMENT RENTAL-AUGER FOR BOBCAT E45 • INSTALL (2)NEW 6" BOLLARDS -PRE FAB • STEEL WORK: o SHORE PLATFORM &REMOVE 2 COLUMNS TO UPPER PLATFORM o SHORE 3RD COLUMN ABD REMOVE LOWER SECTION o REPAIR TREADS, GRATING& PATCH HOLE o FURNISH ONLY NEW ANCHOR BOLTS o FURNISH AND ERECT 2 NEW COLUMNS AND 1 COLUMN EXTENSION o REPLACE 1 TREAD &REPAIR PLATFORM GRATING o EXTEND PLATFORM RAIL AT UPPER PLATFORM TO WALL OF STRUCTURE $10,250.00 95 WEST • NO CARPENTRY • PAINT- SEE SUBCONTRACTOR, PAINT 115 ELM • NO CARPENTRY • PAINT- SEE SUBCONTRACTOR, PAINT CAPEN BOILER • REMOVE EXISTING LAG FASTENERS AND CONFIRM EMBEDMENT DEPTH • SELECT HILTI FASTENING SYSTEM INTENDED FOR SOLID BRICK ATTACHMENT • INSTALL PER MANUFACTURER SPECIFICATIONS • REMOVE OVERGROWN VEGETATION AT BASE OF STAIRS • INTALL T SQUARE, HARD PACKED LEVEL LANDING SURFACE AT BASE OF STAIRS USING GRAVEL • PAINT- SEE SUBCONTRACTOR PAINT • WASTE MANAGMENT AND HAULING CREW HOUSE • NO CARPENTRY • REMOVE VEGETATION • WASTE MANAGMENT AND HAULING MORROW WILSON CONNECTOR/WILSON GARDNER CONNECTOR • ENTIRE STRUCTURE WILL BE REPAINTED—SEE SUBCONTRACTOR PAINT • REMOVE EXISTING WINDOW SCREENS AND RETURN TO COLLEGE- SEE AMMENDMENT • DETERMINE CORRECT FASTENERS TO BE USED WITH EXISTING TOE CAP SYSTEM • INSTALL NEW FASTENERS IN MISSING LOCATIONS • TIGHTEN ALL LOOSE SCREWS • MISC. PAINT/TOUCH-UP ALLOWANCE: $150.00 • WASTE MANAGMENT AND HAULING • STEEL WORK: / ok (-,-5> s � 41 WEST STREET • DETACH VERTICAL POSTS FROM CONCRETE FOOTINGS AND JACK STAIRS AS LEVEL AS POSSIBLE • INSTALL SHIMS BENEATH POSTS AND RE-FASTEN TO EXISTING POST ANCHORS" • INSTALL(1)NEW TECHNO METAL POST AND PT POST TO SUPPORT UPPER LANDING • REMOVE,AND DISPOSE OF, EXISTING STRINGERS AND TREADS • INSTALL (2)NEW TECHNO METAL POSTS AT BASE OF STAIRS • CONSTRUCT NEW PT STAIR ASSEBMLY(STRINGERS, RISERS, AND TREADS)-CODE COMPLIANT • REMOVE, AND DISPOSE OF,EXISTING RAILING AT DECK LOCATION • REMOVE, AND DISPOSE OF, EXISTING DECK PLANKS ON DECK • INSTALL NEW, CODE COMPLIANT RAILING ASSEMBLIES USING EXISTING POSTS • INSTALL NEW 5/4"X 6" PT DECK PLANKS • ALLOWANCE($1000.00) PER ADDENDUM# 1 -ROT REPAIR • PAINT- SEE SUBCONTRACTOR • WASTE MANAGEMENT AND HAULING • TECHNO METAL POSTS - SUBCONTRACTOR 54 BELMONT O, ` I —5p /S • SECURE ALL EXISTING LAG ANCHORS ALONG THE LADDER CONNECTING 2ND/3' FLOORS • CONFIRM ADEQUATE BLOCKING WITHIN EXTERIOR WALL TO ASSURE GOOD CONNECTION • NEW LAG BOLTS MAY BE REQUIRED IF EXISTING BLOCKING IS ROTTED OR NOT POSSIBLE • PROVIDE WATER RESISTANT PROTECTION AT EACH REPAIRED CONNECTION • ALLOWANCE FOR WORK NOTED ABOVE: 8 MAN HOURS • LABOR. ALLOWANCE- SEE NOTE ABOVE" • MISC. PAINT/TOUCH-UP ALLOWANCE: $100.00 • STEEL WORK INCLUDES: o NEW BRACKET ON IST LADDER LEVER ANCHORED TO FOUNDATION o NEW CLIP ATTACHMENT ON 2ND LEVEL LADDER 62 KENSINGTON f ` M Q / G �c I • INSTALL STEEL BRACKET AND FASTEN TO EXISTING BUILDING SIMILAR TO OTHER BRACKETS LOCATED ALONG THE LADDER-STEEL WORK: PENDING • BRACKET SIZE SHOULD BE 3/8 THICK WITH AN OVERALL DIMENSION OF 11 LONG AND WIDE. EACH LEG FOR THE LAG FASTENER WILL BE 2 3/4 LONG-STEEL WORK: PENDING • REMOVE BRICK FROM THE BASE OF LADDER SYSTEM AND CLEAR ANY IMMEDIATE DEBRIS • POUR A 5" THICK CONCRETE PAD APPROXIMATELY 24" X 12" OVER 6" GRAVEL • CAREFULLY REMOVE ALL EXISTING DECKING AND DISCARD • INSTALL NEW PRESSURE TREATED DECKING OF SIMILAR SIZE AND SECURE SIMILAR TO EXISTING. DECK SHAPE IS A TRAPEZIUM WITH A LONG SIDE OF APPROXIMATELY 16'AND THE SHORT LEG 94" . THE WIDTH IS 39" • MISC. PAINT/TOUCH-UP ALLOWANCE: $400.00 • WASTE MANAGMENT AND HAULING 69 BELMONT rml �D • REMOVE(3)EXISTING CONCRETE PIER FOUNDATIONS • INSTALL(3) CONCRETE FILLED 12"DIAMETER SONO TUBES WITH THE BASE OF THE PIER AT LEAST 48" BELOW GRADE& THE TOP OF THE PIER TO BE PLACED APPROX. V ABOVE GRADE • INSTALL NON-SHRINK GROUT BETWEEN TOP OF NEW PIER AND BASE OF COLUMNS, IF REQUIRED • POWER WASH PAD AND EXISTIN CONCRETE 0 S TO MOVE DEBRIS. PARGE WITH MORTAR O /„ s r � ►� BUILDERSNC 6k /�o PROPOSAL Revised June 27, 2013 CUSTOMER NAME: Smith College, Fire Escape Project ADDRESS: 16 Fairview Ave.,Northampton, MA ESTIMATED START DATE: Summer,2014 ESTIMATED PROJECT RUN TIME: 6—8 Weeks FIRE ESCAPE REPAIR PROJECT 01 -GENERAL CONDITIONS • SEE EACH INDIVIDUAL PROJECT FOR WASTE MANAGMENT AND HAULING • TOILET-NOT INCLUDED-ASSUMED THAT FACILITIES ARE PRESENT FOR USE • BUILDING PERMIT(INCLUDING APPLICATION FEES) • SITE SET-UP AND BREAK-DOWN • LOGISTICS, PLANNING, ETC. • STAGING AND EQUIPMENT 01-A QUALIFICATIONS & CLARIFICATIONS • THIS PROPOSAL ASSUMES THAT NO LEAD PAINT IS PRESENT AT TIME OF CONTRUCTION. LEAD ABATEMENT IS NOT INCLUDED. • STEEL FABRICATION AND ERECTION BY AN AISC FIRM • SALES TAX IS NOT INCLUDED • CLEAR ACCESS TO WORK AREA IS ASSUMED 32 BEDFORD TERRACE • SISTER NEW PRESSURE TREATED STRINGERS ALONGSIDE ALL (3)EXISTING STRINGERS • SISTER NEW PRESSURE TREATED RIM BOARD ALONGSIDE EXISTING • INSTALL NEW PRESSURE TREATED 4 X 4 KNEE WALL BRACE FROM REAR CORNER OF EXISTING LANDING BACK TO EXISTING HOUSE. FASTEN AND FLASH AS REQUIRED • INSTALL SECOND KNEE BRACE FROM THE MIDDLE STRINGER BACK TO THE EXISTING STRUCTURE • REMOVE THE EXISTING 2 X 8 AT THE BASE OF THE LANDING AND INSTALL A PIECE OF 3/4" PRESSURE TREATED PLYWOOD TO THE UNDERSIDE OF THE LANDING FRAMING • MISC. PAINT/TOUCH-UP ALLOWANCE: $400.00. NOTE: PAINTING AFFECTED AREAS ONLY • WASTE MANAGMENT AND HAULING • NOTE: PRICING DOES NOT INCLUDE ANY ROT REPAIR OR CARPENTRY BEYOND THAT LISTED ABOVE